Loading...
HomeSearchMy WebLinkAbout16008_Southside Ease_Phase 2 Development_LURU1816008_Southside East Phase 3_City Durham_LURU2016008_Southside East Phase 3_City of Durham_LURU2216008_Southside East_Asbestos Removal16008_Southside East_City of Durham_LURU1716008_Southside East_City of Durham_LURU1816008_Southside East_Kim Rehberg_LURU16008_Southside East_Ph III and IV Additional Assessment Work Plan_Signed_2023032916008_Southside East_Phase 1 Development_LURU1816008_Southside East_Southside Rev Phase I_LURU2016008_Southside East_Southside Rev Phase II_LURU2016008_Southside East_Southside Revit_LURU1916008_Southside East-Phase 1_LURU16008_Southside East-Phase 2_LURU16008_Southside East-Phase 3_LURU1916008_Southside East-Phase 3_LURU19 (2)16008_Southside_East_Rent_Roll_N_Standard_Lease_2017_01_1016008_Southside_East_Southside_Revitalization_LURU1716008_Southside_East_Southside_Revitalization_Phase_II_LURU1716008_Southside_East_Transmittal16008_SouthsideEast_Lease_1916008_SouthsideEastPhase2_Lease_1916008_SouthsideEastPhase2_LURU1920120306_Minor Site PlanApplication Cover Letter - Southside EastApplication-Brownfields Property - Southside EastApproval letter - SMWP Addendum #3Approved Proposed boring locations 9.1.15Attachment 1A - McCormarck Baron Salazar Inc 2010 co Final[1] - Southside EastAttachment 1B - NCHFA LIHTC Phase I - Southside EastAttachment 1C - State HTC Commitment Phase I - Southside EastAttachment 1D - City of Durham Commitment - Southside EastAttachment 2 - Property Tax ID List - Southside EastAttachment 3 - City Support Letter - Southside EastAttachment 4 - Location Map - Southside EastAttachment 5 - Boundary-Topo-Survey - Southside EastAttachment 6 - Site Photographs - Southside EastCity Memo regarding contaminated soilDSC06309DSC06321DurhamGoMaps_D20F0AFD-5056-AB1E-9CBBE8A1F1E4DC36ES RENO ATC Phase II ReportFinal SMWP Southside East Redevelopment - Final 5-30-12FINAL Southside East -Phase II ESA Report_031212[1]Former ravine SMWP Addendum Final - Southside East 1-30-2012Former ravine SMWP Addendum Three Final_3.18.13Former ravine SMWP Addendum Two Final 12-14-2012Handicapped Schematic - cut into impacted soilHandicapped Schematic - Modification to SMWPLetter report number 2_2 17 16_FINALMemo RE Unrestricted Use for Stockpiled SoilsPAHs in soil - Southside EastPhase I ESA Sept 5, 2012Proposed boring locations_8.25.15Proposed boring locations_8.31.15Receptor Survey form Southside East_6 9 14Revised Southside East BPARolling Hills Phase I ESA Report - not durhamSept 25 2023 NonCompliance letters 130Sept 25 2023 NonCompliance letters 131Small Stockpile Result Rcd 11-13-2015SMWP approval - Southside East 06-05-2012Soil Managment Plan - SMWP Southside EastSouthside East - Debris Letter 4-23-2012Southside East - Evaluation of PAH compounds - WasteMgmt 22212Southside East - Rolling Hills Poised 6-8-12Southside East - signed LOESouthside East - Site Reconnaissance 07-12-12Southside East Dev Status letterSouthside East EXHIBIT 1Southside East Redevelop_Google Earth pic of site looking southSouthside East Redevelopment_Interim Letter report_11.6.15_finalSouthside East Stockpile Soil Sampling_8 21 15 final JDRSouthside letter report 2.6.13_draftSouthside_East_BPA