Loading...
HomeMy WebLinkAboutNCC192079_ESC Approval Submitted_20190927 r'a%TAiE o ROY COOPER ' In MICHAEL S.REGAN Secretary S.DANIEL SMITH NORTH CAROUNA tnrerfm Dirertor iEnvironmental Quality June 12, 2019 LETTER OF APPROVAL Albemarle Properties LLC ATTN: T,AIlen Pipkin, Manager 10320 Durant Rd.,Ste 113 Raleigh, NC 27614 RE: Project Name: 70 Mosswood Boulevard Project ID: FRANK-2019-033 Acres Approved: 5.10 County: FRANKLIN, City: Youngsville Address: Mosswood Boulevard River Basin: Neuse, Stream Classification: Other Submitted By: Blakely Design Group Date Received by LQS: May 23, 2019 Plan Type: New Dear Mr. Pipkin: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval moist be posted at the job site. This plan approval shall expire three(3)years following the date of approval, if no land-disturbing activity has been undertaken,as is required by Title 15A NCAC 413.0129. As ol'April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent (NO[) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annettejucas@ncdenrgyov or Paul Clark at P_aul_clark0ncdenr.gvv. After you submit a complete and correct NOI form,a CPOC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for the coverage under the NCG01 permit. However,on or after June 1,2019,a$100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. North Carolina Department of£nvironmental Qualky Ohmision or Energy,Mineral and Land Resource; Raleigh Regional office :1628 Mail Service Center;3800 Barrett Drwe Raleigh,North Carol"27609 919J91A200 Albermarle Properties LLC June 12,2019 Page 2 of 2 Title 15A NCAC 413.0118(a)and the NCGO1 permit require that the following documentation be kept on fife at the job site: 1. The approved E&SC plan as well as any approved deviation. Z. The NCGO1 permit and the COC,once it is received. 3. Records of inspection made during the previous 30 days. Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973(North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations, and rules. 1n addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Say Castle, ,+ Regional Engineering Associate DEMLR Enclosures: Certificate of Approval NCGOI Fact Sheet cc: Taylor Blakely,PE[tayl4r2blakelydesignmet)-Electronic Copy DEMLR- Raleigh Regional Office File