HomeMy WebLinkAboutU-2579AB_AA Permit Modification.docx DocuSign Envelope ID:C2FB2FE7-88FA-41BC-8359-2A085A46CEB6
ROY COOPER ‘6 Air- oli
Governor ?�
ELIZABETH S.BISER n*
Secretary *"` `"°p
S.DANIEL SMITH NORTH CAROLINA
Director Environmental Quality
January 10,2022
Mr.Philip S.Harris,III,P.E.,CPM
Environment Analysis Unit Head
North Carolina Department of Transportation
1598 Mail Service Center
Raleigh,North Carolina,27699-1598
Subject: Modification to the 401 Water Quality Certification(WQC 004131)Pursuant to Section 401 of the Federal
Clean Water Act with ADDITIONAL CONDITIONS,for additional portions of the Winston Salem Northern
Beltway(Eastern Section of Future I-74)from US 311 to I-40 of which includes Sections U-2579AB and U-
2579AA (I-40 Business to US 311 South); Federal Aid Project No. NHF-0918(14); WBS No. 34839.1.7;
NCDWR Project No. 19980260 version 8.
Dear Mr.Harris:
Attached hereto is a modification of Certification No. 004131 issued to The North Carolina Department of
Transportation(NCDOT) originally issued and dated November 14, 2017 for the Winston Salem Northern Beltway
from I-40 to US 52 (R-2247B Phase 2, CA, CB, CD,D, EA,EB, and EC), from US 52 to US 311 North(U-2579C
Phase 2,D,E,and F),and from I-40 Business to US 311 South(U-2579AA and AB);Revision 2 dated December 21,
2017; Revision 3 dated February 7, 2019; Revision 4 dated August 13, 2019; Revision 5 dated November 14,2019;
Revision 6,dated November 30,2020;In-Field Modification dated January 14,2021;and,Revision 7 dated February
9,2021.
If we can be of further assistance,do not hesitate to contact us.
Sincerely,
-DocuSigned by:
awk.,,a, C u pwui n,
S.L 9C9886312DCD474..._
Division of Water Resources
Attachments
Electronic copy only distribution:
Andrew Williams,US Army Corps of Engineers,Raleigh Field Office
Amy Euliss,NC Department of Transportation,Division 9
Colin Mellor,NC Department of Transportation
Carla Dagnino,NC Department of Transportation
Bill Barrett,NC Department of Transportation
Amanetta Somerville,US Environmental Protection Agency
Janet Mizzi,US Fish and Wildlife Service
Andrea Leslie,NC Wildlife Resources Commission
Beth Harmon,Division of Mitigation Services
401-R4notices@epa.gov
File Copy
D ,.,, North Carolina Department of Environmental Quality Division of Water Resources
v�J� 512 North Salisbury Street 1617 Mail Service Center Raleigh,North Carolina 27699-1617
NORTH CAROL3NA
o.wraoem or EnvIronmonial ooan, 919.707.9000
DocuSign Envelope ID:C2FB2FE7-88FA-41BC-8359-2A085A46CEB6
Modification to the 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act
with ADDITIONAL CONDITIONS
THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and
95-217 of the United States and subject to the North Carolina Division of Water Resources(NCDWR)Regulations
in 15 NCAC 2H.0500. This certification authorizes the NCDOT to impact an additional 3,491 linear feet of
jurisdictional streams, 1.64 acres of wetlands and 3.04 acres of open water(ponds)in Forsyth County(for U-
2579AA and AB). The project shall be constructed pursuant to the modification dated November 3,2021. The
authorized impacts are as described in Tables 1 through 7 below:
Table 1. New(Modified)Wetland Impacts in the Yadkin Pee Dee River Basin; U-2579AB.
Permanent Impacts Requiring
New Permit Site Fill Excavation Mechanized Clearing Mitigation
(ac) (ac) (ac) (ac)
14B <0.01 - 0.02 0.02
Previously Permitted Totals 1.11 0.02 0.29 1.43
(for all Sites) _
Notes: Data are rounded.
Table 2.New(Modified)Intermittent Stream Impacts in the Yadkin Pee Dee River Basin; U-2579AB.
Impact Type Permanent Temporary Impacts
New Permit Site Impacts Impacts Requiring
(linear ft) (linear ft) Mitigation
Roadway Fill (linear ft)
31 15 10 -
Previously Permitted Totals(for all Sites) 9,180 824 5,222
Table 3. Stream Impacts in the Yadkin Pee Dee River Basin-U-2579AA.
Permanent Temporary Impacts
Permit Stream Requiring
Site Type Impact Type Impacts Impacts Mitigation
(linear ft) (linear ft) (linear It)
42-inch RCP-V(not buried) 392 0 --
1 I Channel armoring 14 24 --
2C Bank Stabilization 16 20 --
2 @ 9'X 9'RCBC 240 0 240
3 Channel Change 124 0 124
Bank Stabilization 26 20 26
Bank stabilization
3A (detour-ditch outlets) 20 40 20
3B P Bank Stabilization-(detour bridge) 35 18 35
2 @ 10'X 9'RCBC 418 0 418
4 Channel Change 85 0 85
Bank Stabilization 80 0 80
4A Bank Stabilization—(culvert phasing) 67 10 67
DocuSign Envelope ID:C2FB2FE7-88FA-41BC-8359-2A085A46CEB6
Table 3. Stream Impacts in the Yadkin Pee Dee River Basin-U-2579AA.
