Loading...
HomeMy WebLinkAbout19980260 Ver 8_U-2579AA_Stormwater Management Plan missing pages_No2_20211206 Wanucha, Dave From:Barrett, William A Sent:Monday, December 6, 2021 1:44 PM To:Berry, Michelle G Cc:Wanucha, Dave; Turchy, Michael A Subject:FW: U-2579AA_Stormwater Management Plan missing pages_No2 Hi Michelle, In addition to the Culvert Table that DWR requested for the U-2579AA section (sent to you in email dated 12-1-2021), Dave Wanucha is also requesting additional information regarding the SMP. Please see his request in email below. For convenience, I have attached a copy of the SMP that was submitted with the permit modification application for U- 2579AA. Thanks! Bill _____________________________________________ From: Wanucha, Dave <dave.wanucha@ncdenr.gov> Sent: Monday, December 6, 2021 1:06 PM To: Barrett, William A <wabarrett@ncdot.gov> Cc: Turchy, Michael A <maturchy@ncdot.gov> Subject: RE: U-2579AA_Stormwater Management Plan missing pages Hi Bill, Thanks for the attachment, but we’re still not seeing a page for other SMP practices. The pages you provided only show proposed Swales. For example, at Site 12A an energy dissipation basin is proposed but it is not included in the SMP. In the SMP for Section AB, PSH and energy dissipation practices were included as part of the SMP. Please have Hydro include another page for the SMP that lists PSH and energy dissipation practices (if any are proposed) for the AA Section. Thanks. Dave W. Division of Water Resources 401 & Buffer Transportation Permitting NCDOT Divisions 9 and 11 NC Department of Environmental Quality 336-403-5655 Mobile 336-776-9703 Office 1 Dave.Wanucha@ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27106 _____________________________________________ From: Barrett, William A <wabarrett@ncdot.gov> Sent: Monday, December 6, 2021 11:03 AM To: Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: Turchy, Michael A <maturchy@ncdot.gov> Subject: RE: U-2579AA_Stormwater Management Plan missing pages Hi Dave, << File: U2579AA_HYD_SMPv2.07_(20180502) (Oct 2016).pdf >> I have attached the entire SMP, pages 1-6. I am still waiting to receive the culvert burial table from Hydro and will forward upon receipt. Thanks Bill William A. Barrett Environmental Coordinator Environmental Coordination & Permitting North Carolina Department of Transportation 919 707 6103 office 919 302 1908 mobile wabarrett@ncdot.gov 1598 Mail Service Center Raleigh, NC 27699-1598 1000 Birch Ridge Drive Raleigh, NC 27610 << OLE Object: Picture (Device Independent Bitmap) >> _____________________________________________ From: Wanucha, Dave <dave.wanucha@ncdenr.gov> Sent: Monday, December 6, 2021 10:25 AM To: Barrett, William A <wabarrett@ncdot.gov> Subject: U-2579AA_Stormwater Management Plan missing pages Hi Bill, 2 We’re not seeing pages 3 thru 6 of the SMP for the AA Section. Please forward those along when you get the chance. Thanks. Dave W. Division of Water Resources 401 & Buffer Transportation Permitting NCDOT Divisions 9 and 11 NC Department of Environmental Quality 336-403-5655 Mobile 336-776-9703 Office Dave.Wanucha@ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27106 ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3