Loading...
HomeMy WebLinkAboutSW3140601_Supplement EZ Cover Page _9/10/2019SUPPLEMENT-EZ COVER PAGE CORMSLOADEL, PROJECT INFORMATION 1 Project Name 2 Project Area 3 Coastal Wetland Area ac 4 Surface Water Area (ac) Courtyards at Marvin 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks providedjfeet) 8 Will the vegetated setback remain _ve etated? Yes 9 Is BUA other that as listed in .1003 4 c-d out of the setback? Yes 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 _jlnfiltration System ____ 0 12 ___ Bioretention Cell _ _ 0 13 Wet Pond 1 14 Stormwater Welland A 0 15 -_ Permeable Pavement 0 16 Sand Filter 0 17 1 Rainwater Harvesting RWH 0 18 JGreen _Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter _ 0 24 JSilva Cell 0 25 Ba�lter _ 0 26 I Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 1 Name and Title: _ _ Brian Rossi, PE 28 Or anization: EMH&T 29 Street address: 301 McCullough Dr 30 _ City, State, Zip: _ Charlotte, NC 28262 31 Phone numbers : -___ 704-548-0333 32 Email: brossi@emht.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. C A ESS/p _ • � SEAL 9l 045526 ��nnlnlnt�` Signature of Designer ne ,B l9 Date DRAINAGE AREAS 1 Is this a high density project? _ Yes 2 If so, number of drainage areas/SCMs 1 Is all/partof this project subject to previous rule 3 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Wet Pond 5 Total BUA in proiect (sq ft 328780 Sf 6 New BUA on subdivided lots (subject to permitting) (sq ft 328780 Sf 7 New BUA outside of subdivided lots (subject to permitting (soSf 8 Offsite - total area (sq ft Sf 9 Offsite BUA (sq ft Sf 10 Breakdown of new BUA outside subdivided lots: - Parkinsl (sq ft 900 Sf - Sidewalk (sq ft 17015 Sf - Roof (sq ft 241417 Sf - Roadway s ft 69448 Sf - Future (sq ft Sf - Other, please specify in the comment box below (sq ft Sf 11 New infiltrating permeable pavement on subdivided lots (sq ft Sf 12 New infiltrating permeable pavement outside of subdivided lots (sq ft Sf Sf 13permitting) Exisitng Bl1A that will remain (not subject to (sq ft) 14 _ Existing BUA that is already permitted (sq ft Sf 15 Existing BUA that will be removed (sq ft Sf 16 Percent BUA 0.3 17 Design storm inches 1 In 18 Desi n volu_me of SCM cu ft 61169 Cf 19 Calculation method for design volume Rational ADDITIONAL INFORMATION 20 1drainage Please use this space to provide any additional information about the area(s): WET POND 1 Drainage area number 1 17­1­2[besign volume of SCM (cu ft) 61169 cf ,GENERAL MDC FROM 02H 1050 _3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes _ 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? No 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? I Yes _ 17 Was the SCM designed by an NC licensed professional? MDC FROM 02H .1053 Method used Yes SA/DA WET POND 18 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 582.00 21 Elevation of the main pool bottom -(top of sediment removal) (fmsl) 581.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 589.00 23 Elevation of the permanent pool (fmsl) 589.50 24 Elevation of the top of the vegetated shelf (fmsl) 590.00 25 Elevation of the temporary pool (fmsl) 591.50 26 Surface area of the main permanent pool (square feet) 25475:1 27 Vol ume of the main permanent pool (cubic feet) 175739 cf 28 Average depth of the main pool (feet) 6.00 ft 29 Average depth equation used Equation 2 30 if using equation 3, main pool perimeter (feet) 31 If using equation 3, width of submerged veg. shelf (feet) 32 Volume of the forebay (cubic feet) 29875 cf 33 Is this 15-20% of the volume in the main pool? Yes 34 Clean -out depth for forebay (inches) 6 in 35 Design volume of SCM (cu ft) 160539 cf 36 Is the outlet an orifice or a weir? Orifice 37 efi If orifice, orice diameter (inches) 4 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 3 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes 42 Are berms or baffles provided to improve the flow path? Yes 43 Depth of forebay at entrance (inches) 48 in 44 Depth of forebay at exit (inches) 48 in 45 Does water flow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf (feet) loft 47 Slope of vegetated shelf (H:V) 10:1 48 _ Does the orifice drawdown from below the top surface_ of the permanent pool? Yes 49 Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) Yes 51 Is a trash rack or other device provided to protect the outlet system? No 52 Are the dam and embankment planted in non -clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment 54 Has a planting plan been provided for the vegetated shelf? Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about the 55 wet pond(s): Wet Pond 3 4:19 PM 8/27/2019