Loading...
HomeMy WebLinkAboutNCG030503_MONITORING INFO_20181023STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. N CC'� OJ O 5D 3 DOC TYPE ❑ HI RICAL FILE ONITORING REPORTS DOC DATE p � � � D &)� YYYYMMDD Semi-annual Stormwater Di"narge Monitoriniz Report l for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted JP�SLO I T CERTIFICATE OF COVERAGE NO. NCG03 .0 5 D 3 FACILITY NAME pcn1N KrsD � (3W _ra`is COUNTY f EDki1 PERSON COLLECTING SIMPLES ,%,s s. LABORATORY PAC P_,rr,4AL Lab Cert. # l_Z Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR a.Oi'y SAMPLE PERIOD ❑ Jan -June July -Dec or ❑ Monthly'- (month) RECjTff�NG TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA �Z C ❑Zero -flow ❑Water Supply []SA NOV 01 2018 [ 6ther��L�SS_C� CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES Z AND/OR 3 4 DWR SECTION ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) - 24-hour rainfall amount, Inches? Total Suspended Solids pH, pH, units Copper Lead . Zinc Non -Polar 0&G/ Total Petroleum Hydrocarbons Total Toxic Organicss Benchmarks ===s _ - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.033 mg/L 0.067 mg/L 15 mg/L : 1 mg/L N D 1.0 0, oat N D 0. 0 a1 D o-� o o (y 0.2" ND (0•2 o.o�lf ND 0 5q2 ND SDo '3 0 Y 0.Y� 0.045 Nn 0.195 ND Sw - Ll 1 D I$ 0 q.2( 6,0 0 00(P2 ND 0. 12(0 ND 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. "See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. -'Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign th%following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with thermit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) FIHS C.opRaEnJATOR Title (Print title) /4 Z3 zw/Y (Signature (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "ON me/L". where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note; if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring ResulI. ts: only for facilities averaging > 55 gal of new oil per month. No discharge this period?Z N Outfall No. Date Sample Collected! (mo/dd/yr) 24-hour rainfall amount,. 3 inches Non-polarO&G/TPH by EPA 1664 (SGT-HEM) Total.Suspende.d Solids. p.H Benchmarks ===> _ - 15 mg/L ' 100 mg/L or 50 mg/L* 6.0 - 9.0 SU Footnotes from Part A also apply to this Part B * See'General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit D6te,-'/1/2012-10/31/2017 r SWU-245, last revised Ir"'S/2012 Page 2 of 3 Note: if yob . eport a sample value In excess of the benchmark, you must imple,.._nt Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR -PART A AND PART B MONITORING RESULTS: ' • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES 1N A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SE ION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENC S FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES 0 NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES [✓ NO ❑ REGIONAL OFFICE CONTACT NAME: :3a5 r Gne-&wmo Alonr - F_xroswe€ M 2014, �'bk Co PZi .IK AtAD 7-•1NC , Mail an orlalnal and one coon of this DMR, Includina all "No Discharae" reports, within 30 days of receipt of the !ab results (or at end_o} m..or�rrtorinc�per ad In the case of "No Discharae" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTER: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, Including the possibility of fines and imprisonment for knowing violations." (Signature of /Z2-!127(,K (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 250 Old Murdock Road ENGINEERED ESC Troutman, NC 28166 SINTERED ATSUMI (704) 528_7500 COMPONENTS TECH, LLC www.engsin.com October 26, 2018 RE: COC- NCG030503 CERTIFIED MAIVRETURN RECEIPT N.C. Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Sir or Madam: Enclosed are the results of our Second Semi -Annual Storm Water Discharge Outfall Monitoring Report of 2018. We have exceedances for Copper in Outfalls 1, 2 and 3, and exceedances for Zinc at Outfalls 2, 3 and 4. We were granted relief from the Tiered responses for our Copper and Zinc exceedances in January of 2015. Our improvement to the area surrounding the storm drains which report to Outfall 3 has decreased the amount of Suspended Solids at the outfall. We were below benchmark again for this test, making this the seventh consecutive test under benchmark. We also completed maintenance of Outfall 3 drainage ditch to minimize erosion in August of 2017. If you have questions or concerns please feel free to contact me. Respectfully Submitted, Aubrey Meadows EHS Coordinator Cc: Jan Comer, VP of Human Resources I. ENGINEERED SINTERED COMPONENTS May 29, 2018 RE: COC- NCG030503 ESC ATSUMI TECH, LLC CERTIFIED MAIL/RETURN RECEIPT N.C. Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Sir or Madam: 250 Old Murdock Road Troutman, NC 28166 (704) 528-7500 www.engsin.com Enclosed are the results of our First Semi -Annual Storm Water Discharge Outfall Monitoring Report of 2018. We have exceedances for Copper in Outfalls 2 and 3, and exceedances for Zinc at Outfalls 2, 3 and 4. We were granted relief from the Tiered responses for our Copper and Zinc exceedances in January of 2015. Outfall 1 did not flow during this sampling period. Our improvement to the area surrounding the storm drains which report to Outfall 3 has decreased the amount of Suspended Solids at the outfall. We were below benchmark again for this test, making this the sixth consecutive test under benchmark. We also completed maintenance of Outfall 3 drainage ditch to minimize erosion in August of 2017. If you have questions or concerns please feel free to contact me. Respectfully Submitted, Aubrey eadows ED EHS Coordinator JUN 13 2018 Cc: Jan Comer, VP of Human Resources °�` ��"'� ins Semi-annual Stormwater Dis„narge Monitoring Report for North Carolina Division of Water Quality General Permit No..NCG030000 Date submitted . 5z29�21-i CERTIFICATE OF COVERAGE NO. NCG03 0 G 0 3 FACILITY NAME ! ;,.�v e.a St���c�� i✓o 1 s COUNTY t�l PERSON COLLECTING SAMPLES ulxc �(�clo�+7 LABORATORY EtEt Lab Cert. # /Z Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTIO YEAR 209y SAMPLE PERIOD [Jan -June ❑ July -Dec or ❑ Monthly'_ (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water supply []SA [26ther Cl..ss C PLEASE REMEMBER TO.SIGN ON PAGES 2 AND/OR 3 --> No discharge this period?' - .Outfall No. . Date Sample , Collected (mo/dd/yr) 24-hour rainfall `, amount, Inches3 Total Suspended Solids pH, Standard units~ -Copper, . Lead . � �Zino Non -Polar n&G/ . .Total Petroleum Hydrocarbons Total Toxis c Organics Benchmarks 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.033 mg/L 0.067 mg/L 15 mg/L 1 mg/L O0T — l A NO Tl_avJ #/a ni/A n1 A N A N A N A N/A DT- 2 !o rY 0.( " %b � 3 7. 7 0. 27), p 013�L 1. 2r3 iV A 6. q OD-7- 'i S ra Iy O r ., A 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance far the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. k See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 4 s Total Toxic Organics sampling is applicable only for those,facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For. purposes of this;permit the definition of Total Toxic Organics is that definition contained in the 0A .K.;, Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). i Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Note: If you . eport a sample value in excess of the benchmark, you must lmple,.._nt Tier 1, Tier 2, or Tier 3 responses. See Genera! Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SE ION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENC S FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES [NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES F$71 NO ❑ REGIONAL OFFICE CONTACT NAME: N�ctct' &«A«l 0"'s - eq(sk--M iA Tc r� ZfflS, Ma!l an on final and one cogy 2f this DMR Includingoff "No Dlschar e" reports, within 30 days p recel t a the lab results or at end o monitorin erlod in the case of "No Discharae" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED. - "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of�Permittee) t s r, Permit Date: 11/1/2012-10/31/2017 27129 � (Date SWU-245, last revised 10/25/2012 Page 3 of 3 _ ENGINEERED ESC 250 Old Murdock Road SINTERED ATSUMI Troutman, 28166 (704) 528-750500 COMPONENTS TECH, LLC www.engsin.com December 11, 2017 RE: COC- NCG030503 CERTIFIED MAIVRETURN RECEIPT N.C. Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Sir or Madam: Enclosed are the results of our Second Semi -Annual Storm Water Discharge Outfall Monitoring Report of 2017. We have exceedances for Copper in Outfalls 2 and 3, and exceedances for Zinc at Outfalls 2, 3 and 4. We were granted relief from the Tiered responses for our Copper and Zinc exceedances in January of 2015. Outfall 1 did not flow during this sampling period. Our improvement to the area surrounding the storm drains which report to Outfall 3 has decreased the amount of Suspended Solids at the outfall. We were below benchmark again for this test, making this the fifth consecutive test under benchmark. We also completed maintenance of Outfall 3 drainage ditch to minimize erosion in August of 2017. If you have questions or concerns please feel free to contact me. 1p V Respectfully Submitted, Aubrey Meadows EHS Coordinator Dec13W( pSWP WR CT C� Cc: Jan Comer, VP of Human Resources Semi-annual Stormwater M..,nar a Monitorin Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted _ia��l/� (7 CERTIFICATE OF COVERAGE NO. NCG03 Q FACILITY NAME COUNTY -:-L,.,4,Q PERSON COLLECTING SAMPLES LABORATORY Lab Cert. # _ /a Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 24 V7 SAMPLE PERIOD ❑ Jan -June July -Dec or ❑ Monthly' (month' DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑fro -flaw ❑Water Supply []SA (Other Qs�,a C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 No discharge this period ?2 Outfall No. Date Sample p Collected's (mo/dd/yr) 24=hour rainfall amount, Inches3 Total Suspended Solids pH, Standard unitsOrganics Copper Lead � Zinc ..Non -Polar O&G/ Total'Petroleum Hydrocarbons ,'Total Toxic :­ Benchmarks ===> _ - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.033 mg/L 0.067 mg/0 1S mg/L 1 mg/L Al 0 Z.2 , oG64 NC) I.o;- M. /L Al0 0,1 i5 r. L G '7 Url;Ly r L 0.6651 -vfq =ZA Pic) Spa U �r i 4 A10 61 N- NO .3X 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfali. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites maybe eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). N?) 4r,4 D,,4kc�,J Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signatu ) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported In the format. "<XX me/L". where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value In excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text, Part B: Vehicle Maintenance Area Monitoring Results: only for facilities a►ieraging > 55 gal of new oil per month. No discharge this period? Qutfall No. Date Sample 24.hour rainfall Collected amount, : Nan -Polar O&G/TPH 17y, . - Total Suspended Solids ::: , , (mo/dd/yr) Inchess 1:PA; 1664 (SGT-HEM} pH Benchmarks =_=> - - 15 mg/L ' 100 mg/L oe-50 mg/L* :6.0 - 9.0 Su Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date—"./l/2012-10/31/2017 ! SWU-245, last revised 1OL75/201.2 Page 2 of 3 Note: If yow . epart a sample value In excess of the benchmark, you must lmple.