Loading...
HomeMy WebLinkAboutNCC191459_ESC Approval Submitted_20190819ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director NORTH CAROLINA Environmental Quality 8 May 2019 LETTER OF APPROVAL WITH MODIFICATIONS City of Hickory ATTN: Mr. Warren Wood 76 N Center Street Hickory, N.C. 28601 RE: Project Name: NCDOT STBG-DA PROJECT EB-5939 Riverwalk Acres Approved: 2.29 Project ID: BURKE-2019-016 County: Burke City: Hickory Address: Old Lenoir Rd. River Basin: Catawba Stream Classification: Lake Hickory, WS-IV, B, CA Submitted By: Ms. Christine Brown, CPSWQ, CPESC Date Received by LQS: 30 ApriI 2019 Plan Type: Recreational Dear Mr. Wood, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are attached. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOT) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form maybe accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul. clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. D � North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 NORTH CARGLI n + uene,i„—t of ftw.nMmull O.Aly 828.296A500 Letter of Approval with Modifications Mr. Warren Wood 8 May 2019 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Please note that these records shall be maintained until permanent groundcover has been established as required by the G.S. 113A-54AJ} Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, ,;jk- Mi hael S ith Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCG01 Fact Sheet ec: Ms. Christine Brown, CPSWQ, CPESC chris.brownRmcgillassociates. com Letter of Approval with Modifications Mr. Warren Wood 8 May 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: NCDOT STBG-DA PROJECT EB-5939 Riverwalk Project ID: BURKE-2019-016 County: Burke 1. Please provide an original, signed and notarized Financial Responsibility Form (FRO) showing the correct Latitude and Longitude Coordinates for this site. {G.S. 113A-54.11. 2. Please consider adding a construction entrance to the plan sheet at the northeast section of the end of the proposed pedestrian bridge at about STA 10+17.41. {G.S. 113A-57 (3)1. 3. Please consider adding an addition erosion control measures in the vicinity of the northeast end of the proposed pedestrian bridge (STA 90+60 to STA 10+17.41). Because of its proximity to Lake Hickory please consider adding an additional row of silt fence. {G.S. 113A-57 (3)). 4. Please check the labeling of the details on the plan sheets. For example, the detail for proposed drop inlet protection device shown on plan sheet EC-1E is called out as EC-21 on plan sheet 2-D3. The detail for this measure is labeled as STD NO. 104. {G.S.113A-57 (3)1. S. Please consider showing a detail or referencing a standard drawing of the permanent swale (pd) called out on the erosion control sheets. {G.S. 113A-57 (3)1.