Loading...
HomeMy WebLinkAboutNCS000580_Email to EPA RE Mod to Add 002_20190321 Georgoulias, Bethany From:Georgoulias, Bethany Sent:Thursday, March 21, 2019 10:00 AM To:Sampath, Sam Subject:FW: NCS000581 Minor Permit Modification to add SDO 002 Attachments:NCS000580_Permit Modification to Add SDO 002_20190321.pdf Sam, Please see the attached correspondence regarding Mayo Electric Generating Plant’s Stormwater Permit. This is EPA’s copy. From: Georgoulias, Bethany Sent: Thursday, March 21, 2019 9:58 AM To: 'Tollie, Lori White' <Lori.Tollie@duke-energy.com> Cc: Valentine, Thad <thad.valentine@ncdenr.gov>; Denton, Bill <bill.denton@ncdenr.gov>; Lucas, Annette <annette.lucas@ncdenr.gov> Subject: NCS000581 Minor Permit Modification to add SDO 002 Lori, Please see the attached Permit Modification for Mayo Electric Generating Plant (I inadvertently put “Steam Station” in the letter subject, but the permit cover page is correct) with the new Outfall 002 to Bowes Branch. Please let me know if you have any questions. You can find all the files in our Laserfiche Repository file for NCS000580. Best regards, Bethany Georgoulias Environmental Engineer Stormwater Program, Division of Energy, Mineral, and Land Resources N.C. Department of Environmental Quality 919 707 3641 office bethany.georgoulias@ncdenr.gov 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Tollie, Lori White <Lori.Tollie@duke-energy.com> Sent: Tuesday, March 19, 2019 11:26 AM To: Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov> Subject: RE: \[External\] Mayo ISW NCS000581 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov 1 I’ve asked the Mayo station environmental folks to get this asap. Thanks From: Georgoulias, Bethany \[mailto:bethany.georgoulias@ncdenr.gov\] Sent: Monday, March 18, 2019 1:57 PM To: Tollie, Lori White <Lori.Tollie@duke-energy.com> Subject: RE: \[External\] Mayo ISW NCS000581 Lori, Do you have a latitude and longitude coordinate for this new proposed outfall? I need to add that to our BIMS database for this modification. It can be approximate. Also, I’m out all day tomorrow and part of Wednesday, but I’ll resume working on this when I get back to the office. Best, Bethany Bethany Georgoulias Environmental Engineer Stormwater Program, Division of Energy, Mineral, and Land Resources N.C. Department of Environmental Quality 919 707 3641 office bethany.georgoulias@ncdenr.gov 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Tollie, Lori White <Lori.Tollie@duke-energy.com> Sent: Monday, March 18, 2019 11:16 AM To: Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov> Subject: RE: \[External\] Mayo ISW NCS000581 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Bethany, The project work to redirect the stormwater flows away from the ash basin at Mayo is now complete. We have installed a portable pump to move stormwater from basin 1 to the ash basin until the modification of the permit is complete and we can discharge to Bowes Branch. Do you have an estimate for when the modification will be issued? Thanks so much. Lori Lori W. Tollie 2 Duke Energy EHS CCP Permitting & Compliance 2500 Fairfax Road Greensboro, NC 27407 Cell: (336) 408-2591 Office: (336) 854-4916 From: Tollie, Lori White Sent: Wednesday, January 23, 2019 11:07 AM To: Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov> Cc: Lucas, Annette <annette.lucas@ncdenr.gov> Subject: RE: \[External\] Mayo ISW NCS000581 Thank you for the update. Lori W. Tollie Duke Energy EHS CCP Permitting & Compliance 2500 Fairfax Road Greensboro, NC 27407 Cell: (336) 408-2591 Office: (336) 854-4916 From: Georgoulias, Bethany \[mailto:bethany.georgoulias@ncdenr.gov\] Sent: Wednesday, January 23, 2019 11:03 AM To: Tollie, Lori White Cc: Lucas, Annette Subject: RE: \[External\] Mayo ISW NCS000581 *** Exercise caution. This is an EXTERNAL email. DO NOT open attachments or click links from unknown senders or unexpected email. *** Lori, I just saw the letter about a week ago, after we moved offices space earlier this month. I have not begun working on it th yet. It came in very close to the holidays (Dec 20) when we were packing up for the move and also just beginning to train a new Administrative Assistant. I’ll give you an update when I am working on it. Bethany Bethany Georgoulias Environmental Engineer Stormwater Program, Division of Energy, Mineral, and Land Resources N.C. Department of Environmental Quality 3 919 707 3641 office bethany.georgoulias@ncdenr.gov 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Tollie, Lori White <Lori.Tollie@duke-energy.com> Sent: Wednesday, January 23, 2019 10:57 AM To: Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov> Subject: \[External\] Mayo ISW NCS000581 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hi Bethany, I just wanted to follow up with you on the status the minor modification to the Mayo industrial stormwater permit. This mod requested to add an outfall to Bowe’s Branch. The work associated with the process water redirect required by CAMA and the CCR rule is quickly wrapping up with flow needing to be redirected to this outfall away from the ash basin. Please let me know if you have any questions or if I can help in any way. Thanks Lori W. Tollie Duke Energy EHS CCP Permitting & Compliance 2500 Fairfax Road Greensboro, NC 27407 Cell: (336) 408-2591 Office: (336) 854-4916 4