— nt Tier 1, Tier Z, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SE ION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENC S FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES f 1 NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ENO REGIONAL OFFICE CONTACT NAME: KpS,—re. 2-1nc. CYLtl cfylca.) 4� J..•..�d� :ZV '.i6C� PY %�C. �].w�lts f ncre., Mall an e "final and one cony of this DMR h7rluding all " o D! har e" reports. within0 days of recetgtof the lab results for at end of monitoring eriod In the case o "'No Disch r e" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CE_RTIFiCATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature 8f Permittee) Permit Date:11/1/2012-10/31/2017 (( L-7 (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 I ENGINEERED ESC 250 Old Murdock Road SINTERED '� ATSUMI Troutman, 50 28166 COMPONENTS TECH, LLC ww ngsin.00 www.engsln.com May 22, 2017 RE: COC- NCG030503 CERTIFIED MAIURETURN RECEIPT NCDEQ Mooresville Regional Office Division of Water Quality Attn: Mr. James Moore 610 East Center Avenue - Suite 301 Mooresville, NC 28115 Dear Mr. Moore: RECEIVED MAY 3 p 2017 DENR-pEMLR Moore v'lle Regional d Quality Section Offic e Enclosed are the results of our First Semi -Annual Storm Water Discharge Outfall Monitoring Report of 2017. We have exceedances for Copper in Outfalls 1, 2 and 3, and exceedances for Zinc at Outfalls 2, 3 and 4. We were granted relief from the Tiered responses for our Copper and Zinc exceedances in January of 2015. Our improvement to the area surrounding the storm drains which report to Outfali 3 has decreased the amount of Suspended Solids at the outfall. We were below benchmark again for this test, making this the fourth consecutive test under benchmark. We have a plan in place to complete additional general maintenance for erosion control around our shipping area to help keep Suspended Solids to a minimum. If you have questions or concerns please feel free to contact me. Respectfully Submitted, Aubrey Meadows EHS Coordinator Cc: Jan Comer, VP of Human Resources Semi-annual Stormwater Dh..nar a Monitoring Re ort for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted '5/0/261- CERTIFICATE OF COVERAGE NO. NCG031) FACILITY NAMECpr^ao�4t o _ COUNTY tt N � PERSON COLLECTING SAMPLES aw a LABORATORY �o.cc A�c.I..; s..ti Lab Cert. # Comments on sample collection or analysis: o' y Part A: Stormwater Benchmarks and Monitoring Results CD SAMPLE COLLECTION YEAR ;26r 7 SAMPLE PERIOD Jan -June ❑ July -Dec or ❑ Monthly' (month) :r MSCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA -x'c ❑Z$ro-flow ❑Water Supply ❑SA CA: ['other Q^s5 C o � o PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -� ❑ No discharge this period?Z .. Outfall No , , .. Date Sarnpie Collected 1 2Mhour rainfall . amount, .. ,. Total-Suspend•ed Solids pH, Standard units Copper : Lead Zinc Non Total Petroleum Total Toxic' s . Organ[cs Hydrocarbons (mo/ddLYrl Inches.. . .'Benchmarks .' _. ;. - :100°mg/Lor50'mg/L; 6.U-9sU ' ; 0.007_mg/t OQ33.rttg/L: Y O:OfiTmg/L:' 15mgIL SD()- i S za(-r 0, z3" A/D 6.1 0.01-71 ND 01K19; NO SDo� S 9 2_0(1 0. z3" IUD 6,7 Q• a FM ND 0,77-7 ND s Do- 3 5,q f Z01`1 d, z3" 1G.0 6,3 0, 061 ND 0. y6 3 .ND S Do - 14 1511121c, " 6 , u ND ND V. 12S ?-1i 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). ND : 140� O c4cc- (t Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Storrwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit, For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX ms/L". where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. I Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. No discharge this period?' Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date, ^ I./1/2012-10/31/2017 SWU-245, last revised 1n115/2012 Page 2 of 3 Note: If yo,, , eport a sample value in excess of the benchmark, you must lmple..._nt Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALLTRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. + TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Ma!l an orlainal and one copy of this DMIi. including all "No Discharge" reporter within 30 des of reLelnt of the !a6 results for at end of monitoring period in the case of "No Discharge" reports] to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature a0ermittee) Permit Date:ll/1/2012-10/31/2017 9IZ207 (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 ENGINEERED ESC 250 Old Murdock Road (i) Troutman, NC 28166 SINTERED - ATSUMI (704) 528-7500 COMPONENTS TECH, LLC www.engsin.com June 28, 2016 _ RE: COC- NCG030503 CERTIFIED MAIVRETURN RECEIPT NCDEQ Mooresville Regional Office Division of Water Quality Attn: Mr. James Moore 610 East Center Avenue - Suite 301 Mooresville, NC 28115 Dear Mr. Moore: Enclosed are the continued results of our First Semi -Annual Storm Water Discharge Outfall Monitoring Report of 2016. The lab who conducted our sample analysis, Pace Analytical, was unable to obtain a pH sample for the sampling period. I spoke to you on the phone and you told me we were ok to send this report on June 16, 2016 without the pH as long as when we have our next rain event we pull pH samples from all outfalls and submit them at that time. I have collected stormwater from all outfalls except SDO-1 which had no flow during this rain event. I tested the pH of each sample using a Scientific Instruments model no. IQ125 pH meter which was properly calibrated before each individual reading. We are within the allowable range for pH on all outfalls. If you have questions or concerns please feel free to contact me. Respectfully Submitted, Aubrey Meadows EHS Coordinator Cc: Jan Comer, VP of Human Resources Semi-annual Stormwater Dis,n�aree Monitorink Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted „� f 27r_4 CERTIFICATE OF COVERAGE No. NCG03S •S Q. 3 � SAMPLE COLLECTION YEAR 2dic� FACILITY NAME ���a..f 5��•l�.�c.i Ga A awls I SAMPLE PERIOD [+! Jan -June ❑ July- c �. _.�_,_.,..,,... or Monthly' COUNTY .2r�d eU - _ - I ❑ Y month l PERSON COLLECTING SAMPLES f br4v �L. awl DISf,*RGING TO CLASS ❑ORW W ❑Trout ❑PNA LABORATORY N�A Lab Cert. # i R�ero-flow Water Supply ❑SA Comments on sample collection or analysis: ther GI C o1. EASE REMEMBER TO SIGN N PAGES 2 AND/OR 3 4 � CP Part A: Stormwater Benchmarks and Monitoring Resultsd�1 No, discharge is ?2 period _, , ,. , :., ._ :•Date.'. am Ie. '., :24hour: :. rotal:.Sus nded 5o Ids P i P s G" a er r' RA Leatl Zlric Total::P a1 m�sl '�y.•. Total Ta c; �"; amount . 1 Standard%n f.:..#rF Y ,u < V e. .:: .. :Benchmarks/L'or>:50 - -. --:.-: tti L 6 0 ;1 0 0 0O7;m t OtO ;rt1 i , 0 G67 m 1$rtm '..1 rrx IY; 5DO-i SUo -a 4/21/16 Spy- 3 GL2 !z 16 0.3 �• . 'T. 5 ' Sm - 4 0.3 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same param er at the same-outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a check rk here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of t ie rain gauge requirement. A See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchm, irk applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semic iductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that d ition contained In the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 3.11; for semiconductor manufacture use the definition as found in 40 CFR'469.12; for electronic crystal manufacture use the definition as found in 40 CFF 169.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). ii • I Permit Date: 11/1/2012-10/31/2017 j 5 245, last revised 10/25/2012 Pa 1of3 Facilities that incorporate a solvent management plan into the Stormwater Pollutio'!n Prevention Plan may so certify, and the req may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other eleme Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification star "Based upon my inquiry of the person or persons directly responsible for managinglcompliance with the permit monitoring requirem (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing thf solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) LI4S coo, rA-& .+Or Title (Print title) (5ignatur (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other format. When results are below the applicable limits, they must be re orted In=t a for at "<XX mgLC, where XX is the numeri limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See Ger i Part B: Vehicle Maintenance Area Monitoring Results: only for facilities av gaging > 55 gal of new oil per month. 7 ❑ No discharge ment for TTO monitoring listed in the General ant: t for total toxic organics Ich are exposed to rainfall or I the provisions of the iilar non -numerical value of the detection Permit text. period ?2 e .......Y `�` t alt ,j��, r 3;r;:t`hJ,y,!e:�'W e ,tea _ - - r 3_- ; v --:ay,r; 9.<-S•e ,N y - mod', :.t� ' `�" 3a, } c. 4• f tA,.,� S - ,'i yy j '�. k.: i$'.Y ,;.r.r.. -'3f-•ro"Sy+ �.: .. .t,,47V5','.'�;;�.i �1? ;ir.ehkr _ �d''"3�_� `�'R A ;i �k"5�... "t; iS:iMiV .;' offfie"M� .<l,. 5,''•Y .. ,.c I _ ;;W r tt �,.. " a-- •�� \ ,.... - �`s'F; %�s y .1 , a '�°xi,s f:''a,,•.ta.,Fz .^h!, �eJJ' ', �sa.,.rvr .c xr,..Ao.. - . ,.v.a d � +sr._.,. r_�^...tx..<.. :] . - w ; -- � pj... .nr:• �s«,w� Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark ap I es. y Permit Date: tt/1/2012-10/31/2017 S4 245, last revised 1f1-LZ$/2012 Pa 2 of 3 Note: if you , eport a sample value In excess of the benchmark, you must Imple,...rnt Tier 1, Tier 2, or Tier 3 responses. See Gen4l Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II 51 CTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL7 YES NO IF YES, HAVE YOU CONTACTED E DWQ REGIONAL OFFICE? YES NO REGIONAL OFFICE CONTACT NAME: Q—. tAwl- ES6wag ice,4,LJ r Gerplir. d,^Jl In the case of "No Discharae" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a stem designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who mapage the system, or those persons directly responsible for gathering the information, the information submitted Is, to the best of my knowledge and belief, true, aq urate, and complete. am aware that there are significant penalties for submitting false Information, Including the possibility of fines and imprisonment for knowing i lations." (SignaturYof Permittee) Permit Date: 11/1/2012-10/31/2017 xY��4L4 (Date) last revised 10/25/2012 3of3 ENGINEERED ESC 250 Old Murdock Road SINTERED ATSUMI Troutman, 50 2$166 COMPONENTS TECH, LLC ww. ngsin.00 www.erogsin.com May 22, 2017 RE: COC- NCG030503 CERTIFIED MAIURETURN RECEIPT N.C. Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Sir or Madam: 'p- Rp_ctI V E® JUN 01 Z017 CENTRAL FILES DWR'SECTION Enclosed are the results of our First Semi -Annual Storm Water Discharge Outfall Monitoring Report of 2017. We have exceedances for Copper in Outfalls 1, 2 and 3, and exceedances for Zinc at Outfalls 2, 3 and 4. We were granted relief from the Tiered responses for our Copper and Zinc exceedances in January of 2015. Our improvement to the area surrounding the storm drains which report to Outfall 3 has decreased the amount of Suspended Solids at the outfall. We were below benchmark again for this test, making this the fourth consecutive test under benchmark. We have a plan in place .to complete additional general maintenance for erosion control around our shipping area to help keep Suspended Solids to a minimum. If you have questions or concerns please feel free to contact me. Respectfully Submitted, Aubrey Meadows EHS Coordinator Cc: Jan Comer, VP of Human Resources Semi-annual Stormwater D s,nar a Monitoring Re ort for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted '51111 zQ l -7 - CERTIFICATE OF COVERAGE NO. NCG03_0 rl. 1_ a FACILITY NAME _ �nq',nc��c� 5 ; �4tr�d`C01,?QNt"+t COUNTY (L - PERSON COLLECTING SAMPLES w LABORATORY �a.cc /��.�.l.��.; �..� Lab Cert. # /2 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE CO!_LECTION EAR 2d 1 7 SAMPLE PERIOD Jan -June ❑ July -Dec or ❑ Monthly) lmonthJ DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑� Z ro-flow ❑Water supply ❑SA� L�Jother 02,5 C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 --> No discharge this period? Outfall No. .. pate Sa le �1 Co e Collected, (mo/dd/,yr) 24hour:rainfalf amount 3 :Inches. = Total Suspended Solids pH, Standard units Copper : :.. lead Zinc Nan -Polar 0&G/ Total>Petrofeum - Hydrocarbons . . 9tal Toxic: organics Benchmarks 100m ` L or.'S0 mg/L 6.0:-:4:0, . 0.007 mg/L :. 0.033 mg/L 0:067 Mg/1 :: 1.5. ring/L 1;mg/L 5DO- S'1 zo(`7 0.z3" /VD 6,1 O.DI-It ND o.Kz5 N/_ 5Do- 2 S R fvo Q, zV, ND 6.1 4. a T142 ND 0, 77-7 ND 5 Dv - 3 1 f z0r7 0. z.3" 3(, . o 6.3 0, 06 r ND 0.(143ND SDo - q IF, e0-0 a. z3 " 6.4 ND AtD d.125' AID 1 Monthly samnline (instead of semi-annual) must begin with the -second consecutive benchmark exceprfance for the same narametpr at the camp nutfall For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), 4 certify that to the bests of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfal I or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not reRort Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX ms/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. No discharge this period?z Date S;amplery 24-hour-rainfall Out No r Collected amount, Non polar 0&G/TPH by t Solids " (►na/dd/y_r}` ... .;.: , Inches3 ,, EPA1664.(SGT.`HEM} Total Suspended pH 8enchmurks -� ' :. :.> -;, :n ... ., 15,mg/L ,.. .. 100 mg/L as b 0 : 4.0.5U :; Footnotes from Part A also apply to this Part B I * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date- "1./1/2012-10/31/2017 r-, SWU-245, last revised 1005/2012 Page 2 of 3 Note: If yoc. , eport a sample value in excess of the benchmark, you must imple,...:nt Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES 1N A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO [] REGIONAL OFFICE CONTACT NAME; Mail an original and one copy of this DMR including all "No Discharge" re orts within 30 days of reLeW of the lab results Lor at enctof monitorlha gerlod in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and Imprisonment for knowing violations." (Signature o!VPermlttee) Permit Date: 11/1/2012-10/31/2017 S/9 zoi7 (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No.wNCG030000 Date submitted 1- ;L' :00 CERTIFICATE OF COVERAGE NO. NCG03_L g- FACILITY NAME COUNTY 1re.�ull PERSON COLLECTING SAMPLES. t6eey 1`le.c zla-15 LABORATORY P&,Le_ Lab Cert. # Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 1DR, SAMPLE PERIOD ❑ Jan -June July -Dec or ❑ Monthly( (month) DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA []Zero -flow : ❑Water Supply []SA RECEIVED []Other AN 10 2017 PLEASE REMEMBER TO S1GN`ON PAGES 2 AND/OR 3 � CENTRAL FILES °VVR Sr~crIoN • ❑ No discharge this period ?2 Date.Sample : 24 hour rainfall pH; f Zinc Non PolarO&G/ Total:Toxic putfal! No.. 1 Collected amount, : Total Sgspended'Salids - . Standard units , Copper Lead Total Petroleum ;Organics S (mo/dd/yr) .: Inches is Hydrocarbons Benchmarks 100 mg/L or.50 mg/0 '6:0'— 9:0' `' ` 0.007: mg/L;! = 0:03 mg/L .' 0.067 mg/L 4 15-mg/L 1 mg/L 500 - t afit 14 NO F-(4W 0. 4 ND 6,0 0,1` J N /L. NA f.Z /L ' ND 12. Lti, IL 6i 0. 0k I i d.4Re NA 5DO - 4 r yab� p, lG" At . I Q. Jo(ol [ Ni7 .192 L /V b 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkma�rk here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of:the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition.as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities Ulat incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO moni,,,ring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. 1 further certify that this facility is implementing the all -the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." ir �l.rJ C[.Lf t c" -S-- Name (Print'name) Title (Print title) (5ignatu ) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other:similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX me/L", where XX is the numericall;value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part S: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. j_j No discharge :this period?` Date Sample 24hour rainfall Outfall No I Collected `amoun3; Non polar 0&G/TPW by: Total Suspended 5ohds pH . _ (mo/dd/yr).. :Inches .EPk-A664'-(SGT-HEM) . Benchmarks ===> :.. 15' mg/L 100:mg/L or 50; mg/0 :.: 6 0 9-0SV 4 . Footnotes from, Part A also.apply..to.this..Part 6 * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page!2 of 3 Note: if you report a sample value in excess of the benchmark, you must implettient Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER ATTHE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS, SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDEES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES [eNO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES 9 NO ❑ REGIONAL OFFICE CONTACT NAME: 1 r f ! { t VJP- vie'rL b�kf-A NM- L7cPos�•.rc. �Q� CAeptr 4.�e� .Z0Ir7 n���C u,.ewcT ^', CMI�+.Siuc ftsP;n9 J;rc��. M'.nw�.�tf U Dar Mail an original and one copy of this DMR, including aH "No Discharge" reports. within 30 dgvs of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Pe 1`9-201'r (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page'`3 of 3 250 Old Murdock Road ENGINEERED ESC Troutman, NC 28166 ' SINTERED ATSUMI (704) 528-7500 COMPONENTS TECH, LLC www.engsin.com January 2, 2017 RE: COC- NCG030503 CERTIFIED MAIURETURN RECEIPT NCDEQ Mooresville Regional Office Division of Water Quality Attn: Mr. James Moore 610 East Center Avenue - Suite 301 Mooresville, NC 28115 Dear Mr. Moore: Enclosed are the results of our Second Semi -Annual Storm Water Discharge Outfall Monitoring Report of 2016. We have exceedances for Copper in Outfalis 2 and 3, and exceedances for Zinc at Outfalls 2 through 4. We were granted relief from the Tiered responses for our Copper and Zinc exceedances in January of 2015. Outfall 1 did not flow during this test period as it has a very small area which reports to it. We did successfully pull Outfall 1 samples on January 2, 2017 and will submit those results as soon as possible. Our improvement to the area surrounding the storm drains which report to Outfall 3 has decreased the amount of Suspended Solids at the outfall. We were below benchmark again for this test, making this the third consecutive test under benchmark. We have a plan in place to complete additional general maintenance for erosion control around our shipping area to help keep Suspended Solids to a minimum. If you have questions or concerns please feel free to contact me. Respectfully Submitted, Aubrey Meadows EHS Coordinator Cc: Jan Comer, VP of Human Resources ENGINEERED ESC 250 Old Murdock Road SINTERED (i)ATSUMI Troutman, 50 28166 COMPONENTS TECH, LLC www ngsin.00 www.engsin.com June 28, 2016 RE: COC- NCG030503 Y CERTIFIED MAIURETURN RECEIPT N.C. Division of Water Qualit y Attn: DWQ Central Files 00 6 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Sir or Madam: Enclosed are the results of our First Semi -Annual Storm Water Discharge Outfall Monitoring Report of 2016. The lab who conducted the sample analysis, Pace Analytical, was unable to obtain a pH reading from our samples this test period. I contacted Mr. James Moore at the Mooresville Regional Office and he directed me to proceed with the June 16, 2016 submittal as long as when we had our next rain event we gather a pH sample from all outfalls and submit the data at that time. I have collected stormwater from all outfalls except SDO-1 which had no flow during this rain event. I tested the pH of each sample using a Scientific Instruments model no. IQ125 pH meter which was properly- calibrated before each individual reading. We are within the allowable range for pH on all outfalls. If you have questions or concerns please feel free to contact me. Respectfully Submitted, geceNSID ae4-0-e-- �V�- 19 ZA Aubrey Meadows L FILES EHS Coordinator pWWRp R SECTION Cc: Jan Comer, VP of Human Resources Semi-annual Stormwater Dis%.naree Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 21r 96t. = SAMPLE COLLECTIRy YEAR CERTIFICATE OF COVERAGE NO. NCG03Q �S SL.i FACILITY NAME SAMPLE PERIOD Jan -June ❑ July- c COUNTY Z4,..JW or []Monthly' month PERSON COLLECTING SAMPLES Awbr� !'<<��� i DISCHARGING TO CLASS ❑ORW W [:]Trout❑PNA LABORATORY N/,4 Lab Cert. #t ❑ ero-flow Water Supply []SACEIVED Other c! Comments on sample collection or analysis: [O c ou - esiaO &,att V ».s PH AoAt ;JUL 18 2U16 I PLEASE REMEMBER TO SIGN N PAGES 2 AND/OR 3 4 CENTRAL FILES Part A: Stormwater Benchmarks and Monitoring Results �WR SECTION No discharg is period?z ,:...: ... tt :, �<. ,,. � ^'`. 1 -.: ., :;< . _. ; .. : :.�: utfall No � A ` - Date am le ;> � � ,. o r is 1.:... 2�I. h u rain i :,.•, `�'� : .: ,..:.-:- F [ '- '> .. � ,..'.. .•.. -Sus endedSolids p e ,::t ...• r. : f?ollec#ddl :, .:..::<Total _..:>amaun# :. , , ,: Standard'' ni#s r ,Pp �; � � � � r . �, ,� sg;: --.: mo -dd r d. .. e ah drks - 100m ;I ar, 50<rrt L Sf l �. 6 0 9 Q ;0'OO7 m L �_0 Q33 m L t0 06 ,im ...15:m rn L ; �..,•.,, SDo-! svn -,2 4/21/i6 SDo-1$ OP 9/ 16 SDa-4 G Ire 0.3 i, 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive Ebenchmark exceedance for the same param Ner at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a check rk here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of die rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchr iark applies, s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semi iductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 3.11; for semiconductor manufacture use the definition as found in 40 CFR 469.1Z; for electronic crystal manuEfacture use the definition as found in 40 CFF 1.69.