Loading...
HomeMy WebLinkAboutNCC190490_ESC Approval Submitted_20190605ROY COOPER Governor MICHAEL S. REGAN se�rerary S. DANIEL SMITH lnrerlm D(recror NORTH CAROLINA Environmental Quality April 29, 2019 LETTER OF APPROVAL Westchester Country Day School ATTN: Headmaster Cobb Atkinson 2045 N. Old Greensboro Rd. High Point, NC 27625 RE: Project Name: Westchester Country Day School Acres Approved: 14.3 Project ID: DAVID-2019-022 County: Davidson City: High Point Address: 2045 N. Old Greensboro Rd. River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: The Isaacs Group, Brent Cowan Date Received by LQS: Apri123, 2019 Plan Type: Institutional -New Dear Mr. Atkinson This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. North Carolina Department of Environmental Quality Drvtswn of Energy Mineral and Land Resources Winston Salem Re9ronal Office -050 Hanes Miil Road, Suite 30O Winston Salem North Carolina 21103 336.776.9800 Letter of Approval Westchester Country Day School April 29, 2019 Page 2 of 3 As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (CDC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucasPncdenngov or Paul Clark at Paul.clarkPncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance- Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Letter of Approval Westchester Country Day School 1pri129, 2019 Page 3 of 3 Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is,appreciated. Sincerely, Zachary Lenz EI Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCG01 Fact Sheet cc: The Isaacs Group ATTN: Brent Cowan 8720 Red Oak Blvd. Suite 420 Charlotte, NC 28217 WSRO File W o kn u w o v '404� o 04 �a ® o 0 .,d Y e� rwl� CS $Not •� Q � ORO m *ma p c� as Cal �ma ,