Loading...
HomeMy WebLinkAboutNCG170393_Name-Owner Change Form_7/24/2019Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 7/24/2019 10:03:56 AM (Name Change Submission) Approve by McCoy, Suzanne 7/24/2019 2:16:42 PM (Notification to Admin) • The task was assigned to McCoy, Suzanne 7/24/2019 10:03 AM � ST1V{ NORTH C:Ft iO�INA ErtYfranminlQf QYQiff}� I. Permit Information I. Please enter the permit number for which the change is requested. NPDES Stormwater Individual Permit #: NC SX XX XX X -OR- General Permit Certificate of Coverage (COC) #: NCG170393 NC GX XX XX X Use this link to check the permit contact information that is currently in our database. II. Permit Status 11. Permit status prior to requested change. a. Permit issued to: O'Mara Texturing Corporation Companyfbrre b. Person legally responsible for permit: First name:* Middle name: Last name:* Gary Bradley Title: President Permit holder's mailing address:* Street Address PO Box 970 Address Line 2 City State / Rovince / Fbgion Rutherford College NC Fbstal / Zip Code Country 28671 Burke Phone #:* 828- 874- 2100 c. Facility name:* d. Facility address:* Fax #: O'Mara Texturing Corporation Street Address 160 Fashion Avenue Address Line 2 City State / Rovince / Fbgion Rutherford College NC Fbstal / Zip Code Country 28671 USA e. Facility contact person (prior to change, optional): First name: Middle name: Last name: Colin Jennings Phone #: 828-874-2100 III. Requested Change Information 111. Please provide the following for the requested change (revised permit). a. Request for changes is a result r Change in ownership of facility of: * r Name Change of the facility or owner b. Permit to be issued to: Aquafil O'Mara, Inc. Corrpany l\brre c. Person to be legally responsible for permit: First name:* Middle name: Last name:* Gary Bradley Title: President Permit holder's mailing address:* Street Address PO Box 970 Address Line 2 aty Rutherford College Postal / Zip Code 28671 Phone #:* Email address:* 828- gbradley 874- @omarai 2100 nc.com d. Faciltiy name: * Aquafil O'Mara, Inc. Is the FACILITY contact different than the person legally responsible above?* r Yes f No f. Facility contact person: First name:* Todd Phone #:* Middle name 828-874-2100 Email address:* tbaker@omarainc.com Last name:* Baker State / Province / Fbgion NC Country Burke IV. Permit Contact Information Is the PERMIT contact different than the person legally responsible above? r Yes r No IV. Permit contact information (if different form the person legally responsible for the permt) ................................................................................................................................................................................. First Name:* Middle Last Name:* Tom Name: DeYoung Title: Facility Engineer Mailing Address:* Street Address PO Box 970 Address Line 2 City Rutherford College Fbstal / Zip Code 28671 Phone #:* 828-874-2100 Email Address:* tdeyoung@omarainc.com State / Province / Fbgion NC Country Burke V. Permit Facility Activities V. Will the permitted facility continue to conduct the SAME industrial activities conducted prior to this ownership or name change:* r Yes r No VI. Signature In the case of an ownership change request, certifications must be signed by both the permit holder prior to the change and the new applicant. For a name change request, the signed Permittee's Certification is sufficient. This completed application is required for both name change and/or ownership change requests. North Carolina General Statute 143 - 215.6 b (1) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Permittee Certification: I attest that this application for a name and/or ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed, or if all required supporting information is not included, this application will be considered incomplete. Permittee Signature FLrrrit-holder prior to the ownership change, or permt-hdder authorizing the narre change Will another person need to complete or sign this form before it can be submitted? 11/o problem! Simply CLICK the "Save as Draft" button below and send the URL link to the other party to access the form. Questions? Call The Stormwater Program at (919) 707-3639 or e-mail Annette Lucas at annette.lucas(a)ncdenr.gov. Initial Review Project ID: * Reviewer rray revise perrrit number here i incorrect. NCG170393