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). E f Permit Date; 11/1/2012-10/31/2017 i SIO 245, last revised 10/25/2012 Pa 1of3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the req may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other eleme Permit. Fo'r those facilities electing to employ the T70 monitoring waiver, the discharger shall sign the following certification stal i `"Based upon my inquiry of the person or persons directly responsible for managing icompliance with the permit monitoring requirem (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing thi solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) 114 S Title (Print title) J. 'j (Signatur (Date) Note: Results must be reported in numerical format. Do not report Below Detectio{n Limit, BDL, <PQL, Non -detect, ND, or other format. 1. When results are below the applicable limits, they must be reported 'i-rthe format. "<XX me/L". where XX is the numeri limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier2, or Tier 3 responses. See Gen Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. No discharge ment for TTO monitoring listed in the General nt: : for total toxic organics €ch are exposed to rainfall or I the provisions of the filar non -numerical value of the detection Permit text. period ?2 -✓,..-.1 -i ,`."''`:.�...{."'=�, �, _ �r•,ri1 Y r _�. �•.� r S+ . •.4, m�le '• ,F E4 fur ra fall _;'sFf +r 3 -.5.,r`t. iY.tiTj., Ar lk sr? � f?h -.,Rx Viz. ,., 'f�,.✓q a�iia,i+�r: Y �'- i j `: ^+4 �' )OutlalSil■Q. r .» a 3,' -, �..�i * ` _ a :p..H.b += ., .F{r }Sa ` �ti iJ m r .. „� ,,w , �., r t•,4, !. „v� .N f Wi al ►11 ✓ 9elpf�h/Jj�jvarks�.�a j�., Y� a.,.�a ;' e'4' G'i. �' ,;Nn� R \.+, Cn�� tr:r F.= arav:!r.»7 nsa.. ST^zx 1`rn50+ ` g/L` (,s-+�.cs .. ,?_...Fet::�±.m�w^x. Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark ap I es. Permit Date:. 1/1/2012-10/31/2017 ? SW 245, last revised 1r'-g5/2012 Pa 2 of 3 Note: If you , eport a sample value In excess of the benchmark, you must lmplei..-,r.t Tier 1, Tier 2, or Tier 3 responses. See Gen4 Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. + 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 TION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDS PS FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES NO ❑ IF YES, HAVE YOU CONTACTEDq.HE DWQ REGIONAL OFFICE? YES NO ❑ REGIONAL OFFICE CONTACT NAME: L7G wnS rcyo ises r 4,#,vprr &^cJ! Z1c. In the case of "No Discharae" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who rT those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, a am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing (Signaturlrof Permittee) /2Y�2dri: (Date) i designed to the system, or and complete ms." Permit Data 11/1/2012-10/31/2017 S245, last revised 10/25/2012 P 3of3 ENGINEERED ESC 250 Old Murdock Road SINTERED ATSUMI Troutman, 50 28166 �' (704) 52$-7500 COMPONENTS TECH, LLC www.engsin.com June 16, 2016 RE: COG NCG030503 CERTIFIED MAIVRETURN RECEIPT N.C. Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Sir or Madam: RECEIVE® JUN 2 4 2016 CENTRAL FILES DWR SECTION Enclosed are the results of our First Semi -Annual Storm Water Discharge Outfall Monitoring Report of 2016. We have exceedances for Copper in Outfalls 1, 2 and 3, and exceedances for Zinc at Outfalls 1 through 4. We were granted relief from the Tiered responses for our Copper and Zinc exceedances in January of 2015. Our improvement to the area surrounding the storm drains which lead to Outfall 3 has decreased the amount of Suspended Solids at the outfall. We were below benchmark again for this test making this the second consecutive test under benchmark. The lab who conducted the sample analysis, Pace Analytical, was unable to obtain a pH reading from our samples this test period. I contacted Mr. James Moore at the Mooresville Regional Office and he directed me to proceed with this submittal as long as when we have our next rain event we gather a pH sample from all outfalls and submit the data at that time. If you have questions or concerns please feel free to contact me. Respectfully Submitted, Aubrey Meadows 1 EHS Coordinator Cc: Jan Comer, VP of Human Resources ft%O " Semi-annual Stormwater Dis%Aaree Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG03000' Date submitted CERTIFICATE OF COVERAGE NO. NCG03 U 5 U I SAMPLE COLLECTIO YEAR 201( FACILITY NAME C^�1� necrG� S_✓�t,re�i SAMPLE PERIOD [Jan -June ❑ July- ec - _�;r���Q�.e,.�s COUNTY or ❑ Monthly' month PERSON COLLECTING SAMPLES DISCHARGING TO CLASS ❑ORW QW ❑Trout ❑PNA LABORATORY pace Apgt,134.; cAy Lab Cert. # J2 ❑;ero-flo ❑Water Supply []SA i Comments analysis: l 'Other sample collection or an © ss ton No d&�.. 0;il C044 nlxf ra,n CVu.�. ECE D "Co - 1 " PLEASE REMEMBER TO SIC N PAGES 2 AND/OR 3 4 JUN 2 i 2016 Part A: Stormwater Benchmarks and Monitoring Results CENTRA FILES No discha, 911 this period I.{. ::• ,. H !:.F.: w v , t a ry- t,.. e' k A �y p ni. -2. .. :... :. J --:": i:...'1i.+.-.,.-.... Outfall No. , ., I. :... ,, c`,: , ..,. .. .1 ,... ..Y,. ...'- a .... :? ki5,,:?. o a S .f �r., -: rh'. Cb per .�..'{Ha!:..}• Lead Zlnc 7bt I-Petb:.:y , °, N..,.,1. ;GoIlgGted amount, . ` ,, 5tan�iard nits s � p t f . sg � �• � �,{�.,,: 3 f�tg nit ..:, :; , .. {..' iIt1 �• i t :T � k M. i ' /1M 1{ � 100 m L'pr.}50`m I. I fi 0 - 9 0 q gg7pm C f q.g33 m L'<, O OG7.m 15 n1}(.(■yL < 1 ftt.R}/L ... { , :,J... : .'VI :.:-�.: 1, Y- '„:?: {-..7.'•:.::; ^if:',: �.k,-�': !.. A:,T(': ,ti S DO- f 5/1116U. . 4�' 12 n9 L !I A 0.6W#7,-V1_ NIA Q oqI ! ?� SDO - ;25/!� tip �_ qX ° A VIA 0,03F5- N A v 33i SDO — 3 5 [ =1- qy ° r 2.3 +-� iVIA , 0, 0303 --6 /A d, I aG ?� SDo . 17 20tr, '� �o. a l` N q NiA NIA O. ()-7gy1 'Monthly sampling (instead of semi-annual) must begin with the second consecutivg benchmark exceedance for the same parin ter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a chefcki tark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver o the rain gauge requirement, a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benc h iark applies. s Total Toxic.Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture ser i onductors, manufacture electronic crystals, or manufacture cathode ray tubes, For purposes of this permit tke definition of Total Toxic Organics is that di, iinition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CF R 33.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 F 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). l ' I Permit fate: 11/1/2012-10/31/2017 I U-245, last revised 10/25/2012 E I P �e 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the r cl irement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other ele e. is listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification s a lent: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requir rn nt for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or are is hich are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing 'h 11 the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Au6riX�Cc�aas Name (Print name) Title (Print title) i �G am, (Signatur (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or oth r� imilar non -numerical format. When results are below the applicable limits, they must be reported In the`f_ormat. "<XX_ mgZL", where XX is the num ri I value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must impleme61 t Tier 1, firer 2, or Tier 3 responses. See G n ral Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities av+ raging > 55 gal of new oil per month. ❑ No dischar a his period?z ,+$- x � ,+.�'•:D.�•.�m, _ - jR�'✓, V`Sa �. Yy 1 fie }. G a.,,; r- '- tE ti' ;EY� . �;5`: N� .�H ,Y x. ;4U ailNo y���w. -fill, x' r �v�s± r-- t-.�1;s ��l'n.�o, r� n� \ P,p s�, f • ., k�,. W +; {� �q � e m e .. a3 ;t4, i, i fL II r' WE..l� f f`} y 75� ��� ,r.��r� �{y�j �j •'Fln �r-. Al I r ,' 5,.x, ��w��,•-'A. y4 mQS� t�r�`..4 aln ha k a t �¢�k'��{ { e Y �, Masi s' >;}`C'd 1N1 l M � f4�i A :! :%l A;i,`J� �' 4 d J.1iGtr a'+� ': i}f _yG�T 1■� Qr \i TIPIII'hy, -SPA lfiir .:fSGT i+E,.,-. ,a .,;� :7�. 1;•'., s ES t., tel: r .cr � }. ..i ��+,.3; � <:, e! MEIN �r L Z iiti 1kv" EIN -r. •�. a.a #x-z ;, eft >',�.-De��iari t s?'.,S ,S, pendp�d,Solld' Y . / sL� n� G: ;terry. zx, 4 � :h`[f.; x,. ''��.iN'y "',�P(.l�' �•"Nr d''.1� . 7i. 1, ..� Lr 'f4'4'. 't.� �� 4 �i '3{ �.�'4�i' {� yi'!'1 \[ �:, � 1_y�'+� t 4` 5' `� •u` u4 FY`_!'.'i 1..�.J ^�„� JI 5���� :�,t 1,)) � A N rY :.k91 C" t /'. :. M \ ��1�^ �,!"' 'i� —r'�I, „':, A:..'4.. i � : r'.J. .:i�yCv1d- GY: �C. ** M?�+1 S,,ai�.. I I Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark ipl lies. Permit Date:? 1/1/2012-10/31/2017 W -245, last revised 10-fs/2012 '� a e2af3, ! Note: if you , eport a sample value in excess of the benchmark, you must imple,—n!t Tier 1, Tier 2, or Tier 3 responses. See Ge n jal Permit text. FOq PART SAND PART B MONITORING RESULTS: • A BENCHMARK i_XCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PAR1 II ECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDEN ES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YE NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES NO REGIONAL OFFICE CONTACT NAME: _ 3nrtLS r[oar� ESC. ,,i„s c�rn� �.I "NnA- ��pasurc" �n ^"`'`"^f 20t5,re5erd,;. Cv. o J 4 4 our 0k4Car1s, In the case of "No Dlscharae" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED; "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance wit a ;ystem designed to assure that qualified personnel properly gather and evaluate the Information submitted. Baked on my inquiry of the person or persons whc rr inage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, truea curate, and complete. am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowli g ioiations." (Signature o ermittee) (Date) Permit Date: 11/1/2012-10/31/2017 U-245, last revised 10/25/2012 I ge3of3 Semi-annual Stormwater Di's ,naree Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted r 199 / i ' .� CERTIFICATE OF COVERAGE N0. 1YCG03,Q 5 0 '1 SAMPLE COLLECTION YEAR, � - FACILITY NAME SAMPLE PERIOD ❑Jan-]une -DecJuly rogm COUNTY or ❑ Monthly' month PERSON COLLECTING SAMPLES _&JoE . j DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA LABORATORY Lab Cert. # (a ❑Zero -flow []Water Supply []SAComments on sample collection or analysis: DECEIVED E26iher Glass C, OCT 06 z013 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 CENTRAL FILES Part A: Stormwater Benchmarks and Monitoring Results DWR SECTION No discharge this period?' M lid{...........a ,bkdI - . :• .. ....ample,, . 24-haur'ratnfall .` . ii, ,�.,...� { � h,4...,., ....:.. "1' :..>::.::Total Sus ended Solids.., P.: �.:':f; [o er . Lead' ,> Zinc :_ iotal.Petrofeuma_.., Collected amount, P Standard units` PP t.: Organtcs a HydKocarbons ' Imo/dd/y�) Inches , m L:ar 5o L 6 O,w 9 0 .:F 0: 07 m L 0A33>m L S ,0:067. m „ L .:'... , ,15 rri r .._... t '1 (o [ 5 N%Q i . Q D.D`�59 g fn l?. IGq f-i1- N/A Mi LA Sao - q Io i5 0. I r 6 D d . 134 �_ � N/� l0 � AA Ste- 3( [g► (c6it E5 0. K .