Mr. Eric Wallace
Wallace Farm, Inc.
14410 Eastfleld Road
Huntersville, North Carolina . 28078
Dear Mr. Wallace:
Michael F. Easley, Governor
' ' r�- t'
illlarri G.kRoss;Jr.,�Seore a,p(
IN m4h12
North Carolina Departme t vTr"orirnent and Natural Ftesaur g
Coleen H. Sullins, Director
Division of Water Quality
September 30, 2008 OCT - 2 2008
DWG -Surface Water Protection
Subject: Final NPDES Stormwater Permit
Permit NCS000525
Wallace Farm, Inc.
Mecklenburg County
In response to your completed application for an NPDES stormwater discharge permit received
on February 8, 2008, the Division of Water Quality (Division) is forwarding herewith the subject
state - NPDES permit. This permit is issued pursuant to the requirements of North Carolina
General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and
the U.S. Environmental Protection agency dated October 15, 200.7 (or as subsequently
amended).
This final permit Includes several major changes from the_draft permit which was the
subject of the May 28, 2008 Public Hearing. The major provisions of this final permit
Include the following.
L. Wallace Farm must develop and implement a Stormwater Pollution Prevention Plan
(SPPP) within six months of permit issuance. See Part III, -.Section A, Item 1 in the
permit text. The elements of the SPPP are enforceable conditions of the permit.
2. Wallace Farm must provide and employ flexible fabric covers to prevent Incident rainfall
on the working materials in the Product Mixing Area.
3. Within six months of permit issuance, Wallace Farm must. install an approved
stormwater treatment BMP to reduce solids which may be present in the runoff from
the stormwater drainage area. The proposed BMP must be -submitted for approval to
the Division within three months of permit issuance. See Part III, Section A, Item 1 in
the permit text. This is an additional requirement not included in the draft permit.
4. Within six months of permit issuance Wallace Farm must augment the eastern
boundary of the stormwater drainage area shown on the permit application site plan
drawing in order to insure effective run on minimization and segregation. Within three.
months of permit issuance Wallace Farm must request on -site assistance from the
Division for a field determination of the extent and nature of sufficient augmentation
measures necessary to Insure that the drainage divide defining the permitted
stormwater drainage area is effectively established. See Part III, Section A, Item 1 in
the permit text. This is an additional requirement not included in the draft permit.
5. Quarterly sampling for Total Suspended Solids, Chemical Oxygen Demand, Total
Nitrogen, and pH are retained from the draft permit. Quarterly sampling for
Biochemical Oxygen Demand, Total Phosphorus, and Fecal Coliform was not included �tCarolr
the draft permit, and has been added to the final permit. tur41
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 807-6300 Customer Service
Internet h2o,enr.state.ne.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 807-6494 1-877-623-6749
An Equal opportunitylAfflrmative Action Employer— 50% Recycledlf 0% Post Consumer Paper
Mr. Eric Wallace
Permit No: NCS000525
Page 2 of 2
September 30, 2008
6. The tiered approach for management response to benchmark exceedences has'been
retained from the draft permit. Repeated benchmark exceedences may trigger
additional monitoring, additional management measures, and/or the installation of
additional stormwater BMPs. Failure to respond to benchmark exceedences as required
by the permit constitutes a violation of the permit conditions. Failure to complete the
monitoring as required is a violation of the permit and any permit noncompliance
constitutes a violation of the Clean Water Act. Reference Part III, Section A, Item 2
"Duty to Comply", Item 9 "Penalties for Tampering" and Item 10 "Penalties for
Falsification of Reports" of your permit for further information.
If any parts, measurement frequencies, or sampling requirements contained In this permit are
unacceptable to you, you have the right to an adjudicatory hearing upon written request within
thirty (30) days following receipt of this letter. This request must be in the form of a written
petition', conforming to Chapter 150B of the North Carolina General Statutes, and filed with the
Office of Administrative Hearings, Post Office Drawer 27447, Raleigh, North Carolina 27611 -
7447. Unless such demand is made, this decision shall be final and binding.
Please take notice.this permit is not transferable except by action of the Division. Part III,
Section B, Item 2 addresses the requirements to be followed in case of change In ownership or
control of this discharge. This permit does not affect the legal requirements to obtain other
permits which may be required by the Division of Water Quality or permits required by the
Division of Land Resources, Division of Waste Management, or any other federal or local
governmental permit that may be required.
If you have any questions or comments concerning this permit, contact Ken Pickle at (919)
807-6376 or ken.pickle@ncmal1.net
Since ly,
C een H. Sulli
cc: DWQ Mooresville Regional Office, Water Quality Section
DWQ Mooresville Regional Office, Aquifer Protection Section
DWQ Stormwater Permitting Unit
DWQ Central Files
DWM, Michael Scott
Mike Mitchell, EPA Region IV
Mecklenburg County, Rusty Rozzelle
Attachment: Stormwater Permit NCS000525
2
I
Permit No. NCS000525
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
PERMIT
TO DISCHARGE STORMWATER UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Wallace Farm, Inc.
is hereby authorized to discharge stormwaterTfrom a facility located at
Wallace Farm, Inc.
