Loading...
HomeMy WebLinkAboutNCG030401_MONITORING INFO_20190118STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. N CG Q 3 0 416 DOC TYPE ❑HISTORICAL FILE MONITORING REPORTS DOC DATE ❑ „%/ �I � C ! YYYYMMDD .. ...... i- STORMWATER jInUary 18.3:2019' Mr.'Lyhh,J6Urdba Vid&'Prb-'s5iidiht of 00eiatio6§ HdFd6leirs Steel — ­C 4Ary50,6b- l6bUive- Fayetteville N283111 'bdarIW,,j6'(iedefi- b.—17, 2019, 6 site '%Jfi`s­p'ecfi -o,n,."w--ai�c�6hdUbt6d,.fdf.".66�fioliance,withyour facility.19r h,,jaho&,y ;Country. Club NPDESSt6FmW6t& Discharge erHt,'NCG03000O.-,Tft ;1 —*10 'Dfiv6 in,FaYett&lll e'NC'; drains. i hto'L'Cr'oss',C reek; a direcf(n arytc! qmp 1=ear River. A copy, .O!V*Conipliance: nspp�c,�i9n'.�,,ep!prt,,is'aftac6",e,alfI ,,or,ypyr review aqd-re,pp-rd.s.. " jt..:,U.p ate:generaQpermIts • 6111d6l"list of Sid nifId*6ht,Sj5iIli-, occurring duWrihb tlie-"past S years J At the tune of;'i 660-6-666 nl";,,.f6e � 61663V 'e' Were t K& 6 6 1 y d i sb repa n 6 ie s. noted: I wo u I d'I i k e to thank you an' Urstaff f6f the time andassistance1h ,, conducti,ng !I'iis j-ig�edo"' lfieie.are any` qyqstions,re ardingAsfepoplease ( ,_),433-1773. nrk StdrrriW6t6rlh9O&tor City of!<ayettevilEe Attachment .,Copy of. ;C _pmpliance'Anspection,R A.PpO& M. Mike;'LavvVer, NQ'­DivisI6n"6f En-er:g-y,,!Min6rW and t-dridiR6sbOndbs (e-mail) ifx ,B3 Hay;Street Fayett6vffle, N028301,5537 -j6V W -Oxon� (910) 433'-1773:1 W%4Wfa etteVi]166:. I *,w. ffyt The city of FaycttLwki, North ciraiiiii'd66riot dii& L- bri'tfie basis ri6,t rams, sz�ylces,', aeb ro�I!gtt�p; or disAfiiv in 4q,.emiy Ao igr� pportunI!Iqs;,P,-g .,nq Stormwater Facility Inspection Report/Checklist Facility Name: Hercules Steel Inspection Type: Compliance NCG 030000 Permit No.: NCSO Permit Effective 11-1-18 Date (if applicable): Not Applicable ❑ Permit Status Active (if not currently permitted): Inspection 1-17-19 Discharges to: UT to Cross Creek Date: Facility Personnel Inspector(s): Jesse Oxendine Assisting with Lynn Jourden Inspection 910-488-5110 (Name/Phone Number): Entry Time: 8A5 am Exit Time: 9:45 am SIC Code: 3440 Facility Hours of 8am-5pm Operation: Facility Description: Metal Fabrication File Review/History: Improve on monitoring documentation and maintain updated permit Inspection Summary: During my inspection I made observations of the facility and stormwater outfalls. The facility was clean and neat in appearance. Facility needs to update general permit and create a log for spills. This form is a procedural guide for Inspectors to follow when conducting facility stormwater compliance inspections. Page 1 of 5 Rev. 0 Stormwater Facility Inspection Report/Checklist L Site Inspection (continued) Yes No NA Repeat Finding 16. Floor drains —illicit connections ❑ ® ❑ ❑ Comments: 17. Spill Response Equipment ❑ ® ❑ ❑ Comments: IL Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan (SPPP)? ® ❑ ❑ ❑ If the site has a SPPP then complete questions in Sections II and III. 1. Does the Plan include a General Location (USGS) map? ® ❑ ❑ ❑ Facility location in relation to roads and surface waters. Includes: name of receiving stream or name of municipal storm sewer system, and accurate lat. and long. of point of discharge. 2. Does the Plan include a "Narrative Description of Practices"? ® ❑ ❑ ❑ Should cover storage practices, loading and unloading areas, outdoor process areas, dust or particulate generating or control processes, waste disposal practices, etc. 3. Does the Plan include a detailed site map including outfall locations and ® ❑ El El areas? Should show • Location of industrial activities (storage areas, disposal areas, process areas, unloading and loading areas) • The drainage structures • Drainage areas for each outfall and activities occurring in the drainage area • Building locations • Existing BMPs and impervious surfaces and the % of each drainage area that is impervious • For each outfall, a narrative description of the potential pollutants which could be expected to be present in the Stormwater discharge. This forces permittee to analyze the site with relation to stormwater discharges. It is also a tool for the inspector to understand if the site has changed over time, i.e. if site map does not match facility they must update their plan. 4. Does the Plan include a list of significant spills occurring during the past 3 El® El Elyears? Needs to include corrective actions that were taken. The permittee needs to know what the reportable quantities are for wastewater, oil pollution, and SARA Title III. 5. Have stormwater outfalls been evaluated for the presence of non-stormwater ® ❑ El discharges? Signature required: • Corporation - signed by Responsible Corporate Officer or assigned manager • Partnership or Sole Proprietorship — General Partner or the Proprietor Municipality, State, Federal, or other public agency — either principal executive officer or ranking elected official 6. Has the facility evaluated feasible alternatives to current practices? I ® I ❑ I ❑ I ❑ • Provide a review of the technical and economic feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to stormwater. • In areas where elimination of exposure is not practical, the stormwater management plan shall document the feasibility of diverting the stormwater runoff away from areas of potential contamination. 7. Does the facility provide all necessary secondary containment? I ® 1 ❑ ❑ ❑ • Applies to liquid raw materials, manufactured products, waste materials, or by-products • Single AST capacity > 660 gallons • Multiple AS containers in close proximity to each other with a total combined capacity of > 1,320 Page 3 of 5 Rev. 0 Stormwater Facility Inspection Report/Checklist III. Qualitative and Analytical Monitoring Yes No NA Repeat Finding 1. Has the facility conducted its Qualitative Monitoring semi-annually? ® ❑ ❑ ❑ Color Odor Clarity Floating Solids Suspended solids Foam Oil Sheen Other indicators 2. Has the facility conducted its Analytical Monitoring? ® ❑ ❑ ❑ 3 Has the facility conducted its Analytical Monitoring from Vehicle Maintenance ❑ El® Elareas? Qualitative and Analytical Monitoring Comments: IV Permit and Outfalls 1. Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑ 2 Were all outfalls observed during the inspection? ® ❑ ❑ ❑ 3. If the facility has representative outfall status, has it been documented by the NC of Water Quality? ® El El El 4. If the facility has a No -Exposure Certificate, has the facility self -inspected and documented this on an annual basis? ® El ❑ ❑ Permit and Outfalls Comments: Page 5 of 5 Rev. 0 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT C7E OF GENERAL PERMIT NO. NCG030000 SAMPLES COLLECTED DURING CALENDAR YEAR: ZOI B CERTIFICATE OF COVERAGE NO. NCG03 (This monitoring report is due at the Division no later than 30 days from I the date the facility receives the samplin res Its from the laboratory.) FACILITY NAME Nere..0 ifs S7 e£j Co, �� #��E COUNTY eurnbcr PERSON COLLECTING SAMPLES Tor» Wndd 5 ^ PHONE NO. jt O S - S 11 CERTIFIED LABORATORY Lab # JUL 13 20$ Lab # PLEASE SIGN ON THE REVERSE 4 Part A: Specific Monitoring Requirements CENT; -<AL Fil_l~S Dl R SECTION) Outfall No. :.:.Date Sample Collected, mo/ddl r 00530,:' r:00400...: '01051 '_;, :, 5' f:, OOS56: { .'781r43 : !; Total Suspended Solids;: : m • pII;.; Standard units�.:':� Lead, mg/L Oil and Grease,f m Total Tozic Organics.; $enctimaik a' 100 ' ti ; �Vitlii[i ti.0` 9.0:,,: y :; 0:03X._ .: 30.: Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 1 or Tier 2 responses. See General Permit text. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements yes _no Outfall : No. :.'Date :. Sam a Collected, rno/dd/ yr': .<. ' ::':-. ,:.'0055fi- `005305 r:':00400 : Oil-and`Grease; - z; m Total Suspended Solids, ; =m lL ': p11, .Staridard,`units New Mof6r,0il Usage, .Annual `avers e. al/mo Benchmark Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pfl, you must implement Tier 1 or Tier 2 responses. See General Permit text. STORM EVENT CHARACTERISTICS: Date 6 418 (first event sampled) Total Event Precipitation (inches): Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Mail Original and one copy to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 SWU-245-102107 Pagel oF2 Semiannual Stormwater Discharge Monitoring Report for North Carolina Division of Water�uality General Permit No. NCG030000 natp vihmittPrl lulu 10, 2019 fng g-UnIE- 2D18 CERTIFICATE OF COVERAGE NO. NCC`G013 U 0 0 FACILITY NAME f TTef CU l>aS_ _ lJttB1 _Ch . COUNTY Cumber and PERSON COLLECTING SAMPLES C1 LABORATORY Lab Cert. # Comments on sample collection or analysis. ND EL6 W Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR ,2.Q1 8 SAMPLE PERIOD [/] Jan -June ❑ July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow []Water Supply [:]SA ❑Other PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 Zmo discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics' Benchmarks =_=> _ - 100 mg/L or 50 mg/L4 6.0 — 9.0 0.007 mg/L 0.033 mg/L 0.067 mg/L 15 mg/L 1 mg/L N0 kovi ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER I REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMft, including all "No Discharge" reports, within 30 days of receipt of the lob results for at end of monitoring_period in the case of "No Discharge" reports) to: Division of Water Quality Attm DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. i am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 11/1/2012-10/31/2017 ( Date) SWU-245, last revised 10/25/2012 Page 3 of 3 AIL Na rLO W ----'- NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance orr filling out this form, please visit: htt): )ortal.ncdenr.or2web w w5 su i1 dcisNv;:tab-4 Permit No.:.i�/C/�C/D/ 3/Q/ D/ O/d/ Facility Name: Perw l e _ $fee County; ea ber.1 and Inspector: or" Wwcl5 Date of Inspection: (' q. 20/a Time of Inspection: Oo2tr or Certificate of Coverage No.: Co . Phone No. 410- V& 6110 Total Event Precipitation (inches): V - N4 F�DuJ Was this a "Representative Storm Event" or "Measureable Storrs Event" as defined by the permit? (See information below.) Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements voiy, depending on the permit). -------------- - -- ....__ ___..__...--- Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. l A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter j interval is representative for local storm events during the sampling period, and the permittee obtains approval from the IgelT�DWQ Regional Office__.__.__.._.__.-_.-----��---..___..___--------__....---.-_ re; 1 cerofy thift this report is accurate and complete to the best of my knowledge: rill itt�'l�a-'-Designee) Page 1 of 2 5wU-242, last modified 10/25/2012 Hercules Steel Company, Inc. —� 2019 Semi Annual Inspection Report Revision 1, dated JuN� Dat` Buildsng;.area Pre, arec 3% '- — Required 1. Good Housekeeping Procedures YE NO N/A ' Action .A -re work areas and floors clean and dry"'? .Are there anv risible leaks or potentlai sources for discharge of .i nificant material? .Are containment dikes in good condition: v.-ith vai.•es closed'' ___ are dum_psters outside the shop closed" Is loose arbage and «•ante mater.al picked un and disposed re ttlarl�' Is trash and later {emoved from catch basins and other oo.•t,ons of the stormwater drainage system on a regular basis? _ _�1e alcae subject to erosion stabilized with grass mulch, check dams. or other a ro riate sediment control measures? are scrap parts'and scrap metal disposed regularly and prouerl"'? Required 2. Hazardous Substances Handlijag & Stora e ' YES � NO NIA Action is there adequate aisles ace and organization in all storage areas'' A -re items in storage properk- !abeled to indicate contents' Lre all contairlers labeled «vith contents on the apnroa:ia:e abe are all container: closed" :Lre al.] container's m g_ood condition (free of leaks. spi?ls anc corrosion?? Axe there less than :» gallons of hazardous n•asie for each accumulation area" _ I eR:ergenc`icontingencv eca-0-len-. accessible to the actor Lllation 3. Painting Operations :1T: wain -tiny -:ct '.-i7ies performed within designated areas? Does the designated paint area•prevcnt overspray anti the contact of bvi)roductt %vit.n stornl«"ater'' -ire oaints. t:.inners. and solvents rec,cled, reused or disposed o o rope riv Required NIA Action Required 4. Personnel Training& Record Keeping -FS NO NIA Accio❑ Are employees ]"]OII�E:keeJ!n�a*td -�Z?_�__� \.