Loading...
HomeMy WebLinkAboutNCC190067_ESC Approval Submitted_20190418Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY April 3, 2019 LETTER OF APPROVAL Crossroads Mission Church Attention: Rocky Shelton Post Office Box 2090 Shelby, NC 28152 RE: Project Name: Crossroads Mission Church Acres Approved: 3.75 Project ID: CLEVE-2019-007 County: Cleveland City: Shelby Address: Dekalb Street River Basin: Broad Stream Classification: Other Submitted By: Crossroads Mission Church Date Received by LQS: March 29, 2019 Plan Type: Revised Dear Mr. Shelton: ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANNY SMITH Interim Director This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on \ the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or EwAl Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within -three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office in Raleigh. �O Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: �J State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources w�+ Mooresville Regional Office 1 610 East Center Ave Ste 301 1 Mooresville, NC 28115 704 663 1699 T Letter of Approval Crossroads Mission Church April 3, 2019 Page 2 of 2 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice revred by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, ` 5Z) James Moore Assistant Regional Engineer l Land Quality Sec ion THE ��/� Enclosures: Certificate of Approval NCGO 1 Fact Sheet 1 em: larissa@odomengineering. corn