Loading...
HomeMy WebLinkAboutSW3180305_REVISED-6028-MCC-Plan Sheets_6/28/2019STORM DRAINAGE NOTES. PRIOR TO CONSTRUCTION FOR REVIEW AND APPROVAL. 33. CONTRACTOR TO COORDINATE ALL WORK WITH OTHER UTILITY INSTALLATIONS NOT EYP Architecture &Engineering 1. CATCH BASIN RIM ELEVATIONS ARE GIVEN TO THE EDGE OF ASPHALT. 21. "AS -BUILT" DRAWINGS AND PLANS OF THE STORM DRAINAGE SYSTEM, INCLUDING DESIGNED DITCHES, MUST BE SUBMITTED PRIOR TO SUBDIVISION FINAL INSPECTION TO COVERED IN THESE PLANS (ELECTRIC, TELEPHONE, GAS, CABLE, ETC.) AND ALLOW FOR THEIR OPERATIONS AND CONSTRUCTION TO BE PERFORMED. ALEXANDER ST. 2 2 �n 2108 South Boulevard, Suite 205 Charlotte, NC 28213 yp/ THE STATE ENGINEERING DEPARTMENT IN ACCORDANCE WITH THE STATE SUBDIVISION m 1• 2. RIM ELEVATIONS GIVEN ON THESE PLANS ARE APPROXIMATE AND ARE FOR ORDINANCE. 34. CONTRACTOR SHALL REPAIR OR REPLACE IN -KIND ANY DAMAGE THAT OCCURS AS RESULT OF HIS WORK. 704.602.0071 895 - / INFORMATIONAL PURPOSES ONLY. ACTUAL RIM ELEVATIONS SHALL BE DETERMINED BY CONTRACTOR AND ADJUSTED TO MATCH FIELD CONDITIONS. 1 o O � eypae.com e 22. HIGH -DENSITY POLYETHYLENE (HDPE) STORM DRAINAGE PIPE INSTALLED WITHIN EX. OR 35. ALL LINEAR FOOTAGE FOR ALL UTILITY PIPES ARE APPROXIMATE, ACTUAL INSTALLED co , p�E 7A NO y 1 d I 3. COORDINATE ALL CURB AND STREET GRADES AT INTERSECTIONS WITH INSPECTOR. PROP. PUBLIC RIGHT-OF-WAY MUST BE APPROVED BY THE INSPECTOR PRIOR TO ANY BACKFILL BEING PLACED. BACKFILL MATERIAL MUST BE APPROVED BY THE INSPECTOR QUANTITIES MAY VARY. 0 Z m O ESQ • i i \ 4. CONTRACTOR WILL PROVIDE STREET SIGNS PER THE CITY OF STATESVILLE. PRIOR TO PLACEMENT OF THE MATERIAL WITHIN THE PUBLIC STREET RIGHT-OF-WAY. 36. STORM SEWER LEAD-INS TO BUILDINGS SHALL NOT BE INSTALLED UNTIL BUILDING PLANS ARE COMPLETED AND LOCATIONS ESTABLISHED ON THE ARCHITECTURAL PLANS. i 2 N SITE 1 5. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. 23. ALL ROOF DRAIN PIPES TO HAVE A MINIMUM OF 0.5% SLOPE. LEAD-INS MAY CHANGE 15' HORIZONTALLY AND 3' VERTICALLY PRIOR TO INSTALLATION I AT NO ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL REQUEST AND RECEIVE 'A S� / 6. IN ORDER TO ENSURE PROPER DRAINAGE, KEEP A MINIMUM OF 0.50% SLOPE ON THE CURB. 24. NEW FINISHED CONTOURS SHOWN ARE TOP OF PAVING IN AREAS TO RECEIVE PAVEMENT AND TOP OF TOPSOIL IN AREAS TO BE