Loading...
HomeMy WebLinkAboutNC0003425_Report_20190424 1 DUKE James Wells ENERGY Vice President Environmental,Health and Safety Programs&Environmental Sciences 526 South Church Street Mail Code EC13K Charlotte,NC 28202 (980)373-9646 April 24, 2019 Via Overnight Mail Rick Bolich Raleigh Regional Office Regional Supervisor North Carolina Department of Environmental Quality Division of Water Resources 1628 Mail Service Center Raleigh, NC 27609 Bob Sledge North Carolina Department of Environmental Quality Division of Water Resources Water Quality Permitting Program 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: Report Under Special Order by Consent—EMC SOC WQ S 18-005 Duke Energy Progress, LLC — Roxboro Steam Electric Plant NPDES Permit NC0003425 2018 Annual SeepSurvey Report P Dear Messrs. Bolich and Sledge: On behalf of Duke Energy Progress, LLC (DEP), I am submitting to you the Roxboro Steam Electric Plant Annual Seep Report summarizing the findings of the comprehensive survey as required Special Order by Consent (SOC), SOC No. S 18-005 Section 2.c.3). As required by the SOC, I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Messrs. Bolich and Sledge April 24, 2019 Page 2 Please direct any questions concerning the Roxboro Steam Electric Plant SOC No. S 18-005 to Lori Tollie at (336) 854-4916 and to Chris Hallman at(980) 373-7892 relative to the annual seep inspection report. Sincerely, James ells Vice P esident,Environment, Health& Sa - Progr s and Environmental Sciences Duke Energy Attachment: Roxboro Steam Electric Plant 2018 Annual Seep Survey CC: Richard Baker, Duke Energy Lori Tollie, Duke Energy Chris Hallman, Duke Energy Robert Howard, Duke Energy Paul Draovitch, Duke Energy Matt Hanchey, Duke Energy synTerra 2018 ANNUAL SEEP REPORT ROXBORO STEAM ELECTRIC PLANT EMC SOC WQ S18-005 1700 DUNWAY ROAD SEMORA, NC 27343 APRIL 2019 PREPARED FOR DUKE ENERGY PROGRESS, LLC �+•� D ENERGY PROGRESS Erin N. Ki ey, EIT Project Engineer .71:)L , (tt,„41 /- Craig dy, NC L 2 #1599 Senior Project Manager 2018 Annual Seep Report April 2019 Roxboro Steam Electric Plant, Duke Energy Progress,LLC SynTerra TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION 1 2.0 FINDINGS 3 2.1 General Observations 3 2.2 Impact of Decanting 3 2.3 Changes to Seep Status 3 3.0 REFERENCES 4 LIST OF FIGURES Figure 1 SOC Locations and Inspection Areas LIST OF TABLES Table 1 SOC Locations and Descriptions-2018 Inspection LIST OF APPENDICES Appendix A Photographs Page i 2018 Annual Seep Report April 2019 Roxboro Steam Electric Plant,Duke Energy Progress,LLC SynTerra LIST OF ACRONYMS AOW Areas of Wetness CCR Coal Combustion Residuals EAB East Ash Basin EMC Environmental Management Commission SOC Special Order by Consent WAB West Ash Basin Page ii 2018 Annual Seep Report April 2019 Roxboro Steam Electric Plant,Duke Energy Progress,LLC SynTerra 1.0 INTRODUCTION On October 25, 2018, Craig Eady (NC L.G. #1599) of SynTerra inspected the Roxboro Steam Electric Plant (Roxboro or the Site)for existing and potential new areas of wetness (AOWs). The aforementioned activities were performed in accordance with North Carolina EMC Special Order by Consent WQ #S18-005. That Special Order by Consent (SOC) describes inspection requirements as follows: Duke Energy shall conduct annual comprehensive surveys of areas down gradient of ash basins identifying new seeps, and documenting the physical characteristics of previously documented seeps. All examinations of seeps must include identification of seeps by approximate