14410 Eastfield Road
Huntersville, NC
Mecklenburg County
to receiving waters designated as unnamed tributary to Clarke Creek, a class C stream in the
Yadkin -Pee Dee River Basin, in accordance with the discharge limitations, monitoring
requirements, and other conditions set forth in Parts I, IT, III; IV, V and VI hereof.
This permit shall become effective October 1, 2008.
This permit and the authorization to discharge shall'expire at midnight on September 30, 2013.
Signed this day, September 30, 2008.
Division of Water Quality
By the Authority of the Environmental Management Commission
Permit No. NCS000525
TABLE OF CONTENTS
PART I INTRODUCTION
Section A: Individual Permit Coverage
Section B: Permitted Activities
Section C: Location Map
PART II MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED
DISCHARGES
Section A: Stormwater Pollution Prevention Plan
Section B: Analytical Monitoring Requirements
Section C: Qualitative Monitoring Requirements
Section D: On -Site Vehicle Maintenance Monitoring Requirements
PART III STANDARD CONDITIONS FOR NPDES STORMWATER INDIVIDUAL
PERMITS
Section A: Compliance
and Liability
1.
Compliance Schedule
2.
Duty to Comply
3.
Duty to Mitigate
4.
Civil and Criminal Liability
5.
Oil and Hazardous Substance Liability
6.
Property Rights
7.
Severability
8.
Duty to Provide Information
9.
Penalties for Tampering.
10.
Penalties for Falsification of Reports
Section B: General Conditions
1.
Individual Permit Expiration
2.
Transfers
i
Permit No. NCS000525
3. Signatory Requirements
4. Individual Permit Modification, Revocation and Reissuance, or
Termination
5. Permit Actions
Section C: Operation and Maintenance of Pollution Controls
1.
Proper Operation and Maintenance
2.
Need to Halt or Reduce Not a Defense
3.
Bypassing of Stormwater Control Facilities
Section D: Monitoring and Records
1.
Representative Sampling
2.
Recording Results
3.
Flow Measurements.
4.
Test Procedures
5.
Representative Outfall
6.
Records Retention
7.
Inspection and Entry
Section E: Reporting
Requirements
1.
Discharge Monitoring Reports
2.
Submitting Reports
3.
Availability of Reports
4.
Non-Stormwater Discharges
5.
Planned Changes
6.
Anticipated Noncompliance
7.
Bypass
8.
Twenty-four Hour Reporting
9.
Other Noncompliance
10.
Other Information
PART IV LIMITATIONS REOPENER
PART V ADMINISTERING AND COMPLIANCE MONITORING FEE
REQUIREMENTS
PART VI DEFINITIONS
Permit No. NCS000525
PART I INTRODUCTION
SECTION A: INDIVIDUAL PERMIT COVERAGE
During the period beginning on the effective date of the permit and lasting until expiration, the
permittee is authorized to discharge stormwater associated with industrial activity. Such
discharges shall be controlled, limited, and monitored as specified in this permit.
If industrial materials and activities are not exposed to precipitation or runoff as described in 40
CFR § 122.26(g), the facility may qualify for a No Exposure Exclusion from NPDES stormwater
discharge permit requirements. Any owner or.Qperator wishing to obtain a No Exposure
Certification must submit a No Exposure Certification NOI form to the Division; must receive
approval by the Division; must maintain no exposure conditions unless authorized to discharge
under a valid NPDES stormwater-permit; and must reapply for the No Exposure Exclusion once
every five (5) years. .
SECTION B: PERMITTED ACTIVITIES
Until this permit expires or is modified or revoked, the permittee is authorized to discharge
stormwater to the surface waters of North Caroliria or separate storm sewer system that has been
adequately treated and managed in accordance with the terms and conditions of this individual
permit. All stormwater discharges shall be in accordance with the conditions of this permit.
Any other point source discharge to surface waters of the state is prohibited unless it is an
allowable non-stormwater discharge or is covered by another permit, authorization, or approval.. -
The stormwater discharges allowed by this individual permit shall not cause or contribute to
violations of Water Quality Standards.
This permit does not relieve the permittee from responsibility for compliance with any other
applicable federal, state, or local law, rule, standard,. ordinance, order, judgment, or decree.
Part I Page i of 2
SECTION C: LOCATION MAP
Permit No. NCS000525
Latitude: 35°23'30" N NCS000525
Longitude: 80°46'00"W
County: Mecklenburg Wallace Farm, Inc.