`-a•:2l'::i:�C --fit �� --- --- / Is "he!"e obleci?' '-,- _ ._ - -• -- •- - - • -- Required 5. Liquid Stora e in _SST & Fueling YES . NO N/A Action. Is secondary' containment Dro�:ueC c," ar_Us.' -ire `.'ueling areas protected no c! mac, - .or! ant r Dr / A,e spill kits L:vai_iable a: aCli' Y AT C' ?llei tank: ruled carefuil v ""itnot' al'C'ti':":� 0`••e"-�iiLisn' _ire fuel leaks and Sp1113 COnt1'O!'' L;S-r:�: a sc0 bentsid- U nanslDadS" 7,1 Are dry cleanup metho6s used. Stti'E'i7: up, co:iia,tic fize"', find disooseC: of properly? .re valves on containment syst.Ems closed and locked except during cbserved and controlled releases'' Are tank systems. including tank iniegrit.r inspected and tester. . reQularlr?. . Hercules Steel Company, Inc. Semi Annual Inspection Report Revision 1, dated o x1 _ 1 _'—_ -- - - R.equared Isequipment checked for leaking i-lu. ds" A.re maintenance acti%:ties perfcriiied Indoors where pracLicai° A—e %vante materials ro erl+- se re ated. labeied and discarded" ) _ _ire outside ++ash areas in coiupilance witl the Per,111'. _ E is ++-ashwater contained or otherw+ se ken-, out of the storm drainage w Required 7, Preventative Maintenance YES NO NIA Action Are there regularly scheduled inspections of equipment that could resu]t in leaks/spills that could enter the stormwater system? Is a program in place to routine.11N• repair or replace leaking or dripping vehicles and equipment" ' .Aze stormwater =.nanagenzent deice routineiV ir'spectC_d Rn' i mai:stained %e. . cleaning cat h beistns anti doffed -ire sediment traas installed in storin di8i:]s or see+'er stems operating and beinff maintained - Inspection !Notes Observations or Required Actions 5� ° STORMWATER DISCHARGE OUTF'ALL (SDO) MONITORING REPORT GENERAL PERMIT NO. NCG030000 SAMPLES COLLF.C"11,:D DURING CALENDAR YEAR: 190/ CERTiFICATE OF COVERAGE; N'O. NCG03 �-� ("Phis monitoring report is due tit the Division no later titan 30 days rrorn —T the date the facility rcccic-cs the saniplini; r+sults rrom the laboratory.) } a I FACILITY NAME �(�txule I �� — COUNTY PERSON ( OLLECYINC SA,vIPr,1::5T�TGN1 ttUvCa 1'IIONE NO. ( �f�c_) y4,� •• -��� CERTIFIED LABORATORY--- Lab # — Laab # -- - PLEASE SIGN ON THE REVERSF; 4 GFIVED Part A: Specific Monitoring R&nireinents IAN 2 9 2013 Outfall No. Date Sample Cullecteri, mo/dd/yr 00530 ----- 00400 W 01051 00556 78141 _ Total Suspended Solids,f ni l., - pHr Stan(IarrUii R- S E — 1 is{, mg/I, CTION Oil and Grease, m l L Total Toxic Orf anics , nt /I. Benchmark - 1. 161) Within 6.0 - 9.0 0.033 30 1 - _ -2017-- Note: If you rcpor[ a SZMIl)lCd Value in CM:LSs of the henchlrlark value, of irlitsidc tlsc bC1IChrll;11'k ran11C fate kit 1• t'cxa must implun1C1I( liCr I nr Tice 2 r'espomws. 5CC (mural PCI'lllll ICXI. i)id this Facility pafmrm Vehicle hlaiulenancr Ac6VilicS usillg nuur. IL;+u 55 ,allons cal" new +nnlur oil jxr nu 11111" � yc5 —_no (il yes, cornplCle: I'm[ B) Part 11: Vehicle ;M;1iriten.ancc ActivityMuniloi-hig Rerluircm ents Oulfall No. Date Sample Collected, moAld/vr 00556 00530 00400 Oil and Grease, m 1. 'Total Suspended Solids, In •/L pll, Standard tinils New Motor Oil Usage, Annual average gal/mu Benchnvirk _ 30 100 6.0 - 9.0 Now.: 11 you wpoiL it s;mrlhlcd Valor: in CxccSS of Its+; hcnchslsark Value• or Iraa[SIdu 0W hCTIChrnurk IAll"C Stir p11, you IiulSt 1M111Cuu:nl TICI I or Ticr 2 wspo nsc.s. 5cu GCIwi-al Pel'Inil tem. STORM F.VENN'I• (-FIARAC`i'ERiS'Tl(,S: Date 71-1 —_ Hirst event sampled) Total Evcnt Precipitation (inchcsl: !VD_I-UJ Date (list each .additional event sampled this 1-clou-ting period, and rainfall anuriml) Total Event Precipitation (inches): Mail Original and one copy to: T)ivision of Water Quality Ann: I)WQ C;clinal files 1017 ,Mail SCrvicc ('cntcr k alcip,h. North Carolina '2709T 1617 SW13(m Pae142 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted CERTIFICATE OF COVERAGE NO. NCG03 O O C7 FACILITY NAME ge re IpS _S&C COUNTY PERSON COLLECTING SAMPLES _ ToM LABORATORY Lab Cert. # Comments on sample collection or analysis: N y Falj Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 1�a / 7 SAMPLE PERIOD ❑ Jan -June July -Dec or []monthly' _ (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA F> iiero-flow ❑Water Supply ❑SA ❑Other PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ❑ No discharge this period?z Outfall No. Date Sample 1 Collected (mo/dd/yr) 24-hour rainfall amount, Inches Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic s Organics Benchmarks =__> _ 100 mg/L or 50 mg/L4 6.0 — 9.0 0.007 mg/L 0.033 mg/L 0.067 mg/L 15 mg/L 1 mg/L / 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies., 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; For semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469-31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. + 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS, SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES n NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Caro4ina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that thi current and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel pr erly ather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those ersons directly respon A le for g thering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete a aware th th� are si ificant p aloes for submitting false information, including the possibility of fines and imprisonment for knowing violations." (SignajLl a of Krmittee) (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 T Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Permit No.: NICI 1 �G'I 10161 or Certificate of Coverage No.: NIC/GI_I_I_I_l hl Facility Name: _ tier- . l-s -51e, / C county: Ja ,i' .Phone No. cj/o - y KY - .5-// C Inspector: I GM w e o d S _ Date of Inspection: 2 - 5, - 2u 1 -7 By this signature. I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) 1. Outfall Description Outfall No, Structure (pipe, ditch, etc.) _ Receiving Stream: _- Describe the industrial activities that occur within the ourfall drainage area: 2. Color Describe the color of the discharge using basic colors (red, brown, blue, etc,) and tint (light, medium, dark) as descriptors: 3. Odor Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, --- 4. Clarity Choose the number which best describes the clarity of the discharge where 1 is clear and 10 is very cloudy: 2 3 4 5 6 7 8 9 10 Page l swv-242-020705 5. Floating Solids Choose the number which best describes the amount of floating solids in the stormwater discharge where 1 is no solids and 10 is the surface covered with floating solids: 1 2 3 4 5 6 7 8 9 10 6. Suspended Solids Choose the number which best describes the amount of suspended solids in the stormwater discharge where 1 is no solids and 10 is extremely muddy: 1 2 3 4 5 6 7 8 9 10 7. Foam Is there any foam in the stormwater discharge? Yes No 8. Oil Sheen Is there an oil sheen in the stormwater discharge? Yes No 9. Deposition at Outfull Is there deposition of material (sediment, etc.) at or immediately below the outfall? Yes No 10. Erosion at Outfall Is there erosion at or immediately below the outfall? Yes No 11. Other Obvious Indicators of Stormwater Pollution List and describe Note: Low clarity, high solids, ancUor the presence of foam, oil sheen, deposition or erosion may be indicative of conditions that warrant further investigation and corrective action. Page 2 S WU-242-020705 Hercules Steel Company, Inc. Semi Annual Inspection Report Revision 1, dated Data ` BlLddih Area S Hd P Prepared 1W yti v c.•,� e.�..i i. Good Housekeeping Procedures YES NO NIA Required Action Are work areas and floors clean anti (try? Are; there any visible leaks or potential sources for discharge of significant material? Are containment. (likes in good condition with valves closed? Are dumpsters outside the shop closed? % Is loose garbage and waste material picked tip and disposed regularly? Is trash anti litter removed from catch basins and other portions of the stormwat,er drainag�L_syst.cm on a regular basis? Are areas subject to erosion stabilized with grass mulch, check clams, or other a > propriate sediment control measures? Are scrap parts and scrap metal disposed regularly and pro perly? 2. Hazardous Substances Handling & Storage YES O NIA Required Action Is i,here adequate aisle space and organization in all storage areas? Are items in storage properly labeled to indicate contents? Are all containers labeled with contents on the appropriate label? Are all containers closed? Are all containers in good condition (Free of Teaks, spills and corrosion?) Are there less than 55 gallons oF'hazardous waste for each accumulation area? Is ornergencylcontingency equipment accessible; to the accumulation areas? 3. Painting Operations YES NO NIA Required Action Are painting activities performed within designated areas? Does the, designated paint. area prevent overspray and the contact. of byproducts with st:ormwater? Are paints, thinners, and solvents recycled, reused or disposed of properly 4. Personnel Training & Record Keeping YES "NO NIA Required Action Are employees trained in Spill Prevention and response, Good Housekeeping and Hazardous Material mana gement practices? � Is there objective evidence that, training records are kept? 5. U uid Storage in AST & Fueling YE NO NIA Required Action Is secondary containment provided for tanks and fueling areas? Are fueling areas protected from precipitation and run-on? Are spill kits readily available at the Facility? Are fuel tanks filled carefully without allowing over -splash? Are Fiiel leaks and spills controlled using absorbents/drip pans/pads? Are dry cleanup methods used, swept. up, containerized and disposed of pro erly? Are valves on containment; systems closed and locked except during observed and controlled releases? Are tank systems, including tank integrity inspected and tested regularly? Hercules Steel Company, Inc. Semi Annual Inspection Report Revision 1, dated —/ 6. Equipment Maintenance & WashingYE NO N/A Required Action Is equipment checked for leakingfluids? Are maintenance activities perlbrmed indoors where practical? Are waste materials properly segregated, labeled and discarded? Are outside wash areas in com alianco with the Permit? Is washwater contained or otherwise kept: out. of the storm drainage system? 7. Preventative Maintenance YES NO NIA Required Action Are I.here regularly scheduled inspections of equipment that could result; in leaks/spills that, could enter the stormwater system? Is a program in place to routinely repair or replace leaking or dripping vehicles and a ui Lment? Are stormwater management devices routinely inspected and maintained (e.g, cleaning catch basins and clogged. inlets)? Are sediment traps installed in storm drains or sewer systems operating and being maintained properly? Inspection :Notes/Observations or Required Actions ;;�jj STORMWATER January 22, 2018 Mr. Lynn Jourden Vice President of Operations Hercules Steel 950 Country Club Drive Fayetteville, NC 28311 Dear Mr. Jourden: On January 19, 2018, a site inspection was conducted for compliance with your facility for NPDES Stormwater Discharge Permit, NCG030000. This facility located at 950 Country Club Drive in Fayetteville NC drains into Cross Creek, a direct tributary to Cape Fear River. A copy of the Compliance Inspection Report is attached for your review and records. • SPPP was not reviewed and updated in 2017. • Facility stormwater inspection needs to be conducted semi-annually at a minimum. • No evaluation of non-stormwater discharge was conducted in 2017. • Could not locate qualitative and analytical monitoring for the first sampling period of 2017. At the time of inspection, this facility was found to be in compliance. I would like to thank you and your staff for the time and assistance in conducting this inspection. If there are any questions regarding this report, please contact me directly at (910) 433-1669. Thank you, Samantha Taylor Stormwater Inspector City of Fayetteville Attachment: Copy of Compliance Inspection Report 433 Flav Street Fayetteville, NC 28301-5537 (910) 333-1091 1 4vww.fayettevillenc.gov I w%v%v.faytv7,com '11ie City of Fayettekille, North Carolina does not discriminate on the basis of rice, sm sexual orientation, color, age, national origin, religion, or disability in its employment opportunities, programs, services, or activities, Stormwater Facility Inspection Report/Checklist Facility Name: Hercules Steel Company Inspection Type: Compliance NCG 030000 Permit No.: NCSO Permit EffectiveDate 11/1/2012 (It applicable): Not Applicable Permit Status Active (If not currently permitted): Inspection 1/19/2018 Discharges to: UT to Cross Creek Date: Facility Personnel Inspector(s): Samantha Taylor Assisting with Lynn Jourden Inspection 910-485-5110 (Name/Phone Number): Entry Time: 10:00 AM Exit Time: 11:15 AM SIC Code: 3440 Facility Hours of 8:00- 5:00 Operation: Facility Description: Metal Fabricating File ReviewlHistory: Inspection Summary: During my inspection I made observations of the facility and stormwater outfalls. The facility was clean and neat in appearance. Facility needs to improve on qualitative and analytical semi-annual monitoring, maintaining an updated copy of permit, as well as completing inspection and documentation of the semi-annual Facility Inspection Program. This form is a procedural guide for Inspectors to follow when conducting facility stormwater compliance inspections. Page 1 of 5 Rev. 0 Stormwater Facility Inspection Report/Checklist 1. Site 'Inspectidn (c6n6hued) Yes No'- -NA ' Repeat Finding 16. Floor drains —illicit connections ❑ 01 ❑ ❑ Comments: 17. Spill Response Equipment ❑ ® I ❑ ❑ Comments: if. Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan (SPPP)? 1 ® j ❑ I ❑ ❑ If the site has a SPPP, then complete questions in Sections II and W. 1. Does the Plan include a General Location (USGS) map? I ® I ❑ ❑ ❑ Facility location in relation to roads and surface waters. Includes: name of receiving stream or name of municipal storm . sewer system, and accurate lat. and long. of point of discharge. 