Loading...
HomeMy WebLinkAbout19980260 Ver 8_401 Application_20211103 sy STAT Staff Review Form NORTH CAROLINA Envlronm¢ntcl Qvoray Updated September 4,2020 Staff Review Does this application have all the attachments needed to accept it into the review process?* Yes No ID#* Version* 8 19980260 Is this project a public transportation project?* Yes No Is this a DOT Yes No project?* Reviewer List:* Dave Wanucha:eads\djwanucha Select Reviewing Office:* Winston-Salem Regional Office-(336)776-9800 Does this project require a request for payment to be sent?* Yes No Project Submittal Form Please note:fields marked with a red asterisk *below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type:* For the Record Only(Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre-Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Pre-Filing Meeting Information ***Pre-Filing meeting request information is not needed for this project. Project Contact Information ...................................................................................................................................................................................................................................................................................................................................................................................................... Name: Michael Turchy Who is submitting the information? Email Address: maturchy@ncdot.gov Project Information ...................................................................................................................................................................................................................................................................................................................................................................................................... Existing ID#: Existing Version: 19980260 7 20170001(no dashes) 1 Project Name: U-2579 AA and AB-Construction of Winston-Salem Northern Beltway Is this a public transportation project? Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown TIP#: WBS#: U-2579 AA and AB 34839.1.7 (Applies to DOT projects only) County(ies) Forsyth Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document Only pdf or kmz files are accepted. Describe the attachments or comments: Permit Package, including cover letter, DMS Mitigation Summary, DMS Mitigation Acceptance, Permit Drawings,4B and 4C Meeting Minutes. Sign and Submit By checking the box and signing box below, I certify that: • I,the project proponent, hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief. • I,the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the online form. Signature: fi( a TA Submittal Date: Is filled in automatically.