Permanent Temporary Impacts
Permit Stream Requiring
Site Type Impact Type Impacts Impacts Mitigation
(linear ft) (linear ft) (linear ft)
SA Scour Hole Stabilization 42 40 42
(assoc.w/60"CMP removal)
5B P Scour Hole Stabilization 8 10 8
(assoc. w/60"CMP removal)
SD Bank Stabilization 173 0 173
36-inch Welded Steel Pipe/ 57 0 --
6 I channel armoring
Bank Stabilization 68 20 --
7 72-inch Alt/Welded Steel Pipe 26 0 --
Bank Stabilization 23 15 --
7A 72-inch Alt/Welded Steel Pipe 11 0 --
35 10 --
10 P 60 20 --
lOB Bank Stabilization 8 10
10C 8 10 --
10D 10 10 --
12A Channel armoring 33 0
(for Energy Dissipator Basin)
12B I Channel change 80 10 --
13 60-inch Alt/Welded Steel Pipe 32 0 --
Channel Armoring 31 25 --
3 @ 8'X 8'RCBC Extension 150 0 150
14 P 1
Bank Stabilization 97 20 97
14A I 3'Base Ditch 50 10 --
15 P 36-inch RCP-III 249 0 --
Bank Stabilization 16 32 --
Totals 3,044 422 1,801
Notes:For stream types;I=Intermittent,P=Perennial.
Table 4.Wetland Impacts in the Yadkin PeeDee River Basin-U-2579AA.
Permanent Fill Excavation Mechanized Impacts Requiring
Permit Site Impacts Impacts Clearing Impacts Mitigation
(ac) (ac) (ac) (ac)
5 <0.01 0 0.02 0.02
8 0.04 I 0.04 0.02 0.10
9 0 I 0 0.06 0.06
11 0 I 0 0.03 0.03
14B 0.38 I 0 0.05 0.43
15A 0.64 0.07 0.20 0.92
Totals 1.07 0.11 0.38 1.56
Notes: Data are rounded.
DocuSign Envelope ID:C2FB2FE7-88FA-41BC-8359-2A085A46CEB6
Table 5.Open Water Impact(Ponds)in the Yadkin PeeDee River Basin-U-2579AA.
Pond Size Permanent Fill Impacts Requiring
Permit Site (ac) (ac) Mitigation
(ac)
2 0.50 0.50 -
2A 0.12 0.12 -
2B 2.31 2.31 -
6A 0.11 0.11 -
Totals 3.04 3.04 -
Table 6.Wetland Impacts in the Yadkin PeeDee from Utilities-U-2579AA.
Impact Type Impacts Requiring
Utility Excavation
Site Gravity Sewer Line (ac) Mitigation
(inch) (ac)
Site 5 30 0.02 0.02
Site 16 16 <0.01 <0.01
Site 17 16 0.03 0.03
Site 18 30 <0.01 <0.01
Totals 0.06 0.06
Notes: Impacts for Sites 5 and 18 are outside of permanent fill at Wetland Site 5. Data are rounded.
Table 7. Permit Sites where culvert/pipe inverts are to be buried vs.not buried—U-2579AA.
I Yes I 3 I 4 I --
No 1 I 6 I 7 I 7A I 13 I 14 I 15
The application provides adequate assurance that the discharge of fill material into the waters of the Yadkin PeeDee
and Roanoke River Basins in conjunction with the proposed development will not result in a violation of applicable
Water Quality Standards and discharge guidelines. Therefore,the State of North Carolina certifies that this activity
will not violate the applicable portions of Sections 301,302,303,306,307 of PL 92-500 and PL 95-217 if
conducted in accordance with the application and conditions hereinafter set forth.
This approval is only valid for the purpose and design that you submitted in your modification application dated
November 3,2021.All the authorized activities and conditions associated with the original Water Quality Certification
dated November 14,2017 for the Winston Salem Northern Beltway from I-40 to US 52(R-2247B Phase 2,CA,CB,
CD,D,EA, EB, and EC), from US 52 to US 311 North(U-2579C Phase 2,D, E, and F), and from I-40 Business to
US 311 South (U-2579AA and AB) and subsequently modified (Revision 2 dated December 21, 2017; Revision 3
dated February 7,2019; Revision 4 dated August 13,2019;Revision 5 dated November 14,2019;Revision 6,dated
November 30,2020;In-Field Modification dated January 14,2021;and,Revision 7 dated February 9,2021)still apply
except where superseded by this certification.