2. Does the Plan include a "Narrative Description of Practices"? ® ❑ ❑ ❑ Should cover storage practices, loading and unloading areas, outdoor process areas, dust or particulate generating or control processes, waste disposal practices, etc. 3. Does the Plan include a detailed site map including outfall locations and ® ❑ ❑ ❑ drainage areas? Should show • Location of industrial activities (storage areas, disposal areas, process areas, unloading and loading areas) • The drainage structures • Drainage areas for each outfall and activities occurring in the drainage area • Building locations • Existing BMPs and impervious surfaces and the % of each drainage area that is impervious • For each outfall, a narrative description of the potential pollutants which could be expected to be present in the stormwater discharge. This forces permittee to analyze the site with relation to stormwater discharges. It is also a tool for the inspector to understand if the site has changed over time, i.e. if site map does not match facility they must update their plan. 4. Does the Plan include a list of significant spills occurring during the past 3 FEI I ❑ ® ❑ years? Needs to include corrective actions that were taken. The permittee needs to know what the reportable quantities are for wastewater, oil pollution, and SARA Title III. 5. Have stormwater outfalls been evaluated for the presence of non-stormwater 7Z El El discharges? Signature required: • Corporation - signed by Responsible Corporate Officer or assigned manager • Partnership or Sole Proprietorship — General Partner or the Proprietor Municipality, State, Federal, or other public agency — either principal executive officer or ranking elected official 6. Has the facility evaluated feasible alternatives to current practices? ® ❑ 1 ❑ 1 ❑ • Provide a review of the technical and economic feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to stormwater. • In areas where elimination of exposure is not practical, the stormwater management plan shall document the feasibility of diverting the stormwater runoff away from areas of potential contamination. 7. Does the facility provide all necessary secondary containment? 1 ® 1 ❑ ❑ ❑ • Applies to liquid raw materials, manufactured products, waste materials, or by-products • Single AST capacity > 660 gallons • Multiple AS containers in close proximity to each other with a total combined capacity of > 1,320 Page 3 of 5 Rev. 0 Stormwater Facility Inspection Report/Checklist 111. Qualitative and Analytical Monitoring Yes No NA Repeat Findin 1. Has the facility conducted its Qualitative Monitoring semi-annually? ® ❑ ❑ ❑ Color Odor Clarity Floating Solids Suspended solids Foam Oil Sheen Other indicators 2. Has the facility conducted its Analytical Monitoring? ® ❑ ❑ ❑ 3. Has the facility conducted its Analytical Monitoring from Vehicle Maintenance El El® Elareas? Qualitative and Analytical Monitoring Comments: Could not find first half of 2017 IV. Permit and Outfalls 1. Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑ 2. Were all outfalls observed during the inspection? ® ❑ ❑ ❑ 3. If the facility has representative outfall status, has it been documented by the NC Division of Water Quality? ❑ El ® ❑ 4. If the facility has a No -Exposure Certificate, has the facility self -inspected and this on an annual basis? El El ® El Permit and Outfalls Comments: Page 5 of 5 Rev. 0 STORMWATER January 23, 2017 Mr. Lynn Jourden Vice President of Operations Hercules Steel 950 Country Club Drive Fayetteville, NC 28311 Dear Mr. Jourden: On January 9, 2017, a site inspection was conducted for compliance with your facility for NPDES Stormwater Discharge Permit, NCG030000. This facility located at 950 Country Club Drive in Fayetteville NC drains into Cross Creek, a direct tributary to Cape Fear River. A copy of the Compliance Inspection Report is attached for your review and records. • Inlet protection is needed around the drop inlet located in the wash area. At the time of inspection, this facility was found to be in compliance. I would like to thank you and your staff for the time and assistance in conducting this inspection. If there are any questions regarding this report, please contact me directly at (910) 433-1091. CTh you, anny S ickland Stormwater Inspector City of Fayetteville Attachment: Copy of Compliance Inspection Report cc: Mike Lawyer, NC Division of Energy, Mineral and Land Resources (e-mail) Twila Josey, Stormwater Administrative Assistant 433 t-lay Street Fayetteville, NC 28301-5537 (910) 433-1091 1 www.fayettevillermc.gov I www,faytv7.eotn The City of Fayetteville, North Carolina does not discriminate on the basis of rr,ex, sex, BCXU21 orientation, color, age, national origin, religion, or disability hi its employment opportunities, programs, services, or activities. Stormwater Facility Inspection ReportlChecklist This form is a procedural guide for Inspectors to follow when conducting facility stormwater compliance inspections. Page 2 of 6 Rev. 0 Stormwater Facility Inspection Report/Checklist L Site inspection (continued) Yes No NA Repeat Finding _ 16. Floor drains — illicit connections ❑ ® ❑ ❑ Comments: 17. Spill Response Equipment ❑ ® ❑ ❑ Comments: IC Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan (SPPP)? ® ❑ ❑ ❑ if the site has a SPPP, them complete questions in Sections If and Ul. 1. Does the Plan include a General Location (USGS) map? ® _ ❑ ❑ ❑ Facility location in relation to roads and surface waters. Includes: name of receiving stream or name of municipal storm sewer system, and accurate lat. and long. of point of discharge. 2. Does the Plan include a "Narrative Description of Practices"? ® 1 ❑ ❑ ❑ Should cover storage practices, loading and unloading areas, outdoor process areas, dust or particulate generating or control processes, waste disposal practices, etc. 3. Does the Plan include a detailed site map including outfall locations and drainage ® ❑ ❑ ❑ areas? Should show • Location of industrial activities (storage areas, disposal areas, process areas, unloading and loading areas) • The drainage structures • Drainage areas for each outfall and activities occurring in the drainage area • Building locations • Existing BMPs and impervious surfaces and the % of each drainage area that is impervious • For each outfall, a narrative description of the potential pollutants which could be expected to be present in the storrnwater discharge. This forces permittee to analyze the site with relation to stormwater discharges. It is also a tool for the inspector to understand if the site has changed over time, i.e. if site map does not match facility they must update their plan_ 4. Does the Plan include a list of significant spills occurring during the past 3 years? ❑ I ❑ ® ❑ Needs to include corrective actions that were taken. The permittee needs to know what the reportable quantities are for wastewater, oil pollution, and SARA Title Ill_ 5. Have stormwater outfalls been evaluated for the presence of non-stonnwaler ® ❑ ❑ ❑ discharges? Signature required:- — • Corporation - signed by Responsible Corporate Officer or assigned manager • Partnership or Sole Proprietorship ._ General Partner or the Proprietor Municipality, State, Federal, or other public agency— either principal executive officer or ranking elected official 6. Has the facility evaluated feasible alternatives to current practices? ® ❑ ❑ ❑ • Provide a review of the technical and economic feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to Stormwater, • In areas where elimination of exposure is not practical, the stormwater management plan shall document the feasibility of diverting the stormwater runoff away from areas of potential contamination. 7. Does the facility provide all necessary secondary containment? ® ❑ ❑ ❑ • Applies to liquid raw materiais, manufactured products, waste materials, or by-products • Single AST capacity a 660 gallons • Multiple AS containers in close proximity to each other with a total combined capacity of > 1,320 Page 4 of 6 Rev. 0 Stormwater Facility Inspection ReportiChecklist Ill. Qualitative and Analytical Monitoring Yes No NA Repeat Finding _ 1. Has the facility conducted its Qualitative Monitoring semi-annually? ® ❑ ❑ ❑ Color Odor Clarity Floating Solids - Suspended solids Foam Oil Sheen Other indicators 2. Has the facility conducted its Analytical Monitoring? ® ❑ ❑ ❑ 3. Has the facility conducted its Analytical Monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Qualitative and Analytical Monitoring Comments: Sampling done in Septembor 2016. , IV. Permit and Oultalls 1. Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑ 2. Wer observed du ring the inspection? ❑_ ❑ ❑ 3. If the facility has representative outfall status, has it been documented by the NC Division of Water Quality? ® ❑ ❑ ❑ 4_ If the facility has a No -Exposure Certificate, has the facility self -inspected and -T-❑ documented this on an annual basis? ❑ ® ❑ Permit and Outfalls Comments: Page 6 of 6 Rev. 0 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT GENERAL PERMIT NO. NCG030000 yu,.o 3 0 SAMPLES COLLECTED DURING CALENDAR YEAR: Zold CERTIFICATE OF COVERAGE NO. NCG403 (This monitoring report is due at the Division no later than 30 days from the date the facil ity receives the sampling results from the laboratory.) FACILITY NAM� COUNTY 5 �V111 -Cct AA &V46--i PERSON COLLECTING SAMPLES INEC EN :D -PHONE NO. (ftor 40 z,-'s CERTIFIED LABORATORY d4l".,,6,4.e_ Lab # Lab # J2D17 AN I I PLEASE SIGN ON THE REVERSE 4 Part A: Specific LMonitoring Requirements CENTRAL FILES DWR SECTION a a 6� W F XX :T A Sa,m'p'l % e sp;,rd P 'CAR id m 0 14 V 4 7 -M 4-v Z .0, 0 ;'s /-S-0,0 Note: If you report a sampled value, in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 1 or Tier 2 responses. See General Permit text. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month?_ yes `/no (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements - IV Q4A -y �V- MO t T6tAl, UiWagbo , , ­M7 t7c' Ih_r U , I, �Wel ... Q 0 �,. s � g M !"N V & 6ij — A li 0 "Wq 7 1 2-11h 7% 0 -a A XMA M rZrR.6Kk!X Mote: if you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 1 or Tier 2 responses. See General Permit text. STORM EVENT CHARACTERISTICS: Date IZ44 (first event sampled) Total Event Precipitation (inches): Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): M ' ail Original and one copy to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 SWU-245-102107 I Page 1 of 2 FavetteN isle DiN•ision Certificate Iil'Af1ah-sis Hercules Steel C(I. I)ate Reprrled: 1)1/06/17 1%Ir' Lynn burden Proiccl: 5iurtuivater Sample Daly Reccivekl: 01J102116 950 Country Clash I)rire Dme Sampl<d: 09/02/16 Fayetteville NC, 28301 Samplcd By: mid Outprini! Drain K610083-01 Result Units Analyaxd Analyzcd lay Method QL.nhlicr Anat,,2W try. Microbac Laboratories, Snc. - Farjetteville Lead <0.003 melt OQ/16/I 6 15:52 JAW EPA '200.7 P.er 4.4 ! 9qz; Oil & Grease (IIFYI) < .00 111`'Il, 09/13!16 12:02 SW, FPA If;04 Rev. 13 pH 7.1 pH Units 09/05/16 11:10 I-L.:"M SM 11500 H—H-2000 H �rlquci)u5} Total Suspended Solids 840 mg/1- f19/06116 I I AS AC SN'1 2540 U-199 i QC Batch Rult - (,ilicrrrhac Laboratories, Lnc. - 1'rtiiwenille) Ana1)'le RcsulI l,lllls Source ltirl> I_Ililli Total Suspended Solids 4.00 itli ii, K61003') Total Suspended Solids 65A ;11u/1' K610070 2� 'local Suspended Solids 1.30 Ing/L K610086 0 pl-1 7.1 131-1 Units K610093 0 2 0 G 'Lead 0.239 nlL K610506 '00 Lead ND lilts'/L K61031 S 200 Lead NI) tlL K610506 20C Lead 0.257 Inu/L K6103IS 0.8 200 Samples received at tab at an incorrect temperature Notes and Definitions I l :1nal} C Has prepartd atld/Of at1h-4ed UtttSIdtL. of Ihr :ulalti ti ai tne111ud 1101din.2 I1111C Slaty Certiticauions: NCDNR # I I NCD011 437714 Rcspccil"ully tiuhttrttral }eanrtc Uvrrstrc L k'rui,•a ;`• !Ml ter Thank You for your business. Wv +rtvae your 1'r,r,Ihur4 w nor 1,-veI q ,-,nIh In y.IU i'l,'l1,e , rnner , r%u' I)lI 1,+n,1 fua,,4•,•r, Itoh 1 krnu•r ut J1lI-.w,,J-1 V21 a lfir r,n Ucn•s burn. R,u rrrtn' 41Lrn ,. uor„,'1 .I. '1 ii I -, n" H"u , r. I ,,- ,,kPit ur pr"v, h-Pir 'ibw I Cn 16-'., nrrr Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Permit No.: NICI!rEI l2 �lU/C�1 a or Certificate of Coverage No.: 1�'IGGI_l l_I_l�hl Facility Name: �2cc,�e'S �c�are County: C Phone No. I ) o Inspector: Date of Inspection: _ -lam —1 y this sign�v` , I�ertify tha't�ttis report is accurate and comple[e to tht best of my knowledge ignatdr�,Pf' cme ttee or Designee) 1. Outfall Description Outfall No. _�� Structure (pipe, ditch, etc.) Receiving Stream: Describe the industrial activities that occur within the outfall drainage area: 2. Color Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: L tin-? /S ✓ _ 3. Odor Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.) Ak' d - - 4. Clarity t Choose the number which best describes the ciarity of the discharge inhere 1 is clear and 10 is very cloudy, V 1 2 3 v 5 b 7 8 9 t0 Page 1 Sw�J-242-020705 S. Floating Solids Choose the number which best describes the amount of floating solids in the stormwater dischargc where 1 is no solids and 10 is the surface covered with floating solids: 5) 2 3 4 5 6 7 8 9 10 6, Suspended Solids Choose the number which best describes the amount of suspended solids in the stomwater discharge where I is no solids and IO is extremely muddy: 1 0 3 4 5 6 7 8 9 10 7. Foam Is there any foam in the stormwater discharge? Yes 8. Oil Sheen Is there an oil sheen in the stormwater discharge? Yes CO 9, Deposition at Outfall Is there deposition of material (sediment, etc,) at or immediately below the outfall? Yes Q-N-Do 10, Erosion at Outfall Is there erosion at or immediately below the outfail? Yes No 11. Other Obvious Indicators of Storrnwater Pollution List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, deposition or erosion may be indicative of conditions that warrant further investigation and corrective action, Paee 2 SWU•242-020705 Hercules Steel Company, Inc. Semi Annual Inspection Report Revision 1, dated Data' iiuildinglarex Pre.]