Loading...
HomeMy WebLinkAboutNCC190953_ESC Approval Submitted_20190715 Engineering Services Department B. Keith Pugh, P.E. DIRECTOR s NORTH CAROLLNNS INTERNATIONAL.CITY"` July 11,2019 Owner/Financially Responsible Party Holbrook and Associates,Incorporated 1513 Johnson Street High Point,NC 27262 RE: APPROVAL of EROSION and SEDIMENTATION CONTROL PLAN Project:Wynne Brook Lot 7 Location: 3917 Wynne Brook Court,High Point,NC 27262 Land-Disturbing Permit#EN1902182275 Dear Sir or Madame: The Engineering Services Department has completed the review process for the Soil Erosion Sedimentation Control Plan submitted on 7-03-2019 for the project referenced alcove. Based on our review, the plan is hereby approved. This plan approval will specifically cover the Erosion and Sediment Control Measures required for both the Grading Phase and the Building Phase. If a different identity (from the Grading Phase) executes the Building Phase,this approved Erosion and Sediment Control Plan(E&SCP) may be transferred to the firm/person executing the Building Phase. Prior to transferring the plan, written authorization and a Financial Responsibility Form must be submitted to our office for review. The terms and conditions of the approved plan shall remain in place unless otherwise noted. The Erosion Control Measures shown on the plan(s) are approximate. Some field adjustment may be required to make the measures work correctly. An Erosion Control Financial the Land-Disturbance Permit will not be required. This letter will serve notice that: • Asper NCGS 15A NCAC 04B .0120 (b) and (c), INSPECTIONS AND INVESTIGATIONS,this letter shall serve as notice that inspection of sites shall be carried out by the staff of Department of Environmental Quality or other qualified persons authorized by the Commission or Department of Environmental as necessary to carry out its duties under the Act and no person shall refuse entry or access to any City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA Fox: 336.883.4118 Phone: 336.883.3194 TDD:336.883.8517 representative of the Commission or any representative of a local government who requests entry for purposes of inspection. • As per High Point Development Ordinance 2.5.10.0.1 and 2, the Land-Disturbing Permit will become null and void one (1)year from the date of issuance. You may request in writing, a 180-day permit extension 30 days prior to the expiration date, for good cause. • The approval of the draft Erosion and Sediment Control Plan and the Land Disturbing Permit issued by the City of High Point is conditional based on the applicant's compliance with Federal and State water quality laws,regulations, and rules. • The approval of the draft Erosion and Sediment Control Plan is based in part on the accuracy of the information provided on the submitted Financial Responsibility Form. If any changes to the submitted Financial Responsibility Form(e.g. ownership, address, company name)occur,then you are required to submit an amended form showing such changes. • The approval of the draft Erosion and Sediment Control Plan does not supersede any other permit or approval. • Approval of the draft Erosion and Sediment Control flan, authorizes the permittee to discharge stormwater in accordance with the standard and regulations of current General Permit NCGO 10 and the National Pollutant Elimination System(NPDES). • This Letter of Approval must be posted at the site of the land disturbing activity along with the Land-Disturbing Permit,the approved Erosion and Sediment Control Plan, a copy of the NPDES/NCGO10 Permit, and a copy of the Certificate of Coverage(COC). • Records of Inspections must be kept on site for twelve(12)months. • All data used to complete the e-NOI and all Inspection Records must be maintained for a period of three (3)years and available upon request(40 CFR 122.41). • Construction site pollutants must be maintained on-site and not allowed to reach the state's waters. Any spent fluids from construction traffic must be cleaned up and disposed of properly. Any herbicide,pesticide and fertilizer must be used in accordance to the label restrictions. All wastes composed of building materials shall be disposed of in accordance with North Carolina General Statues, Chapter 130A, Article 9—Solid Waste Management, and rules governing the disposal of solid waste (NC Administrative Code Section 15A NCAC 1313). No dumping of paint and other liquid building material waste in storm drains. Concrete materials onsite,including excess concrete,must be controlled and managed to avoid contact with surface waters,wetlands or buffers.No concrete [ slurry shall be discharged from the site. • Only minor