SEEDED. WRITTEN APPROVAL FROM PRIME CONTRACTOR PRIOR TO INSTALLATION OF LEAD-INS. I CONTRACTOR SHALL COORDINATE LOCATIONS, SIZE AND INVERT ELEVATIONS OF G�1ERR STORM SEWERS WITH APPROVED BUILDING PLUMBING PLANS. w l / \ \ I 7. CURB AND GUTTER SHOWN ON PLANS MAY BE ADJUSTED BASED UPON FIELD STAKING BY ENGINEER. STORM 25. DIMENSIONS ON BUILDINGS ARE FOR GRADING PURPOSES ONLY AND ARE NOT TO BE USED TO LAYOUT FOOTINGS. 37. INVERTS ON ROOF DRAINAGE ARE GIVEN AT CLEANOUTS. Q Q S� ASSOCIATED DRAINAGE MAY ALSO REQUIRE MODIFICATION BASED UPON FIELD CONDITIONS. 26. GRADING CONTRACTORS SHALL NOTIFY AND COOPERATE WITH ALL UTILITY COMPANIES 38. THE DEVELOPER SHALL MAINTAIN EACH STREAM, CREEK, OR BACKWASH CHANNEL IN O \ OR FIRMS HAVING FACILITIES ON OR ADJACENT TO THE SITE BEFORE DISTURBING, AN NON -OBSTRUCTED STATE AND SHALL REMOVE FROM THE CHANNEL AND BANKS OF I Q I \ 1 \ \ I . 8THE PURPOSE OF THE STORM DRAINAGE EASEMENT IS TO PROVIDE STORM WATER CONVEYANCE AND ANY STRUCTURES AND/OR OBSTRUCTION TO STORM WATER FLOW ALTERING, REMOVING, RELOCATING, ADJUSTING OR CONNECTING TO SAID FACILITIES. CONTRACTORS SHALL PAY ALL COSTS IN CONNECTION WITH THE ALTERATION OF OR THE STREAMS, ALL DEBRIS, LOGS, TIMBER, JUNK AND OTHER ACCUMULATIONS. z LU co m�N <� O NE IS PROHIBITED. TEDF N RELOCATION OF THE FACILITIES. CONTRACTORS SHALL RAISE OR OF O 9. ALL YARD INLETS CONNECTED TO 15" DIA. OR GREATER PIPE SHALL BE STANDARD LOWER TOPS EX. MANHOLES AS REQUIRED TO MATCH FINISHED GRADES. I 2 n CONSULTANTS: A \ BRICK OR PRECAST DROP TYPE INLETS. RIM ELEVATIONS GIVEN ON PLANS FOR YARD INLETS REFER TO TOP OF GRATE. 27. GRADING CONTRACTOR SHALL COOPERATE AND WORK WITH ALL OTHER CTORS I N N, ON THIS PROJECT TO INSURE PROPER AND TIMELY PEHS LCOMPETION O \ 10, ALL STORM DRAIN PIPE 12" DIA, OR SMALLER SHALL BE CORRUGATED HDPE WITH A SMOOTH INTERIOR. SEE DETAILS FOR INLET CONSTRUCTION ON HDPE PIPE. OF T PRONGCWORK � co � co N �S� LandDe . err/C 28. THE GRADING CONTRACTOR SHALL USE WHATEVER MEASURES ARE REQUIRED TO SILT CONSTRUCTION I Z SNPRP d l 11. CONSTRUCTION SHALL BE IN ACCORDANCE WITH MITCHELL COMMUNITY COLLEGE AND ALL OTHER CITY, STATE AND FEDERAL REGULATIONS AND/OR STANDARDS. PREVENT AND DEBRIS FROM FLOWING ONTO ADJACENT PROPERTIES. CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL Q _ CREATING PLACES THAT MATTER. I