HomeMy WebLinkAboutATF Infrastructure - PN 80037 ATF Infrastructure Construction Sequence CONSTRUCTION SEQUENCE For PN 80037 ATF INFRASTRUCTURE PROJECT FORT BRAGG MILITARY RESERVATION Located in: HOKE COUNTY MOORE COUNTY Prepared for: NCDEQ Prepared By: 2941 Logistics Street, Bldg. N-6307 Fort Bragg, North Carolina 28310 Phone: 910-495-1311 APRIL 2019 CONSTRUCTION SEQUENCE 1. Obtain plan approval and other applicable permits. 2. Flag the work limits and stream areas for protection. 3. Hold preconstruction conference at least one week prior to starting construction. Lift Station and Access Roadway 4. Install temporary gravel construction entrance. 5. Install temporary sediment trap. 6. Rough grade access road, lift station site, and detention ponds; stock pile top soil and install silt fencing as needed. I 7. Install catch basins, extend existing culverts, and install storm water pipes. Install inlet protection around catch basins. Install head walls and rip rap outlet protection on extended storm water pipes. 8. Install concrete headwalls, inlet box, and 18-in storm drain pipe in wet detention pond west of the lift station. Plug the weir in concrete riser and construct a temporary sediment trap in this basin. Install headwall and rip rap outlet on 18-in storm drain. 9. Construct Lift Station. 10. Complete final grading for lift station, access road, and swale. Stabilize access road with gravel. Install long term matting in swale, and stabilize all disturbed areas. 11. Once all upstream areas have been permanently stabilized, convert temporary sediment trap and sediment basins into bio-retention ponds and install rip rap outlets at all headwalls.