EROSION AND SEDIMENT CONTROL
LAND DISTURBING PERMIT
LETTER OF APPROVAL
Date: 6/4/2019
Pulte Home Company,LLC
Attn: Chris Raughley
1225 Cresent Green Drive Suite 250
Cary, NC 27518
RE: Project Name: Regency at Heritage Permit No: 2018-0001750
Location: Forestville Road Acres Approved: 26.0
Wake Forest,NC 27587
Submitted By: Timmons Group
Date Received: 7/30/2018
Dear Sir/Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. Final signature copies shall be submitted to the
Town of Wake Forest as well as a digital copy.The plan approval shall expire two (2) years following
the date of approval. A preconstruction meeting shall be held prior to start of any work onsite. The
erosion and sediment control permit and NPDES permit will be issued at this meeting.
Per the UDO, a copy of the approved erosion control plan shall be on file at the job site. Also, this
letter gives the notice of our right to periodically inspect the jobsite to insure compliance with the
approved plan as outlined in the UDO.
The Town of Wake Forest Erosion and Sediment Control Program is performance-oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is inadequate to meet the
requirements of the Town of Wake Forest Erosion and Sediment Control Ordinance, this office
may require revisions to the plan and implementation of the revisions to insure compliance with the
UDO.
Acceptance and approval of this plan is conditioned upon your compliance with Federal, State, and
Local water quality laws, regulations, and rules. This approval does not supersede any other permit
or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if
there are any changes in the information included on the form. Please set up a preconstruction
conference with all parties involved through the Planning Department in order to receive the land-
disturbing permit and install erosion control measures. An initial inspection of these measures will
have to be conducted prior to any clearing/grubbing or earth moving activities.
Be aware that your project will be covered by the NPDES General Stormwater Permit NCGO1000
(Construction Activities).A copy of this permit will need to be obtained separately from the State.
Sincerely,
Scott Miles,PE
Public Infrastructure Engineer
Town of Wake Forest