EROSION SEDIMENT AND SILTATION ORDINANCES. CONTRACTOR SHALL REMOVE ALL I - 12. ALL SHORING SHALL BE IN ACCORDANCE TO OSHA TRENCHING STANDARDS, PART 1926 TEMPORARY EROSION CONTROL STRUCTURES UPON COMPLETION OF PERMANENT1 DRAINAGE FACILITIES AND NOT BEFORE ALL AREAS DRAINING INTO THESE STRUCTURES VICINITY AP _ I SUBPART P, AS AMENDED. ARE SUFFICIENTLY STABILIZED. NTS I \ 223 N. Graham St. 1 1 ggs V I 13. CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. 29. FOR ANY WORK ON THE STATE OR CITY RIGHT-OF-WAY, THE GRADING CONTRACTOR SHALL: � J � Charlotte, NC 28202 704.333.3025 (- - 8 e 20' --►� 14. IF PROP. UTILITIES ARE INSTALLED WITHIN 12 INCHES, HORIZONTAL OR VERTICAL, FROM A GAS MAIN, THE CONTRACTOR SHALL INFORM GAS COMPANY. 29.1. NOT STORE MATERIAL, EXCESS DIRT OR EQUIPMENT IN THE RIGHT-OF-WAY 29.2. IN CASE OF MULTILANE HIGHWAYS. THE PAVEMENT SHALL BE KEPT FREE FROM ANY MUD OR EXCAVATION WASTE FROM TRUCKS OR OTHER EQUIPMENT. \ \ I ineerin NC En Firm License # C-0658 9 9 N t ^ �\ ays I �C 8�6✓ ) ( I 1 I 15. ALL PERSONS OR AGENCIES DOING WORK IN THE PUBLIC STREETS, HIGHWAYS, OR PUBLIC RIGHTS -OF -WAY ARE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS, COORDINATING 29.3. ON COMPLETION OF THE WORK ALL EXCESS MATERIAL SHALL BE REMOVED FROM THE RIGHT-OF-WAY. THE WORK WITH ALL AFFECTED GOVERNMENT AGENCIES AND UTILITIES AND INFORMING OCCUPANTS OF ADJACENT PROPERTIES OF ACCESS IMPACTS DUE TO 30. B) PROVIDE ALL NECESSARY AND ADEQUATE SAFETY PRECAUTIONS SUCH AS SIGNS, FLAGS, LIGHT BARRICADES AND FLAGMEN AS REQUIRED BY THE LOCALTHE 1 \ I I I \ AUTHORITIES AND IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC \�'7.� 1 1 / 1 ✓ 1 o, 1 J 1 1 1 I I 16. RESPONSIBILITY FOR THE INSTALLATION AND MAINTENANCE OF ADEQUATE SAFETY DEVICES FOR THE PROTECTION OF THE PUBLIC, THE WORKERS, AND GENERAL CONTROL DEVICES. THE GRADING CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR AND HOLD HARMLESS THE CITY OF CHARLOTTE, THE STATE OF NORTH CAROLINATHE ARCHITECT/ENGINEERAND THE OWNER FROM ANY CLAIMS FOR �o\ i�ll I Ilii �sliminiq2019 1 :14 PM Q yi �c //� CA Rol// `�\ ��• N j''�, I I 1 I PROTECTION OF THE WORK SHALL REST WITH THE CONTRACTOR DOING THE WORK. , , DAMAGE DONE TO EX. PRIVATE PROPERTY, PUBLIC UTILITIES, OR TO THE / �c > ,. 'ES si'p •. j �, . �'• •'•;�� ; O •.