Stream Class: C
Receiving Stream: UT to Clarke Creek
Sub -basin: 03-07-11 Yadkin -Pee Dee River Basin
Facility
Location
North 11 Map Not to Scale
Part I Page 2 of 2
Permit No. NCS000525
PART II MONITORING, CONTROLS, AND LIMITATIONS FOR
PERMITTED DISCHARGES
SECTION A: STORMWATER POLLUTION PREVENTION PLAN
The permittee shall develop a Stormwater Pollution Prevention Plan, herein after referred to as
the Plan. This Plan shall be considered public information in accordance with Part III, Standard
Conditions, Section E, Paragraph 3 of this individual permit. The Plan shall include, at a
minimum, the following items:
Site Plan. The site plan shall provide a description of the physical facility and the
potential pollutant sources that may be expected to contribute to contamination of
stormwater discharges. The site plan shall contain the following:
a. A general location map (USGS quadrangle map or appropriately drafted
equivalent map), showing the facility's location in relation to transportation
routes and surface waters, the name of the receiving Water(s) to which the
stormwater outfall(s) discharges, or if the discharge is to a municipal separate
storm sewer system, the name of the municipality and the ultimate receiving
waters; and accurate latitude and longitude of the points) of discharge. The map
should identify whether each receiving water is impaired (on the state's 303(d)
list of impaired waters) or is located in a watershed for which a TMDL has
been established, and what the parameter(s) of concern are.
North Carolina's 303(d) list can be found here:
http://h2o.enr.state.nc.usltmdl/General 303d.htm#Downloads
North Carolina TMDL documents can be found here:
http://h2o.enr.state.nc.us/tmdl/TMDL—list.htt-'n-#.Fi'nal—TMDLs
b. A narrative description of storage practices, Ioading and unloading activities,
outdoor process areas, dust or particulate generating or control processes, and
waste disposal practices. A narrative description of the potential pollutants which
could be expected to be present in the stormwater discharge from each outfall.
C. A site map drawn to scale with the following items:
(1) 'Distance legend and north arrow
(2) Site property boundary and topography
(3) Location of industrial activities (including storage of materials,
disposal areas, process areas, and loading and unloading areas)
(4) Drainage features and structures
(5) Stormwater discharge points (outfalls)
(6) Delineated drainage areas for each outfall
(7) Drainage area for each outfall in acres and percentage or each
drainage area that is impervious .
(8) All on -site and adjacent surface waters and wetlands
(9) Building locations
(10) Existing BMPs and impervious surfaces
Part II Page 1 of 10
Permit No. NCS000525
d. . A list of significant spills or leaks of pollutants that have occurred at the facility
during the three (3) previous years and any corrective actions taken to mitigate
spill impacts.
e. Certification that the stormwater outfalls have been evaluated for the presence of non-
stormwater discharges. The certification statement will be signed in accordance with
the requirements found in Part III, Standard Conditions, Section B, Paragraph 3.
2. Stormwater Management Plan. The stormwater management plan shall contain a
narrative description of the materials management practices employed which -control or
minimize the exposure of significant materials to stormwater, including structural and
nonstructural measures. The stormwater management plan, at a minimum, shall
incorporate the following:
a. Feasibility Study. A review of the technical and economic feasibility of changing
the methods of operations and/or storage practices to eliminate or reduce
exposure of materials and processes to stormwater. Wherever practical, the
permittee shall prevent exposure of all storage areas, material handling
operations, and manufacturing or fueling operations. In areas where elimination
of exposure is not practical, the stormwater management plan shall document the
feasibility of diverting the stormwater runoff away from areas of potential
contamination.
b. Secondary Containment Requirements and Records. Secondary containment is
required for:bulk storage of liquid materials; storage in any amount of Section
313 of Title III of the Superfund Amendments and Reauthorization Act (SARA)
water priority chemicals; and storage in any amount of hazardous substances to
prevent leaks and spills from contaminating stormwater runoff. A table or
summary of all such tanks and stored materials and their associated secondary
containment areas shall be maintained. If the secondary containment devices are
connected directly to stormwater conveyance systems, the connection shall be
controlled by manually activated valves or other similar devices which shall be
secured closed with a locking mechanism, and any stormwater that accumulates
in the containment area shall be at a minimum visually observed for color, foam,
outfall staining, visible sheens and dry weather flow, prior to release of the
accumulated stormwater. Accumulated stormwater shall be released if found to
be uncontaminated by the material stored within the containment area. Records
documenting the individual making the observation, the description of the
accumulated stormwater and the date and time of the release shall be kept for a
period of five (5) years.
C. BMP Summary. A. narrative description shall be provided of Best Management
Practices (BMPs) to be considered such as, but not limited to, oil and grease
separation, debris control, vegetative filter strips, infiltration and stormwater
detention or retention, where necessary. The need for structural BMPs shall be
based on the assessment of the potential of pollutant sources to contribute
significant quantities of pollutants to stormwater discharges and data collected
through monitoring of stormwater discharges.
Part II Page 2 of 10
Permit No. NCS000525
d. Temporary Covers Requirement in the Product Mixing Area. The permittee must
provide a readily accessible flexible cover for each pile of material in process at
the Product Mixing Area shown on the site plan. The covers shall be located in
an adjacent building, and must be immediately employed to prevent exposure to
incident rainfall onto materials being sized, sorted, mixed, or staged in the area.
