Loading...
HomeSearchMy WebLinkAbout_External_ RE_ U-2579AA March 2023 modification error_Corps1000001202.jpg1000001203.jpg1000001205.jpg1000005523.jpg1000005559.jpg19980260 Ver 8_401 Application_2021110319980260 Ver 8_add info memo_2021120619980260 Ver 8_add info memo2_2021120619980260 Ver 8_Meeting Request Review_2021022419980260 Ver 8_PreFiling 30-Day Clock Reached Email_2021032719980260 Ver 8_Pre-Filing Acknowledgement Email_2021030119980260 Ver 8_Pre-Filing Attachment_2021030119980260 Ver 8_Pre-Filing Meeting Information_2021110319980260 Ver 8_Staff Comments_2022021719980260 Ver 8_U-2579 AB and U-2579 AA Phased Modification November 3 2021_2021110319980260 Ver 8_U2579AA_HYD_SMPv2 07_2021120619980260 Ver 8_U2579AA_HYD_SMPv2.07_(20180502) (Oct 2016)_2021120619980260 Ver 8_U-2579AA_Stormwater Management Plan missing pages_No2_2021120620230907153404256.pdfAfter 1.jpgAfter 2.jpgAfter 3.jpgBefore 1.jpgBefore 2.jpgDerailement Location on RFC Plan Pages.pdfDownstream of loss location.jpgFW_ _External_ FORSYTH U-2579AA - NEW PERMIT SITE 19_FW_ R-2247EB Norfolk Southern DerailmentFW_ R-2247EB Silt Loss Permit Site 14_julyFW_ Silt loss report AA 9_11_23FW_ U-2579AB Sediment Loss 9_10_23IMG_3877.jpgIMG_3878.jpgIMG_3879.jpgIMG_3880.jpgIMG_3881.jpgInlet of Culvert 5 downstream from loss location.jpgOutlet side of pump around.jpgPhoto of dike inside work area.jpgR-2247 EB permit plan revision_firstR-2247EB Permit Drawing 8 of 71 original.pdfR-2247EB Permit Drawing 8 of 71 revision.pdfRE_ _External_ Compliance_ RE_ SAW-2017-02112 (NCDOT_U-2579_R-2247_Winston-Salem Northern Beltway_DIV 9)RE_ _External_ Please cancel RE_ U-2579AB USACE and DWR site reviewRE_ _External_ RE_ R-2247 EB permit plan revisionRE_ flagging_fencingRE_ Silt loss report AA 9_11_23RE_ U-2579AA March 2023 modification errorRE_ U-2579AB Sediment Loss 9_10_23RE_ U-2579AB sediment losses_picsRevisedPermitMod_Site4A.pdfSite 2 Post Cleanup (7-9-23 Loss).jpgSite 7 Post Cleanup 1 (7-9-23 Loss).jpgSite 7 Post Cleanup 2 (7-9-23 Loss).jpgSite 7 Post Cleanup 3 (7-9-23 Loss).jpgSite 9 Post Cleanup 1 (7-9-23 Loss).jpgSite 9 Post Cleanup 2 (7-9-23 Loss).jpgU-2579AA Add infoU-2579AA environmental precon meeting attendees.pdfU-2579AA March 2023 modification errorU-2579AA permit modification 3.24.2023 package plan sheets_KB Markup.pdfU-2579AA permit modification for additional temporary impactsU2579AA_HYD_SMPv2.07_completeU-2579AB_AA Permit Modification.docx