�oF by ., 1 / / I I I / J \ I 17. ALL LANE CLOSURES THATARE REQUIRED SHALL FOLLOW THE MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). TRAVELING PUBLIC. 31. GRADING CONTRACTOR SHALL TAKE ALL AVAILABLE PRECAUTIONS TO CONTROL DUST. CONTRACTOR SHALL CONTROL DUST BY SPRINKLING, OR BY OTHER METHODS AS I - - I I \ _ CORPORATE _ = :DBu - SEAL' = SEAL _ __ 033804 / / / 1 / / I I I 18. ALL ROAD IMPROVEMENTS ARE TO BE COORDINATED WITH MITCHELL COMMUNITY COLLEGE ENGINEERING DEPARTMENT PRIOR TO CONSTRUCTION. DIRECTED BY ENGINEER AND/OR OWNER'S REPRESENTATIVE AT NO ADDITIONAL COST \ �'. C-0658 / \ 1 y / / I 19, SUBSURFACE TO OWNER. I \� \ �/ iO,/� ••t> ,.•,�� �ij ..G IN E�;i.�lt•�`V �� .`I / DRAINAGE FACILITIES MAY BE REQUIRED IN THE STREET RIGHT-OF-WAY IF DEEMED NECESSARY BY THE INSPECTOR. 32. GRADING CONTRACTOR TO COMPLY WITH ALL STATE AND LOCAL SEDIMENT CONTROL AND AIR POLLUTION ORDINANCES OR RULES. c A�O�Y`/C/� D IIIIIII00\ //i�illu���cc � I 19.59 LF OF 2 PE @ 5.10% BD 03 \ - BD 03 SDMH - (134) RIM:891.38 I I 20. PE SEALED SHOP DRAWINGS FOR RETAINING WALL MUST BE SUBMITTED TO ENGINEER I I! 4 12" INV. IN: 887.00 (RB - (133)) � \\ I I 24" INV. IN: 880.00 (FLOW SPLITTER - (127)) 24" INV. OUT: 880.00 (EX DI - (131)) I 1 I \ I I I I I \ 1 BD 03 EX DI - (131) \ \ I \ RIM:889.70 24" INV. IN: 879.00 (SDMH - (134)) 30" INV. IN: 877.78 (EX. 30 IN) 15" INV. IN: 877.75 (EX. 15 IN) 1Q0 \ "PIQ Bk<,, \ 1 O �99 I J / 1 I I I \ BD 03 HIN RIM: 911.58 24" INV. OUT: 909.00 (SDMH - (117)) 48" INV. OUT: 877.69 (EX. 48 IN) / 1 yOo 0�2 PROP. MAINTENANCE I \ A ACCESS EASEMENT 11 23.99 LF OF 24" HDPE @ 8.34% BD 03 TIE TO EX. STORM STRUCTURE 1 0 9 1 ����6 x �V I BD 03 SDMH-1 \ - - 910 �- V �� �6oe 0 "' \3 I BD 03 FLOW SPLITTER - 127 ( ) U RIM: 956.39 16" INV. IN: 904.00 (SDMH - (89)) = _ --- 895} as RIM: 896.00 I� / 24" INV. IN: 903.00 (SDMH - (117)) --------- - 895 e as 24" INV. IN: 892.50 (SDMH-1) I � 24" INV. OUT: 903.00 (FLOW SPLITTER - (127)) - � - - - - - - - 1 \ I 8" INV. IN: 893.17 (8 INCH CURB)- 24" INV. OUT: 892.50 (SDMH - (134)) I 12" INV. OUT: 892.50 (HW- (132)) 00 < CO _ - 232.85 LF OF 24 HDPE @ 1.72% BD 03 10,{'8 J I I NORTH \ 1 BD 03 RB - (133) I I I + - � r -- LINE C LINE C BD 03 SDMH - (117) J / 9p9 \\ RIM: 894.25 1\ 6° INV. IN: 888.50 (CO - (136)) i I 12" INV. OUT: 888.00 (SDMH - (134)) 7­77_ _ 'i 248.01 LF OF 24" HDPE @ 