�c�/1- a mo� Z lt- N .5]� �C L �11 A 4A 0 5 Do - 1 l(5 , ( r f l N /� . �, ; v Q NIA Q. Zq ' J �lL 11r A .N/A ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here, 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Note: If yogi. ,eport a sample value in excess of the benchmark, you must Fmple,—nt Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION • TIER 3. HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one cony of this DMIi includin all "No Discharge" reports, within 30 days of receipt of the lab results or at end of monitoring eriod in the case o "No Discharge" re orts to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Perm Permit Date: 11/1/2012-10/31/2017 k 5 (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 ENGINEERED ESC 250 Old Murdock Road ' SINTERED ATSUMI Troutman, 28166 �.' COMPONENTS TECH, LLC {704) 528-750D www.engsin.com September 29, 2015 RE: COC- NCG030503 CERTIFIED MAIVRETURN RECEIPT N.C. Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Sir or Madam: Enclosed are the results of our Second Semi -Annual Storm Water Discharge Outfall Monitoring Report of 2015. We have exceedances for Copper in Outfalls 1, 2 and 3, and exceedances for Zinc at Outfalls 1 through 4. We were granted relief from monthly monitoring for our Copper and Zinc exceedances in January of 2015. Our improvement to the area surrounding the storm drains which lead to Outfall 3 has decreased the amount of Suspended Solids at the outfall. We were below benchmark for this test. We continue to maintain a Corrective Action for our exceedances of Copper and Zinc for all outfalls. We also continue to conduct frequent checks of areas where materials are stored. If you have questions or concerns please feel free to contact me. Respectfully Submitted, Aubrey Mea ows EHS Coordinator Cc: Jan Comer, VP of Human Resources (i) ENGINEERED SINTERED COMPONENTS November 24, 2014 RE: COC- NCG030503 ETC ATSU M I TECH, LLC CERTIFIED MAIURETURN RECEIPT N.C. Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Sir or Madam: 250 Old Murdock Road Troutman, NC 28166 (704) 528-7500 www.engsin.com RECEIVED DEC 0 5 2014 CENTRAL FILES DWR SECTION Enclosed are the results of our November 2014 Storm Water Discharge Outfall Monitoring Report. We have exceedances for Copper in Outfalls 1 through 3, and exceedances for Zinc at Outfalls 2 through 4 with Outfall 4 registering just .003 above benchmark. We continue to maintain a Corrective Action for our exceedances of Copper and Zinc for all outfalls. We have requested that we be given permission to return to biannual sampling and are currently gathering information, as requested by Mr. James Moore of NCDENR, on the matter. If you have questions or concerns please feel free to contact me. Respectfully Submitted, it, 1 Aubrey Meadows EHS Coordinator Cc: Jan Comer, VP of Human Resources Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted CERTIFICATE OF COVERAGE NO. NCG03 U S O 3 FACILITY NAME Enc ,AuXJ 5;,A J COUNTY JO PERSON COLLECTING SAMPLES rt dc�rs LABORATORY kc A (vim r�ri Lab Cert. # _ 1 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR '2"q SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or [z'Monthly' ev1w t,, month DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA [Other i"'1�x G PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -4 F� No discharge this period ?2 outfall No. Date Sample s Collected (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids p rd Standard units Copper Lead Zinc Non-Polar O&G/ Total Petroleum Hydrocarbons Total c OrgannicIcs5 Benchmarks 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 me,/L SbU — li I'1 p toiS,� � . q rv. S. t; 0.cl act �5/1 No D,03q /V C) 6 . GF ND 5, i osagM L NZ) 4. q15 , AID L i t 11 14 9- t :� I , 4 s. 9 U .005'i r,, (, C) 7 ,•,Ap 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date; 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 IV Page 1 of 3 : r, Note: If you report a sample value in excess of the benchmark, you must implement Tier .1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE: SAME PARAMETER ATTHE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES []NO[] REGIONAL OFFICE CONTACT NAME: Mail an original and one coov of this DMR,including all 'No Discharge"reports, within 30 days of recelpt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS C RTIFICATION FOR ANY INFORMATIQN REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of A ®Z y / (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 ENGINEERED SINTERED COMPONENTS November 20, 2014 RE: COC- NCG030503 ESC ATSUMI TECH, LLC CERTIFIED MAIVRETURN RECEIPT N.C. Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Sir or Madam: 250 old Murdock Road Troutman, NC 28166 (704) 528-7500 www.engsin.com RECEIVED DEC 05 2014 CENTRAL F1 DWR SEC7.10N Enclosed are the results of our October 2014 Storm Water Discharge Outfall Monitoring Report. We have exceedances for Copper and Zinc in all outfalls except for SDO-1 where we were only exceeding for Cu. We continue to maintain a Corrective Action for our exceedances of Copper and Zinc for all outfalls. We have requested that we be given permission to return to biannual sampling and are currently gathering information, as requested by Mr. James Moore of NCDENR, on the matter. If you have questions or concerns please feel free to contact me. Respectfully Submitted, Aubrey Meadows EHS Coordinator Cc: Jan Comer, VP of Human Resources Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted CERTIFICATE OF COVERAGE NO. NCG03 U 5 0 'a FACILITYNAME COUNTY I re.cic�k PERSON COLLECTING SAMPLES ^Vore_ c�oi0V15 LABORATORY�� 66 Cert. # ) Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR �u(4 SAMPLE PERIOD ❑ Jan -June �July-Dec or [�lonthlyicoo loe,- (month_ ) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout EJPNA []Zero -flow []WaterSupply []SA Other C I PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -i No discharge this period?" Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rafnfal! amount, Inches- Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics$ Benchmarks 100 mg/L or 50 mg/L 6.0 - 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L (W (). I :,3 �. �c,l, 0.U,7 NO O.0fGw, j IVD Sb<% tJ �9 (`1 0 , 1 ,� N� 0. t<� �. L N U • lror/�ir�fi NC7 - o % I`� l ;} 3 • i �r L o.C99� A ND 0-3fq^,/K Nfl 11Z/,�, LK�9 ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. ' Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (far metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Bate: 11/1/2012-10/31/2017 A t s1 N� � � 5WU-245, last revised 10/25/2012 Jv LJ Page 1 of .3 91 r Note: if you report a sample value in excess of the benchmark, you must implement,Tie'r 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART It SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL7 YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES NO REGIONAL OFFICE CONTACT NAME: Mail an original and one -copy of this DMR including all "No Discharge" reports within 30 do s 9f recei t of he Urejults for at end of monitoring eriod in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN TH15 CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is,'to the best of my knowledge and belief, true, accurate, and complete. I am aware that there significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Perm Permit Date:11/1/2012-10/31/2017 Avg-gllq (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 250 Old Murdock Road ENGINEERED ESC Troutman, NC 28166 SINTERED ATSUMI (704) 528-7500 COMPONENTS TECH, LLC www.engsin.com September 29, 2015 RE: COC- NCG030503 CERTIFIED MAIURETURN RECEIPT NCDENR Division of Land Quality Attn: Mr. James Moore 610 East Center Ave. Suite 301 Mooresville, NC 28115 Dear Sir: RECEIVED C " 1 5 2015 ~]l, NF-DEMLR Land Quality Section ;,Aooresaille Regional Office Enclosed are the results of our Second Semi -Annual Storm Water Discharge Outfall Monitoring Report of 2015. We have exceedances for Copper in Outfalls 1, 2 and 3, and exceedances for Zinc at Outfalls 1 through 4. We were granted relief from monthly monitoring for our Copper and Zinc exceedances in January of 2015. Our improvement to the area surrounding the storm drains which lead to Outfall 3 has decreased the amount of Suspended Solids at the outfall. We were below benchmark for this test. We continue to maintain a Corrective Action for our exceedances of Copper and Zinc for all outfalls. We also continue to conduct frequent checks of areas where materials are stored. If you have questions or concerns please feel free to contact me. Respectfully Submitted, Aubrey Meadows EHS Coordinator Cc: Jan Comer, VP of Human Resources Semi-annual Stormwater Dibl..narge Monitoring Report for North Carolina Division of Water ality General Permit No. NCG030000 Date submitted { g d9 I CERTIFICATE OF COVERAGE No. NCG03_0 5 0 5 FACILITYNAME COUNTY _LCL. Q<< PERSON COLLECTING SAMPLES_-brL.i /"�tc�•�aw5 LABORATORY_?AA ,Q,wl. kcal „ Lab Cert. # (a Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results RECENT_ OCT -1; 2015 SAMPLE COLLECTION YEAR Zt5 SAMPLE PERIOD ❑ Jan -June July -Dee h�"`•` nr.Rl R or ❑ Monthly' T (month). DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trdbt1L•❑PNA- ❑Zero-flow ❑Water Supply ❑SA []tither Q_-% C, PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 No discharge this period?z t< .: ,<•. .. , .: ,... .::: at Sam lex P ..;)::; , ... :: .24-hour rainfall ..,�. r H N F °. Outfall,No f „,:. . :Total Sus ended;5olids> ..:,' Co er pp Lead •: Zinc Total Petroleum 'A .Totak;Tciitic ; s Collected a mount, .; Standard units in ,orgy 3 Wydrocarhons k N •,.: a i :a ;., . . ... .v�.:::^"' •.i 10D:mg/L or 50.:mg/L : 76 .'} t 6 0 9.0 0 007 mg/I Jk `r.-:1:..::, O Q33 mg/I U. 0 067 mg/L .:$ 4'-: ^:v).' iS mg/L 1 mg%L .. `00 r5 Q I7" NJA 11.0�-JL N /A (J•V�G�(+��.:;� N/h 5'DO - q (o rs "t " n1 A 0 0. 134 4 t_ N/,k a5 &5A NIX 1U A SDo- 3 1 l6([ 5 0. q �z AL_ (P a '-) I- N A L N A AFA 00 - L( i to t-5 I N �. 6 N A NIA 0 zq 115 k 91A A 1VIU11LI Ily Dallly11116 k1H,"LC4U V1 ZM1111-a1111Ud ) 1HUZIL LOC6111 Mi. 1 1. 11=1CL.Uj1U 1.V113C4UL1VC VC111.1111101 A CA1-CCU0111-C 1V1 LI1C J0111C JJ0I42111CLC1 aL LI 1C ]a1[1C UU0011. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433,11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Note: if yoc. ,6port a sample value In excess of the benchmark, you must imple,._.nt Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART li SECTION • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an oriainal and one cony of this DMR, includina all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitorina period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of 'Permit Date: 11/1/2012-10/31/2017 � 29 l6' (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 .. ENGINEERED SINTERED COMPONENTS September 22, 2014 RE: COC- NCG030503 ETC ATSU M I TECH, LLC CERTIFIED MAIVRETURN RECEIPT N.C. Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Sir or Madam: 250 Old Murdock Road Troutman, NC 28166 (704) 528-7500 www.engsin.com RECEIVED SEP 26 20u CENTRAL FILES DWR SECTION Enclosed are the results of our September 2014 Storm Water Discharge Outfall Monitoring Report. We have exceedances for Copper and Zinc in all outfalls. We also sampled virgin rainwater which was above benchmark in several instances for Copper and Zinc prior to being affected by ESC. We continue to maintain a Corrective Action for our exceedances of Copper and Zinc for all outfalls. We would like to request that we be given permission to return to biannual sampling. Our testing of virgin rain water has consistently shown that the rainwater we are receiving is above benchmarks for Copper and Zinc prior to being effected by ESC property. In some instances, we are essentially filtering the rainwater as it was testing lower at the Outfalls than it was as virgin rainfall. If you have questions or concerns please feel free to contact me. Respe tfully Submitted, Aubrey Meadows Environmental Coordinator Cc` Jan Comer, VP of Human Resources 0r Semi-annual Stormwater Discharize Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted a t� CERTIFICATE OF COVERAGE N0. NCG03-0 5 P 3 FACILITY NAME _E n2 t,, ^ e.r'eJ 5 i ^4 cre_ a!-" COUNTY a (-140 ' PERSON COLLECTING SAMPLES &Jo/Af_&J0w5 LABORATORY i7o.Gt, Lab Cert- # f 2- Comments on sample collection or analysis: 14aW\j AG\,1,+Dcor ;n 1 5 fin; n.xl•cS p \��' be.c�� rv.: n� a� C�o.� s. � A►� � Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR aofY SAMPLE PERIOD ❑Jan -June ❑ July -Dec or QMonthly' _Sez;f[A•�e-r- (montf71 DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA 06ther ass _ C PLEASE REMEMBER TO SIGN ON PACES 2 AND/OR 3 4 ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo%dd/yr} 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Nan -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organlcss Benchmarks 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L q .(I 14 0 57"A /3.5 AD L 7. 0705m-V71 175 0.090F, 5Dd 9 (t1q 6 . S, s� �a� M�. L. 5, a D, rsa L 0.vc�s 10, 166 Ml .Soo— 3 9.1, C..S 33 6 rD /L 6 � Ir 6. $09� 1- D , (3�5 C Q. 8S2 IsD0 - L4 9 ( p. s ,� rt8�. a.M. L, 5•a o0`l3 1 Nc> OAQaM /4 i Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. a For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433,11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31), Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 1 of 3 Note: If you report a sample vdlue in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES NO REGIONAL OFFICE CONTACT NAME: Mail an original and one copv of this DMR, includinga// "No Aischarre" rego,Ls`within 30 days of receipt of the lab results {or at end o f monitorir g period in the case; of "No Discharge" reports} to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing vioiations." (Signature of per ' tee) (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 91,21b �r CERTIFICATE OF COVERAGE NO. NCG03j� (� 3 FACILITY NAME E-51a-C-eJ _5;14t,— COUNTY .L retie It PERSON COLLECTING SAMPLES c,,larc ^c do�-S LABORATORY kJ_ Lab Cert. fi 4a Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR '�&lq SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or �onthlyl month] DISCHARGING TO CLASS ❑ORW HQW ❑Trout ❑PNA []Zero -flow ❑Water supply [:]SA RECEIVED Bother_- (Ja55 C - — SEP 0 8 2014 PLEASE REMEMBER TO SIGN ON PAGES 2 ANEW/OR 3 CENTRAL FILES DWR SECTION No discharge this period?z Outfall No. Date Sample Collected' [ma/dd/yr) 24-hour rainfall amount, Inch es3 Total Suspended Solids p , H Standard units Copper Lead Zinc Non-Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics$ Benchmarks 100 mg/L or 50 mg/L" 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L S DU - a 1yo FL ov) soo - 3Alo Fww - No Fi-oW ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement, ° see General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. ' Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in-40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 1 of 3 Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 115ECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER ATTHE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring geriod in the case o "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." / y {Date} Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 ENGINEERED ESC 250 Old Murdock Road SINTERED ATSUMI Troutman, 28166 (704) 52$-750500 COMPONENTS TECH. LLC www_engsin.com September 2, 2014 RE: COC- NCG030503 CERTIFIED MAIL/RETURN RECEIPT N.C. Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Sir or Madam: Enclosed are the results of our August 2014 Storm Water Discharge Outfall Monitoring Report. We had no flow during normal work hours this month. We continue to maintain a Corrective Action for our exceedances of Copper and Zinc for all outfalls. We plan to continue testing virgin rainwater prior to being effected by ESC as well. These tests will be conducted each month as we continue our efforts to reach our Environmental goals. We would appreciate any assistance you may be able to offer in meeting our goals. If you have questions or concerns please feel free to contact me. Respectfully Submitted, 4r47&�� Aubrey Meadows EHS Coordinator Cc: .tan Comer, VP of Human Resources Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Qual2golq y General Permit No. NCG030000 Date submitted � .CERTIFICATE OF COVERAGE No. NCG03� 0 5 3 SAMPLE COLLECTION YEAR dry FACILITY NAME _ E��eerea 'S,v�te�r�a tAMo�en�S SAMPLE PERIOD Jan -June ❑�,uly-Dec COUNTY ZrJe_( or ErMonthly J(A trnonthl PERSON COLLETING SAMPLES bT eAJ0ws ECEIv�RARGING TO CLASS ❑ORW HQW ❑Trout ❑PNA 'LABORATORY _Ace. AA6,IX4ical Lab Cert. # ❑Zero -flow [—]Water Supply ❑5A Comments on sample collection or analysis: AUG 11 2014 Mother_Cfs�55 [, _ ENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -4 DWQ/BOG Part A: Stormwater Benchmarks and Monitoring Results ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inche53 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics5 Benchmarks ===> _ - 100 mg/L or 50 mg/L 6.0— 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 550- .55n 1. `7.44 0.1y3 , t 6_Q A, )X ND p - -115 !W 6. 11 AID 17 0,01113 end. ND D. loGr /VD SDO— 3 I.-11151/11-ii, Is /y ;A iri rL . O.ab3,n40.610 O.a55�/L p NO O.662 l4 /W) 10. 5,y Ic. 5.3 U.Q7Y3 ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433,11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 1 of 3 Semi-annual Stormwater Discharee Monitorine Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted I{5 ao iN CERTIFICATE OF COVERAGE NO. NCG03-Q -- 0 FACILITY NAME EA!J ,,ecred 51^4crcc4 :COUNTY ciel1 PI:R50N COLLETING SAMPLES tadows .LABORATORY 1-AA( +?cal _ Lab Cert. g t2 _Comments on sample collection or analysis: Part A: 5tormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR SAMPLE PERICID ❑ Jan -June July -Dec or [✓(Monthly;JL4/1, mont l DISCHARGING TO CLASS []ORW : , HQW ❑Trout ❑PNA []Zero -flow Water Supply OSA ®0ther_t,1ASS C _ PLEASE REMEMBER TO SIGN ON PAGES 2 AND/(]It 3 -� No discharge this period Outfall No. Date Sample Collected 1 (mo/dd/yr) 24-hour rainfall amount, inches Total Suspended Solids pH, Standard units Copper Lead zinc. Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic organics s Benchmarks ===> - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L I s IU 0.11 �� 0. /42- A ND 0. toy, Roo foal 1i'15 (N t[ ;�• ; /03 IL . MVP L9./7I M 15 (N 0.11 A ,Z33 ND C7.lIv FUA � e A _1i.S4 Q . t( ;.. ,6993 KZ U 00 3 ph 0 .16A L- ' Mnothiv Kamniine (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The. total precipitation must be' recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver'of the rain gauge requirement. See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics Is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to.sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 1 of 3 Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART ll SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER ATTHE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR includin_a all "No Dlschc rae" reports, within 30 days of receipt of the lap results for at end of mon_itorinq period in the case o "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPgRTED_ "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, Including the possibility of fines and imprisonment for knowing violations." (Signature of P&iittee) 1 Permit Date: 11/1/2012-10/31/2017 a0 (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 Copper (mg/L) Zinc (mg/L) SDO-1 0.143 0.152 Pool-1 0.162 0.108 ESC input -0.019 0.044 5DO-2 0.0173 0.106 Pool-2 0.103 0.171 ESC input 0.0857 ' -0.065 SDO-3 ' 0.203 0.255 Pool-3 0.233 0.11 ESC input -0.03 0.145 SDO-4 0.0093 0.502 Pool-4 0.0993 0.162 ESC input -0.09 0.44 oservations: 1. In all outfalls, ESC is essentially filtering Copper as the concentration of Cu in all instances is lower when it exits our property than when it arrived. 2. Zinc continues to be an issue however, in all cases Zn already exceeds our benchmark prior to be effected by ESC. . ENGINEERED ESC 250 Old Murdock Road ' SINTERED ATSUMI Troutman, 28166 (704) 528-75050Q COMPONENTS TECH, LLC www.engsin.com August 7, 2014 RE: COC- NCG030503 CERTIFIED MAIVRETURN RECEIPT N.C. Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Sir or Madam: Enclosed are the results of our July 2014 Storm Water Discharge Outfall Monitoring Report. All outfalls have exceeded for both Copper and Zinc. It still remains in our Environmental Management System as an Environmental Corrective Action Response. However, we continue to capture virgin rainwater in small plastic pools in the areas relating to each storm water discharge to.test the concentrations of metals in the rainwater coming to us from the sky prior to touching our property. Again, we found in all instances the virgin rainwater we captured were already exceeding our benchmarks for Copper and Zinc. Attached you will also find a short comparison analysis on Copper and Zinc concentrations of each Storm Drain Outfall with its corresponding pool. These tests will be conducted each month as we continue our efforts to reach our Environmental goals. We would appreciate any assistance you may be able to offer in meeting our goals. If you have questions or concerns please feel free to contact me. Respectfully Submitted, aoYZ4-e4G,... Aubrey Meadows EHS Coordinator Cc: .tan Comer, VP of Human Resources Semi-annual Stormwater Discharge Monito'ringReport for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 1,/a / P014 CERTIFICATE OF COVERAGE No. NCG03 0 5 3 FACILITY NAME PaneAf S COUNTY r_lt PERSON COLLECTING SAMPLES o n Gavr LABORATORY Pact no.fu�� I _ Lab Cert. # oZ Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 90 f q SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or [ Nonthly' ,,+Le_ (month ING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA i ECEMED ❑Zero -flow [_]WaterSupply ❑5A JUL 0 7 ZOi4 ®other,CLA%S C CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES z AND/OR 3 4 DWQlBOG ❑ No discharge this perrod?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper' Lead Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organicss Benchmarks =__> - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L s DO -7. 