Loading...
HomeMy WebLinkAboutNCC190482_NOI Application_20190605Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 6/5/2019 7:13:13 AM (NCG01 NOI Submission) Approve by Georgoulias, Bethany 6/5/2019 1:43:40 PM (Review- Construction NOI 11758) In Confirmed with Chris Morgan that he is an appropriately authorized individual to sign the Certification for the NOI application and is under the same overall organization entity as the permittee listed. • The task was assigned to Georgoulias, Bethany by round robin distribution 6/5/2019 7:13 AM • The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: June 7, 2019 5:00 PM 6/5/2019 7:13 AM Submit by Georgoulias, Bethany 6/7/2019 8:07:51 AM (Payment Verification - NCG01-2019-0482) p Scan of signed certification form from Mr. Clark obtained via email on 6/7/2019 and will be added to the permit records. **Also, reviewer inadvertently included comments for another eNO1 application on the previous re view step for this submittal. Those comments should be disregarded. — The task was assigned to Georgoulias, Bethany. The due date is: June 6, 2019 5:00 PM 6/5/2019 1:43 PM STME NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Inforrration 1. Project Name * Handee Hugo's 2. County* Guilford 3. Highway or Street 2829 Randleman Rd. Address * Street name only is acceptable if no address nurrtrer assigned yet 4. City or Township* Greensboro 5. State * NC 1 r-i) iTiT 7i1) M fiIi (-_TiI a 10141 6. Zip Code* 27406 7. Latitude * Enter the latitude in decirral degrees 36.0187 8. Longitude * Enter the longitude in decirral degrees (MIST be negative) -79.8032 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 06/11/2019 Estimated Construction Project Start Date 10. Date to End* 02/10/2020 Estimated Construction Project End Date 11. SIC (Primary)* Commercial (1542) Standard Industrial aassification for Development 12. Acres to be 1.44 disturbed* (including off -site borrow and waste areas) 13. Total site area 1.96 (acres)* 14. Post- 0.82 construction (Estimated) impervious area (acres) * NCC Project NCC-GUILF-2019-Handee Hugo's Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may enter up to 3 waterbodies. 15a. Receiving Ryan Creek Wate rbody* Narre of waterbody into which stormuater runoff will discharge 15b. Waterbody 16-11-14-2-3 Index No. * NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Perrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Sampson Bladen Oil Company, Inc Name * 2. First Name* Haddon ff Corporation, enter Registered Agent First l\brre 3. Last Name * Clark Y Corporation, enter Registered Agent Last Barre 3b. Title President 4. Permitee E-mail Haddon.Clark@sampsonbladen.com Address* 5. Permittee 919-789-7002 Telephone No.* 6. Permittee Mailing Street Address Address* 3309 Drake Circle Address Line 2 City Raleigh Postal / Zip Code 27607-3332 Check box if the street address the same as mailing address 7. Permittee Street Address* fJ Yes Street Address 3309 Drake Circle Address Line 2 City Raleigh Fbstal / Zip Code 27607-3332 State / Province / Region NC Country us State / Province / Region NC Country us C. Site Contact Information Part C. Roiect Site Contact Information 1. Type of Non -Government Ownership* 2. Primary Site Haddon Contact - First Name * 3. Primary Site Clark Contact - Last Name * 4. Title President 5. Site Contact E- Haddon.Clark@sampsonbladen.com mail Address* 6. Site Contact 919-789-7002 Telephone No.* 7. Organization Sampson Bladen Oil Company, Inc Name 8. Site Contact Street Address Mailing Address* 3309 Drake Circle Address Line 2 City Raleigh Rbstal / Zip Code 27607-3332 State / Province / Region NC Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 06/05/2019 Approved * 2. E&SC Plan Project 2943 Number/ID* Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by r Local Program 4. Local Program* City of Greensboro Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan NCG01-Approval Letter (2943).pdf 297.85KB Approval Mist be FDFfornat letter/documentation 6. NOI Certification NOI Completed form-Handee Hugo's 212.pdf 462.37KB Form Mist be RDFfornat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6B (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * V The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * V If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I7 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important: The person who signs this Certification above and signs the NOI Certification Form should be the same person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information) of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature qe"'Zr�r.1avr (WI. C?//'?4-11!1 Type Name* Haddon M. Clark Title President Organization Sampson Bladen Oil Company, Inc Date * 06/05/2019 F. Tracking and COC Info NOI Tracking No. 11758 NC Reference No. NCG01-2019-0482 Uses 'count number variable (incremrented by SP) Certificate of NCC190482 Coverage (COC) Uses'count_nunber'variable (incremrented by SF) No. * Count Number 482 Sequential nunber for subrrittal that is incremented by Stored Procedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)