Loading...
HomeMy WebLinkAboutNCC190913_ESC Approval Submitted_20190710 N,nv m r� t e ROY COOPER Governor MICHAEL S.REGAN Secretary QtVdA S.DANIEL SMITH NORTH CAROLINA interim Director Environmental Quality June 11, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Greenfield-Serenity, LLC Attn: Matt Brubaker, Manager P.O. Box 2135 Angier,NC 27501 RE: Project Name: Serenity Subdivision Phase IA Acres Approved: 69 Project ID: HARNE-2019-040 County: Harnett, City: Fuquay-Varina, Address: Piney Grove Rawls Road River Basin: Cape Fear Stream Classification: HQW Submitted By: Timmons Group Date Received by LQS: May 24, 2019 Plan Type: Revised Dear Mr. Brubaker: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1,2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit.This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.ne.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette,lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially,DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after June 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. North Carolina Department of Environmental Quality[Division of Energy,Mineral and Land Resources Fayetteville Regional Office 1225 Green Street.Suite 714 I Fayetteville,North Carolina 28301 910.433.3300 01FA[AIMMEnWmtmxnW Aul11}\ !— Letter of Approval Greenfield-Serenity, LLC June 11, 2019 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous twelve (12) months. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with theAct. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing.activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land-disturbance,as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and the stormwater retention measures. (GS 113A-54.1(b)). You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. if Sincerely j Jodi Pace,EI Regional Engineering Associate DEMLR Enclosures: Certificate of Approval cc: Sean Hein, Timmons Group(electronic copy) Jay Sikes,Building Inspector (electronic copy) Ken Slattum, Building Inspector (electronic copy) DEMLR-Fayetteville Regional Office File Letter of Approval Greenfield-Serenity, LLC June 11, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: SERENITY SUBDIVISION—PHASE 1A Project ID: Harm-2019-040 County: Harnett 't I s No work is to be done in the streams or wetlands until Approval from the Army Corps of Engineers ers and NC DWW is received. Per G.S. 113A-54.1 (a) Wattles should be used instead of silt fence in the wetlands. Before house construction begins on the lots, a plan showing the individual lot measures will be required. Per G.S. 113A-54.1 (a) i