HomeMy WebLinkAboutNCC190229_ESC Approval Submitted_20190509LAUREL PARK
H 1DE RSON COUNW
SOIL E-ROSIION AND SE-MME T CONTROL OFFICE
May 2, 2019
LETTER OF APPROVAL
WXZ/SG Acquisition LLC
ATTN: Mark Kipcienski
22720 Fairview Center Dr
Fairview Park OR 44126
RE: Project Name: Arcadia Views SD Phase 1
Acres Approved 13.12
Project ID: 20181207
County: Henderson
City: Town of Laurel Park
Address: 0 Brevard Road (HWY 64 W)
River Basin: French Broad
Stream: Shaw Creek
Stream Classification: WS-IV
Submitted By: Jeff Foster PE
Date Received by Henderson County 1/20/2019
Plan Type: New
Dear WXZ/SG Acquisitions LLC,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan
to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of
Approval must be posted at the job site. This plan shall expire three (3) years following the
date of approval, if no land disturbing activity has been undertaken, as is required by Title
15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to
the commencement of any land disturbing activity on the above -named project. The NOI form
may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette
Lucas at Annette.lucas(c�r�,ncdenr.gov or Paul Clark at Paul. clarkgncdenr. gov. After you submit a
complete and correct NOI Form, a COC will be emailed to you within three business days.
Initially, NC DEQ DEMLR will not charge a fee for coverage under the NCGO1 permit.
However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to
the DEMLR Stormwater Central Office staff in Raleigh.
100 NORTH KING STREET, SUITE 118
HENDERSONVILLE, NC 28792
TELEPHONE: (828) 694-6521
LETTER OF APPROVAL
NAME OF FINANCIAL RESPONSIBLE PARTY
DATE OF LETTER
PAGE 2OF2
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following
documentation be kept on file at the job site:
1. The approved Soil Erosion & Sedimentation Control plan as well as any approved
deviation.
2. The NCGOI permit and the COC, once received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is inadequate to
meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede any
other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in
the Financial Responsibility Form, which you provided. You are requested to file an amended
form if there is any change in the information included on the form. In addition, it would be
helpful if you notify this office of the proposed starting date for this project. Please notify us
if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Project Engineer
Soil Erosion & Sedimentation Control Office
Enclosures: Certificate of Approval
NCGO1 Fact Sheet
ec: Shawna Riddle, Asheville Regional Office DEQ-DEMLR
100 NORTH KING STREET, SUITE 118
HENDERSONVILLE, NC 28792
TELEPHONE: (828) 694-6521