The covers shall remain in place for the duration of any rainfall, and when the
necessary operating personne
Y are not present: The Stormwater Management Plan
shall record the storage location of the flexible covers and the associated anchors
to prevent removal by wind, a specification of the materials of construction and
thickness of the covers, and a narrative on the weather, timing, and any other
operating circumstances related to the employment of the covers. The permittee
shall keep a daily log of the instances when the flexible covers are employed.
Staff training on the employment of the covers and anchors shall be recorded in
the SPPP.
e. Stormwater Treatment BMP. The permittee shall install a stormwater treatment
BMP to reduce pollutant migration off site. Significant portions of the permitted
area are regularly disturbed by heavy equipment and have the potential to
generate soils or other suspended solids into the runoff. The BMP shall, at a
minimum, be designed to reduce sediment, suspended solids, and turbidity from
the total permitted runoff flow before it is discharged to the receiving water.
Prior to installation, the permittee shall submit the proposed BMP for review and
approval to DWQ's Mooresville Regional Office Supervisor, Surface Water
Protection Section. The BMP shall be inspected at least once every seven
calendar days, and within 24 hours after any storm event of 0.5 inches of rain per
24-hour period.
f. Run On Reduction and Segregation Measures. The permittee shall augment the
surface drainage divide along the eastern boundary of the permitted drainage area
as shown on the application site plan drawing. Additional ditching, berming,
raised road surface, culverts, or other improvements as necessary shall be
installed from the discharge point at the southern extent of the drainage area
extending up to Product Storage and Bagging Building areas. The permittee
shall request on -site inspection and assistance from the DWQ Mooresville
Regional Office Supervisor, Surface Water Protection Section for field
identification of the extent of drainage divide augmentation.
3. Spill Prevention and Response Plan. The Spill Prevention and Response Plan (SPRP)
shall incorporate an assessment of potential pollutant sources based on a materials
inventory of the facility. Facility personnel (or team) responsible for implementing the
SPRP shall be identified. A responsible person shall be on -site at all times during facility
operations that have the potential to contaminate stormwater runoff through spills or
exposure of materials associated with the facility operations. The SPRP must be site
stormwater specific. Therefore, an oil SPCC plan may be a component of the SPRP, but
may not be sufficient to completely address the stormwater aspects of the SPRP. The
common elements of the SPCC with the SPRP may be incorporated by reference into the
SPRP.
Part II Page 3 of 10
Permit No. NCS000525
4. Preventative Maintenance and Good Housekeeping Program. A preventative
maintenance program shall be developed. The program shall document schedules of
inspections and maintenance activities of stormwater control systems, plant equipment
and systems. Inspection of material handling areas and regular cleaning schedules of
these areas shall be incorporated into the program.
Employee Training. Training schedules shall be developed and training provided at a
minimum on an annual basis on proper spill response and cleanup procedures and
preventative maintenance activities for all personnel involved in any of the facility's
operations that have the potential to contaminate stormwater runoff. Facility personnel
(or team) responsible for implementing the training shall be identified.
6. Responsible Party. The Stormwater Pollution Prevention Plan shall identify a specific
position(s) responsible for the overall coordination, development, implementation, and
revision to the Plan. Responsibilities for all components of the Plan shall be documented
and position assignments provided.
7. Plan Amendment. The permittee shall amend the Plan whenever there is a change in
design, construction, operation, or maintenance that has a significant effect on the
potential for the discharge of pollutants to surface waters. The Stormwater Pollution
Prevention Plan shall be reviewed and updated on an annual basis. The annual update
shall include an updated list of significant spills or leaks of pollutants for the previous
three years, or the notation that no spills have occurred. Tlie annual update shall include
re -certification that the stormwater outfalls have been evaluated for the presence of non-
stormwater discharges.
The Director may notify the permittee when the Plan does not meet one or more of the
minimum requirements of the permit. Within 30 days of such notice, the permittee shall
submit a time schedule to the Director for modifying the Plan to meet minimum
requirements. The permittee shall provide certification in writing (in accordance with
Part III, Standard Conditions, Section B, Paragraph 3) to the Director that the changes
have been made.
8. Facility Inspection Program. Inspections of the facility and all stormwater systems shall
occur at a minimum on a semi-annual schedule, once during the first half of the year
(January through June) and once during the second half (July through December), with at
least 60-days separating inspection dates (unless regular inspections are performed more
frequently). The inspection and any subsequent maintenance activities performed shall
be documented, recording date and time of inspection, individual(s) making the
inspection and a narrative description of the facility's stormwater control systems, plant
equipment and systems. Records of these inspections shall be incorporated into the
Stormwater Pollution Prevention Plan. These facility inspections are different from, and
in addition to, the stormwater discharge characteristic monitoring required in other
Sections of Part II of this permit.
