Loading...
HomeMy WebLinkAboutNCC190453_NOI Application_20190603 Action History (UTC-05:00) Eastern Time(US&Canada) Submit by Anonymous User 6/3/2019 12:09:24 PM(NCG01 NOI Submission) Approve by Morman,Alaina 6/3/2019 3:47:54 PM(Review-Construction NOI 11644) • The task was assigned to Morman,Alaina by round robin distribution 6/3/2019 12:09 PM • The task was assigned to DEMLR NCG01 NOI Review Team.The due date is:June 5,2019 5:00 PM 6/3/2019 12:09 PM Submit by Morman,Alaina 6/3/2019 3:48:54 PM(Payment Verification-NCG01-2019-0453) • The task was assigned to Morman,Alaina.The due date is:June 4,2019 5:00 PM 6/3/2019 3:47 PM 1 sees �' � ••. -• i •• i i• i µt+tu.n.asF' IY sell NORTH CAROLINA Ernvlronmenfal QUII A. Project Information Part A. Project Location and Waterbody Information 1. Project Name* Erwin-Selma 230 kV Transmission Line Switch Installations and Access Roads 2.County* Johnston 3. Highway or Street N/A Address* Street narre only is acceptable if no address nun-ber assigned yet 4. City or Township* Four Oaks 5. State* NC 6.Zip Code* 27524 7. Latitude* Enter the latitude in decimal degrees 35.4156 8. Longitude* Enter the longitude in decimal degrees(MUST be negative) -78.4535 If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 06/01/2019 Estimated Construction Project Start Date 10. Date to End* 06/01/2020 Estimated Construction Project End hate 11. SIC(Primary)* Other(0000) Standard Industrial Classification for Developrrent 12.Acres to be 5.34 disturbed* (including off-site borrow and waste areas) 13.Total site area 5.34 (acres)* 14. Post- 0.27 construction (Estimated) impervious area (acres)* NCC Project NCC-JOHNS-2019-Erwin-Selma 230 kV Transmission Line Switch Tracking ID Installations and Access Roads Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may enter up to 3 waterbodies. 15a. Receiving Beaverdam Swamp Wate rbody* Narre of waterbody into which storrrwater runoff will discharge 15b.Waterbody 27-52-6-4 Index No.* NC Waterbody Index Ninber Stormwater PF No discharges will flow r Yes to additional wate rs* 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Perrrittee Information-Legally Responsible Entity and Individual ..................................................................................................................................................................... Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president,secretary,treasurer, or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. 1.Organization Duke Energy Progress Name* 2. First Name* Rodney ff Corporation,enter Registered Agent First l\b e 3. Last Name* Hutcherson ff Corporation,enter Registered Agent Last Barre 3b.Title Director of Transmission Engineering 4. Permitee E-mail rodney.hutcherson@duke-energy.com Address* 5. Permittee 919-546-2235 Telephone No.* 6. Permittee Mailing Street Address Address* 410 S.Wilmington Street Address Line 2 City State/Province/Region Raleigh NC Postal/Zip Code Country 27601 United States Check box if the rJ Yes street address the same as mailing address 7. Permittee Street Street Address Address* 410 S.Wilmington Street Address Line 2 City State/Province/Region Raleigh NC Pastal/Zip Code Country 27601 United States C. Site Contact Information Part C. Project Site Contact Information .................................................................................................................... 1.Type of Non-Government Ownership* 2. Primary Site Rodney Contact-First Name* 3.Primary Site Hutcherson Contact-Last Name* 4.Title Director of Transmission Engineering 5.Site Contact E- rodney.hutcherson@duke-energy.com mail Address* 6.Site Contact 919-546-2235 Telephone No.* 7.Organization Duke Energy Progress Name 8.Site Contact Street Address Mailing Address* 410 S.Wilmington Street Address Line 2 City State/Province/Fegion Raleigh NC Fbstal/Zip Code Country 27601 United States D. E&SC Plan Part D. Erosion&Sediment Control(E&SC)Ran Approval Information ....................................................................................................................................................................................................................................... ............................................................................................. 1. Date E&SC Plan 05/13/2019 Approved* 2. E&SC Plan Project JOHNS-2019-019 Number/ID* Assigned by agency or local program 3. E&SC Plan f•State DEQ Office Approved by r Local Program 4.State DEQ Office* Raleigh (RRO) Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a complete application. 5. E&SC Plan JOHNS-2019-019 LOA MOD 20190513 revised.pdf 168.63KB Approval Mist be FDFfornat letter/documentation 6. NOI Certification signed NOI.PDF 44.35KB Form Mist be R7Ffornat This is an Express f•No Review Project* r Yes E. Certification North Carolina General Statute 143-215.613(1)provides that: Anyperson who knowinglymakes any false statement,representation,or certification in anyapplication,record,report,plan,or other documentfiled or required to be maintained under this Article or a rule implementing this Article;or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit,and for any civil or criminal penalties incurred due to violations of this permit. * rJ The information submitted in this NOI is,to the best of my knowledge and belief, true,accurate, and complete based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s)and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important:The person who signs this Certification above and signs the NOI Certification Form should be the same person(or authorized responsible person within the same organization)as listed in Section B(Permittee Information) of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president,secretary,treasurer, or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. Signature Type Name* Rodney Hutcherson Title Director of Transmission at Duke Energy Progress Organization Duke Energy Progress Date* 06/03/2019 F. Tracking and COC Info NOI Tracking No. 11644 NC Reference No. NCG01-2019-0453 Uses'count number variable(incremented by SP) Certificate of NCC190453 Coverage (COC) Uses'count_nunber'variable(incremrented by SF) No.* Count Number 453 Sequential nunber for subrrittal that is incremented by Stored Procedure COC Year 2019 Year of date reviewed(used to assign YY digits after"NGC'in OOCno.)