9 t g IL, -7- 0 0, 4709 /y,D O.0 L AID Do ' as/aai�+ o.a� +� (5. ,oga3 ao /V� Do -3 32YM c G.a a.Gq NO y S a o lcf d. U i- . I -A . 7 G, 5. 0 1 Al i:� , - Nr�> O: 060q=41 NO ' Monthly sampling (Instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling Is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found In 40 CFR 469.12; for electronic crystal manufacture use the definition as found In 40 CFR 469.22 and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 0 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted CERTIFICATE OF COVERAGE No. NCG03_ _ FACILITY NAME COUNTY PERSON COLLECTING SAMPLES LABORATORY Lab Cert. # Comments on sample collection or analysis: (wry z SAMPLE COLLECTION YEAR SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ❑ Monthly' month DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA []Zero -flow ❑Water5upply ❑SA []Other EASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 r Part A: Stormwater Benchmarks and Monito g�Rtgsyi� I � �Qf� ./��} �Y ((�� I � SiLue this perio02 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic s Organics Benchmarks =__> - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L I R, 6/2 a014 D. � rr, 41 0.;Tr3 0.00 U-/67 s SD 4Z 6.Q79 t2A of No 0. OFA3 ZL I is .5w a as 1 q 0. 4 . she)3 0. OY L Nl> U. a a u u fa 2 ,S a614 0.1e, 051 ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. ' Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433,11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 —t 7 p'3 Facilities wat incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO moni,oring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or Stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Narrte� t na ei q(inttl(Date) Note: Results must be reported in numerical format. Do not reporl Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported In the format. "<XX me/L where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note, If you report a sample value in excess of the benchmark, you must implement Tier I, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period ?2 Outfal! No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar 0&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: il/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 ENGINEERED ESC 250 Old Murdock Road SINTERED = ATSUMI Troutman, 28 i6fi (704) 528-750500 COMPONENTS TECH, LLC www.engsin.com July 2, 2014 RE: COC- NCG030503 CERTIFIED MAIURETURN RECEIPT N.C. Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Sir or Madam: Enclosed are the results of our June 2014 Storm Water Discharge Outfall Monitoring Report. Outfalls 1, 2 & 3 have exceeded for both Copper and Zinc. It still remains in our Environmental Management System as an Environmental Corrective Action Response. However, we captured virgin rainwater in small plastic pools in the areas relating to each storm water discharge to test the concentrations of metals in the rainwater coming to us from the sky prior to touching our property. We found in all instances the virgin rainwater we captured were already exceeding our benchmarks for Copper. Pools number 1 & 2 were exceeding the benchmark for Zinc as well. These tests will be conducted each month as we continue our efforts to reach our Environmental goals. We would appreciate any assistance you may be able to offer in meeting our goals. If you have questions or concerns please feel free to contact me. Respectfully ubmitted, Jan S. Comer VP of Human Resources Cc: Marty Todd, VP of Operations ENGINEERED ESC 250 Old Murdock Road Troutman, NC 28166 SINTERED ATSUMI (704) 528-7500 COMPONENTS TECH. LLC www.engsin.com June 5, 2014 RE: COC- NCG030503 CERTIFIED MAIL/RETURN RECEIPT N.C. Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Sir or Madam: RECEIVE® JUN 11 2014 CENTRAL FILES DWQIBOG Enclosed are the results of an additional test for May 2014, Storm Water Discharge Outfall Monitoring Report. All outfalls (1,2,3 & 4) have exceeded levels for Copper and Outfalls 3 & 4 have exceeded levels for Zinc. We captured rainwater runoff as it entered the storm drain grate at our shipping dock which corresponds with SDO 3. We found that Copper and Zinc concentrations were higher at the drain than it was at the outfall. We also tested rainwater runoff in our Wet Weather Stream which runs onto the property from Old Murdock Rd was already exceeding the benchmark for Copper and was threatening the benchmark for Zinc. We will continue to add additional rainwater testing as we continue our efforts to reach our Environmental goals. If you have questions or concerns please feel free to contact me. Respectfully Submitted, n S. Comer VP of Human Resources Cc: Marty Todd, VP of Operations Semi-annual Stormwater Discharge Monitoring ReRo_rt for North Carolina Division of Water Qua 'ty eneral Permit No. NCG030000 Date submitted / CERTIFICATE OF COVERAGE NO. NCG03�} Q 3 FACILITY NAME Erw.i�et�cGd Sin_ �.r�n+ytn�S- -- COUNTY Jc-_t_�_ _ PERSON COLLECTING SAMPLES? .. Cn�r LABORATORY t, o l Lab Cert. t# Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2,0(q SAMPLE PERIOD ❑ Jan -June July -Dec or 6WUonthlyI month DISCHARGING TO CLASS ❑ORW OHQW []Trout ❑PNA Zero -flow []Watersupply []SA Other_ Class C PLEASE REMEMBER TO SIGN ON PAGES 2 APJI)/OR 3 4 No discharge this period?" Outfall No. Date Sample , Collected (mo/dd/yr) 24-hour rainfall amount, Inches Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic s Organics Benchmarks 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 5no - k 5 I st I-( r aoam JL AID 0.035 Sou — -DL 51111 Lq [ 0.004 .0355 fo 5 Is f(A 0.053(# (g 14, D 0. 105 1 Monthly sampling (instead of semi-anrival) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. " See General Permit, Table 3 identify}ng the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor` manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date, 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Semi-annual Stormwater Discharize Monitorinq Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 4 % aL01Lt CERTIFICATE OF COVERAGE NO. NCG0312 _�j Q.1 FACILITY NAME itQ� Lick S i H COUNTY Taje k _ PERSON COLL TING SAMPLES LABORATORY ' e [ Lab Cert. # �2 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR ac)f_q SAMPLE PERIOD ❑ Jan -June [] July -Dec or Monthly' month DISCHARGING TO CLASS ❑ORW DHQW ❑Trout ❑PNA []Zero -flow Water Supply [SA 140therf //ass G _ PLEASE REMEMBER TO SIGN ON PAGES 1 ANIy/Qi{ 3 � Part A: S ormwater Benchmarks and Monitoring Results �UL � � i� fj a t g � �5 No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics' Benchmarks ===> - - 100 mg/L or 50 mg/L4 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 5 l 4 1. a1 ",'. Q, r q t D 1047 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall, Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date, 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 1 of 3 Note: If yot, . eport a sample value In excess of the benchmark, you must imple&.... nt Tier 1, Tier 2, or Tier 3 responses, See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEE DANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO;�< IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mall an on irinnal and one copv of this DMR. includina all "No Discharae" reports, within 30 da s o recef t of the lob results or at end of monitorina yeriad in the case o "No Dischar e" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those perso directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am our that t ere are signni ant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." �4i / (Date) Permit Date: 114/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Copper (mg/L) Zinc (mg/L) SDO-1 0.0709 0.0837 Pool-1 0.283 0.167 :qcjilp SDO-2 0.0923 0.4 Pool-2 0.279 0.0823 ESC­ inert 7 -0.186 ---- V.3177 SDO-3 0.634 0.549 Pool-3 0.0484 0.0286 tk inpUi 0`5856;:"'�'- 0526444 SDO-4 ND 0.0624 Pool-4 0.0145 0.0511 HC ENGINEERED ESC 250 Old Murdock Road Troutman, NC 28166 SINTERED ATSUMI (704) 528-7500 COMPONENTS TECH. LLC www.engsin.com June 5, 2014 RE: COC- NCG030503 CERTIFIED MAIL/RETURN RECEIPT N.C. Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Sir or Madam: VEI V D JUN 1 1 2014 CENTRAL FILES DWQIBOG Enclosed are the results of our May 2014 Test #1 Storm Water Discharge Outfall Monitoring Report. Outfalls 2, 3 & 4 have exceeded for both Copper and Zinc. We have also entered it into our Environmental Management System as an Environmental Corrective Action Response. However, we captured virgin rainwater in small plastic pools to test the concentrations of metals in the rainwater coming to us from the sky prior to touching our property. We found in all instances the virgin rainwater we captured were already exceeding our benchmarks for Copper and Zinc. These tests will be conducted each month as we continue our efforts to reach our Environmental goals. We would appreciate any assistance you may be able to offer in meeting our goals. If you have questions or concerns please feel free to contact me. Respectfully Submitted, n S. Comer VP of Human Resources Cc: Marty Todd, VP of Operations Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Qu li y General Permit No. NCG030000 Date submitted 1oI r CERTIFICATE OF COVERAGE NO. NCG03 6 5 u 3 FACILITY NAME �tr<e (-CJ S;r,+¢reel Ga,�•.00r.� s COUNTY t-t� PERSON COLLECTING SAMPLES Son -` Meg LA130RATORY l�occ A^o-i3,�tcal Lab Cert. # 12- , Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR., ;ZUlq _ SAMPLE PERIOD ❑ Jan -June July -Dec or tiVlonthlyi month DISCHARGING TO CLASS ❑ORW MHQW [:]Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA Other C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -) ❑ No discharge this period?'? Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar 0&GJTotal Total Petroleum Hydrocarbons Toxic Organics' Benchmarks ===> i - - 100 mg/L or 50 mg/L4 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 5c)0 - I 14 No row - 5 0.10 "., . N p , o �) o-; 3M Nib p - 3 9 � � (U «'. � I $. 5 � L /�l f • !o . q (9 C 0. 