Loading...
HomeMy WebLinkAboutNCC190731_ESC Approval Submitted_20190625ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director NORTH CAROLINA Environmental Quality June 21, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Novozymes North America, Inc. ATTN: Richard H. Olofson, Treasurer PO Box 576 Franklinton, NC 27525 RE: Project Name: Novozymes Spray Dryer Project ID: FRANK-2019-034 Acres Approved: 11.29 County: FRANKLIN, City: Franklinton Address: River Basin: Tar Pamlico, Stream Classification: Submitted By: S&ME Date Received by LQS: May 22, 2019 Plan Type: New Dear Mr. Olofson: Perry Chapel Church Rd Other This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval with Modifications. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NO[ form may be accessed at deq.nc.gov/NCG01. Please direct questions about the N01 form to Annette Lucas at Annette.lucasOncdenr.goy or Paul Clark at Paul.clark ri ncdenr.gov. After you submit a complete and correct NOI form, a CPOC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for the coverage under the NCG01 permit. However, on or after June 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. a EQ.� no„n, 1 Lv North Carolina Department of Environmental Quality I Division of Energy, Mineral and land Resources Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh. North Carolina 27609 919,7914200 Letter of Approval with Modifications Novozymes North America, Inc. June 21, 2019 Page 2 of 3 Title 15A NCAC 413.0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspection made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Sally Castle, :l Regional Engineering Associate DEMLR Enclosures: Certificate of Approval NCGOI Fact Sheet cc: Christopher J. L. Stahl, PE (cstahl@smeinc.com) - Electronic Copy DEMLR - Raleigh Regional Office File Letter of Approval with Modifications Novozymes North America, Inc. June 21, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Novozymes Spray Dryer County: FRANKLIN Project ID: FRANK-2019-034 1. Provide two copies of the plan set issued for construction (one full-size and one half-size), prior to initiating land -disturbing activity. These plan sets are to be complete with cover page containing project name, vicinity map, and contact information. The plan sets are to include existing conditions, sheets representing all phases of grading with the associated erosion and sedimentation control measures, an overall erosion and sedimentation plan sheet, utility sheets, and final conditions. Include the limits of disturbance on all plan sheets. Securely bind all plan sheets in the proper order (no loose sheets). If changes to the permitted plan sets are made, provide a cover letter addressing the changes, one copy of additional items (such as design calculations) and bubble, highlight, or otherwise identify the changes to your resubmittal. Reference the project name and ID on the submittal package. (G.S. 113A-57(4))