Should your project change,you are required to notify the NCDWR and submit a new application. If the property is
sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for
complying with all the conditions. If any additional wetland impacts, or stream impacts, for this project(now or in
the future) exceed one acre or 300 linear feet, respectively, additional compensatory mitigation may be required as
described in 15A NCAC 2H.0506(h)(6)and(7). For this approval to remain valid,you are required to comply with
all the conditions listed below. In addition,you should obtain all other federal,state or local permits before proceeding
with your project including (but not limited to) Sediment and Erosion control, Coastal Stormwater, Non-discharge
and Water Supply watershed regulations. This Certification shall expire on the same day as the expiration date of the
corresponding Corps of Engineers Permit.
Condition(s)of Certification:
1. This modification is applicable only to the additional proposed activities and design that you submitted in
your request for modification dated November 3,2021.All the authorized activities and conditions
DocuSign Envelope ID:C2FB2FE7-88FA-41BC-8359-2A085A46CEB6
associated with the original Water Quality Certification dated November 14,2017 for the Winston Salem
Northern Beltway from I-40 to US 52(R-2247B Phase 2,CA,CB,CD,D,EA,EB,and EC),from US 52
to US 311 North(U-2579C Phase 2,D,E,and F),and from I-40 Business to US 311 South(U-2579AA
and AB)and subsequently modified(Revision 2 dated December 21,2017;Revision 3 dated February 7,
2019;Revision 4 dated August 13,2019;Revision 5 dated November 14,2019;Revision 6,dated
November 30,2020; In-Field Modification dated January 14,2021;and,Revision 7 dated February 9,
2021)still apply[15A NCAC 02H.0506(b)(1,2)].
2. Placement of culverts and other structures in open waters and streams,shall be placed below the elevation
of the streambed by one foot for all culverts with a diameter greater than 48 inches,and 20 percent of the
culvert diameter for culverts having a diameter less than 48 inches,to allow low flow passage of water and
aquatic life. Table 7 above lists those permit sites where culvert/pipe burial is exempt from this condition
or not. Design and placement of culverts and other structures including temporary erosion control
measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds
or banks,adjacent to or upstream and downstream of the above structures.The applicant is required to
provide evidence that the equilibrium is being maintained if requested in writing by NCDWR. If this
condition is unable to be met due to bedrock or other limiting features encountered during construction,
please contact NCDWR for guidance on how to proceed and to determine whether or not a permit
modification will be required. [15A NCAC 02H.0506(b)(2)]
Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal
and/or civil penalties. This Certification shall become null and void unless the above conditions are made
conditions of the Federal 404 and/or Coastal Area Management Act Permit. This Certification shall expire upon the
expiration of the 404 or CAMA permit.
If you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing. You may obtain the petition form from the office of Administrative Hearings. You must file the petition
with the office of Administrative Hearings within sixty(60)days of receipt of this notice. A petition is considered
filed when it is received in the office of Administrative Hearings during normal office hours. The Office of
Administrative Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm,except
for official state holidays. The original and one(1)copy of the petition must be filed with the Office of
Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office of
Administrative Hearings within five(5)business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh,NC 27699-6714
Telephone: (919)431-3000,Facsimile: (919)431-3100
A copy of the petition must also be served on DEQ as follows:
Mr.Bill F.Lane,General Counsel
Department of Environmental Quality
1601 Mail Service Center
This the 10th day of January 2022
DIVISION OF WATER RESOURCES
,-DocuSigned by:
ape, c ► m,
-9C9886312DCD474...
S.Dulllel 31111M,I/11CGLV1
WQC No. 004131
DocuSign Envelope ID:C2FB2FE7-88FA-41BC-8359-2A085A46CEB6 Win...,
Dk,, STATE,,
41 .u u R'k7py
ROY COOPER g 1 0„
Governor `
ELIZABETH S.BISER k� �
rt -,,,,ar��al* r _�'
Secretary 4%` ^` =
S.DANIEL SMITH NORTH CAROLINA
Director Environmental Quality
NCDWR Project No.: County:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules,and
any subsequent modifications,the applicant is required to return this certificate to the 401 Transportation Permitting
Unit,North Carolina Division of Water Resources, 1617 Mail Service Center,Raleigh,NC,27699-1617. This form
may be returned to NCDWR by the applicant,the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certification
I, ,hereby state that,to the best of my abilities,due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and
specifications,and other supporting materials.
Signature: Date:
Agent's Certification
I, ,hereby state that,to the best of my abilities,due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and
specifications,and other supporting materials.
Signature: Date:
Engineer's Certification
Partial Final
I, ,as a duly registered Professional Engineer in the State of North
Carolina,having been authorized to observe(periodically,weekly,full time)the construction of the project for the
Permittee hereby state that,to the best of my abilities,due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules,the approved plans and specifications,and other supporting materials.
Signature Registration No.
Date
DA5"
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1617 Mail Service Center Raleigh,Narth Carolina 27649 1617
NORTH CAROL3NA
Oearlme R ue&wimnmonmi 4unLy 919.707.9000