latitude and longitude and date-stamped digital photographs of their appearance.A report summarizing the findings of the surveys, including a section analyzing the effect decanting of the basin(s)has on seep flows, accompanied by copies of the photographs noted above("Annual Seep Report"), shall be submitted to DWR in conjunction with submittal of the April 30 quarterly report noted in 2(c)(2)above. This Annual Seep Report must list any seep that has been dispositioned(as described below) during the previous year, including an analysis of the manner of disposition. All locations listed in Table 1 of the SOC were observed and documented with photographs during the inspection. General ins pection observations include: • No previously unidentified seeps were observed during the inspection. • No notable changes to seep status were observed during this inspection. • Decanting had not begun at the time of this inspection. Page 1 2018 Annual Seep Report April 2019 Roxboro Steam Electric Plant,Duke Energy Progress,LLC SynTerra Inspection Details Weather during and preceding the inspection was clear. Temperatures ranged from approximately 40 to 55 degrees F. No precipitation was recorded on the day of the inspection or the three days before the inspection according to the onsite rain gage. The inspector reviewed previous AOW inspection reports and the weekly dam safety inspection reports for each ash basin. Jake Muessen (Duke Energy system owner) conducted the ash basin dam safety inspections and prepared the reports. Prior to the inspections, Mr. Mueseen, Mr. Eric Cleaver (CCP Implementation Manager, Roxboro Plant), and Mr. Robert Howard (Environmental Coordinator, Roxboro Plant) were interviewed concerning recent rainfall, construction/stabilization projects associated with the ash basins, and general site conditions in and around the ash basins. Observations from the dam safety inspection reports were consistent with observations made during the SOC inspection. The inspection included observations in the following areas (Figure 1): • West Ash Basin (WAB) dam and chimney drains • Areas northeast of the WAB dam • Southern half of the sluice lines access area • The effluent discharge canal from the WAB extension impoundment to the Heated Water Discharge Pond • The East Ash Basin (EAB) dam • Areas proximate to the EAB dam to the southwest and northeast; eastern side of the EAB/industrial landfill • Effluent discharge canal from the EAB extension impoundment to the east side of the gypsum storage area • Area between the south side of the industrial landfill and unnamed tributary • Southwestern and eastern sides of the industrial landfill (south of the EAB extension impoundment) The inspection scope of work included a review of the areas identified as downgradient of ash basins. SOC locations are shown on Figure 1. Observations noted during the inspection are summarized on Table 1. Photographs of each seep location are included in Appendix A. Page 2 2018 Annual Seep Report April 2019 Roxboro Steam Electric Plant,Duke Energy Progress,LLC SynTerra 2.0 FINDINGS 2.1 General Observations Inspection observations are shown for each seep in Table 1. Details include: • Water redirect activities were noted near the base of the EAB dam with the installation of piping. • Water levels in the Heated Water Discharge Pond, the Cooling Tower Pond, and the Cooling Water Intake Canal were at normal levels. Water levels in the WAB/EAB effluent discharge canals and the basin impoundments were noted at water levels similar to previous inspections. 