Loading...
HomeMy WebLinkAboutNCC191844_ESC Approval Submitted_20190912Wake County Environmental Services Department Water Quality Division, Watershed Management Section I . 336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602 WAIT TEL 919 856-7400 • FAX 919 743-4772 COUNTY Nif 1,111 (%IIVi.INA SECPA -SEDIMENT AND EROSION CONTROL CONSTRUCTION PLAN APPROVAL North Hampton Project Name Town Homes Watershed Crabtree Date Processing Date Received 9/7/18 Initiated 9/19/18 Disturbed Acreage 8.76 Plan Review Fee $2190 Applicant: Name --------------------------------------------------------------------- David Stallings 3724 National Dr. STE 220 Address: --------------------------------------------------------------------- Raleigh, NC 27612 Phone: --------------------------------------------------------------------- Email: --------------------------------------------------------------------- David @shenandoahhomes.us Plan Date/Revision Date: 9.4.18/8.1.19 Engineer: Jurisdiction Morrisville Project Number SEC-005706-2018 Permit Fee $2190 Mike Roselli --------------------------------------------------------------------------------------------- 4130 Parklake Ave. STE 130 Raleigh, NC 27612 919-578-9000 --------------------------------------------------------------------------------------------- mroselli@bohlereng.com --------------------------------------------------------------------------------------------- Approval Date: Construction Plan Approved with the following Conditions of Approval and Applicable Standards 8.22.19 ® -include Silt fence outlets at low points and discharge points -add Wake County Signature Block to cover sheet Conditions of Approval Items marked with an "X" were noted as conditions of the Sediment and Erosion Control Plan approval. Unless otherwise noted, all references shown in brackets are for the Wake County Unified Development Ordinance (UDO), adopted 04/17/06. ® 1. A mandatory preconstruction meeting is required between the owner, contractor, and Wake County prior to issuance of the Land Disturbance Permit. The permit fee is due at that time. [10-30-7(C)] ® 2. Grading, other than for installation of soil erosion and sedimentation control measures, is prohibited prior to the issuance of a Certificate of Compliance. [10-30-7(D)] Contractor shall follow plans strictly and maintain contact with Wake County prior to making any field ® 3. modifications to erosion and sediment control devices. No devices shall be removed without prior approval from Wake County. Wake County's sedimentation pollution control program is performance oriented, requiring protection of the natural resources and adjoining properties. If at any time during the project it is determined that the Erosion ® 4. and Sedimentation Control Plan is inadequate to meet the requirements of the Erosion and Sedimentation Control Ordinance of Wake County, this office may require revisions in the plan and its implementation to ensure compliance with the Ordinance. Prior to the preconstruction meeting with the county, the applicant must obtain NCG-010000 NPDES Construction Stormwater General Permit coverage by completing an electronic Notice of Intent (NOI) effective April 1, 2019. The online NOI submittal must include the completed and notarized Financial ® 5. Responsibility/Ownership Form and this approval letter. Beginning on or around June 1, 2019, a $100 annual general permit coverage fee will be required per §143-215.3D by NCDEQ-DEIVILR. See NCDEQ web site at: https://deg.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-permits/stormwater- permits/construction-sw. ® 6 SUBDIVISIONS ONLY Builders are required to obtain grading permits for cumulative disturbance over one acre (including non-contiguous lots). 1 APPROVAL S&EConstructionPlan ReviewChecklist-V.2 Wvl WRT 1N'A E COUNTY Nif I',l 11 (%IIVI.INA Wake County Environmental Services Department Water Quality Division, Watershed Management Section 336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602 TEL 919 856-7400 • FAX 919 743-4772 SECPA —SEDIMENT AND EROSION CONTROL CONSTRUCTION PLAN APPROVAL Applicable Regulations Unless otherwise noted, all references shown in brackets are for the Wake County Unified Development Ordinance (UDO), adopted 04/17/06. 10-30-6 Validity of Plan, Lapse of Approval - An approved erosion and sedimentation control plan is valid for 2 ® 7. calendar years from the date of approval. If a land disturbance permit has not been obtained within the 2-year period, the erosion and sedimentation control plan approval becomes null and void. ® 8. 10-30-8 Actions Required Prior to Land Disturbance S&EC plan approval and land disturbance permit issued must be prominently displayed until all ® a. construction is complete, all permanent sedimentation and erosion control measures are installed and the site has been stabilized. A copy of the approved plan must be kept on file at the job site. ® b No person shall initiate a land -disturbing activity until notifying Wake County of the date that the land - disturbing activity will begin. ® 9. 10-31-1 Authority County officials may enter any property, public or private, at reasonable times for the purpose of investigating and inspecting the sites of any land -disturbing activity. No person shall refuse entry or access ® a• to any authorized representative or agent for the County who requests entry for purposes of inspections, and presents appropriate credentials, nor shall any person obstruct, hamper, or interfere with any such representatives while in the process of carrying out their official duties. Agents and officials of the County will periodically inspect land -disturbing activities to ensure compliance with the North Carolina Sedimentation Pollution Control Act, this article, or rules or orders adopted or ® b' issued pursuant to this article, and to determine whether the measures required in the erosion and sedimentation control plan are effective in controlling erosion and sedimentation resulting from land - disturbing activity. ® c' Any land -disturbing activity will be the responsibility of the person(s) conducting the land disturbing activity, including the property owners. Failure to prevent off site sedimentation will be deemed a violation of the erosion and sedimentation control regulations of this article. Wake County Watershed Management Section is not responsible for subject approvals of other Local, State or Federal Agencies. The subject approvals are (but not limited to) Federal Emergency Management Area Flood regulations/requirements, Division of Water Quality under stormwater or other water quality regulations/requirements, U.S. Army Corps of Engineers under Article 404/401 (Wetlands/Streams) jurisdiction/requirements, and/or any Federal, State, County and Local municipal regulations or permit requirements. The approval issued in this letter cannot supersede any other required permit or approval. Environmental Cinnamon Black Contact Info: Cinnamon.blackwakegov.com Consultant: 919 842 7142 Shawn .springer wakegov,com Wake County PE: Contact Info: Shawn Springer pPE,(.FM 919 369 6135 2 APPROVAL S&EConstructionPlanReviewChecklist-V.2 WM