Loading...
HomeMy WebLinkAboutRE_ _External_ Compliance_ RE_ SAW-2017-02112 (NCDOT_U-2579_R-2247_Winston-Salem Northern Beltway_DIV 9) Wanucha, Dave From:Euliss, Amy Sent:Tuesday, January 31, 2023 2:34 PM To:Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA); Alsmeyer, Eric C CIV USARMY CESAW (USA); Wanucha, Dave Subject:RE: \[External\] Compliance? RE: SAW-2017-02112 (NCDOT/U-2579/R-2247/Winston- Salem Northern Beltway/DIV 9) Eric, There are three sections of the WSNB currently under construction. R-2247B is the furthest along and has been reviewed by the USACE and DWR several times. U-2579AB is well under construction. It has not been reviewed by the USACE and DWR. I would assume this would be the best use of your time. U-2579AA is just starting, so there isn’t much to see at this time. Steve/Dave, Please send me your availability for the following dates/times if you would like to join Eric for a site review. 2.9 anytime 2.10 anytime 2.13 9-12 2.17 anytime 2.20 anytime 2.24 anytime Amy From: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil> Sent: Tuesday, January 31, 2023 12:21 PM To: Euliss, Amy <aeuliss@ncdot.gov> Cc: Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA) <Stephen.A.Brumagin@usace.army.mil> Subject: \[External\] Compliance? RE: SAW-2017-02112 (NCDOT/U-2579/R-2247/Winston-Salem Northern Beltway/DIV 9) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Amy: I don’t know the status of the uncompleted sections of the W-S Beltway, but want to ask if there are any portions of it completed or under construction that it would make sense for Steve and I, and Dave W if he’s available, to do a joint compliance inspection on. I don’t know Steve’s schedule, but I would be available in a couple of weeks, 9 Feb or later. Days I am not available are 14 and 15 Feb, and 21 -23 Feb. Thank you. Please reply or call if you have any questions or if I may serve you in any other way. 1 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at https://regulatory.ops.usace.army.mil/customer-service-survey/. Eric Eric Alsmeyer Project Manager Work Cell: 919.817.1570 WRDA / NCDOT BRANCH US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Office Tel: (919) 554-4884, x23 (I am working out of the office most days of the week, but I try to check my voicemails daily) Regulatory Homepage: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.aspx From: Alsmeyer, Eric C CIV USARMY CESAW (USA) Sent: Wednesday, February 10, 2021 1:51 PM To: Phil Harris <pharris@ncdot.gov> Cc: Harmon, Beth <beth.harmon@ncdenr.gov>; Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; Barrett, William A <wabarrett@ncdot.gov>; Turchy, Michael A <maturchy@ncdot.gov> Subject: Mod 06 with NCDMS Mitigation required RE: SAW-2017-02112 (NCDOT/U-2579AB/Winston-Salem Northern Beltway/DIV 9) Phil: Attached to this message is your requested Section 404 permit modification for the following project: Mod 06 with NCDMS Mitigation required RE: SAW-2017-02112 (NCDOT/U-2579AB/Winston-Salem Northern Beltway/DIV 9) Also attached are the corresponding regional and general conditions, and a copy of the permit compliance certification. The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. Please note that the general and special conditions must be strictly adhered to in order for this permit authorization to remain valid and that the compliance certification must be returned to this office when the work is completed. This electronic copy is your official Department of the Army authorization; no paper copy will be mailed. This verification has also been e-mailed to the NC Division of Mitigation Services. Please reply or call if you have any questions or if I may serve you in any other way. Eric Eric Alsmeyer Project Manager Regulatory Division Office 2 US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Office Tel: (919) 554-4884, x23 (I am working out of the office, but I try to check my voicemails daily) Regulatory Homepage: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.aspx From: NCDOT_REG <NCDOT_REG@usace.army.mil> Sent: Thursday, December 3, 2020 9:21 AM To: Turchy, Michael A <maturchy@ncdot.gov> Cc: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil>; Matthews, Monte K CIV USARMY CESAW (USA) <Monte.K.Matthews@usace.army.mil> Subject: SAW-2017-02112 (NCDOT/R-2247/U-2579/Winston-Salem Northern Beltway/DIV 9) Good Morning, Mr. Eric Alsmeyer received the Application for a Phased Individual Permit Modification Distribution for the above project. Thank you, Josephine Schaffer From: Turchy, Michael A <maturchy@ncdot.gov> Sent: Wednesday, December 2, 2020 10:20 PM To: Matthews, Monte K CIV USARMY CESAW (USA) <Monte.K.Matthews@usace.army.mil>; Chapman, Amy <amy.chapman@ncdenr.gov>; NCDOT_REG <NCDOT_REG@usace.army.mil> Cc: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Euliss, Amy <aeuliss@ncdot.gov>; Archer III, Wright <warcher@ncdot.gov>; Barrett, William A <wabarrett@ncdot.gov>; Harmon, Beth <beth.harmon@ncdenr.gov>; Davenport, Ronald E <rondavenport@ncdot.gov>; Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>; Chambers, Marla J <marla.chambers@ncwildlife.org>; Morgan, Stephen R <smorgan@ncdot.gov>; Al-Dhalimy, Nadia A <naaldhalimy@ncdot.gov>; Sanders, Byron <bsanders@ncdot.gov>; Hanks, Brian <bhanks@ncdot.gov>; NCDOT Service Account - Roadway Design <roadwaydesign@ncdot.gov>; Fischer, Kevin <wkfischer@ncdot.gov>; Staley, Mark K <mstaley@ncdot.gov>; Griffin, Randy W <rgriffin@ncdot.gov>; Turchy, Michael A <maturchy@ncdot.gov>; Dagnino, Carla S <cdagnino@ncdot.gov>; Amanetta Somerville (Somerville.Amanetta@epa.gov) <Somerville.Amanetta@epa.gov>; Coleman, Clarence <Clarence.Coleman@dot.gov>; Hernandez, Jennifer D <jdhernandez@ncdot.gov>; White, Allison K <akwhite@ncdot.gov>; Williams, Pamela R <prwilliams@ncdot.gov> Subject: \[Non-DoD Source\] U-2579AB Application for a Phased Individual Permit Modification Distribution The Application for a Phased Individual Permit Modification for U-2579 AB (Winston-Salem Northern Beltway - from I-40 to I-40 Business/US 421) has been posted to the NCDOT Permit Application Website. The file named “U-2579AB Phased Modification December 2 2020.pdf” can be viewed/downloaded at: https://xfer.services.ncdot.gov/pdea/PermApps or Direct Link to Application: https://xfer.services.ncdot.gov/pdea/PermApps/U-2579AB%20Phased%20Modification%20December%202%202020.pdf This email serves as NCDOT's permit application submittal to the US Army Corps of Engineers and NC Division of Water Resources. Thank you, Michael 3 Michael Turchy Environmental Coordination and Permitting North Carolina Department of Transportation 919 789-1102 mobile 919 707-6157 office 1598 Mail Service Center Raleigh, NC 27699-1598 1000 Birch Ridge Drive Raleigh, NC 27610 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 4