2.2 Impact of Decanting Decanting of the ash basin at Roxboro had not yet begun at the time of this inspection. 2.3 Changes to Seep Status Mr. Eady inspected each seep to evaluate whether it may be dispositioned in accordance with the SOC. The requirements for dispositioning a seep are as follows: For purposes of this Special Order, "dispositioned" includes the following: (1) the seep is dry for at least three consecutive quarters; (2) the seep does not constitute, and does not flow to, waters of the State or Waters of the United States for three consecutive quarters; (3) the seep is no longer impacted by flow from any coal ash basin as determined by the Director of DWR in accord with applicable law and best professional judgment;or(4) the seep has been otherwise eliminated (e.g., through an engineering solution). If a seep that has been dispositioned through drying up reappears in any subsequent survey, such a seep will no longer be deemed dispositioned and can be subsequently re-dispositioned as specified above. Non-constructed seeps described in paragraph 1(h) of this SOC cannot be dispositioned through option (2)above. Seeps dispositioned during 2018 were done so at the time of the SOC issuance. Table 1 lists those seeps dispositioned and the basis for disposition. Seeps identified as dispositioned at Roxboro are S-10, S-11, S-12, and S-13. These dispositioned seeps will continue to be inspected and evaluated for any change in flow conditons. In general, there was no change in status of the dispositioned seeps and no change in status of remaining seeps observed during this inspection. Page 3 2018 Annual Seep Report April 2019 Roxboro Steam Electric Plant,Duke Energy Progress,LLC SynTerra 3.0 REFERENCES North Carolina Department of Environmental Quality. (2018). Special Order by Consent EMC SOC WQ S18-005. • Page 4 2018 Annual Seep Report April 2019 Roxboro Steam Electric Plant,Duke Energy Progress,LLC SynTerra FIGURE .�y , _____ L...-_......1 -r• 1 �' 1. / . -_ /' J 11 -,--- P F/ INTAKE CANAL • it 1 .,.WATER I __.j t J DISCHARGE POND ,I` �/"�s'''._./ � x'^+ •�rl _ . • taga ° 1 , . pNF� fir" t,TT*�T '."'_`, LEGEND PONDS /' t• ,Q 4 NPDES CONSTRUCTED SEEP(APPROXIMATE) " @a NON CONSTRUCTED SEEP(APPROXIMATE) • OISPOSITIONED SEEP(APPROXIMATE) ., V:ESTASM„ _ -.• "`'.` -ASH BASIN WASTE BOUNDARY ,.;.. •.,:. _'•':.. .. AWN,,,,, ;:�.:,. _ .. :, M '.:..'.. _..ASH BASIN COMPLIANCE BOUNDARY S. INDUSTRIAL LANDFILL BOUNDARY ...�..n...TO /� "'� DUKE ENERGY PROGRESS ROXBORO PLANT BOUNDARY •. -q EFFLUENT DISCHARGE CANAL f - '}- —i-STREAM(JURISDICTIONAL/NON-JURISDICTIONAL) .`1 r23 WETLAND(AMEC NRTR 2015) ':.� Ezz SPECIAL ORDER BY CONSENT(SOC)INSPECTION AREA E.e SPECS '•„�, M1 I SPECIAL ORDER Br CONSENT ISOcI LOCATIONS ARE Dfscmef0 INEMc soc wo stems 9 .\, f • E'LUTANTpSCXARGEELINNATONSYSTEMINPOEUtEg ATIIC= OE IN PERM TNCOBOSA2AALLNVOESSEEVSARE NCLu0E0 NOUTFALL BBI ON THE '...9 ,` ' ALL BOUNDARIES �a ME APPROXIMATE . , `y ENERGY P0000RTY LINES ORE REPRESENTED BOOED ON HISTORICAL DOCUMENTED '~' �� •\• ` 1 I SOUTHERN BOUNDARIES OCURREM PERSON ARCOWIYGISTOFEHE MEGY IS STA.MARIN° /.' PROPERTY PROPERTY xIENS'ON wEPWNAOw°NiN THE AREA SOUTHWEST OF THE •e 1 A. • ETENSION ' F'��,•' SORTIE1LOCATIONS WERE DERIVD FROM VARIOUS SOURCES AND ARE AM%OF SURVEYED CI •.y` IMPOUNDMENT `Y, , �w ELocArIows THEREFORESAMPLE LCC DNS ARE TO BE DEEMED PPR A4MAr 1' 1 r WAS PHOTOGRAPHY OBTAINEDB M GOGGLE EARTH PRO ON OCTOBER 11 2O9 AERIAL • cOLLECTEO ON JUNE 12 M FROM ',...,r. T T'``I .