0-j" 1. % 4- l� o- 41 NC> 1 .01n, O �. Azlt NO ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall, 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ' See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 1 of 3 Semi-annual Stormwater Discharge Monitorina Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted tra�3��dic{ CERTIFICATE OF COVERAGE NO. NCG03_0 0 9 FACILITYNAME Enl) n,AWLJ S>IeA -Go CnMoo,en4:, COUNTY S(Loi¢Ll PERSON COLLECTING SAMPLES LABORATORY 2oaca- AA*,1u� c. c.l Lab Cert. # la Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results �4k& SAMPLE COLLECTION YEAR Z.0 I ' SAMPLE PERIOD ❑ Jan -June ❑ Jul -Dec or ERMonthlyl monti� DISCHARGING TO CLASS RORW�MHQW ❑Trout ❑PNA Zero -flow ❑Water Supply ❑SA Other C I 6 PLEASE REMEMBER 10 SIGN ON PAGES 2 AND/OR 3 4 S - Poo f ❑ No discharge this period?Z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar 0&G/Total Total Petroleum Hydrocarbons Toxic organicss Benchmarks ===> - - 10D mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L Rooq 5 IU [ q 0.17-7 0.00G5 0.195 .01-19 .515-q L R _Ott v %v� (0 0. I3X L D 0. l I L 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/l/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 1 of 3 Note: If you . eport a sample value in excess of the benchmark, you must imple....mt Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mall an origin. al and one copy of this DMR, including all "No Discharge" reports, within 30 days of recel t of the lab results or at end of monitoring eriod in the case of "No Discharge" rMrtsl to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am awar hat there are sig i icant penalties for submitting false information, including the possibility/of fines and imprisonment for knowing violations." n(O (Signature)v Permittee} (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 0 In O tz) of r w z wwz 3 zwa u�F WzUIU r -- 1 Y3 4 4 LL �l L� LL IL R it to V ci M � ; Ll� Cx � M Q' r s V �1 V U U U rn � v� c °_ 3 Q O Q j3, t \0 S • a � J a 3 o � c ' C � a v J o 0 W c a < ' G 6 ¢L { � 5 u z s L! '3 7 ll dw►�� NCDENR North Carolina Department of Environment and'Natural Resources Pat McCrory John E. Skvarla, III Govemor Secretary May 13, 2014 Ms. Jan Comer, Vice President -Human Resource Engineered Sintered Components 250 Old Murdock Road Troutman, NC 28166 Subject: Compliance Evaluation Inspection General Stormwater Permits NCG030503 Engineered Sintered Components Iredell County Dear Ms. Comer: Enclosed is a copy of the Compliance Evaluation Inspection (CEI) report for the inspection conducted on May 12, 2014 by Mr. Samar Bou-Ghazale of this Office. The report should be self-explanatory; however, should you have any questions concerning the report, please do not hesitate to contact Mr. Bou-Ghazale at (704) 663- 1699 Ext.2199. Sincerely, Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer -Land Quality -Section ------- Attachment Division of Energy, Mineral, and Land Resources Land Quality Section - Mooresville Regional Office 610 East Center Avenue, Suite 301, Mooresville, North Carolina 28115 Telephone: 704-663-1699 / FAX: 704-663-6040 • Internet http:/Iportal.nodenr.org/webArAand-quality An Equal opportunity J Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper t Compliance Inspection Report Permit..44CG030503. -- -Effective: 11101112• Expiration:' 10/31/1T "Owner: Engineered Sintered Components Company SOC: Effective: - Expiration: Facility: Engineered Sintered Components Company County: Iredell 250 Old Murdock Rd Region: Mooresville Contact Person: Stephen Jenkins Directions to Facility: System Class itacations: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Title: Inspection Date: 05/12/2014 Entry Time: 11:00 AM Primary Inspector: Samar E Bou Ghazale Secondary Inspector(s): Troutman NC 28166 Phone: 704-528-7500 Certification: Exit Time: 12:40 PM Phone: Phone: 704-663-1699 Ext.2199 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Q Compliant E Not Compliant Question Areas: E Storm Water (See attachment summary) Page: 1 Permit: NGG030503 Owner - Facility: Engineered Sintered Components Company Inspection Date: 05/12/2014 inspection Type:, Compliance Evaluation ; Reason for Visit:...Roufne.,,_ ,. . Inspection Summary: There are 4 stormwater discharge outfalls at this facility. Zinc and copper were all above the bench mark values in 2013 except for copper at SDO-4. The facility did not start the monthly monitoring for the stormweater discharge in compliance with the permit requirements because of personel turn over at the facility. According to Jan Comer, Vice President -Human Resource, they will start the monthly requirement starting this month. During the site investigation it was noted that there was not a secondary containment for the (heat treat oil coolers). Also, It was suggested to sweep clean the parking lots prior to the sampling events. Page: 2 t Permit: NGG030503 Owner - Facility: Engineered Sinlered Components Company laspection Dater. 051.1212Q.14 ..... Inspection Type._P.pmp!iance Eyaluatiop_-_-, -_ __- .... _Reason for Yisit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? moo n # Does the Plan include a General Location (USGS) map? ■ ❑ n n # Does the Plan include a "Narrative Description of Practices"? ■ n n n # Does the Plan include a detailed site map including outfall locations and drainage areas? ® 0 0 0 # Does the Plan include a list of significant spills occurring during the past 3 years? ■ ❑ Q D # Has the facility evaluated feasible altematives to current practices? ■ n n n # Does the facility provide all necessary secondary containment? fl ■ n n # Does the Plan include a BMP summary? ■ 0 Fl ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ D 0 0 # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ 0 Q Q # Does the facility provide and document Employee Training? ■ n n in # Does the Plan include a list of Responsible Party(s)? ■ n n n # Is the Plan reviewed and updated annually? ■ n n Cl # Does the Plan include a Stormwater Facility Inspection Program? ■ n in n Has the Stormwater Pollution Prevention Plan been implemented? ■ 0 ❑ 0 Comment: Please provide a secomdary containment for heat treat oil coolers. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ ❑ D 0 Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ■ ❑ Q # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Q ❑ ■ 0 Comment: The facility did not start the tiers response after copper and zinc level were noted above the permit bench mark. According to Jan Comer, Vice president -Human Resourse, monitoring for copper and zinc were dropped when the previous employee that is responsible for the permit requirement left the company at the end of 2013, Penmit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ D 0 Q # Were all outfalls observed during the inspection? ■ D 00 # If the facility has representative outfall status, is it properly documented by the Division? ❑ 0 ■ 0 Page: 3 Permit: NCG030503 'Owner - Facility: Engineered Sintered Components Company Inspection- Date: 05112)2014: -,Inspection Type: Compliance Evaluation , Reason for Visit.: Routine # Has the facility evaluated all illicit (non stormwater) discharges? Comment: lit ❑n0 Page: 4 � V*A NCDENR North Carolina Department of Environment- and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretap! March 26, 2009 Mr. Stephen Jenkins, CSP, REM Engineered Sintered Components 250 Old Murdock Road Troutman, North Carolina 28166 Subject: Compliance Evaluation Inspection Engineered Sintered Components Permit No. NCG030503 Iredell County, NC Dear Mr. Jenkins: Enclosed is a copy of the Compliance Evaluation Inspection (CEI) report for the inspection conducted at the subject facility on March 25, 2009, by Mr. Michael L. Parker with this Office. Thank you for your assistance and cooperation during the -inspection. The enclosed report should be self-explanatory. Overall; your facility's Stormwater Pollution Prevention Plan (SPPP) was well developed and implemented, however, there were certain sections of your SPPP that need to be addressed and/or updated. These areas were discussed during the inspection and are also noted on the attached inspection report. As a reminder, please notes that your SPPP should be updated on an annual basis as required by Part II, Section A, No. 7 of your permit. If you have any questions, comments, or need assistance with understanding any aspect of your permit, please do not hesitate to contact Mr. Parker at (704) 663-1699. Sincerely, for Robert B. Krebs Regional Supervisor Surface Water Protection Section Enclosure cc: Shelton Sullivan — NPS/ACO Unit Mooresville Regional Office Location: 610 Fast Center Ave., Suite 301 Mooresville, NC 28115 One Phone: (704) 663-1699 1 Fax: (704) 663-60401 Customer Service: 1-877-623-6748 NorthCarolina Internet: www.ncwaterquality.org �lrtltrrrlll� An Equal Opportunity 1 Affirmative Action Employer — 50% Recycledll0% Post Consumer paper IV Compliance Inspection Report Permit: NCG030503 Effective: 11/01/07 Expiration: 10/31/12 Owner: Engineered Sintered Components Company SOC: Effective: Expiration: Facility: Engineered Sintered Components Company County: [redell 250 Old Murdock Rd Region: Mooresville NC 22IE5 Contact Person: Gregory Lathrop Title: Phone: 704-528-7500 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): 24 hour contact name Stephen Jenkins Phone: 704-508-7567 On -site representative Stephen Jenkins Phone: 704-508-7567 Related Permits: Inspection Date: 03/25/2009 Entry Time: W30 AM Exit Time: 11:20 AM Primary Inspector: Michael L Parke rw Phone..704-663-1699 Ext.2194 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Meta[ Fabrication Stormwater Discharge COC Facility Status: ■ Compliant Q Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: NCG330503 owner - Facility: Engineered Sintered Components Company Inspection Date: U2512009 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ®n n n # Does the Plan include a General Location (USGSI mao? ■ n n n # Does the Plan include a "Narrative Description of Practices"? ■ n n n # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ n n n # Does the Plan include a list of significant spills occurring during the past 3 years? ■ n n n # Has the facility evaluated feasible alternatives to current practices? 1=l ■ n n # Does the facility provide all necessary secondary containment? ■ n n n # Does the Plan include a BMP summary? n ■ n n # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ n n Cl # Does the facility provide and document Employee Training? ■ n n n # Does the Plan include a list of Responsible Party(s)? ■ Q n n # Is the Plan reviewed and updated annually? ■ n n n # Does the Plan include a Stormwater Facility Inspection Program?. n ■ n n Has the Stormwater Pollution Prevention Plan been implemented? ■ n n n Comment: Based on information obtained during the site visit, Outfalls 002 and 004 do not receive drainage from industrial process areas and should be removed from this facility's SW sampling program. Visual documentation of the releases from all secondary containment structures should be collected and maintained in the SPPP as required by Part II, Section A, No. 2(b) of the General Permit. SPPP should include a detailed BMP summary. The SPRP should be site SW specific and a list the responsible team members should be contained in the SPRP. Qualitative Monitoring res No NA NG Has the facility conducted its Qualitative Monitoring semi-annually? ■ n n 0 Comment: Analytical Monitorin Yes No NA NE Has the facility conducted its Analytical monitoring? ■ n n n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? n ❑ ■ Comment: Page: 3 a 1 Permit: NCG030603 Owner - Facility: Engineered 5intered Components Company Inspection Date: 03/25/2009 Inspection Type: Compliance Evaluation Reason for Visit: Routine Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ON ., .,... ... ,.�; .....ter$„ ... # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: All illicit (non stormwater) discharges should be listed in the SPPP. Page: 4