Loading...
HomeMy WebLinkAboutNCC190930_ESC Approval Submitted_20190710 U c0 dry CtA�o� MECKLENBURG COUNTY Land Use & Environmental Services Agency Storm Water Services 7/3/2019 Email: 2raham8401(&,ao1xom Rodney Graham PO Box 2562 Davidson,NC 28036 Re: Davidson Springs Phase III& IV (9389146) Approval as noted of plans Denuded acreage 3.1 Dear Mr. Graham: Please be advised that the above referenced plan has been approved by this Office. This approval is required prior to applying for the Construction Stormwater General Permit(NCGO10000). Application for this permit can be made at htt12s://ded.nc.gov/NCG01. Please contact Chanell Hatch(980-555-5775), Erosion Control Inspector to set up a pre-construction meeting after obtaining your Certificate of Coverage (COC)from NCDEQ. Refer to the attached Fact Sheet for additional information. The Planning Department of the Town of Davidson is being notified of this approval by copy of this letter. Plans that are stamped approved will be held within EPM's"approved package"for printing out as needed. In addition,please always print out an approved set with approval stamps to be kept out at the site. If you have any questions,please give me a call at 980-314-3240. Sincerely, VWJJ. *4•CL* Michael A.Machttyre,PE Mecklenburg County Project Manager CC: Town of Davidson Planning Department—Travis Johnson Project Manager—Skip Notte—Dewberry Engineers Inc. Erosion Control Inspector—Chanell Hatch Mecklenburg County Land Development-Tommy Keziah EPM Approved project PEOPLE • PRIDE • PROGRESS • PARTNERSHIPS • 2145 Suttle Avenue • Charlotte,North Carolina 28208-5237 • www.mecklenburgcountync.gov