�- ALRErOURCES TECHNICAL REPORT MRTRI PREPARED BY AWL FOSTER WHEELER �• J NLY 0TH O10 A [.. SURVEY CONDUCTED APml t2.20I4 L S" r" _ Y "d '' OR FNS BffNSET V1THA VROJECTION OF NORTH CAROLINA STATE PLANE pNATE SYSTEM F v4 52001NAOeSI to* • ' 0 ,iI _/ % rr °° 350 °° 2.OD FIGURE 1 GRAPHIC SCALE RE FEET ,, SOC LOCATIONS AND INSPECTION AREAS Fit. y...,, �.i 1R0 RIVERBTREET SUITE�]D \l, RFENWlsE SOUTNCA,TRE0 A]9R01 ROXBORO STEAM ELECTRIC PLANT PHO'E B64 21999 DUKE ENERGY PROGRESS,LLC syrrTerra .DRAWN BY ro`Rm .Y• DAaWN� EA C MY WE OFF LW2019 SEMORA,NORTH CAROLINA ✓a CHECKED M INSEY L 2018 Annual Seep Report April 2019 Roxboro Steam Electric Plant,Duke Energy Progress,LLC SynTerra TABLE TABLE 1 SOC LOCATIONS AND DESCRIPTIONS-2018 INSPECTION ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS,LLC,SEMORA,NC Location Coordinates Receiving Facility Sample ID Receiving Waterbody Waterbody Description SOC Monitoring Interim Action Levels Notes from Inspection Latitude Longitude Classification Heated Water Discharge NA-Not a NA-Seep contribution Chimney drain discharge from active ash basin NA-Not a Classified Very low flow to stagnant conditions.Algae and Roxboro S-Ol 36.477043 -79.076467 Pond flowing to NPDES Classified dam to Heated Water Discharge Pond analyzed in NPDES Surface Water organic floc.Biofllm in certain locations permit outfall 003 Surface Water Permit monitoring Heated Water Discharge NA-Not a NA-Seep contribution Debris from the pipe intake was removed to allow Chimney drain discharge from active ash basin analyzed In NPDES NA-Not a Classified pipe.flow through 1" Flow is low but can sample Roxboro S-02 36.477055 -79.076727 Pond flowing to NPDES Classified dam to Heated Water Discharge Pond y Surface Water 9 p permit outfall 003 Surface Water Permit monitoring from pipe. Heated Water Discharge NA-Not a NA-Seep contribution Roxboro S-03 36.476994 -79.076978 Pond flowing to NPDES Classified Chimney drain discharge from active ash basin analyzed In NPDES NA-Not a Classified Flow sufficient for sample collection and flow permit outfall 003 Surface Water dam to Heated Water Discharge Pond Permit monitoring Surface Water measurement. Heated Water Discharge NA-Not a NA-Seep contribution Roxboro 5-04 36.476923 -79.077204 Pond flowing to NPDES Classified Chimney drain discharge from active ash basin analyzed in NPDES NA-Not a Classified Low flow and sufficient to sample based.Orange permit outfall 003 Surface Water dam to Heated Water Discharge Pond Permit monitoring Surface Water floc and staining. Heated Water Discharge NA-Not a NA-Seep contribution With the exception of a small,stagnant puddle at Roxboro S-05 36.476751 -79.077412 Pond flowing to NPDES Classified Chimney drain discharge from active ash basin analyzed In NPDES NA-Not a Classified the base of the rip-rap,the channel was dry and permit outfall 003 Surface Water dam to Heated Water Discharge Pond Permit monitoring Surface Water no sample was collected. Heated Water Discharge NA-Not a NA-Seep contribution Very low flow to stagnant conditions.No orange Roxboro S-06 36.47669 -79.077643 Pond flowing to NPDES Classified Chimney drain discharge from active ash basin analyzed in NPDES NA-Not a Classified floc or iron staining but very slight algae in permit outfall 003 Surface Water dam to Heated Water Discharge Pond Permit monitoring Surface Water puddled areas. Heated Water Discharge NA-Not a NA-Seep contribution Orange iron oxide staining present on concrete. Chimney drain discharge from active ash