Loading...
HomeMy WebLinkAboutNCC190682_ESC Approval Submitted_20190620ROY COOPER Governor MICHAEL S. REGAN secretary S. DANIEL SMITH Interim Director NORTH CAROLINA Environmental Quality May 23, 2019 LETTER OF APPROVAL WITH MODIFICATIONS RFM and Gwaltney Farms, LLC Attn: Mr. William H. Wakeman, III 306 E. Main Street Suite 200 Lakeland, FL 33804 RE: Project Name: RED FOX MEADOWS Acres Approved: 2.5 Project ID: AVERY 2019-004 County: Avery City: Banner Elk Address: Highway 184 River Basin: Catawba Stream Classification: UT's to Whitehead Creek -- C;Trout Submitted By: Mr. David Stern Date Received by LQS: March 15, 2019 Date Disapproved by LQS: April 12, 2019 Date Revision Received by LQS: May 13, 2019 Plan Type: Residential Dear Mr. Wakeman: This office has reviewed the subject revised erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this Letter of Approval with Modifications. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. D � N North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 I Swannanoa, North Carolina 28778 NOHIN Cr�fiOS�NA '�1 n.�.rm.nm sm-.4 828.296.4500 Letter of Approval with Modifications RFM and Gwaltney Farms, LI,C May 23, 2019 Page 2 of 4 As of April 1, 2019, all financially responsible parties for new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Ms. Annette Lucas at Annette.lucas@ncdenr.gov or Mr. Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: I . The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Note that the Sediment Pollution Control Act (113A-54.I(e)) states that "The record shall be maintained until permanent ground cover is established...." Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Letter of Approval with Modifications RFM and Gwaltney Farms, LLC May 23, 2019 Page 3 of 4 Your cooperation is appreciated. Sincerely, Land Quality Section Enclosures: Certificate of Approval NCG01 Fact Sheet ec: Mr. Michael Warnock michael.warnock@drepllc.com Mr. David Stern moddyvalley@skybest.com Letter of Approval with Modifications RFM and Gwaltney Farms, LLC May 23, 2019 Page 4 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: RED FOX MEADOWS Project ID: AVERY 2019-004 County: Avery 1. Prior to any additional disturbance at this site, the erosion sediment control plan must incorporate all requirements of NCGO1 Construction Stormwater General Permit (see link below for additional information); and the Certificate of Coverage for NCG01 Construction Stormwater General Permit must have been received. {NCG01 Construction Stormwater General Permit} https :Hdeq. nc. gov/about/divisions/energy-mineral-land-resources/energy-mineral-land- permits/stormwater-permits/construction-sw 2. All surface waters must be protected from sediment -laden runoff with adequate erosion sediment control devices and an adequate buffer. Compliance with the trout buffer variance TB- AVERY 2019-001, issued May 21, 2019, is required. Note the October 15, 2019 deadline for all trout buffer restoration/stabilization to be completed. {G.S. 113A-571{ 15A NCAC 04B .0106} { 15A NCAC 04B .0109} { 15A NCAC 04B .0125}