9. Implementation. The permittee shall implement the Plan. The permittee shall document
all monitoring, measurements, inspections and maintenance activities and training
Part II Page 4 of 10
Permit No. NCS000525
provided to employees, including the log of the sampling data and of actions taken to
implement BMPs associated with the industrial activities, including vehicle maintenance
activities. Such documentation shall be kept on -site for a period of five years and made
available to the Director or the Director's authorized representative immediately upon
request.
SECTION B: ANALYTICAL MONITORING REQUIREMENTS
Analytical monitoring of stormwater discharges shall be performed as specified in Table 1. All
analytical monitoring shall be performed during a representative storm event. The required
monitoring will result in a minimum of twenty analytical samplings being conducted over the
term of the permit at each stormwater discharge outfall (SDO).
A representative storm event is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours in which no storm event measuring greater than 0.1
inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation. For example, if it rains for 2 hours without producing any collectable discharge,
and then stops, a sample may be collected if a rain producing a discharge begins again within the
next 10 hours.
Table 1. Analytical Monitoring Requirements
a�~` iz ,
��
Cliaracter�st�cst:uenc
Measurement "� R
a ��
.1 ....
� 5aniple
W.�
T e?
f'' Sample��,
s
'Laeation3
Total Suspended Solids
m L
quarterly
Grab
SDO
Chemical Oxygen Demand
m L
quarterly
Grab
SDO
Biochemical Oxygen Demand
m L
quarterly
Grab
SDO
Total Nitrogen
m L
quarterly
Grab
SDO
Total Phosphorus
m
quarterly
Grab
SDO
Fecal Coliform
col./100 ml
quarterly
Grab
SDO
H
standard
quarterly
Grab
SDO
Total Rainfal14
inches
quarterly
rain Gauge
I -
Footnote
I Measurement Frequency: Quarterly during a representative storm event, for each year until either another permit
is issued for this facility or until this permit is revolted or rescinded. If at the end of this permitting cycle the
permittee has submitted the appropriate paperwork for a renewal permit before the submittal deadline, the
permittee will be considered for a renewal application. The applicant must continue quarterly monitoring until
the renewed permit is issued. See Table 2 for schedule of monitoring periods through the end of this permitting
cycle.
2 If the stormwater runoff is controlled by a stormwater detention pond, a grab sample of the discharge from the
pond shall be collected within the first 30 minutes of discharge.
3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) unless representative
outfall status has been granted.
Part lI Page 5 of 10
Permit No. NCS000525
4 For each sampled representative storm event the total precipitation must be recorded. An on -site rain gauge or
local rain gauge reading must be recorded.
The permittee shall complete the minimum twenty analytical samplings in accordance with the
schedule specified below in Table 2.
Table 2. Monitoring Schedule
'w�"'-",�
..T L,"T'CKV�
wa 'Tr
g
M onttorin 490-
4 p4�.0
C.�,�k
k!
'
�`1
....
'
w
Sumple�periad
Sample period`
Sam !e eriad Y,
p p
.
,Sample period
.4.
Year 1
10/ 1 /08 — 12/31 /08
1 / 1 /09 — 3/31 /09
4/ 1 /09 — 6/30/09
7/ 1 /09 — 9/30109
Year 2
10/1/09 — 12/31/09
1/1/10— 3/31/10
4/1/10 — 6/30/10
7/l/10 — 9/30/10
Year
10/1/10— 12/31/10
1/l/11—.3/31/11
4/1/11—6/30/11
7/1/11—9/30/11
Year 4
10/1/11 — 12/31/11
1/l/12 — 3/31/12
4/1/12 — 6/30/12
7/l/12 — 9/30/12
Year 5
10/1/12 — 12/31/12
1/1/13 — 3/31/13
4/1/13 — 6/30/13
7/l/13 — 9/30/13
Footnotes:
1 Maintain quarterly monitoring during permit renewal process. The applicant must continue quarterly
monitoring until the renewed permit is issued.
2 If no discharge occurs during the sampling period, the permittee must submit a monitoring report indicating
"No Flow" within 30 days of the end of the sampling period.
Monitoring results shall be compared to the benchmark values in Table 3. The benchmark values in
Table 3 are not permit limits but should be used as guidelines for the permittee's Stormwater
Pollution Prevention Plan (SPPP). Exceedences of benchmark values require the permittee to
increase monitoring, increase management actions, increase record keeping, and/or install
stormwater Best Management Practices (BMPs) in a tiered program. See below the descriptions of
Tier One and Tier Two.
Table 3. Benchmark Values for Analytical Monitoring
n""¢F" V". Tm`5,::x5Ce
,Discharg�Chararterishcs;
r'.
nixs
ti,'�. . dY.
L.3YChYk:,,
Bechmar
Total Suspended Solids
mg/L
100
Chemical Oxygen Demand
mg/L
120
Biochemical Oxygen Demand
mg/L
30
Total Nitrogen
mg/L
30
Total Phosphorus
mg/L
2
Fecal Colifonn
colonies/100 mI
1000
pH
standard units
6 - 9
Part II Page 6 of 10
Permit No. NCS000525
f h'1„ 0 t X � 3 t ! -�`n' •... r +<. „ wa ry v-' ,s. - xlr ,.:x
s u r r
v ti . of >; x, 4' Tier One
If: The sampling results are above a benchmark value, or outside of the benchmark range, for any
parameter at any outfall;
Then: The permittee shall:
1. Conduct a stormwater management inspection of the facility within two weeks of receiving
sampling results.