4.23% BD 03 � z 905 - o° / /�=��C906 �� / ° Q w / RIM:911.00 / 24" INV. IN: 907.00 (HW - (116)) 24" INV. OUT: 907.00 (SDMH-1) / 911 / / KEY PLAN: \ I ° 22.88 LF OF 12" HDPE @ 2.19% BD 03 / �j // \ / Q'° 41.35 LF OF 16" HDPE @ 3.00% BD 03 911 39.84 LF OF 12" HDPE @ 1.50% BEND - (104) RIM: 908.84 12" INV. IN: 907.73 DI - 79 / 12" INV. OUT: 907.73 (RL - (121)) I / / \ \ I ABOVE GROUND HW- (132) //////� / // g°h RIM: 893.55 / // / 31.13 LF OF 12" HDPE 1 @ 0.50% /56.23 LF OF 12" HDPE @ 1.50% _ goo 70.00 LF OF 12" HDPE @ 1.50% / 1 SAND FILTER BMP. SEE BMP DETAIL SHEET C4.02 12" INV. IN: 892.00 (FLOW SPLITTER- (127)) / / � //L �� / / L �� /// 11 /// ° 11 62.85 LF OF 12" HDPE @ 0.50 /o ati° �- o LINEA RL-(120) RL-(121) o N \ ` \ 895 RIP RAP APRON �� E � ' E6 / J s / // / / // / ^/ I1 )) j - IN BD 03 SDMH - (89) BEND - (92) / R2MINV 11N 907.89 (RL - (119)) TIE BUILDING DRAINS Z2 J TO SDMH 89 AND • J '.. ° ° •. - o^ // o 12" INV. IN: 905.89 (RL - (119)) ROUTE TO SDMH-1 16" INV. OUT: 905.24 (SDMH-1) / - / a - TIE 4" PERFORATED PVC FOUNDATION DRAIN TO PROP STORM. REFER TO o / 1 0 DS / LU / 911.5 \ DS / ELEVATOR SUMP -PUMP / / DS - 911.5 - ARCH & STRUCTURAL PLANS FOR FURTHER FOUNDATION DETAILS. C / CONNECTION ROOF LEADER CONNECTION / CD Lq 98.52 LF OF 12" HDPE @ 2.72% IL 0 1 / 1 � / I l I IIII o I II III \ °� 911.5- �, co- i � 911.5 / \\ L�---'��- /� / C - �.---------- - - - � � 915 -�------, -- __------ 915 - - - - DI-(77) RIM:915.58 10" INV. IN: 911.16 (RL - (76)) - 33.83 LF OF 12" HDPE @ 0.50% - - - - - - - - - - - - - -- 10" INV. OUT: 911.16 (DI - EL 35.00 LF OF 10" HDPE @ 1.00% - °^ O a / - - - - 1\ I I \\\1 \ I \ / / 911.5 _------ -� /�---- - --- - 4 NCDEQ STORMWATER REVIEW 06/28/2019 sea \ 1 \ \ rno / I \ \ \ \ - / / T / 911. DS 927.5 DS RL -76 ( ) DS s - DI 79 r' ( ) 3 BULLETIN 03 03/11/2019 / a BEND-( 94) _ m 18.77 LF OF 10" HDPE @ 2.00% J 39.83 LF OF 12" HDPE @ 1.00% 12" INV. IN: 910.42 (DI - (78)) 12" INV. OUT: 910.42 (BEND - (104)) - - 2 RFI 03 1012312018 / FL FL 911 FL F / 32.90 LF OF 12" HDPE @ 5.00% DI - (78) Cs`. O Cf �p 895 \ \ 1 ) \ / � � � \ � - FL - F FL FL FL / / o° o / . 