/: r.rr: kid•: 1. Good Housekeeping Procedures YE�� ' NO N/A Required Action I Are work areas and floors r;lean ;md drv? ,----i f f7 Are there any vlslbii! leaks significant, material? C0I111lr1111t,1}I, {Iikvti in ((pULi Cca3{ 1S-iG1). lvilll 'ti aiCCs t'.11)si]fi. 1 Are dune )stern outside t.lie shop (do-sed? Is loose garb;igo and waste inat(Iri II I )ickn(I u) and (1is]n)se(I r(,- 121;11-1 Is trash and litter remover] 1'rom catch basins :111(1 (th(:r j)ort.ions ol't.he. Stow Water dMillag(_'' SN'SU)IT1 011 a regular basis? — jf Are areas subject. io orosion stabilized with (grass mulch. (heck darns. or other a ) propriai,e seditnent ct)rurol moasurv;s? Xt� _� Are Scr'a) parts aI7d surd) metal dis poso'd retr,tll;Irly and fro )er'Iy'l �/ I I Required 2. Hazardous Substances Handling & Storage YE5/ NO NItx .A,tiol) --- Is there atlec uate aisle space and organization in all sror'a-0 areas'? Are items in storage properly labeled to indicate conTrnts'? l / Are all containers labeled with coweitt.son the .i )j?rol)riate lab(d? Are all containers (los(,cl'?Are ;III con (aint'i'; lrl (FOO(l CC)ndlllisn Are there less th:ln 55 gallons of hazardous w,iSte fur o:u:h— 4CCt11111a1ati0al 15 0tnElC�ri RC1'/CDn[r[1rCr1C�' ei{lllE)I7iP,tlt at;CCssllplU to I lie :W([I In111;16011 areas? PaintinU_ YES N/A I Required I Action3. Are paint.i.ng aci:iviti(:s peribrrrle(I within d(- ignal{,d-- Does the designated ]paint. area a11(1 the com:l(I 01' / by produces ivit.h storrmvater? Are ]paints. thinners. and solvents recvuled. rullsed or disposed of / properly Re(;aired 4. Personnel Training & Record Keeping NO NIA I Action Are emplo.vees trained in Spill Prevent ion and Ri s;)on=(:. Good _ I-lop,Ckt'cyi11a and Hazardous Matt:rtal rnarlag(,mont 171'fICtICCs.) / Is 1,11e1'e objective oyidgrme d1ol I.rairllll;; r(CO!'(#s 8r(. kepi? -- I _ Require(i 5. Liquid Storage in ASI' & Fueling � E., NO NIA action I -- [s seeondary containnlont. provide({ for tanks and k1elin; �__— Are fueling areas protected frog]] preci )iiaiion anti run-on? Al'C spill kits readily availablQ :It the Are tilt,] tank filled carofully NN is haul :111oiti ing Are fuel leaks an(I spills tmltndlt:d using (b orb(:rttsidr'i;pAre dry cfentiti p methods trs(,(] swept up, contninerizAA and disEpo;ed� of pro perly'?Are valves on cotitainnlenI systems clo;cd and lipc;ke,d ex(:ept. d ul'iII obsen•ed and controlled releases? Are t:3nk svatenls, including tank intr:hrity in:;;pefle :rug# testr;rl I Hercules Steel Company, Inc. Semi Annual Inspection Report Revision 1, dated 6. Equipment Maimtenance & Washing----- I YFISA NO NIA Acton Is equipmeml, (Twjyj Or MAW Ouds? JL.erlbrniud indpors ic-a[? Are waste materials Pylerly labcdod and disc'lrdod'. Poe owAde "ash areas in complOnce "Wh the Pyrnit? Is washwor contained or odc.-rwisu kupi ow ol't he, Storm draillam swern? 7. Preventative Maintenance YES N 0 N /,,k Required Action Are there regularly s(,hedtdod inspections ofc(plipment that. Could re.gult in leak-s/sl)jIls that could enier Oi(e storim Ater Isa program in place to rou6neY, repair or replan: Basking or dripping volikles and equipment? Are MonnwaWr management devhms rouhnak inspeoed and maintainwl fog. WOng catch Won and y5myl Why)? Are sedhoont traps installed in storm drains or sc!%Vor spimm I operating and bAng nmintakod pnj2dW -� -- --� Inspection :[Motes/Observations or Required Actions: Fayetteville Division 2592 Hope Mills Road -- Fayetteville, NC 28306 (910) 86`4-1920 / 864-8774 fax CHAIN OF CUSTODY RECORD PAGE 1 OF 1 CLIENT NAMES ADDRESS: PO . 7 PROJECT r LOCATION: Ht(2 (,L,Ie- S / ee 1 U) w m 0 TYPE OF ANALYSIS PRESERVATION (CODE) 5 \� 4 � !_- 1` ` J Cat\` CODE: A = None B = HNO3 (pH<2) + <6'C G = H2SO4 (pH<2) + <6"C D = NaOH + <6'C E = ZN Acetate } <6° <6'C.LL. F = I- U G = Sodium Thio CONTACT PERSON: - 11/1v r/U 0 e EMAIL: SAMPLED BY: y� I fn ovv) J If PHONE NUh1BER: 6' 1U �1 d - G DATE 1 METHDD OF SHIPMENT: LAB ID # SAMPLE TYPE DATE TIME C01.7P GRAB PII FLOW TEMP'C rv:s. CHLORINE SULFIDE I �ry Lab Initials♦ R`eDnn�quished by: ` r ] (4 D 171 /� S W D t) 1 Date fr i— � Y� l Time /;,5 ( ei y: (Signature} 2� Date Time 1-3 6 Relinquished by: Date - Time Received by: (Signature) Date Time 3 : Relinquishe9 by: Time Received by: (Signakure) Dalo Tlana late 6 Turnaround time: REGULAR RUSH Comments or Soe%c�ialll Hazards: ph Field: ph Field: Water Level N1 IS DATA FOR REG. COMPLIANCE PURPOSE? Temp Field 1: Temp Field 2: Water Leval 92 NO YES WHICH: hCGa3�`f�( HERCULES S UMPANY, INC. P.O. Drawer 5?�08O Country Club Drive Phone: 910 881 hl 0W 910-488-4040 FAYETTEVILLE, ON _ VH C,�ROLINA 28301 — 0208 July 8, 2016 Division of Water Quality Attn: DWQ Center Files 1617 Mail Service Center Raleigh, NC 27699-1617 Re: Year One, Period 1 January 1, 2016 through June 30, 2016 To whom it may concern, "CEWSD JUL 11 2016 CENT-;�AL F� DwR Sic NS We were unable to collect a water sample during the first six months of 2016. We therefore are unable to turn in a monitoring report. This letter is to indicate that we had a "No Flow" during that period of time. We are currently wa g for the next substantial rainfall during business hours to collect a water sample and report e i formation to you. Si I STO TER DISCHARGE hcG6�40 l RVIwAMONITOR MONITORING REPORTFALL (SDO) GENERAL PERMIT NO. NCG030000 RECEIVED SAMPLES COLLECTED DURING CALENDAR YEAR: CERTIFICATE OF (AVERAGE NO. NCG03 (This monitoring report is due at the Division no later than 30 days from FACILITY NAME JUL 1 1 2016 PERSON cOLLEcTING SAMPLES.--r-NITPAI Pit CERTIFIED LABORATORY ntnrL a Part A. Specific Monitoring Requirements the date the facility receives the sampling results from the laboratory.} COUNTY PHONE NO. PLEASE SIGN ON THE REVERSE 4 Outfall No. Date Sample Collected, mo/dd/ r 0053(1 00400 01051 00556 78141 Total Suspended Solids, mg/1. phl, Standard units Lead, mg/l, Oil and Grease, m L 'Total Toxic Organic; , m Benchmark - 100 Within 6.0 - 9,0 0.033 30 1 O Note: if you report it sampled value in excess Of the benchiilark value, or ou(sidc the hc;nchniark rank for pH, you muss impiement Tier l orTicr 2 responses. See General Permit text. Did this facility perforin Vehicle Maintenance Acliviiics using mnrc than 55 allons of ncW motor oil per month? _ yes _no (if yes, complete Part R) Ptwt R• Vohivh- AA:.inh• —ni— Arl:vity Mnnitnrinu Rpnnirenientc Out£all No. Date Sample Collected, mo/dd/vr 00556 00530 00400 Oil and Grease, m elf, Total Suspended Solids, nt g/L pH, Standard units New Motor Oil Usage, Annual average gal/nio Benchmark 30 101) 6.0 - 9.0 Note It you report it sampled value in excess of the benchmark value, or' nutsidc the henchmark range for pl-1, you must Implenu:nt I ier 1 or I icr Z responses. See Gcncral Permit text. STORM EVENT CHARACTERISTICS: Date (first event sampled) Total Event Precipitation (inches): _ Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Mail Original and one copy to: Division of Water Quality Alta: DWQ Central Files 1617 Mail Scs-vice Cemer Raleigh, North Carolina 27699-1617 SWU-245-03 1308 ]'age 1 of 2 t Tolal Toxic Organics sampling is appliCablc only for those faciiities which perform ntGal finishing open[ions, manufaClur'c u:nticonclucaors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic ()rganics is chat delinition contained in the FPA Effluent Guidelines for the facility ~object to the requirement it) sample (for metal finishing use the del-ntifion as found in 40 CFR 433.1 1 for semiconductor n)rnutacutrc use. the definifion as found in 40CFR 469. 12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for c:uhodc ray tube ntantrlaCtnre u.cc the definition found in 40 CFR 469.31y Facilities that incorporale a solvent rnanagument plan into the Slommatcr Pollution Prevention Plan may so certify, and the rceiuircniunt Sur TTO monitoring may he waived. ']'he solvent management plan shall include It list ol-Iht- IOlal toxic organic compounds used and the other elements listed in the General Permit. For those facilities ciccling to employ the I-fO moniloring waiver, the discharger shall sign the fiollowing Cut'lilicnliott statcmc1W "Based upon my inquiry of the person OF parsons dircc-lly nsponsihIc for managing compliance with the purmil monitoring requirement for total toxic organics (-I` O), certify that to the hest of my knowledge and helid, no duniloing of Conucntratcd toxic organics tilt(] She `utrnrwatcr m alias which arc exposed to rainfall or stormwalcr runoff has occurred since riling the fast discharge ntonilurinl; report. I furthercertify that this facility is imhlc•ntcnling lhu all the provisions of the solvcnf management plan inclucicil in the Stonnwatcr Pollution Prevention flan.' tl IM A certify, tinder penalty of law, that this doctitnent and all attachnients were prepared tinder my direction or supervision in accordance with a system dcsigne(l to assure that qualified personnel properly gather in([ evaluate the information submitted. Based on my inquiry ol'thc person or persons who manage the systeiii, or those persons directly responsible for gathering the information, the information submitted is, to the hest al' my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for suhmilting false information, including the possibility of fines and imprisonment for knowing violations." (Signature ol- Permittee) (Date) SWU-245-031 ifiii Pagc 2 of 2 J/)C.C=0 �)o�-oI Hercules Steel Company, Inc. Semi Annual Inspection Report Revision I, dated -—l( D"te: / Building/Area Prepared B ZY 1_ Good Housekeeping Procedures YES NO NIA Required Action Aro work areas and floors clean and (Irv? Are there any visible leaks or potential sources for discharge of significant. material? Are containment. dikes in good condition. with valves cloy/? Are dum psters outside the shop closed'? Is loose garbage and waste material picked up and'dis posed re ularly? Is trash and litter removed from catch basins and other portions ofthe stormwater drainage system on a regular basis? Are areas subject to erosion stabilized with grass mulch, check dams, or other appropriate sediment, control measures? _ 7 Are scrap )arts and scrap metal disposed re TularIv and properly? 2. Hazardous Substances Handling & Storage YE NO NIA Required Action Is there adequate aisie space and organization in all storage areas? Are items in storage properly labeled to indicate contents? Are all conuiiners labeled with contents on the appropriate label? Are all con tainers,closed? Are all containers in good condition (free of leaks, spills and corrosion?) Are there less than 55) gallons of hazardous waste for each accumulation area? Is emergency/contingency equipment accessible to the accumulation areas? 3. Painting Operations YE NO NIA Required Action Are paint ing activities performed within designated areas? Does the designated paint. area prevent. oyerspray and the contactof by products with st;ormwater? Are paints, thinners, and solvent~ recycled, reused or disposed of pro �erly • 4. Personnel Training& Record KeepingYES NO NIA Required Action Are employees trained in Spill Prevention and response. Good Housekeeping and Hazardous Material management practices'? is t.horc clpjec'iye evidence that t-raining records are kept? 5. Liquid Storage in AST & Fueling No NIA Required Action Is secondary containment. providod for tanks and fuelir r areas? Are Fueling areas protected from precipitation and run-on? Are spill kits readily available at; the Facility? Are fuel tanks filled carefully without allowin oyer-s dash•? Are fuel leaks and spills controlled using absorbents/drip pans/ pads? Are dry cleanup methods used. swept up. containerized and disposed of' properly? Are valves on containment; systerns closed and locked except during observed and controlled releases? Are tank yvstems, including tank integrity inspected and tasted rc ru la rly? RECEIVED JUL 1 ] CENTRAL FILES DWR SECTIOA� Hercules Steel Company, Inc. Semi Annual Inspection Report Revision 1, dated �-7-�� 6. Equipment Maintenance & Washin YE NO NIA Required Action Isequipment checked for leaking fluids? Are maintenance activities performed indoors where practical? Are waste materials property segregated, labeled and discarded? Are outside wash areas in compliance with the Permit? Is washwater contained or otherwise kept out of the storm drainage system? 7. Preventative Maintenance YES NO NIA Required Action Are there regularly scheduled inspections of equipment that could result in leaks/spills that could enter the stormwater system? Is a program in place to routinely repair or replace leaking or dripping- vehicles and equipment? Are stormwai.er management devices routinc;ly inspected and maintained (e.g.cio aning catch basins and clog<i"ed inlets)? Are sediment traps installed in storm drain,, or sewer systems operating anti being maintained ro periv? Inspection :Notes/Observations or Required Actions: Cfty of tevik Engineering & Infrastructure Stormwater Division February 3, 2016 Mr. Lynn Jourden Vice President of Operations Hercules Steel 950 Country Club Drive Fayetteville, NC 28311 Dear Mr. Jourden: 433 Hay Street Fayetteville, NC 28301-5537 (910) 433-1613 www. cityof [ayetteviIle.org On January 26, 2016, a site inspection was conducted for compliance with your facility for NPDES Stormwater. Discharge Permit, NCG030000. This facility located at 950 Country Club Drive in Fayetteville NC drains into Cross Creek, a direct tributary to Cape Fear River. A copy of the Compliance Inspection Report is attached for your review and records. The Following is a list of items addressed during the inspection: • There was no Qualitative monitoring for 2015 and it should be performed semi-annually. Analytical monitoring for 2015 was reported as "No Flow". At the time of inspection, this facility was found to be in compliance. I would like to thank you and your staff for the time and assistance in conducting this inspection. If there are any questions regarding this report, please contact me directly at (910) 433-1091. T tn�y:Stri land Stormwater Inspector City of Fayetteville Attachment: Copy of Compliance Inspection Report cc: Mike Lawyer, NC Division of Energy, Mineral and Land Resources (e-mail) Twila Josey, Stormwater Administrative Assistant "fuu i The City of Fayetteville, North Carolina does not discriminate on the basis of race, sex, color, age, national origin, religion, or disability in its employment opportunities, programs, servii-Ts, or activities. 