2. Identify and evaluate possible causes of the benchmark value exceedence.
3. Identify potential, and select the specific: source controls, operational controls, or physical
improvements to reduce concentrations of the parameters of concern, or to bring
concentrations to within the benchmark range..
4. Implement the selected actions within two months of the inspection.
5. Record each instance of a Tier One response in the Stormwater Pollution Prevention Plan.
Include the date and value of the benchmark exceedence, the inspection date, the personnel
conducting the inspection, the selected actions, and the date the selected actions were
implemented.
n
`t: During the term of this permit, the sampling results are above the benchmark values, or outside
of the benchmark range, for any specific parameter at a specific discharge outfall two times in a
row (consecutive);
Then: The permittee shall:
1. Repeat all the required actions outlined above in Tier One.
2. Immediately institute monthly monitoring for all parameters at every outfall where a
sampling result exceeded the benchmark value for two consecutive samples. Monthly
(analytical and qualitative) monitoring shall continue until three consecutive sample results
are below the benchmark values, or within the benchmark range, for all parameters at that
outfall.
3. If no discharge occurs during the sampling period, the permittee is required to submit a
monthly monitoring report indicating "No Flow."
4. Maintain a record of the Tier Two response in the Stormwater Pollution Prevention Plan.
Part II Page 7 of 10
Permit No. NCS000525
During the term of this permit, if the sampling results exceed the benchmark value, or are outside
the benchmark range, for any specific parameter at any specific outfall on more than four
occasions, the permittee shall report the same in writing to the DWQ Regional Office Supervisor.
DWQ may:
• Require that the permittee increase or decrease the monitoring frequency for the
remainder of the permit;
• require the permittee to install structural stormwater controls;
• require the permittee to implement other stormwater control mdasures; or
• require that the permittee implement site modifications to qualify for the No Exposure
Exclusion.
This site discharges to impaired waters experiencing problems with biological integrity. If a
Total Maximum Daily Load (TMDL) is approved for this segment of the unnamed tributary to
Clarke Creek, or for Clarke Creek, the permittee may be required to monitor for the pollutant(s)
of concern in the future and submit results to the Division. of Water Quality. The Division will
consider the monitoring results in determining whether additional BMPs are needed to control
the pollutant(s) of concern to the maximum extent practicable.
If additional BMPs are needed to achieve the required level of control, the permittee will be
required to (1) -develop a strategy for implementing appropriate BMPs, and (2) submit a
timetable for incorporation of those BMPs into the permitted Stormwater Pollution Prevention
Plan.
Part II Page 8 of 10
Permit No. NCS000525
SECTION C: QUALITATIVE MONITORING REQUIREMENTS
Qualitative monitoring requires a visual inspection of each stormwater outfall regardless of
representative outfall status and shall be performed as specified in Table 4, and during each
analytical monitoring event. Qualitative monitoring is for the purpose of evaluating the
effectiveness of the Stormwater Pollution Prevention Plan (SPPP) and assessing new sources of
stormwater pollution.
In the event an atypical condition is noted at a stormwater discharge outfall, the permittee shall
document the suspected caitse of the condition and any actions taken in response to the
discovery. This documentation will be maintained with the SPPP.
Table 4. Qualitative Monitoring Requirements
�,.DYNischa,ggr�ge.`Characteristics
PPf;Freque'ncy1 ,q
Monitoring
Locati0n2
Color__quarterly
SDO
Odor
SDO
Clarity
-quarterly
quarterly
SDO
Floating Solids
quarterly
SDO
Suspended Solids
quarterly
SDO
Foam
quarterly
SDO
Oil Sheen
quarterly
SDO
Erosion or deposition at the
outfall
quarterly
SDO
Other obvious indicators
of stormwater pollution
quarterly
SDO
Footnotes:
l Measurement Frequency: Quarterly during a representative storm event, for each year until either another permit
is issued for this facility or until this permit is revoked or rescinded. If at the end of this permitting cycle the
permittee has submitted the appropriate paperwork for a renewal permit before the submittal deadline, the
permittee will be considered for a renewal application. The applicant must continue quarterly monitoring until
the renewed permit is issued. See Table 2 for schedule of monitoring periods through the end of this permitting
cycle.
2 Monitoring Location: Qualitative monitoring shall be performed at each stormwater discharge outfall (SDO)
regardless of representative outfall status.