41 GAS GAS 18.33 / g1 I I \ 919 Q � RIM: 915.57 I _ to 10" INV. IN: 910.81 LF OF 12" HDPE @ 0.50% / - - 920 to 12" INV. IN: 912.20 oti (DI - (77)) 1 NCDEQ STORMWATER REVIEW 0511112018 \ / / ,q r / 92, szz sz1 12" INV. OUT. (SDMH - (114)) - 910.81 (DI - (79)) - - # R@VISI011 Date \ DI - (80) O TIE 4" PERFORATED PVC FOUNDATION 923 RIM: 910.80 T r\ DRAIN TO PROP STORM. REFER TO 924 \ O - /�/ / 12" INV. IN: 908.94 (RL - (96)) ARCH & STRUCTURAL PLANS FOR - - STORM DRAINAGE LEGEND I� I I I / / 12" INV. OUT: 908.94 (BEND - (94)) C� �I, FURTHER FOUNDATION DETAILS. I � PROPERTY LINE PROP. WATERMAIN /II �p°I° SDMH - (114) CB - (108) QW RIM:921.81 RIM: 925.13 12" INV. IN: 919.08 (CB - (108)) _ _ _ - 12" INV. OUT: 913.85 (DI - (78)) / 12" INV. IN: 920.25 (CB - (109)) O - - - _ PROP. SANITARY / / / / / I / / / A \ /� O 12" INV. OUT: 920.25 (SDMH - (114)) HEALTH SCIENCES _ - - �� / / / Z�F - - O PROP. STORM PROP. CURB INLET - J BUILDING PROP. DROP INLET- / ,' 92� p -J MITCHELL COMMUNITY COLLEGE PROP. STORM MANHOLE PROP. CLEANOUT / ' I � � 920 - J g - _ 00% / / - 706 CHERRY STREET EX. STORM 1 / // � / /' / / / / , � // // // /' /' � I -1° _ Q _ - - - - - - - - - - STATESVILLE NC 28677 EX. WATERMAIN EX. SANITARY 1 / I qo / 925 OF \ ss I \ \ i / / / l I I JC7 / / / Alb. / �o / a - - / - - _ - - - - - 4 C%j 0 PROP. SANITARY MANHOLE EX. GAS \ -s-s - 1 \ \ ° / / I 0-0 b I // /' /' / / / / g2� _ - _ Q� EX. ELECTRIC - S� /� /' 7 /, \ ---- �-- (A - - _ - - / - - - - - - - - - DATE: 03/28/18 EX. TELECOM EX. SANITARY MANHOLE EX. ROW (TYP.) I \ 0 \ 1 I \ szs SCALE: cal Q_j EYP PROJECT NO.: 1014077.01 CD EX. CURB INLET EX. TELECOM MANHOLE /'L7�m:�� ® O 1\ \\ o / I / / oo �I II I I � I I CB - (109) I RIM: 924.36 12" INV. OUT: 921.00 (CB - (108)) Gj O SCO PROJECT NO.: 17-17098-02A NCCCS PROJECT NO.: 2253 CD / EX. ELECTRIC MANHOLE EX. LIGHT POLE QQ w� \ - M \ M I M . M I M SSS 1 1 M M w � hIV -� ss ss-SS-ss-�-ss-ss-ssTss-ss-ss W w wl w ss-ss-ss-ss-ss-ss-ss w w w w SS- DRAWN BY: MDM EX. WATER VALVE _ J \ ►. 1 J / o w �v w w CHECKED BY: MDM .o A o � EX. FIRE HYDRANT �p �b I \ N Sb.9 ni i nu ni i nu0 �^rnO �n�0 �^rnO Sb0 0 RI I0 �„0 �- I 0 �„� i�'� '�O`i'riu 0`i'riu0111 a; Sve Sve sve Sve Sve SVS SVE) SV!D S`d ��l STORMWATER 0�; 0 020 40 o� N � C �U MANAGEMENT C4m00 © 2017 EYPI PLAN a 0 N M 0 N CD :• :•1 M 875 SAND FILTER PROFILE VIEW HORIZONTAL SCALE: 1" = 20' VERTICAL SCALE: 1" = 2' .