basin NA-Not a Classified Roxboro S-07 36.476736 -79.077954 Pond flowing to NPDES Classified dam to Heated Water Discharge Pond analyzed in NPDES Surface Water Very low flow,insufficient for sample collection permit outfall 003 Surface Water Permit monitoring and measurement.Some biofilm on pooled areas Very low to negligible flow observed at bank. Seepage area approximately 30 feet west of Heated Water Discharge NA-Not a chimney drain#7.Drainage/flow is to the Heated NA-Seep contribution Minor drops with iron floc and staining noted on Roxboro S-08 36.476719 -79.078064 Pond flowing to NPDES Classified Water Discharge Pond.This non-constructed seep analyzed in NPDES NA-Not a Classified soil surface.Insufficient flow to sample.Area permit outfall 003 Surface Water flows to a portion of an NPDES wastewater Permit monitoring Surface Water appears much drier than past inspections. treatment system. Wet/marshy area remains towards the western side of the dam. Water was clear with no observable aerobic NA-Seep contribution See page 6 of this bacteria,flor,or iron-oxidation on the vegetated Roxboro S-09 36.47823 -79.056076 UT to Hyco Lake WS-V;B Discharge from extension of East Ash Basin. analyzed In NPDES Attachment A of Roxboro substrate.Unable to get to exact 5-09 location Permit monitoring SOC document. due to reed overgrowth,area not maintained. Sufficient flow to sample near S-09 based on coordinates. NA-Not a Minimal AOW with no flow located on northern NA-Seep A ditch that directs stormwater flow during heavy Roxboro 5-10** 36.479169 -79.056963 Extension of East Ash Basin Classified portion of East Ash Basin berm.Any flow would dispositioned NA-Seep dispositioned or sustained precipitation events.Area was dry. Surface Water drain to extension of east ash basin. l NA-Not a Minimal AOW with no flow located on northern NA-Seep Roxboro S-1.1** 36.478569 -79.056737 Extension of East Ash Basin Classified portion of East Ash Basin berm.Any flow would dispositioned NA-Seep dispositioned A vegetated area.Dry during inspeciton. Surface Water drain to extension of east ash basin. SOC Tebles_ALLnnel_2019_04_17 Page 1 of 3 TABLE 1 SOC LOCATIONS AND DESCRIPTIONS-2018 INSPECTION ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS,LLC,SEMORA,NC Location Coordinates Receiving - - Facility Sample ID Receiving Waterbody Waterbody Description SOC Monitoring Interim Action Levels Notes from Inspection Latitude Longitude p Classification NA-Not a Minimal AOW with no flow located on northern NA-Seep Roxboro 5-12** 36.478103 -79.056735 Extension of East Ash Basin Classified portion of East Ash Basin berm.Any flow would dispositioned NA-Seep dispositioned Dry during inspection. Surface Water drain to extension of east ash basin. Not a seep.Outfall of culvert channeling flow from See page 6 of this See page 6 of this Strong,steady flow from both culverts.Water was Roxboro S-13** 36.486175 -79.059612 Hyco lake WS-V;B UT on east side of facility that receives flow from Attachment A of Attachment A of Roxboro clear.Slight iron staining inside of concrete East Ash Basin extension and S-21.Flows to Roxboro SOC facility water intake channel(Hyco Lake). document. SOC document. culverts Location is the end of the 24"pipe draining a boggy area south of the gypsum pad.Pipe extends Heated Water Discharge NA-Not a under the pad towards the northwest,under NA-Seep contribution Strong flow,no biofilm as had been observed at Roxboro 5-14 36.483738 -79.063751 Pond flowing to NPDES Classified railroad tracks,with