Loading...
HomeMy WebLinkAboutNCC190453_Certificate of Coverage_20190603 Certificate of Coverage STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL,AND LAND RESOURCES GENERAL PERMIT NO. NCG010000 NC Reference No. NCG01-2019-0453 Certificate of Coverage No. NCC190453 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1,other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission,and the Federal Water Pollution Control Act,as amended, Duke Energy Progress is hereby authorized authorized to discharge stormwater associated with CONSTRUCTION ACTIVITIES to surface waters of North Carolina from a site located at: Erwin-Selma 230 kV Transmission Line Switch Installations and Access Roads N/A Four Oaks Johnston County in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in N.C. General Permit No. NCG010000. This Certificate of Coverage is affiliated with E&SC Plan Project No.JOHNS-2019-019 This Certificate of Coverage shall become effective 6/3/2019. This Certificate of Coverage shall remain in effect for the duration of the General Permit or until rescinded. for S. Daniel Smith Interim Director, Division of Energy, Mineral,and Land Resources By the Authority of the Environmental Management Commission