SECTION D: ON -SITE VEHICLE MAINTENANCE MONITORING REQUIREMENTS
Facilities which have any vehicle maintenance activity occurring on -site which uses more.than
55 gallons of new motor oil per month when averaged over the calendar year shall perform
analytical monitoring as specified below in Table 5. This monitoring shall be performed at all
stormwater discharge outfalls which discharge stormwater runoff from vehicle maintenance
Part II Page 9 of 10
Permit No. NCS000525
areas, and in accordance with the schedule presented in Table 2 (Section B). All analytical
monitoring shall be performed during a representative storm event.
Table 5. Analytical Monitoring Requirements for On -Site Vehicle Maintenance
Diseliarge Mar`cteristics'
i�F�
R , ""LTnts#'� ""
da
Measurement
1, s
Fre uenc ,� .
Sample
rT e2�
IN >.
r Sample x�
rK3y a^
_ .Lacatian.:
H
standard
quarterly
Grab
SDO
Oil and Grease
mg/1
quarterly
Grab
SDO
Total Sus ended Solids
m /l
quarterly'
Grab
SDO
Total Rainfall4
inches
quarterly
Rain gauge
New Motor Oil Usage
I gallons/month
I quarterlyEstimate
1-
Footnotes:
I Measurement Frequency: Quarterly during a representative storm event, for each year until either another permit
is issued for this facility or until this permit is revoked or rescinded. If at the end of this permitting cycle the
permittee has submitted the appropriate paperwork for a renewal permit before the -submittal deadline, the
permittee will be considered for a renewal application. The applicant must continue quarterly monitoring until
the renewed permit is issued. See Table 2 for schedule of monitoring periods, through the end of this permitting
cycle.
2 If the stormwater runoff is controlled by a stormwater detention pond a grab sample of the discharge from the
pond shall be collected within the first 30 minutes of discharge from the pond.
3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) that discharges
stormwater runoff from area(s) where vehicle maintenance activities occur.
4 For each sampled representative storm event the total precipitation must be recorded. An on -site or local rain
gauge reading must be recorded.
Monitoring results shall be compared to the benchmark values in Table 6. The benchmark
values in Table 6 are not permit limits but should be used as guidelines for the permittee's
Stormwater Pollution Prevention Plan (SPPP). Exceedences of benchmark values require the
permittee to increase monitoring, increase management actions, increase record keeping, and/or
install stormwater Best Management Practices (BMPs), as provided in Part II Section B.
Table 6.
Benchmark Values for Vehicle Maintenance Analytical Monitoring
Discharg��Claaracter�stics`�Units
_,
;�,�Bench�nark��;
pH
standard
6-9
Oil and Grease
mg/L
30
Total Suspended Solids
mg/L
100
Part IT Page 10 of 10
Permit No. NCS000525
PART III STANDARD CONDITIONS FOR NPDES STORMWATER INDIVIDUAL PERMITS
SECTION A: COMPLIANCE AND LIABILITY
Compliance Schedule
The permittee shall comply with Limitations and Controls specified for stormwater discharges in
accordance with the following schedule:
The Stormwater Pollution Prevention Plan shall be developed and implemented within six months of the
effective date of the initial permit and updated thereafter on an annual basis.
Secondary containment, as specified in Part II, Section A, Paragraph 2b of this permit, shall be
accomplished within six months of the effective date of the initial permit issuance.
The stormwater BMP required in Part II, Section A, Paragraph 2e of this permit shall be installed within
six months of the effective date of the initial permit issuance. Within three months of permit issuance the
permittee shall submit to DWQ's Mooresville Regional Office Supervisor, Surface Water Protection
Section, a narrative description, layout drawing, and dimensional information for the proposed stormwater
BMP.
The drainage divide augmentation required in Part I1, Section A, Paragraph 2f of this permit shall be
accomplished within six months of the effective date of the initial permit issuance. Within three months of
permit issuance the permittee shall request a field determination of the necessary extent of augmentation
measures by DWQ's Mooresville Regional Office Supervisor, Surface Water Protection Section.
2. Duty to Comply
The permittee must comply with all conditions of this individual permit. Any permit noncompliance
constitutes a violation of the Clean Water Act and is grounds for enforcement action; for permit
termination, revocation and reissuance, or modification; or denial of a permit upon renewal application.
a. The'permittee shall comply with standards or prohibitions established under section 307(a) of the
Clean Water Act for toxic pollutants within the time provided in the regulations that establish
these standards or prohibitions, even if the permit has not yet been modified to incorporate the
requirement.
