Loading...
HomeMy WebLinkAboutNCC190008_NOI Application_20190403Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 4/3/2019 10:13:31 AM (NCG01 NOI Submission) Approve by McCoy, Suzanne 4/3/2019 10:20:02 AM (Review- Construction NOI 9832) • The task was assigned to McCoy, Suzanne by round robin distribution 4/3/2019 10:13 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: April 5, 2019 5:00 PM 4/3/2019 10:13 AM Submit by McCoy, Suzanne 4/3/2019 10:20:50 AM (Payment Verification - NCG01-2019-0008) • The task was assigned to McCoy, Suzanne. The due date is: April 4, 2019 5:00 PM 4/3/2019 10:20 AM 1r-i)iTII�T:2,11111711MF11f_TiIa10141 NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Inforrration 1. Project Name * Mason Park Phase 3 2. County* Johnston 3. Highway or Street Josephine Road Address * Street narra only is acceptable if no address nurrber assigned yet 4. City or Township* Cleveland 5. State * NC 6. Zip Code* 27529 7. Latitude * Enter the latitude in decirral degrees 35.5713 8. Longitude * Enter the longitude in decirral degrees (MJSTbe negative) -78.5102 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 10. Date to End* 11. SIC (Primary)* 12. Acres to be disturbed * 13. Total site area (acres)* 14. Post - construction impervious area (acres) * 04/15/2019 Estirrated Construction Project Start Date 06/28/2019 Estirrated Construction Project End Date Residential, Single Family Houses (SFE) (1521) Standard Industrial aassification for Developrrant 11.50 (including off -site borrow and waste areas) 32.08 3.78 NCC Project NCC-JOHNS-2019-Mason Park Phase 3 Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may enter up to 3 waterbodies. 15a. Receiving Swift Creek Wate rbody* Barre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 27-43-(8) Index No. * NCWaterbody Index Nmber Stormwater fJ No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act? * B. Permittee Information Part B. Perrrittee Information - Legally Fbsponsible Entity and Individual ......................................................................................................................................................................... 1. Organization Capital Properties of Raleigh II, LLC Name * 2. First Name* David ff Corporation, enter Fbgistered Agent First 1\brre 3. Last Name * Stallings V Corporation, enter Registered Agent Last f brre 4. Permitee E-mail david@shenandoahhomes.us Address* 5. Permittee 9842005540 Telephone No.* 6. Permittee Mailing Street Address Address* 3724 National Drive Address Line 2 Suite 220 City State / Province / Region Raleigh NC Postal / Zip Code Country 27612 us Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 3724 National Drive Address Line 2 Suite 220 City State / Province / Region Raleigh NC Postal / Zip Code Country 27612 us h C. Site Contact Information Part C. Proiect Site Contact Inforrretion 1. Type of Individual Ownership* 2. Primary Site Zach Contact - First Name * 3. Primary Site Daugherty Contact - Last Name * 4. Title 5. Site Contact E- zach@shenandoahhomes.us mail Address* 6. Site Contact 9105488433 Telephone No.* 7. Organization Shenandoah Homes, LLC Name 8. Site Contact Street Address Mailing Address* 3724 National Drive Address Line 2 Suite 220 City Raleigh Fbstal / Zip Code 27612 State / Province / Fbgion NC Country United States h D. E&SC Plan Part D. Erosion & Sediment Control (MSC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 03/25/2019 Approved * 2. E&SC Plan Project JC# 18-086-P Number/ID* Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by r Local Program 4. Local Program* Johnston County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan Erosion & Sedimentation Control Plan Approval from Approval 124.92KB JoCo.pdf letter/documentation Mist be R7F forrret 6. NOI Certification Signed NOI.pdf 270.69KB Form Mist be RDFfornet This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6B (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * V The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * V If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I7 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person' "This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Zachary Daugherty Date * 04/03/2019 F. Tracking and COC Info NOI Tracking No. 9832 NC Reference No. NCG01-2019-0008 Uses 'count_nunber variable (increrrented by SP) Certificate of NCC190008 Coverage (COC) Uses 'count _nunber'variable (increrrented bySP) No. * Count Number Sequential nunber for subrrittal that is increrrented by Stored Procedure COC Year 2019 Year of date reviewed, used to assign YY digits after "NOC' in OOC no.)