discharge to a ditch that analyzed in NPDES NA-Not a Classified 9 y Surface Water previous inspections.Significant reed and permit outfall 003 Surface Water drains to the Heated Water Discharge Pond.This Permit monitoring vegetation growth around culvert and ditch. I non-constructed seep flow to a portion of an NPDES wastewater treatment system. Seepage to wet area north of active ash basin. Quarterly monitoring at Small stream flowing to Flows north Into a waterbody flowing into Heated Hardness 1200 mg/L Algae growth in substrate with biofilm on water Roxboro S-18 36.477947 -79.073728 Heated Water Discharge WS-V;B(Hyco Water Discharge Pond.Waterbody is potentially point prior to flowing TDS 1600 mg/L surface observed.Sufficient flow for sam lin at Pond I- Lake) WOTUS.This non-constructed seep flows to a into Heated Water Sulfates 1000 mg/L beam E-71. p 9 portion of an NPDES wastewater treatment system. Discharge Pond. AOW with minimal flow located adjacent to the S- Heated Water Discharge NA-Not a 01 chimney drain at the east end of the 1973 ash 9 NA-Seep contribution Roxboro S-19 36.4771755 -79.07639 Pond flowingto NPDES Classified basin dam.Any flow moves toward the Heated NA-Not a Classified Water Discharge Pond.This is non-constructed analyzed in NPDES Surface Water No flow or saturated soil observed. permit outfall 003 Surface Water seep flows to a portion of an NPDES wastewater Permit monitoring treatment system. Seep flow to small stream channel northeast of West Ash Basin dam Drains west through wetland Quarterlymonitoringat Small stream flowing to g Hardness 1200 mg/L Stagnant conditions observed near AOW sign. Roxboro 5-20 36.47799 -79.0749 Heated Water Discharge WS-V;B(Hyco to Heated Water Discharge Pond.No sample data point prior to flowing Biofilm,orange floc and algae buildup.Sufficient 9 TDS 1600 mg/L g Pond Lake) due to lack of flow.This non-constructed seep into Heated Water flow for sampling available closer to the Heated portion of an NPDES wastewater Discharge Pond. Sulfates 1000 mg/L flows to a 9 Water Discharge Pond. treatment system. Monitoring of UT to Small drainage channel from a storm water Seep emerging downgradient of storm water basin Hardness 1000 mg/L Hyco Lake at collection basin.Minimal flow emerging from seep. Roxboro S-21 36.48246 -79.0559 UT to H co Lake WS-V;B(Hyco below East Ash Basin.Flow drains adjacent to East TDS 1000 mg/L Ponded areas within channel have very y established Duke Lake) Ash Basin effluent channel from point of Sulfates 1000 mg/L low flow emergence to UT to Hyco Lake. Energy S-13 Copper 5 pg/L between them.Algae,iron floc,and abundant leaf monitoring location. litter observed within channel. Located just east of the cooling tower ponds. Saturated conditions have promoted the growth of Heated Water Discharge NA-Not a Wetness emerges from several points on the hill 9 NA-Seep contribution Phragmites In the area.Several distinct Roxboro 5-22 36.48184 -79.0657 Pond flowingto NPDES Classified side area.Minimal flow could eventually reach NA-Not a Classified analyzed In NPDES emergencepoints were observed along outfall 003 Surface Water Outfall 003.No sample data to date due to lack of Surface Water 9 u the west permitflow.This non-constructed seep flows to a portion Permit monitoring side of the asphalt road.Flow is low but steady, of an NPDES wastewater treatment system. divides along road with discharge to both ponds. SOC Tablea_ALLFlna 1_2019_01 1) Page 2 of 3 • TABLE 1 SOC LOCATIONS AND DESCRIPTIONS-2018 INSPECTION ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS,LLC,SEMORA,NC Location Coordinates Receiving Facility Sample ID Receiving Waterbody Waterbody Description SOC Monitoring Interim Action Levels Notes from Inspection Latitude Longitude Classification Located on sloped area along the southwest end of the East Ash Basin dam.Large AOW but with little Heated Water Discharge NA-Not a to no flow.Diffuse flow is directed to channel with NA-Seep contribution Very saturated soil.No flow channel.Water Roxboro S-23 36.48035 -79.0685 Pond flowing to NPDES Classified discharge to Heated Water Discharge Pond and analyzed in NPDES NA-Not a Classified flowing in rip rap storm drain.Thick grass and permit outfall 003 Surface Water Outfall 003.No sample data to date due to lack of Permit monitoring Surface Water phragmites abundant. flow.This non-constructed seep flows to a portion of an NPDES wastewater treatment system. Prepared by:jOf Checked by:QIO flutsE: •-Location previously investigated as a seep.Monitoring has not indicated the presence of coal combustion residuals. ••-Seep dispositioned via repair and/or non-flowing condition to potentially reach Waters of the U.5.,or other,es noted.Monitoring shall be conducted at the approximate locations Indicated on the attached site map. All monitoring shall be conducted par the requirements found in Attachment B of this Order. pg/L-micrograms per liter mg/L-mllograms per liter NA-Not Applicable NPDES-National Pollutant Discharge System SOC-Special Order by Consent UT-Unnamed Tributary TD5-Total Dissolved Solids SOC Tables_ALL_Final_2019_09_17 Page 3 of 3 2018 Annual Seep Report April 2019 Roxboro Steam Electric Plant,Duke Energy Progress,LLC SynTerra APPENDIX A PHOTOGRAPHS 2018 Annual Seep Report April 2019 Roxboro Steam Electric Plant,Duke Energy Progress, LLC synTerra .. x';ry ;, k W ? r Jai , --... ''.'..1.1.iita„:„7„,,r_ __.,,b2,...,,,,.,,,, : ,....4t:^4444'...,,x1 -,esi___-i!... .,* . ,tea . A� r < r *,r,":- '... =3- - r? 41 r yx , • S-QZ View of seep location south. --- ::__.,___ _ -ak,,.,, ` `-''','' +.,mac%'~ ..i ,— +� nik a try x �r rz,ri tH Y p+ „,9. ire.:. k ,,`. N.yd 44 G\•, 'r" of ' AC ,Y i `', 1 t! iS-Q2 View of seep location facing south. 0 synTerra 1 2018 Annual Seep Report April 2019 Roxboro Steam Electric Plant,Duke Energy Progress,LLC SynTerra ,'" � j s .x 1 S-03 View of seep location facing sou th. Ate. ^^».` r♦ sy'+ y. C `' a} t + t F .. 4 s+' S-04 View of seep location facing south. L? synTena 2018 Annual Seep Report April 2019 Roxboro Steam Electric Plant,Duke Energy Progress,LLC SynTerra r r _ 7 ' � 9R 1R' 9e E „ r? w Abl ,€+k r.. t- i z r k CJctaber7 � ` 36 476751 .e .1 x r ?AS S-05 View of seep location facing south. "l k - Z • w � - ,.„ r ,yr " `a fie A, . , w "� . o 4 .fig at .Y.,-.- . w (.. ,. e .w, f { -11' w ,A0 , Vie_ y r . S-06 View of seep location facing south. L'' synTerra . 2018 Annual Seep Report April 2019 Roxboro Steam Electric Plant,Duke Energy Progress,LLC SynTerra .. .., - , i.; ?fit r . ? �'` , ` a :.'i'— -ice ' '+w. .�"ay8 31• *�B % -, `.a .� e as .. r gi+, ^s e 7";- "4",n' A ,yam ,4w.'S. 4. ij } Y--Z *'!► JF F ���n°ai. N{ r ,x; A.0W+1. S-07 `" ar Pryor y:.:.,/ 4, -'' �. .✓..,r' '- -ts.-r: - ", _ss -ydLd,,.'.-'Y':larlaf.i.: - L!',_,u *t.i.;:CI?S':,_1'1 .iiL .;i,i,, ,*,,, Ya. ,'' s. S-07 View of seep location facing south. e" 4 s f , ,,i / r{ y 1 October 25 .2f 18 ,t; ', : 3 ! tF 35.4767199.078064 _ 1, ,._ mow-I, .