Loading...
HomeMy WebLinkAboutNCC190996_ESC Approval Submitted_20190717 �04�90"C06, Jackson County Office of Permitting & Code Enforcement www.iacksonnc.ofglcode-enforcement.html Tony, Elders, Director tonyelders kjacksonnc.org �pR ,���� Sylva Office:401 Grindstaff Cove Road, Suite 145, Phone: 828-586-7560/Fax: 828-586-7563 Tk CpR� Cashiers Office: 357 FrankAllen Road, Phone:828-745-6850/Fax: 828-745-6867 LETTER OF APPROVAL Church of God of Sylva NC TTES Attn: Tim Pressley PO Box 2011 Sylva, North Carolina 28779 Re: Project Name: Church of God of Sylva Acres Approved: 2.9 ac Project ID: 19-109 County: Jackson Address: Asheville Highway City: Sylva River Basin: Little Tennessee Stream Classification: C Submitted By: Tim Pressley Date Received by Jackson County: 07/02/19 Plan Type: Commercial Dear Mr. Pressley, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The-Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by 4B .Ad. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas ckncdenr.gov or Paul Clark at Paul.clark&ncdenr.gov . After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by of our right of periodic inspection to insure compliance with the approved plan. Letter of Approval Church of God of Sylva 07/02/19 Page 2of3 North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, J Steve Beasley Land Development Administrator Jackson County Permitting& Code Enforcement Enclosures: ec: youthpester&aol.com Letter of Approval Church of God of Sylva 07/02/19 Page 3of3 New Submittal (X) Revision ( Modification ( ) LETTER OF APPROVAL WITH MODIFICATIONS Note: Approval is conditioned upon the incorporation or addition of these modifications to the plan. If these modifications are not included in the plan and implemented on the construction site, the site will be in violation of the Sedimentation Pollution Control Act of 1973 and the Jackson County Code of Ordnances. Please be advised that Chapter 10, Division 4, Section 10- 277c of the Jackson County Code of Ordinances requires that a copy of the approved soil erosion control plan be on file at the job site. Stipulations and Conditions There were no comments by Jackson County Soil and Water Conservation District. Due to the impact on the proper in question, metal backed silt fencing needs to be installed onsite 8' maximum span standard strength fabric with wire fence). Any dirt taken offsite to waste areas will need to be permitted separately from this large grading project. Request on-site meeting with grading contractor prior to any site work being started. Approval does not cover areas which require 401 and 404 permits from the US Army Corps of Engineers and NC Department of Environment and Natural Resources, and/or other such governing agencies,until such time as said permits are in place. This approval does not exempt this project from any other state or local permits or regulations that may be additionally required. Please know that approval of this sedimentation and erosion control plan does not qualify this site for vested rights with regard to the proposed subdivision ordinance and that this development may be subject to the subdivision ordinance when adopted. LETTER OF APPROVAL WITH PERFORMANCE RESERVATIONS Note: Should the plan not perform adequately; a revised plan will be required.