-. M M M M N O 0 S N Lq � 00OD 00 M 00 00 � �~ �0000 H + W �000 cad oco 0 -v � o BERM: 895.00 O » ; O m0 w U U) Z U COEz o �o o 0 o 00 EMERGENCY SPILLWAY: 894.75 M O 00 I- O 00 o m 00C2000-YR 24- R=894.5 +rn -----------2-Y 24-H =894.39 - ----- ----- _ oozz 0 - Pv=894.27- - -- ---- - - -- - - -- p > > > 12"W x 2"H ORIF CE INV: 893.92 w U) z -- WQv=893.90-- -- ------ ----- OQ CLASS B RIP RAP BERM CREST: 894.00 PROP. GROUND ' BOTTOM OF BASIN 892.00 STA: 0+90.29 2.50' MIN. - RIM:894.25 INV. IN: 888.50 (CO - (136)) CLEANED WASHED - - INV. OUT: 888.00 (SDMH - (134)) EX. GROUND (TYP.) 3.92 LF OF 6" SAND 12" HDPE @ 1.11% 1.00' GRAVEL MIN. 9029 LF OF 19.61 LF OF 6" HDPE @ 1.00% HDPE @ 1.00% 0+00 0+50 1+00 1+50 :•1 ::E 875 8.25' A P P X - !1 Pl/\1 I I O ^ 4 �VIoTToM �F BMP RISER SCHEMATIC N.T.S. 0.50' (TYP.) BMP NOTES: IN ACCORDANCE WITH NCDEQ SAND FILTER MDCS 6 AND 8, THE SAND MEDIA MUST MEET ASTM C33 OR EQUIVALENT AND MUST BE MAINTAINED IN A MANNER THAT RESULTS IN A DRAWDOWN OF AT LEAST TWO INCHES PER HOUR AT THE SAND SURFACE. SITE ALLOWABLE BUA SUMMARY CHART ROADS/PARKING 14,854 SF SIDEWALK/CONCRETE 4,182 SF BUILDINGS 20,095 SF SITE AREA 3.27 AC TOTAL SITE BUA 39,131 SF = 27.47% NOTE: BUA AS -BUILT SHALL BE PROVIDED PRIOR TO THE ISSUANCE OF BMP AS -BUILT APPROVAL SAND FILTER BMP BUA SUMMARY CHART ROADS/PARKING 8,067 SF SIDEWALK/CONCRETE 4,182 SF BUILDINGS 20,095 SF DRAINAGE AREA 2.00 AC TOTAL SITE MAX ALLOWABLE BUA 32,344 SF = 37.13% ABOVE GROUND SAND FILTER BMP SUMMARY CHART PEAK CONTROL STORM EVENTS PRE -DEVELOPMENT RUNOFF (CFS) POST -DEVELOPMENT RUNOFF (CFS) POST -ROUTING RUNOFF (CFS) ELEVATION TOP OF DAM dL 895.00 10YR - 24HR 9.64 5.62 5.51 894.50 2YR - 24HR 5.75 3.58 2.50 894.39 1YR - 24HR 4.33 2.84 0.56 894.27 1IN - 6HR - 1.65 0.00 893.90 BOTTOM OF BASIN 892.00 SAND FILTER MAX ALLOWABLE BUA 32,344 SF EYP Architecture & Engineering 2108 South Boulevard, Suite 205 Charlotte, NC 28213 704.602.0071 eypae.com CONSULTANTS: LandDesign CREATING PLACES THAT MATTER. 223 N. Graham St. Charlotte, NC 28202 704.333.3025 NC Engineering Firm License # C-0658 ``����%�IIIIIi,,,� CORPORATE SEAL = C-0658 EYP/ ,J�iuA� ' 2019 1:14 PM 0l _ SEAL DBu� 033804 GIN /" C D. '///// 1w%0 grE KEY PLAN: HEALTH SCIENCES BUILDING MITCHELL COMMUNITY COLLEGE 706 CHERRY STREET STATESVILLE, NC 28677 DATE: 03/28/18 SCALE: EYP PROJECT NO.: 1014077.01 SCO PROJECT NO.: 17-17098-02A NCCCS PROJECT NO.: 2253 DRAWN BY: MDM CHECKED BY: MDM BMP DETAIL Cill4m02 @ 2017 EYPI