5tormwater Facility Inspection Report/Checklist This form is a procedural guide for Inspectors to follow when conducting facility stormwater compliance inspections. Page 2 of 6 Rev. 0 Stormwater Facility Inspectlon ReportlChecklist 1. Site Inspection (continued) Yes No NA Repeat Findin 16. Floor drains - illicit connections ❑ ® ❑ ❑ Comments: 17. Spill Response Equipment ❑ ® ❑ ❑ Comments: II. Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan (SPPP)? ❑ ❑ ❑ If the site has a SPPP then corn lets questions in Sections II and tll. 1. Does the Plan include a General Location (USGS) map? ® ❑ ❑ ❑ Facility location in relation to roads and surface waters. Includes: name of receiving stream or name of municipal storm sewer system, and accurate lat. and long. of point of discharge. 2. Does the Plan include a "Narrative Description of Practices"? ® ❑ ❑ ❑ Should cover storage practices, loading and unloading areas, outdoor process areas, dust or particulate generating or control processes, waste disposal practices, etc. 3. Does the Plan include a detailed site map including outfall locations and drainage ® ❑ ❑ Elareas? Should show • Location of industrial activities (storage areas, disposal areas, process areas, unloading and loading areas) • The drainage structures • Drainage areas for each outfall and activities occurring in the drainage area * Building locations • Existing BMPs and impervious surfaces and the % of each drainage area that is impervious For each outfap, a narrative description of the potential pollutants which could be expected to be present in the stormwater discharge. This forces permittee to analyze the site with relation to stormwater discharges. It is also a tool for the inspector to understand if the site has changed over time, i.e. if site map does not match facility they must update their plan_ 4. Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ® ❑ Needs to include corrective actions that were taken. The permittee needs to know what the reportable quantities are for wastewater, oil pollution, and SARA Title IIt. 5. Have stormwater outfalls been evaluated for the presence of non-stormwater ® ❑ ❑ ❑ discharges? Signature required: • Corporation - signed by Responsible Corporate Officer or assigned manager • Partnership or Sole Proprietorship - General Partner or the Proprietor Municipality, State, Federal, or other public agency - either principal executive officer or ranking elected official 6. Has the facility evaluated feasible alternatives to current practices? 1 ® 1 ❑ I ❑ ❑ • Provide a review of the technical and economic feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to stormwater. • In areas where elimination of exposure is not practical, the stormwater management plan shall document the feasibility of diverting the stormwater runoff away from areas of potential conlamination. 7. Does the facility provide all necessary secondary containment? ® ❑ ❑ ❑ • Applies to liquid raw materials, manufactured products, waste materials, or by-products • Single AST capacity > 660 gallons • Multiple AS containers in close proximity to each other with a total combined capacity of > 1,320 Page 4 of 6 Rev. 0 Stormwater Facility Inspection Report/Checklist 111. Qualitative and Analytical Monitoring) Yes No NA Repeat Finding 1. Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ® ❑ ❑ Color Odor Clarity Floating Solids Suspended solids Foam Oil Sheen Other indicators 2. Has the facility conducted its Analytical Monitoring? 10 ❑ ❑ ❑ 3. Has the facility conducted its Analytical Monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Qualitative and Analytical Monitoring Comments: No Qualitative Monitoring has been done. "No Flow" was reported for Analytical Monitoring. IV. Permit and Outfalls 1. Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑ 2. Were ail outfalls observed during the inspection? ® ❑ ❑ E] l 3. if the facility has representative outfall status, has it been documented by the NC Division of Water Quality? ® ❑ ❑ ❑ 4. If the facility has a No -Exposure Certificate, has the facility self -inspected and documented this on an annual basis? ❑ ❑ ® ❑ Permit and Outfalls Comments: Page 6 of 6 Rev. 0 hc(�- (000�1c� f)4,tc� TORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT GENERAL PERMIT NO. NCG030000 SAMPLES COLLECTED DURING CALENDAR YEAR: CERTIFICATE OF COVERAGE NO. NCG03 (This monitoring report is due at the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITY NAME COUNTY PERSON COLLECTING SAMPLES PHONE NO. ( ) CERTIFIED LABORATORY Lab # Lab # PLEASE SIGN ON THE REVERSE 4 Part A: Specific Monitoring Requirements Outfall No. Date Sample Collected, mo/dd/ r 00530 00400 01051 00556 78141 Total Suspended Solids, m pH, Standard units Lead, mg/L Oil and Grease, m Total Toxic Organics', In Benchmark - 100 Within 6.0 — 9.0 0.033 30 1 ® e -. Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for 131� M ft§t N15reinent Tier I or Tier 2 responses. See General Permit text. FEB 4 1 2016 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil perCEj1 rRr,Lc lam' (if yes, complete Part 13) DWR SECTION Part B: Vehicle Maintenance Activitv Monitoring Requirements Outfall No. Date Sample Collected, moldd/vr 00556 00530 00400 Oil and Grease, m Total Suspended Solids, m pH, Standard units New Motor Oil Usage, Annual average aVmo Benchmark - 30 100 6.0 — 9.0 - Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 1 or Tier 2 responses. See General Permit text. STORM EVENT CHARACTERISTICS: Date (first event sampled) Total Event Precipitation (inches): _ Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Mail Original and one copy to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 r S W U-245-031308 Page I of 2 1 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture senti_onductors. manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the delinition of Total Toxic Organics is that definition contained in the FPA 17'fTluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.1 1; for semiconductor manufacture use the definition as found in 40 CFR 469.12, for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31), Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for T70 monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the 170 monitoring waiver, the discharger shall sign the following certification statement: 'Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (T70), 1 certify that to the best of my knowledge and belief; no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since tiling the last discharge monitoring report. 1 further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." i (late) "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. B on y inquiry of the person or persons who manage the system, or those persons directly responsible for athering a information, the information submitted is, to the hest of my knowledge and belief, true cura and co plete. 1 aware that there are significant penalties for submitting; false information, including t possibility o fi and ii risonment for knowing violations." (Date) S W U-245-031308 Pagc 2 of 2 Hercules Steel Company, Inc. Semi Annual Inspection Report Revision 1, dated - Z� D te" Building/Area Prepay d BY 1. Good Housekeeping Procedures j Are work areas and floors clean and dry? ! A -re there any visible leaks or potential sources for discharge of I 1 significant material'? _ Are containment dikes in good condition: with valves closed'? j Are dumpsters outside the shop closed? I Is loose garbage and waste material pieked up and disposed regularly? I Is trash and Iitter removed frown catch basins and other portions of the stormw•ater drainage system on a regular basis? _ -ire areas subject to erosion stabilized with grass mulch, check dams, or other a ra riate sediment control measures? Are scrap arts and scrap metal disposed regularly —and ro erly? 2. Hazardous Substances Handling & Storage Is there adequate aisle space and organization in all storage areas? -l•e items in storage 2roperly labeled to indicate contents? i re all containers labeled with contents on the ap -Lo riate label? I Are all containers closed"� -lre all containers in good condition (free of leaks, spills and corrosion?) i _ -re there less than 7- gallons of hazardous n'aste for each E accumulation area? Is eniergency/contingency" eqtup❑rent accessible to the accumulation areas? 3. Painting Operations I Required YES,/�;O NIA I Action : I I I ! _.r YES NO Required NIA Action I � I I f I I � E I Required I NIA I Action YFSs.l NO Are Daintin activities 2erformed within designated areas? I Does the designated paint area prevent overspray and the contact of by roducts with storm water? Are paints, thinners, and solvents recycled, reused or disposed of � 1 property Required 4. Personnel Training & Record Keeping I NO N/A Action Are employees trained in Spill Prevention and Response, Good 1 Housekeeping and Hazardous \-laterial managenneni practices' Is there objeCLIVe evidence that training records are kept'? I I ' i ; 1 Required 5. Liquid Storage in _SST & Ftiel.ing NO ! NIA I Action j Is Secondary containment provided for tanks and fuelin-, al'eas° i At•e fuelin areas rotected from reci nation and run•on'? �: I i -1-re spill kits readily available at the Facility? C I _lie fuel tams filled carefully "'ithout allowing over -splash? Are fuel leaks and spills controlled using absorhent.sldri pans/pads? 1 i Are dry cleanup methods used, swept. up. containerized and disposed of ra erly? :-re valves on containment systems closed and locked except during observed and controlled releases? Are tank systems, including tank integrity- inspected and tested I regularIN-9 I �, Hercules Steel Company, Inc. Semi Annual Inspection Report Revision 1, dated I Required I f 6. Equipment Maintenance & Washing i YFfi-! NO i NIA Action !f Ise ui ment checked for leaking fluids? Are maintenance activities performed indoors where ractical? � Are waste materials properlN, se re ated, labeled and discarded? Axe outside wash areas in compliance with the Permit? f Is washwater contained or otherwise kept out of the storm drainage systeRi? 'f I j 7. Preventative Maintenance YES I f O NIA Required . Action F.--�xe there regularly scheduled inspections of equipment that could result in leaks/spills that could enter the storrnwater sv,tem'? 1 Is a program in place to routinely repair or replace leaking or dripping vehicles and equipment? I I I I I ! ' Are stormwater management devices routinely inspected and maintained (e. . cleaning catch basins and cloiged inlets):' i Are sediment traps 'installed in storm drains or sewer systems operating and being maintained properly? � � I Inspection=NoteslObservations or Required Actions: I i i ! HERCULES STDC,OMPANY, INC. P.O. Drawer 3520E O;Country Club Drive Phone: 910-48815I11O yFaz1910-488-4040 w-s FAYETTEVILLE. NORTH CCA.ROLINA 28301 —0208 January 21, 2016 Division of Water Quality Attn: DWQ Center Files 1617 Mail Service Center Raleigh, NC 27699-1617 Re: Year One, Period 2 July 1, 2015 through December 31, 2015 To whom it may concern, We were unable to collect a water sample during the second six months of 2015. We therefore are unable to turn in a monitoring report. This letter is to indicate that we had a "No Flow" during that period of time. We are currently waiting for the next substantial rainfall during business hours to collect a water sample and report the 'nfo ation to you. Sincerely n WfttCit Engineering & Infrastructure Stormwater Division January 20, 2015 Mr. Lynn Jourden Vice President of Operations Hercules Steel 950 Country Club Drive Fayetteville, NC 28311 Dear Mr. Jourden: 433 Hay Street Fayetteville, NC 28301-5537 (910) 433-1613 www. ci tyo ff aye t tevi l i e.org On January 13, 2015, a site inspection was conducted for compliance with your facility for NPDES Stormwater Discharge Permit, NCG030000. This facility located at 950 Country Club Drive in Fayetteville NC drains into Cross Creek, a direct tributary to Cape Fear River. A copy of the Compliance Inspection Report is attached for your review and records. The Following is a list of items addressed during the inspection: • The facility Stormwater Inspection Program needs to be done semi-annually. • There was no Qualitative monitoring for 2014 and it should also be performed semi- annually. • Analytical monitoring for 2014 was reported as "No Flow" however it to needs to be performed semi-annually. At the time of inspection, this facility was found to be in compliance with your permitted Certificate of