deviation from the approved plan can be approved by the Erosion Control Inspector. Deviations are limited to the following deficiencies: o Addition of E&SC measures (e.g., silt fence, inlet protection, check dam,rolled erosion control practices, etc.). o Relocation of E&SC Measures that improve the overall stormwater and sediment control. • Erosion Control Measures must be maintained until site is stabilized with sufficient ground cover. The Sedimentation Pollution Control Act of 1973 (NCGS 113A-51 through 66) is performance-oriented, requiring protection of existing natural resources and adjoining properties. If following the commencement of this project,the approved E&SCP is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973, revisions to the plan may be required by the Erosion Control Inspector. City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA Fox:336.883.4118 Phone:336.883.3194 TDD:336.883.8517 I i • A condition of this approval is that the streets in this phase must be kept free of sediment. • Erosion Control Measures to prevent construction traffic from tracking sediment onto the streets must be maintained. Any debris or sediment shall be cleaned from the street surface immediately. • All applicable fees must be paid prior to the issuance of the Land-Disturbing Permit. When you are ready for the Land-Disturbing Permit to be issued,please notify my office to arrange for a pre-construction meeting. Site Data: Project Name: Wynne Brook Subdivision Lot 7 Land-Disturbing Permit(Project ID): EN1902182275 Limits of Disturbance (in acres) approved: .34 acres Address: 3917 Wynne Brook Court City: High Point State: NC Zip Code: 27265 County: Guilford Latitude (in decimal degrees): 36.034 degrees Longitude (in decimal degrees): -79.994 degrees River Basin: Cape Fear Draft E&SCP submitted by: Holbrook and Associates, Incorporated Date(s) draft E&SCP Received: July 10,2019 Plan Type: E&SCP Is this site part of a project covered under a common plan of development: Yes Site Plan: EN1801072219 issued July 16, 2018 Additional Information: Important Notice: Per NCG010000 Construction Stormwater General Permit effective April 1, 2019: • An owner,developer or builder conducting construction activities that includes clearing, grading,or excavation activities that results in the disturbance of land greater or equal to one acre which requires a common plan of development(a.k.a. Site Plan). OR • An owner,developer or builder conducting construction activities that includes clearing,grading, or excavation activities on a site that is regulated by a common Alan of development(a.k.a. Site Plan). You are required to complete and submit an electronic Notice of Intent(NOI)form requesting a City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA Fax: 336.883.4118 Phone:336.883.3194 TDD:336.883.8517 Certificate of Coverage (COC) under the NCGO 10000 Construction Stormwater General Permit frorn the Department of Environmental Quality (DEQ). This form MUST be submitted prior to the commencement of any land disturbing activity on the above-named project. The NOT form may be accessed at deq_nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. DEQ will charge a fee ($100) for coverage under the NCGO1 pen nit. This fee is not part of the City of High Point submittal and is to be sent to the DEMLR Stormwater Central Office staff in Raleigh_ Upon completion of project,the Financial Responsibility Person shall request a close-out inspection by CHP Staff. Once the report is obtained from CHP Staff, an electronic Notice of Termination(e-NOT)with a copy of the closeout inspect must be uploaded to DEMLR. The e- NOT is available at hLtps://deq.nc.gov/NCG01. DEMLR will email confirmation of the close-out of the COC within three (3)business days after the submittal of a complete and correct e-NOT. Information on the NCGO 10/NPDES Permit, e-NOI, COC, and e-NOT, can be found at the following link htt sv Hdcq_nc.gov/about/divisions/energy-mineral-land-resources/energy=mineral- land- rmits/stormwater- ermits/construction-sw The NCGO1 O/NPDES permittee must comply with all conditions of the NCGO 10 Permit. Any noncompliance constitutes a violation of the Clean Water Act(CWA) and is grounds for enforcement action: for permit termination,revocation, or modification: or denial of a permit upon renewal application. [40 CFR 122.41]. Please call me if you have any questions or comments. Sincerely, Scott E.Ford Engineering Services Department (336) 883-3194 cc: File RIMAR, LLC, 926 Country Club Drive, High Point,NC 27262 City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA Fax:336.883.4118 Phone:336.883.3194 TDD: 336.883.8517