HomeMy WebLinkAboutNCS000580_Email to EPA RE Mod to Add 002_20190321
Georgoulias, Bethany
From:Georgoulias, Bethany
Sent:Thursday, March 21, 2019 10:00 AM
To:Sampath, Sam
Subject:FW: NCS000581 Minor Permit Modification to add SDO 002
Attachments:NCS000580_Permit Modification to Add SDO 002_20190321.pdf
Sam,
Please see the attached correspondence regarding Mayo Electric Generating Plant’s Stormwater Permit. This is EPA’s
copy.
From: Georgoulias, Bethany
Sent: Thursday, March 21, 2019 9:58 AM
To: 'Tollie, Lori White' <Lori.Tollie@duke-energy.com>
Cc: Valentine, Thad <thad.valentine@ncdenr.gov>; Denton, Bill <bill.denton@ncdenr.gov>; Lucas, Annette
<annette.lucas@ncdenr.gov>
Subject: NCS000581 Minor Permit Modification to add SDO 002
Lori,
Please see the attached Permit Modification for Mayo Electric Generating Plant (I inadvertently put “Steam Station” in
the letter subject, but the permit cover page is correct) with the new Outfall 002 to Bowes Branch. Please let me know if
you have any questions. You can find all the files in our Laserfiche Repository file for NCS000580.
Best regards,
Bethany Georgoulias
Environmental Engineer
Stormwater Program, Division of Energy, Mineral, and Land Resources
N.C. Department of Environmental Quality
919 707 3641 office
bethany.georgoulias@ncdenr.gov
512 N. Salisbury Street, Raleigh, NC 27604 (location)
1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing)
Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
Email correspondence to and from this address is subject to the North Carolina Public Records
Law and may be disclosed to third parties.
From: Tollie, Lori White <Lori.Tollie@duke-energy.com>
Sent: Tuesday, March 19, 2019 11:26 AM
To: Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov>
Subject: RE: \[External\] Mayo ISW NCS000581
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
1
I’ve asked the Mayo station environmental folks to get this asap. Thanks
From: Georgoulias, Bethany \[mailto:bethany.georgoulias@ncdenr.gov\]
Sent: Monday, March 18, 2019 1:57 PM
To: Tollie, Lori White <Lori.Tollie@duke-energy.com>
Subject: RE: \[External\] Mayo ISW NCS000581
Lori,
Do you have a latitude and longitude coordinate for this new proposed outfall? I need to add that to our BIMS database
for this modification. It can be approximate.
Also, I’m out all day tomorrow and part of Wednesday, but I’ll resume working on this when I get back to the office.
Best,
Bethany
Bethany Georgoulias
Environmental Engineer
Stormwater Program, Division of Energy, Mineral, and Land Resources
N.C. Department of Environmental Quality
919 707 3641 office
bethany.georgoulias@ncdenr.gov
512 N. Salisbury Street, Raleigh, NC 27604 (location)
1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing)
Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
Email correspondence to and from this address is subject to the North Carolina Public Records
Law and may be disclosed to third parties.
From: Tollie, Lori White <Lori.Tollie@duke-energy.com>
Sent: Monday, March 18, 2019 11:16 AM
To: Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov>
Subject: RE: \[External\] Mayo ISW NCS000581
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Bethany,
The project work to redirect the stormwater flows away from the ash basin at Mayo is now complete. We have installed
a portable pump to move stormwater from basin 1 to the ash basin until the modification of the permit is complete and
we can discharge to Bowes Branch. Do you have an estimate for when the modification will be issued? Thanks so much.
Lori
Lori W. Tollie
2
Duke Energy
EHS CCP Permitting & Compliance
2500 Fairfax Road
Greensboro, NC 27407
Cell: (336) 408-2591
Office: (336) 854-4916
From: Tollie, Lori White
Sent: Wednesday, January 23, 2019 11:07 AM
To: Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov>
Cc: Lucas, Annette <annette.lucas@ncdenr.gov>
Subject: RE: \[External\] Mayo ISW NCS000581
Thank you for the update.
Lori W. Tollie
Duke Energy
EHS CCP Permitting & Compliance
2500 Fairfax Road
Greensboro, NC 27407
Cell: (336) 408-2591
Office: (336) 854-4916
From: Georgoulias, Bethany \[mailto:bethany.georgoulias@ncdenr.gov\]
Sent: Wednesday, January 23, 2019 11:03 AM
To: Tollie, Lori White
Cc: Lucas, Annette
Subject: RE: \[External\] Mayo ISW NCS000581
*** Exercise caution. This is an EXTERNAL email. DO NOT open
attachments or click links from unknown senders or unexpected
email. ***
Lori,
I just saw the letter about a week ago, after we moved offices space earlier this month. I have not begun working on it
th
yet. It came in very close to the holidays (Dec 20) when we were packing up for the move and also just beginning to
train a new Administrative Assistant. I’ll give you an update when I am working on it.
Bethany
Bethany Georgoulias
Environmental Engineer
Stormwater Program, Division of Energy, Mineral, and Land Resources
N.C. Department of Environmental Quality
3
919 707 3641 office
bethany.georgoulias@ncdenr.gov
512 N. Salisbury Street, Raleigh, NC 27604 (location)
1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing)
Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
Email correspondence to and from this address is subject to the North Carolina Public Records
Law and may be disclosed to third parties.
From: Tollie, Lori White <Lori.Tollie@duke-energy.com>
Sent: Wednesday, January 23, 2019 10:57 AM
To: Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov>
Subject: \[External\] Mayo ISW NCS000581
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Hi Bethany,
I just wanted to follow up with you on the status the minor modification to the Mayo industrial stormwater permit. This
mod requested to add an outfall to Bowe’s Branch. The work associated with the process water redirect required by
CAMA and the CCR rule is quickly wrapping up with flow needing to be redirected to this outfall away from the ash
basin. Please let me know if you have any questions or if I can help in any way. Thanks
Lori W. Tollie
Duke Energy
EHS CCP Permitting & Compliance
2500 Fairfax Road
Greensboro, NC 27407
Cell: (336) 408-2591
Office: (336) 854-4916
4