Coverage. I would like to thank you and your staff for the time and assistance in conducting this inspection. If there are any questions regarding this report, please contact me directly at (910) 433-1091. Th k you, r anny trickland Stormwater Inspector City of Fayetteville Attachment: Copy of Compliance Inspection Report You The City of Fayetteville, North Carolina does not disuhninate on the basis of race, sex, color, age, national origin, religion, or disability in its employment opportunities, programs, sen�ices, or activities. Industrial Compliance 1 Inspection geport Permit #: &&2p3oocz Effeettve, 11- E, 1.2 Expiration: l o-31— I" j Owner: erc jks '34"1 L.s rn'e.521 J� SIC: 3 yyo� — pacIllty: Contact Person: Lr_Jb.r?sn Title; / !. of dT 40r 11-' Phone: 9la— ySs"� 5�10 Facility Address;. D14vc. NC J I Inspection Date. — is- s Entry,Time: . E)dt Time; l �•� 4,1 q i Primary Inspector; n S \ { Phone; Reason for Inspection: Lof+l�I •e hc� _ Inspection Type; M��i?y Permit Inspection Type; �ri�Vj'�jrt h / S// P9AJWe- :jr) yi I Facility Status: (g Compliant ❑foot Compliant Question Areas: LJLIJ Storm Water NoteslComments; 339ALEXANDERSTREET FAYETTEVILLE, NC 28301-5797 (910) 433-166011661 • FAX (910) 433-1647 www.6tyoffaye1levil1 e. org An Equal Opportunity EMPloycr City of Wovkel Engineering & Infrastructure Stormwater Division January 9, 2014 Mr. Lynn Jordan Vice President of Operations Hercules Steel 950 Country Club Drive Fayetteville, NC 28311 Dear Mr. Jordan: 433 Hay Street Fayetteville, NC 28301-5537 (910) 433-1 b13 www.6tvoffayetteville.org On January 9, 2014, a site inspection was conducted for compliance with your facility for NPDES Stormwater Discharge Permit, NCG030000. This facility located at 950 Country Club Drive in Fayetteville NC drains into Cross Creek, a direct tributary to Cape Fear River. A copy of the Compliance Inspection Report is attached for your review and records. At the time of inspection, this facility was found to be in compliance with your permitted Certificate of Coverage. However, it was noted during the inspection that the training records for 2013 was not available and that there was no sampling of Copper and Zinc during the June 10, 2013 sampling event. I would like to thank you and your staff for the time and assistance in conducting this inspection. If there are any questions regarding this report, please contact me directly at (910) 433-1091. Thank you, Danny Strickland Stormwater Inspector City of Fayetteville Attachment: Copy of Compliance Inspection Report cc: Mike Lawyer, NC Division of Energy, Mineral and Land Resources Nikkia Benitez, Stormwater Administrative Assistant Michelle Faye, Stormwater Paralegal You I �.4 The City of Payelhzvillo, North Caroling does not discriminate on the basis of race, sex, color, age., national origin, reli f ion, or disability in its emplanrment opportun'sties, programs, senVites, in' activities. Industrial omp iance InspectionKeport Permit#; NC603g000w Effective: f l-1 ! Z2 Expiration: lb- 3)- j'1 _ Owner: SIC: �3910 Facility: 14 I 'I ContAei Person: L4, J or far Title: . UP of Phone: Facility Address: ! 5 o 0�, nr,� C-`--' Inspection Date: - 4 Entry Time: 50 Exit Time: Primary Inspector: c'n S trl �+� ��`1� Phone: Reason for Inspection; Ors p yp : c `` _� Q ��r�c.� Inspection e V�OrMw�.�CT — t Perntit Inspection Type: f�3Cc,_a3oaoo inZoStrir- i Z�-korMI Facility Status: CE Compliant ❑ Not Compliant Question Areas: Tf c,t n;.-jtn _onj Storm enter Notes/Commenis:qq y 339 ALEXANDER STREET FAYETTEVILLE, NC 28301.5797 (910) 433.1660/1661 - PAX (910) 433.1647 www' Cayoffayetlevine,org An Equal Opportunity Employer Industrial olltp Iance Inspection.Report Permit#: NC6030000 Effective: Expiration: (b- 3 1 - t 7 Owner: _ r�ClCcdfs LJ � SIC; 3 9 `1 d Facility: Contact Person: ��nn Tor Title: _,% p Q .00fa-iJ Phone: Facility Address: _ 115 () _ L 0 n� � cAllb lb" Inspection Date: _9 ' Entry Tinie: 50 Exit Time: Primary Inspector: Cd-\�I��'� Phone: Reason for Inspection: nQ S�rt`�c!� i 1 c.r�c 2 - Inspection Type: - - - - - -- - ' Pernlit Inspection 'Type: NC(Z, p3D�.JOLI n U Facility Status: cg Compliant ❑ Not Campiiant Question Areas: f p Storm Water Notes/Comineols:ii (� 1 �TD JarnQl.^c. ^ MCA��-}w�fGtz.Tio�l - 339 ALEXANDER STREET FAYETTEVILLE, NC 29301-5797 (910) 433-1660/1661 • FAX (910) 433-1647 www'Cityoffayetteville.org An Equal Opportunity Employer STORMWATER DISCH MONITORI GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE NO. NCG03 b �d FACILITY NAME PERSON COLLECTING SAMPLES CERTIFIED LABORATORY Lab # Lab # Part A: Specific Monitoring Requirements ARGE OUTFALL (SDO) (� / 14G REPORT SAMPLES COLLECTED DURING CALENDAR YEAR: (This monitoring report is due at the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY PIIONE NO. ( )_ PLEASE SIGN ON THE REVERSE 4 Outfall No. Date Sample Collected, mo/dd/ r 00530 (10400 01051 00556 78141 Total Suspended Solids, m= L pH, Standard units Lead, mg/L Oil and Grease, mg , Total Toxic Organics', m L Benchmark 100 Within 6.0 — 9.0 0.033 30 1 Note: If you report a sampled value in excess of the benchmark value, or outside (fie benchmark range for pl-1, you must iniplemcnt 'I'icr I or-Ticr 2 responses. See Gencral Permit text. Did this facility perform Vehicle Maintcnancc Aclivitics using more than 55 gallons of new motor oil per month? _ yes Tno (if yes, complete Part S) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall No. Jate Sample Collected, mo/dd/ r 00556 00530 00400 Oil and Grease, mWL Total Suspended Solids, m pH, Standard units New Motor Oil Usage, Annual average gal/mo Benchmark - 30 lot) 6.0 — 9.0 - Note: If you report a sampled value in excess of the henchrnark value, or outside the henchniark range for pl-1, you musl implement Tier I or Tier 2 responses. See General Permit text. STORM EVENT CHARACTERISTICS: Date (first event sampled) Total Event Precipitation (inches): _ Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches); Mail Original and one copy to: Division of Water Qualitv Attw DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27099-1617 S W U-245-031308 Page I of 2 I Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.1 l; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469,22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may he waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." f (Date) "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information sub 'I d. Based on my inquiry of the person or persons who manage the system, or those persons directly responsibor gathering the information, the information submitted is, to the best of my knowledge and belief, tr ccurate, anmplete. I am aware that there are significant penalties for submitting false information, including e pos 'bility of fiand imprisonment for knowing violations." (Sig to of rmittee) (Date) S W U-245-031308 Page 2 of 2 Hercules Steel Company, Inc. _ Semi Annual Inspection Report Revision 1, dated Date: Building/Area Prepared By: 1. Good Housekeeping Procedures YES ,NO NIA Required Action Are work areas and floors clean and dry? Are there any visible leaks or potential sources for discharge of significant material? Are containment dikes in good condition, with valves closed? Are dum sters outside the shop closed? Is loose garbage and waste material picked up and disposed regularly? Is trash and litter removed from catch basins and other portions of the stormwater drainage system on a regular basis? Are areas subject to erosion stabilized with grass mulch, check dams, or other appropriate sediment control measures? Are scrap arts and scrap metal disposed regularly and properly? 2. Hazardous Substances Handhng & Storage YES NO NIA Required Action Is there adequate aisles ace and organization in all storage areas? Are items in storage proRerly labeled to indicate contents? Are all containers labeled with contents on the appropriate label? Are all containers closed? Are all containers in good condition (free of leaks, spills and corrosion?) Are there less than 55 gallons of hazardous waste for each accumulation area? Is emergency/contingency equipment accessible to the accumulation areas? ` 3. Painting Operations YESNO NIA Required Action Are painting activities performed within designated areas? Does the designated paint area prevent overspray and the contact of byproducts.with stormwater? / Are paints, thinners, and solvents recycled, reused or disposed of properly 4. Personnel Training & Record Keeping YES: NO NIA Required Action Are employees trained in Spill Prevention and Response, Good Housekeeping and Hazardous Material managementpractices? Is there objective evidence that training records are kept? 5. Li uid Storage in AST & Fuehn Y-ET NO NIA Required Acton Is secondary containment provided for tanks and fueling areas? Are fueling areas protected from precipitation and run-on? Ares ill kits readily available at the Facility? Are fuel tanks filled carefully without allowing over -splash? Are fuel leaks ands ills controlled using absorbents/drip pans/pads? Are dry cleanup methods used, swept up, containerized and disposed of properly? Are valves on containment systems closed and locked except during observed and controlled releases? Are tank systems, including tank integrity inspected and tested regularly? / Hercules Steel Company, Inc. Semi Annual Inspection Report Revision 1, dated 6. Equipment Maintenance & Washing YEFY NO NIA Required Action Isequipment checked for leaking fluids? Are maintenance activities performed indoors wherepractical? Are waste materials properly segregated, labeled and discarded? Are outside wash areas in compliance with the Permit? Is washwater contained or otherwise kept out of the storm drainage system? 7. Preventative Maintenance YES ; NO NIA Required Action Are there regularly scheduled inspections of equipment that could result in leaks/spills that could enter the stormwater system? Is a program in place to routinely repair or replace leaking or dripping vehicles and equipment? Are stormwater management devices routinely inspected and maintained (e.g. cleaning catch basins and clogged inlets)? Are sediment traps installed in storm drains or sewer systems operating and bein "maintained properly? Inspection VoteslObservations or Required Actions: HERCULES STf OMPANV, INC. P.O. Drawe48,N � �0 o nt Club Drive Phone:91;1 0910-488-4U40 FAYETTEVILLE, N RQ �s C_AROLINA 28301—0208cS`\ j Jp,N 0 � �p15 CENR SECS ON DW January 5, 2015 Division of Water Quality Attn: DWQ Center Files 1617 Mail Service Center Raleigh, NC 27699-1617 RE: Year One, Period 2 July 1, 2014 through December 31, 2014. To Whom It May Concern, We were unable to collect a water sample during the last six months of 2014. We therefore are unable to turn in a monitoring report. This letter is to indicate that we had a "No Flow" during that period of time. We are currently waiting for the next substantial rainfall during business hours to collect a water information to you. Citwttevk. LJ111114ca�xl� Engineering & Ii1fr,1Stl'UCtltt'e Stormwater Division (910) 433-1656 July 18, 2013 Mr. Lynn Jordan Vice President Operations Hercules Steel 950 Country Club Road Fayetteville, NC 28311 Dear Mr Jordan: 433 Hay Street Fayetteville, NC 28301-5537 XVW%%r.cityoffayettevil le.org On June 10, 2013. a site inspection was conducted at your Facility located at 950 Country Club Road in Fayetteville, NC. This Facility has been granted a Certificate of Coverage, NCG030401 under the General Permit NCG300000 with North Carolina Department of Environment & Natural Resources (NCDENR) for stormwater discharge. Stormwater from this Facility drains through the City of Fayetteville's conveyance system into Cross Creek within the Cape Fear River Basin. A copy of the Field Information Report has been included with this letter for your review and records. At the time of inspection your Facility was found to be in compliance with the conditions set forth by the Certificate of Coverage issued by North Carolina Department of Environment & Natural Resources (NC DENR). would like to thank you and your staff for the time and assistance given to conduct this inspection, and the effort given to comply with this Permit. If there are any questions regarding this letter or the inspection itself, please contact me directly. CITY OF FAYETTEVILLE Dennis Miller, Fayetteville Stormwater PH # 910-433-1655 dmiller@ci.fay.nc.us DEM/sd Cc: Mike Lawyer, NC Division of Water Quality Enclosure: Field Inspection Report rff,53 Yau .� The City ot'Fayumc ilie. North Carohnadoes lint dist'riminateon the basi. ot'raLv. se.v color, age. national origin. religion, or disability ill its employment opportunities, pro grarm. services. or activities. irsiCTtliL 3 �. Permit 4: 0 B0 qb Effeet No: I -I Expiration: U- 4°t a- Oivncr: SIC: . 1 �{?{a -- _ Contaet Person: LddAi SQrjAlJ -- Facility Address: qwCOVA4- v Inspection Date: Ytje- 6_ , a-Q13 + Primary Inspector: ��„ e N+tJ l b ( 1 l Reason for Inspection: A Atli-4 pel•ntit Inspection Type: fA Facility Status: ® Compliant Question Ares:. — --- _ IN Storm water Notes/Comments: Facility. 