` _ L S-08 View of seep location facing south. L' synTerra 2018 Annual Seep Report April 2019 Roxboro Steam Electric Plant,Duke Energy Progress,LLC SynTerra Pl\ ,,,.. fti ' -';'' --",.. ''''.,..r.. 44.i.,- --9 1._ \,t.,,,c,..., ..,,,,24.,,,rci„...,74,7,.... ,. •."7.------ _ --- .-7,1 \ ' ' '' . , , ., t /, , ` t i I / \t / es R ''e� , ''%,'.. F P o fw � •. yy a ^ -r4Rr* tik/4 +4a r ! i - O S-09 View of seep location facing southwest. . l s s�A '.''M .'-mac c` "A ��k t..-.. a -- � / S}r' 4 3 .. I �# . es p, -� IC '`BF '.Y•' '4. H �. J lye yb _ .�. { .�• „S-1O View of dispositioned seep location facing west. 0 synTerra I April 2019 2018 Annual Seep Report Roxboro Steam Electric Plant,Duke Energy Progress,LLC SynTerra i • 3 - * , x . +,1 �t s S-11 View of dispositioned seep location facing southwest. ___,,,Y. w I. s '.A �"5 1s. �.' 9 fir` ;- S-12 View of dispositioned seep location facing southwest. 0 synTerra ' 2018 Annual Seep Report April 2019 Roxboro Steam Electric Plant,Duke Energy Progress,LLC SynTerra i, . I October 25 €1I 8 a , • ',6,486175 t79.059612 0 4. View of the SOC sample location facingdown with the concrete culvert I S-13 discharging to the north into the water intakechannel. mammy ,t I .1 t• '. 1 ; ..„ i d i L .s - r, , . ,,�x ty',' ' 4 . ,'♦ 's 'rea '. 1 4. ii ' { j`tlritilv t ;ii. "4:f:';10. 14,, ' 1.'--:-. ,'\ ' . , . „ 4.-i1/4:s - - --,-,-or,. , --'t.-1 , , loo. S-14 View of seep location facing northeast. L' synTerra 4 April 2019 SynTerra 2018 Annual Seep Report Roxboro Steam Electric Plant,Duke Energy Progress, LLC a 1 I k r ARa$l- w f t / 1,, ` �'' "� +� _ ' .k 3 ' 4,.e sYti i fi,,, ,47 �_� 14 ik yp ' .+ 46 t % i .yaps i ° + 4 ,, Y 4 iz:m,, �, eRtl 4 #'4 *5" . N„L r 47�+ ,lgt g�Y t 4. r sit�y. ' �' tq K '�G/.d J` f 43 "$ ae a:yc a.4- r,t .! = 7 4 c 4"" 1,;. ,,+Eye (�'7y'/� '`" .j}k '!`a c d' V ,7,A... 4 t� ARy,� y, i.,,t +r+. `' ' !U"" +L' cto r r yO1 8il, p:�S.��* �S`'�.4 i ..1{ .ph4�4e »° "�k. ?' 7 -. �;. a z A, * dl+r' Pi k, 3 ' # .;mot# a ' S-18 View of the SOC sample location facing southeast. - :'AWaf�ttMi.n•. a, ..t N' x ? 4Ce:JF Rrrgc , 4 ' u < w '4 dae t • S-19 View of seep location facing northwest. synTerra • 2018 Annual Seep Report April 2019 Roxboro Steam Electric Plant,Duke Energy Progress,LLC Syn I crra i ' ` x ' i, y t L w ''r 4 t 3.Q2 11 0 ' .t r ��g . • 1 S-20 View of SOC sample location facing east. -IA u:a, 0y..'" ti •�I, '' y. Cn M^C . -it, { ttt- Y- f C L* I .I�r` y J1e # Y'`'F"Ae t ,+ * �'y� ;tom ' •S pt s i 1Ji i"att:ti a �13; ' , X- l '.' y t w I q i t Y. ,, Y:., „,"— 1 y i �'. f„`',y 4 ,1 r. •iit crF' , t ^y� . w g. 'i y•Zks * -.„ .a �' Y" - _„em. ,'r - o - ''''. ,,,,E1,-', A ii•—• • "!-. ,tA: .v.. - . 444 • ,,, ..... .N.. „,_444„,„ ,?*4.1. N .. ,‘, yw S-21 View of seep location facing� northeast. . L'f synTerra 2018 Annual Seep Report April 2019 Roxboro Steam Electric Plant, Duke Energy Progress,LLC SynTerra m r�,a �.. t / , v , )1 .. f,�c , 4 , •{ff ff' , 7. �,� f ,it I r 1 ¢y��{Yp.,p $ K 11 tf I1.r' frJ $ tt ',f }r�F'fLL\ 1{- 1 1' 1 i ,j1 1 rr t , ,7 s , I ,: { x • ti � �>��i � � 1 N � � } i t�;�rrA 1 � a ',tl IA - ,� 1 • {1� (ISLlj'^i �'�, id f'•;1 1 t �'/; 1 ,ryr V aa,'`` 1 Rat { ] j l 1'�'1 a 1,.+ 1`t Fi1°tR� t.)} Nil,,, `�L', .ltJTi f q"N .r +'Li 1 ,`` f, 1 1 -; `� 1 4' +t. YYY 11't ' i r a 4. i 4, It \I ^)I li;\' 9 11 t • l S-22 View of seep location facing east. ® AA), »* a a .h a '1 *j a c9rn..4 «.i ta'"1 t 1 .4. iI 1 r,. _ f: f Ix . f 1 1..1 ! t' . c } k of ..c s 4l ) !1 1 Y .r ., erg } SO? #. ., . � ', . • t}ti�� ..", a • j TTNN[[\f 1 r 1, t S-23 View of seep location facing west. synTet I d