Loading...
HomeMy WebLinkAboutNCCU Student Center - O&M AgreementOperation & Maintenance Agreemen Project Name: NCCU Student Center Project Location: Fayetteville Street, between Nelson Street and Cecil Street Cover Page ,s= Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & corres Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity; Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level SpreaderNFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: User Defined BMP Present: onding O&M tables will I Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): - 1 No No 11U auucU auwn,atwan IParkinq Lot I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. * Responsible Party:IDr. Cornelius Wooten Title & Organization: Vice Chancellor for Administration and Finance Street address: 1801 Fayetteville Street City, state, zip: Durham, NC 27707 Phone number(s): 919 530 - 7425 Email: cwooten8anccu-edu Signature:_J R J, Date: r�krrz. rar] 1 c Lja 1 , a Notary Public for the State of /2ery -t-0 /% h County of L)l r;) an _ , do hearby certify that Dr. d)rn t'v s Dbvfeh personally appeared before me this /1r V-4- day of 44 1 1 30/ 9 and acknowledge the due execution of the Operations ai en gr nt Witness my hand and official seal, N,iNa,«IunpM,, 4 Glet J "-'V'r` My commission expires 4/15/2019 Version 1.4 O&M manual - Page 1 of 3 " Sa Important maintenance procedures: - The drainage area will be carefully managed to reduce the sediment load to the sand filter. - The sedimentation chamber or forebay will be cleaned out whenever sediment depth exceeds six inches. - Once a year, sand media will be skimmed. - The sand filter media will be replaced whenever it fails to function properly after maintenance. The sand filter shall be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How to remediate the problem: Entire BMP Trash/debris is present. Remove the trash/debris. Adjacent pavement (if applicable) Sediment is present on the pavement surface. Sweep or vacuum the sediment as soon as possible. Perimeter of sand filter Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one- time fertilizer application. Maintain vegetation at an appropriate height. Vegetation is too short or too long. Flow diversion structure The structure is clogged. Unclog the conveyance and dispose of any sediment offsite. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the swale. Regrade the swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Remove sediment and replace with clean stone. Stone verge is clogged or covered in sediment (if applicable). Forebay or pretreatment area Search for the source of the sediment and remedy the problem if possible. Remove the sediment and stabilize or dispose of it in a Sediment has accumulated to a depth of greater than six inches. location where it will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turfmatting or riprap if needed to prevent future erosion problems. Erosion has occurred. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. Filter bed and underdrain collection system Water is ponding on the surface for more than 24 hours after a storm. Check to see if the collector system is clogged and flush if necessary. If water still ponds, remove the top few inches of filter bed media and replace. If water still ponds, then consult an expert. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Erosion or other signs of damage have occurred at the Repair or replace the outlet device. Contact the local NC Department of Environment and Natural Resources Regional Office. The receiving water outlet. STORM-EZ 4/15/2019 Version 1.4 O&M Manual Page 3 of 3