14e,,"06- ItCd Title; VIP. Q�A4 ta1Vb Phone, q jQ - 4Tm _- 511Q - ►� t:, Entry Time: 1A0 PYA Exit Time:F i Phone: �1b _ ti 3 3' l ffl S F } Inspection Type: ❑ Not Compliant 1 ' i 339 ALEXANVER STREET FAMTEVILLE, NC 28301-5797 (910) 433.1660/1661 - fAX (910) 433.1647 www.cilyoffayetteville.org An Equal Opportunity Employer NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Hercules Steel Company Attn: Lynn Jourden, VP of Operations 950 Country Club Drive Fayetteville, NC 28301 Division of Water Quality Charles Wakild, P.E. Director May 22, 2012 Subject: COMPLIANCE EVALUATION INSPECTION Hercules Steel Company, Certificate of Coverage-NCG030401 NPDES General Permit-NCG030000 Cumberland County Dear Mr. Jourden: Dee Freeman Secretary On May 17, 2012, a site inspection was conducted for the Hercules Steel Company facility located at 950 Country Club Drive, Fayetteville, Cumberland County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Your time and assistance during the inspection is greatly appreciated. Permit coverage authorizes the discharge of stormwater from the facility to the City of Fayetteville's Municipal Separate Storm Sewer System (MS4) and Cross Creek, a Class WS-IV waterbody in the Cape Fear River Basin. The site visit and file review revealed that the subject facility is covered by NPDES General Permit-NCG030000, Certificate of Coverage- NCG030401. As a result of the inspection, the facility was found to be in compliance with the conditions of the NCG030000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the subject NPDES General Permit are subject to a civil penalty assessment of up to,$25,000 per day, per violation. If you or your staff has any questions, comments, or needs assistance with understanding any aspect of your permit, please contact me at (910) 433-3329 or by e-mail at mike. lawyer@ncdenr.gov. Sincerely, Michael Lawyer, CPSWQ Environmental Specialist Enclosure cc: Dennis Miller -City of Fayetteville Stormwater (via e-mail) FRO -Surface Water Protection N'rki Maher-WBS Compliance & Permits Unit DWQ Central Files Location: 225 Green Street, Suite 714, Fayetteville North Carolina 28301 Phone: 910433-33001 FAX: 910-486-07071 Customer Service: 1-877-623-6748 Internet: ht1p:1/porIal.ncdenr.orglweb1wq An Equal Opportunity % Affirmative Aelion Employer NorthCarolina Natlrl"l lly Permit: NCG0304D1 Owner - Facility: Hercules Steel Co Inspection Date: 05/17/2012 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Joint inspection conducted along with Dennis Miller with Fayetteville Stormwater. Met with Mr. Lynn Jourden, VP of Operations. Made observations of site conditions including storm drains, processing and storage areas, and stormwater discharge outfall. Site appeared well maintained. Reviewed facility's Stormwater Pollution Prevention Plan (SPPP) and monitoring records. Made some recommendations regarding the SPPP to include documentation of an annual review/update, necessary signatures, completion/more detail of certain components, and additions to the site map such as direction of flow. Based on monitoring records from 2010 to present, there have been no exceedances of Benchmark Values with two 'No Flow' events documented for the second half of 2010 and first half of 2011. Facility personnel stated that pH has been measured using a color kit. Personnel were advised to begin using a calibrated meter to check pH values within 15 minutes of collecting discharge sample. Since the previous inspection conducted on April 26, 2010, this site has come into compliance with the conditions of the NCG030000 permit. Page: 2 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P.E. Governor Director March 5, 2012 Lewis 3ourden Hercules Steel Co -Cumberland PO Drawer 35208 Fayetteville, NC 28303 Subject: NPDES Stormwater Permit Coverage Renewal Hercules Steel Co -Cumberland COC Number NCG030401 Cumberland County Dear Permittee: Dee Freeman Secretary Your facility is currently covered for stormwater discharge under General Permit NCG030000. This permit expires on 10/31/2012. The Division staff is currently in the process of renewing this permit. When a draft is available for notice and public comment, it will be posted on our website at http://portal.ncdenr.org/web/wq/ws/su/public-notices. Please continue to check this website to review and comment on proposed changes to the permit. Once the permit is reissued, your facility would be eligible for continued coverage under the reissued permit. To assure consideration for continued coverage under the general permit, you must apply to the Division of Water Quality (DWQ) for renewal of your permit. Enclosed you will find a Permit Coverage Renewal Application Form. The application must be completed and returned by May 4, 2012, Letters confirming our receipt of the completed application will not be sent. Failure to request renewal within the time period specified may result in a civil assessment of at least $250.00. Larger penalties may be assessed depending on the delinquency of the request. Discharge of stormwater from your facility without coverage under a valid stormwater NPDES permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties of up to $25,000 per day. "No exposure exclusion" is now available to industrial facilities in any of the categories of "storm water discharges associated with industrial activity," (except construction activities). If you feel your facility can certify a condition of "no exposure", i.e. the facility industrial materials and operations are not exposed to stormwater, you can apply for the no exposure exclusion. For additional information contact the Central Office Stormwater Staff member listed below or check the Stormwater Permitting Unit Web Site at http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-5. If the subject stormwater discharge to waters of the state has been terminated, please complete the enclosed Rescission Request Form. Mailing instructions can be found on the bottom of the form. You will be notified when the rescission process has been completed. If you have any questions regarding the permit renewal procedures please contact Bethany Georgoulias of the Central Office Stormwater Permitting Unit at (919) 807-6372. Sincerely, Bradley Bennett Supervisor, Stormwater Permitting Unit 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location:512 N. Salisbury SL Raleigh, North Carolina 27604 Phone: 9 19-807-6300 1 FAX: 919.807-64941Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer One NorthCarolina Naturally aF v+nrgq o� o� Permit Rescission Request Form a ° Y National Pollutant Discharge Elimination System General Permit NCG030000 Certificate of Coverage Number NCG030401 Please fill out and return this form only if you no longer need to maintain your NPDES stormwater permit. The following is the information currently in our database for your facility. Please review this information carefully and make all corrections as necessary in the space provided to the right of the current information. Owner Affiliation Information Owner / Organization Name: Owner Contact: Mailing Address: Phone Number: Fax Number: E-mail address: * Rescission Correspondence will be mailed to the owner address Hercules Steel Co. Lewis 3ourden PO Drawer 35208 Fayetteville, NC 28303 910-488-5110 Ext. 910-488-4040 Facility/Permit Contact Information Facility Name: Hercules Steel Co -Cumberland Facility Physical Address Facility Contact: Mailing Address: Phone Number: Fax Number: E-mail address: 950 Country Club Dr Fayetteville, NC 28301 Reason for rescission request (This is required information. Attach separate sheet if necessary): REQUEST AND CERTIFICATION I, as an authorized representative, hereby request rescission of certificate of coverage NCG030401 under NPDES Stormwater General Permit NCG030000 for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Signature Print or type name of person signing above Date Title Please return this completed rescission request form to: SW General Permit Coverage Rescission Stormwater Permitting Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 —, STORMI1fATER DISCHARGE OUTFA.LL, (SDO) NiGitiI-TORING REPORT GF.,NERAL PER1 UT NO. NCG030000 SAMPLES COLLFCT'ED DURING CALENDAR YEAR: I C ' CE:RT•IF ICATK OF COVERAGE NO. NCG03 C) 0 L. _ (This monitoring report is due at the Division no later than 30 ci.:ys from ` the (late the facility receives the sampling results fro n the laboratory_) FACILITY NAME COUNTY�s PERSON C(�L[.ECI'IN[: SAc�IPC.,Etia PHONE NO. !O_)_ YE S!! O CERTIFIED I.,ABORAToln, 0"1',C.cp brlC Lalr # I.ah t9 PLEASE SIGN ON THE' REVF,RSE Part A: Specific Monitoring Requirements OlitfalI No. Daie ` Sample Collected,, tiro/dd/yr �' '?; : 00530; " :: 00400 OOSSb. 7814 h ` ? rotal Suspended Solids, m"/I ;. pti; St$iiilar.d (gulls : I cad; rig/L.:: 'Oil rind Grease, 'rn /i i; iot1l Fo ie Organics , m /L BenclimaTk - `:^ '::: I00. ��itliiii b-.O,— 0,0 ..., .'0.033i- 06, o f o b o l4 ai>? . S 'v Note: If you report a sampled value in excess of the benchmark value, or outside the 17e]SChinar1: range for pl-I, you must impienient "Pier 1 or Tier 2 responses. See General Permit text. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _ yes —no -. B, �l. ycF, CCiiep tP.iC +:t ; Part 15: VehicIe iiNlaintenance Activity Monilorin g Rec nirenicrits Outrrdl No. Mate Sample: Collectc ' 06556 00531) ;': :. i Oaaon ail+urrd Grease, ... fatal Susptatded Solids; . pII, Stairilard•;imits: i t ew;Motor. Oil Usage, :Annual averii a gaultio Benchmark - ,. °: :.. 30 ' 100 . �? ! ! : 6.0 9 0 Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pl-I, you trust implement Tier l or Ticr 2 responses. See General Permit text. STORM EVENT CHARACTERISTICS: Mail Original: anti ogre copy to: Division of Water Quality Date („ I -!0 (first event sampled) Attn: DWQ Central Files "Total Event Precipitation (inches): 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Date (list each additional event sampled this reporting period, and rainfall atDE G'V VR—r RO Total went Precipitation (inches): !UN 2 1 2010 D'1 � J S W U-24 5-102107 it Page I of 2 I "Total Toxic Organics sampling is applicable only for those f;rcilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility sub.jcct to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.1 1; for semiconductor manufacture use the definition as found in 40 CFR 469.12: for electronic crystal manufacture use the definition as found in •10 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 C17R 469.31). Facilities that incorporate a solvent management plan into th-, Storntwater Pollution Prevention Plan may request that DWQ waive monitoring of total toxic organics. -1'he solvent managcrircnt plan shall include a list of the total toxic organic, compounds used and the other elements listed in the General 1'c1 Init. I -or those facilities allowed such a waiver, the disch,rrber shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TT()), I certify that to the best of'my knowledge and belief, no dumping of concentrated toxic.organics into the storrnwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention flan." mc (p.:,tt na;ne) Title. (Print title) (Signature) (Date) "1 certify, under penalty of law, that this document anti all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fink and imprisonment for knowing violations." (Sims to a of PegMittee) (Date) SWU-245-102107 Pale 2 of 2 Fayetteville Division 2592 Hope Mills Rd 8-13 Wendy Court Fayetteville, NC 28306 Greensboro, NC 27409 910.964,1920 Phone 336.856.9710 Phone 910.864.8774 Fax 336,856.9711 Fax Certificate of analysis Hercules Steel Co. Date Reported: June 13, 2010 Mr. Lynn Jourden Project: Stormwater Sample po 950 Country Club Drive Date Received: June 01, 2010 Fayetteville NC. 28301 Sampled By: Thomas Wood Date Sam pled: June Ol, 2010 Stormwater 1006058-01 Analyte Result Unit Analvsis Date lime Analyst Method Qualifier Anayzed try: Microbac - Fayetteville Division Lead 0.00890 Oil 8 Grease (HEM) 22.5 Total Suspended Solids 27,3 mglL 6I4/M 6:59 mg/l., 617l10 8:00 mg/L 6/2/10 14:30 Notes and Definitions RAS SM 20th Ed. 3113 B RAS EPA 1664 ARS SM 20th Ed. 2540 D DEN - r �1 JUN 2 1 DWQ State Certifications: Respectfully Submitted NCDNR #11, #693- s4CDOH #37714, #37795 USDA #3787 R. W. Sanders, VP/Managing Director Thank you for your business. We un•ue rnur feedhack nn our le%vt of senrce ro 3vu. f'hnse corrracr rhr f'1! M�+ngmR 17irrcx,r. Rrrrr 4.xien nr 9111-46J-1V711. James Nnkr�, 1'm.rrQrrrr, pr makr�--Me rnm nr Tre—, Nnu v CPO w rh,n—a rmhnn.cnm w nh rmv rnmmenrc rsr mvvr nvrn v. d �f ,J4A7.6� DENR-FR(. o� °cam .SUN 2 1 2010 Dw0 R Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Permit No.: NIC1610131U/0/0Q1 or Certificate of Coverage No.: NICIGI01 31 UI qld Facility Name: 2rCu !J4-2e. C.o"n Gtit�! T County: Corn-) ber L�.-1 —Phone No. _ !0 - 44 Inspector: Date of Inspection; Lo _ I - I_ _ _ - By this signature, I certify that this report is accurate and complete to the nest of my knowledge (Signature of Permittee or Designee) 1. Outfall Description Outfall No. Structure (pipe, ditch, etc.)+4J0X Receiving Stream. _ Describe the industrial activities that occur within the outfall drainage area:_ 2. Color Describe the color of the dark) as descriptors: _ arge using- basic colors (red, brown, blue, etc.) and tint (light, medium, 3. Odor Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.) 4. Clarity Choose the number which best describes the clarity of the discharge where 1 is,c]car and 10 is very cloudy: 1 2 ]J 4 5 6 7 8 9 10 Page l swv-242-020705 5. Floating Solids Choose the number which best describes the amount of floating solids in the stormwater discharge where 1 is no solids and 10 is the surface covered with floating solids: C, ) 2 3 4 5 6 7 8 9 10 6. Suspended Solids Choose the number which best describes the amount of suspended solids in the stormwater discharge where 4 is no solids and 10 is extremely muddy: G 2 3 4 5 6 7 8 9 t0 7. Foam Is there any foam in the stormwater discharge? Yes No 8. Oil Sheen Is there an oil sheen in the stormwater discharge? Yes Na 9. Deposition at Outfall Is there deposition of material (sediment, etc.) at or immediately below the outfall? 10. Erosion at Outfall Is there erosion at or immediately below the outfall? Yes No 11, Other Obvious Indicators of Stormwater Pollution List and describe Yes No Note: Low clarity, high solids, anchor the presence of foam, oil sheen, deposition or erosion may be indicative of conditions that warrant further investigation and corrective action, Page 2 j SWU-242-020705 Fayetteville Division 2592 Hope Mills Rd 8-B Wendy Court Fayetteville, NC 28306 Greensboro, NC 27409 910.864.1920 Phone 336.956.9710 Phone 910.964.8774 Fax 336.856.9711 Fax Certificate of Analysis Hercules Steel Co, Mr. Lynn Jourden Date Reported: June 13, 2010 Y Project: Stnrmwater Sample 950 Country Club Drive Date Received: June Ol, 2010 Fayetteville NC, 28301 Sampled By: Thomas Wood Date Sampled: June O1, 2010 Stormwater 1006058-01 Analyte Result Unit Analysis Date/Time Analyst Method Qualifier Analyzed by: Microbac - Fayemevllle Division Lead 0,00890 mg/L 6/4/10 6:59 RAS SM 20th Ed. 3113 B Oil & Grease (HFM) 22.5 mg/L 6/7/10 8:00 RA EPA 1664 Total Suspended Solids 27.3 mg/L 612110 14:30 ARS SM 20th Ed. 2540 D Notes and Definitions DENR-FRO JUN 17 2010 DWO State Certifications: Respectfully Submitted NCDNR #11, #693 NCDOH #37714, #37795 X. w— Aa zc" USDA #3787 R. W. Sanders, VP/Managing Director Thank you for your business_ We incite ynorfeed6ack un Rrrr level rfren ice ro yrw. Please ammo the Vf'.Managing Director, Run Sanders at 910-N64-1920..lames Nukes, President. at jnuke.r afrricrobac.rnm ar Trewr Noyre, CF-'O, ar tboyre^a�nicmi>ac.com >,irh onyrommenrs a. suggestions. Page I of l HERCULES/S'TE'E°L• COMPANY, 1NC. P.O. DraM352Q8 \95 Country Club Drive Phone :9910=4-5�1 Fax:910-488-4040 FAY ETTEVIIs Ei�NORl 1 AROLINA28301 —0208 May 11, 2010 Attn: Belinda Henson Division of Water Quality 225 Green Street -Suite 714 Fayetteville, NC 28301 Dear Ms. Henson, DENR-FRO MAY 13 2010 DWVO We are in receipt of the Notice of Violation on our Stormwater General Permit-NCG30000. We are awaiting any kind of substantial rainfall so that we may take the required samples, get them tested, and forward you the results. It has been some time since we had substantial rainfall during working hours. We will try to ensure that all required testing be kept current in the future. Please do not hesitate to call if there are any questions. ,7�L Beverly Eaves Perdue Governor WA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Coleen H. Sullins Director May 5, 2010 CERTIFIED MAIL: 7009 0820 0000 2473 7872 RETURN RECEIPT REQUESTED Hercules Steel Company Attn: Lynn Jourden, VP of Operations 950 Country Club Drive Fayetteville, NC 28301 Subject: NOTICE OF VIOLATION (NOV-2010-PC-0542) Hercules Steel Company NPDES Stormwater General Perm it-NCG030000 Cumberland County Dear Mr. Jourden: Dee Freeman Secretary DENR-FRO MAY 13 2010 DWO On April 26, 2010, Michael Lawyer from the Fayetteville Regional Office of the Division of Water Quality, conducted a site inspection for the Hercules Steel Company facility located at 950 Country Club Drive in Fayetteville, Cumberland County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Your time and assistance during the inspection is greatly appreciated. Stormwater from the facility drains to the City of Fayetteville's Municipal Separate Storm Sewer System (MS4) and ultimately to Cross Creek, a Class WS-TV water located in the Cape Fear River Basin. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit-NCG030000 under Certificate of Coverage NCG030401. Accordingly, the Following observations and/or permit conditions violations were noted during the Division of Water Quality inspection: 1) Stormwater Pollution Prevention Plan (SPPP) A Stormwater Pollution Prevention Plan (SPPP) has been developed, recorded, and properly implemented. Yes Ie No ❑ 2) Qualitative Monitoring Qualitative monitoring has been conducted and recorded in accordance with permit requirements. [Yes ❑ No 3) Analytical Monitorinp, Analytical monitoring has been conducted and recorded in accordance with permit requirements. [Yes ❑ No® Location: 225 Green Street, Suite 714, Fayetteville, North Carolina 28301 Phone: 910A33-33001 FAX: 910-086-07071 Customer Service: 1-877-623-6748 Internet: wwriwate[gualitymg An Equal Opportunity 1 Affirmative Acton Employer Nne oahCarolina naturally Other Observations: Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Requested Response: You are asked to respond to this office, in writing, within 30 calendar days from receipt of this notice. Your response should include a Plan of Action to address the aforementioned violations as well as a reasonable time frame that you expect to be in full compliance with the conditions of the NCG030000 general stormwater permit. "Thank you for your attention to this matter. This office requires that the violations, as detailed above, be properly resolved. These violations and any future violations are subject to a civil penalty assessment of up to $25,000 per day for each violation. Should you have any questions regarding this matter, please contact Mr. Lawyer or myself at (910) 433-3300. Sincerely, lza, No rd 1. W11 � Belinda S. Henson Regional Supervisor Surface Water Protection Section BSH: MI.,/ml Enclosure cc: FRO -Surface Water Protection NPS-Assistance & Compliance Oversight Unit DWQ Central Files Compliance Inspection Report Permit: NGG030401 Effective: 11/01/07 Expiration: 10/31/12 Owner: Hercules Steel Co SOC: Effective: Expiration: Facility: Hercules Steel Co -Cumberland County: Cumberland 950 Country Club Dr Region: Fayetteville Fayetteville NC 28301 Contact Person: Lynn Jourden Title: VP of Operations Phone: 910-488-5110 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): On -site representative Lynn Jourden Phone: 910-488-5110 Related Permits: Inspection Date: 04/2612010 Entry Time: 09:00 A Exit Time: 1020 AM Primary Inspector: Mike Lawye4 Phone: 910-433-3300 ExjL� �.ecenda*v-Inspezter{s�:. ��.�A�� 33y�r Belinda S Henson Phone: 910-433-3300 Ext,'Z ' Reason for Inspection: Routine Inspection Type: Compliance Evaluation 33Z� Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ❑ Compliant Y Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 Permit: NCG030401 Owner - Facility: Hercules Steel Co Inspection Date: 04/26/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Inspection conducted to ensure compliance with the conditions of the NCG030000 general stormwater permit. Based on file, this is the first stormwater inspection conducted by DWQ at the facility. Met with Mr. Lynn Jourden, Vice President of Operations, who provided available documents for review and tour of the facility. A Stormwater Pollution Prevention Plan (SWPPP) has been developed and was reviewed for completeness. The facility's SWPPP was detailed yet easy to follow and appeared to contain all permit -required components. Monitoring records were not available as according to Mr. Jourden, monitoring has not been conducted throughout the facility's permit coverage, which began in 1996. Mr. Jourden expressed that contact has been made with a laboratory to provide sample containers and testing services. A recently received sample kit was observed at the time of inspection. Monitoring requirements including both Qualitative (Visual) and Analytical were discussed. Mr. Jourden was informed that a Notice of Violation would be issued to the facility for failure to conduct and document monitoring events as required by the NCG030000 general permit. Page: 2 Permit: NCGO30401 Owner - Facility: Hercules Steel Co Inspection Date: 04/26/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ■ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ■ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ■ ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ■ ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ■ n n n # Does the Plan include a BMP summary? m ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ ❑ ❑ # Does the facility provide and document Employee Training? ■ ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ■ ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ■ ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ■ Cl ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ■ ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ■ ❑ ❑ Comment: No monitoring throughout permit coverage. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ■ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ■ ❑ Comment: No monitoring throughout permit coverage. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑ # Were all outfalls observed during the inspection? ■ ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ■ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ■ ❑ ❑ ❑ Page: 3 Permit: NCG030401 Owner - Facility: Hercules Steel Co Inspection Date: 04/26/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Comment: Facility has 9 drains within industrial activity areas that all connect to a single outfall prior to entering the city's storm sewer system. There are 2 additional drains, however they only receive storm flow from the employee parking area. Page: 4 Adja NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director May 5, 2010 CERTIFIED MAIL: 7009 0820 0000 2473 7872 RETURN RECEIPT REQUESTED Hercules Steel Company Attn: Lynn Jourden, VP of Operations 950 Country Club Drive Fayetteville, NC 28301 Subject: NOTICE OF VIOLATION (NOV-2010-PC-0542) Hercules Steel Company NPDES Stormwater General Permit-NCG030000 Cumberland County Dear Mr. Jourden: Dee Freeman Secretary On April 26, 2010, Michael Laxvyer from tine Fayetteville Regional Office of the Division of Water Quality, conducted a site inspection for the Hercules Steel Company facility located at 950 Country Club Drive in Fayetteville, Cumberland County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Your time and assistance during the inspection is greatly appreciated. Stormwater from the facility drains to the City of Fayetteville's Municipal Separate Storm Sewer System (MS4) and ultimately to Cross Creel:, a Cass WS-IV water located in the Cape Fear River Basin. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit-NCG030000 under Certificate of Coverage NCG030401. Accordingly, the following observations and/or permit conditions violations were noted during the Division of Water Quality inspection: 1) Stormwater Pollution Prevention Plan (SPPP) A Stormwater Pollution Prevention Plan (SPPP) has been developed, recorded, and properly implemented. Yes ■ No ❑ 2) Qualitative Monitoring Qualitative monitoring has been conducted and recorded in accordance with permit requirements. es ❑ No ■ 3) Analytical Monitoring Analytical monitoring has been conducted and recorded in accordance with permit requirements. Yes ❑ No ■ Location: 225 Green Street, Suite 714, Fayetteville, North Carolina 28301 Phone: 910 433-33001 FAX: 910A86-07071 Customer Service: 1-877-623-6748 Internet: www wwaterguality.org An Equal Opportunity 1 Affirmative Action Employer None rthCarol>ina �atura!!y Compliance Inspection Report Permit: NCG030401 Effective: 11/01/07 Expiration: 10/31/12 Owner: Hercules Steel Co SOC: Effective: Expiration: Facility: Hercules Steel Co -Cumberland County: Cumberland 950 Country Club Dr Region: Fayetteville Fayetteville NC 28301 Contact Person: Lynn Jourden Title: VP of Operations Phone: 910-488-5110 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): On -site representative Lynn Jourden Phone: 910-488-5110 Related Permits: Inspection Date: 04/26/2010 Entry Time: 09:00 A Exit Time: 10:20 AM Primary Inspector: Mike Lawye� Phone: 910-433-3300 Ex� �mspect�:. y� 33z"i L ^C' Belinda S Henson � � Phone: 910-433-3300 Ex� Reason for Inspection: Routine Inspection Type: Compliance Evaluation 3~� Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ❑ Compliant ■ Not Compliant Question Areas: 0 Storm Water (See attachment summary) Page: 1 Permit: NCG030401 Owner - Facility: Hercules Steel Co Inspection Date: 04/26/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ In n n # Does the Plan include a General Location (USGS) map? ■ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ■ ❑ n n # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ■ ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ■ ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ■ n n n # Does the Plan include a BMP summary? ■ n n ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ ❑ ❑ # Does the facility provide and document Employee Training? ■ ❑ n n # Does the Plan include a list of Responsible Party(s)? ■ ❑ Cl ❑ # Is the Plan reviewed and updated annually? ■ ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ■ ❑ ❑ Cl Has the Stormwater Pollution Prevention Plan been implemented? ■ n n ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? n ■ ❑ ❑ Comment: No monitoring throughout permit coverage. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ■ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Comment: No monitoring throughout permit coverage. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑ # Were all outfalls observed during the inspection? ■ ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ■ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ■ ❑ ❑ ❑ Page: 3