b. The Clean Water Act provides that any person who violates a permit condition is subject to a civil
penalty not to exceed $27,500 per day for each violation. Any person who negligently violates
any permit condition is subject to criminal penalties of $2,500 to $25,000 per day of violation, or
imprisonment for not more than 1 year, or both. Any person who knowingly violates permit
conditions is subject to criminal penalties of $5,000 to $50,000 per day of violation, or
imprisonment for not more than 3 years, or both. Also, any person who violates a permit
condition may be assessed an administrative penalty not to exceed $11,000 per violation with the
maximum amount not to exceed $137,500. [Ref: Section 309 of the Federal Act 33 USC 1319 and
40 CFR 122.41(a).]
C. Under state law, a daily civil penalty of not more than twenty-five thousand dollars ($25,000) per
violation may be assessed against any person who violates or fails to act in accordance with the
terms, conditions, or requirements of a permit. [Ref: North Carolina General Statutes 143-
215.6A]
Part III Page 1 of 8
Permit No. NCS000525
d. Any person may be assessed an administrative penalty by the Director for violating section 301,
302, 306, 307, 308, 318, or 405 of the Act, or any permit condition or limitation implementing
any of such sections in a permit issued under section 402 of the Act. Administrative penalties for
Class I violations are not to exceed $11,000 per violation, with the maximum amount of any Class
I penalty assessed not to exceed $27,500. Penalties for Class II violations are not to exceed
$11,000 per day for each day during which the violation continues, with the maximum amount of
any Class II penalty not to exceed $137,500.
Duty to Mitigate
The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this
individual permit which has a reasonable likelihood of adversely affecting human health or the
environment.
4. ' Civil and Criminal Liability
Except as provided in Part III, Section C of this permit regarding bypassing of stormwater control facilities,
nothing in this individual permit shall be construed to relieve the permittee from any responsibilities,
liabilities, or penalties for noncompliance pursuant to NCGS 143-215.3, 143-215.6A, 143-215.613, 143-
215.6C or Section 309 of the Federal Act, 33 USC 1319. Furthermore, the permittee is responsible for
consequential damages, such as fish kills, even though the responsibility for effective compliance may be
temporarily suspended.
5. Oil and Hazardous Substance Liability
Nothing in this individual permit shall be construed to preclude the institution of any legal action or relieve
the permittee from any responsibilities, liabilities, or penalties to which the permittee is or may be subject
to under NCGS 143-215.75 et seq, or Section 311 of the Federal Act, 33 USC 1321.
Prope[jy Rights
The issuance of this individual permit does not convey any property rights in either real or personal
property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of
personal rights, nor any infringement of Federal, State or local laws or regulations.
7. SeverabiIity
The provisions of this individual permit are severable, and if any provision of this individual permit, or the
application of any provision of this individual permit to any circumstances, is held invalid, the application
of such provision to other circumstances, and the remainder of this individual permit, shall not be affected
thereby.
8. Duty to Provide Information
The permittee shall furnish to the Director, within a reasonable time, any information which the Director
may request to determine whether cause exists for modifying, revoking and reissuing, or terminating the
permit issued pursuant to this individual permit or to determine compliance with this individual permit.
The permittee shall also furnish to the Director upon request, copies of records required to be kept by this
individual permit.
9. Penalties for Tampering
The Clean Water Act provides that any person who falsities, tampers with, or knowingly renders
inaccurate, any monitoring device or method required to be maintained under this individual permit shall,
Part III Page 2 of 8
Permit No. NCS000525
upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not
more than two years per violation, or by both. If a conviction of a person is for a violation committed after
a first conviction of such person under this paragraph, punishment is a fine of not more that $20,000 per
day of violation, or by imprisonment of not more than 4 years, or both.
10. Penalties for Falsification of Reports
The Clean Water Act provides that any person who knowingly makes any false statement, representation,
or certification in any record or other document submitted or required to be maintained under this
individual permit, including monitoring reports or reports of compliance or noncompliance shall, upon
conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more
than two years per violation, or by both.
SECTION B: GENERAL CONDITIONS
1. Individual Permit Expiration
The permittee is not authorized to discharge after the expiration date. In order to receive automatic
authorization to discharge beyond the expiration date, the permittee shall submit forms and fees as are
required by the agency authorized to issue permits no later than 180 days prior to the expiration date. Any
permittee that has not requested renewal at least 180 days prior to expiration, or any permittee that does not
have a permit after the expiration and has not requested renewal at least 180 days prior to expiration, will
be subjected to enforcement procedures as provided in NCGS § 143-2153.6 and 33 USC 1251 et. seq.
2. Transfers
This permit is not transferable to any person except after notice to and approval by the Director. The
Director may require modification or. revocation and reissuance of the permit to change the name and
incorporate such other requirements as may be necessary under the Clean Water Act, The Permittee is
required to notify the Division in writing in the event the permitted facility is sold or closed.
Signatory Requirements
All applications, reports, or information submitted to the Director shall be signed and certified.
a. All applications to be covered under this individual permit shall be signed as follows:
(1) For a corporation: by a responsible corporate officer. For the purpose of this Section, a
responsible corporate officer means: (a) a president, secretary, treasurer or vice president
of the corporation in charge of a principal business function, or any other person who
performs similar policy or decision making functions for the corporation, or (b) the
manager of one or more manufacturing production or operating facilities employing more
than 250 persons or having gross annual sales or expenditures exceeding 25 million (in
second quarter 1980 dollars), if authority to sign documents has been assigned or
delegated to the manager in accordance with corporate procedures.
(2) For a partnership or sole proprietorship: by a general partner or the proprietor,
respectively; or
(3) For a municipality, State, Federal, or other public agency: by either a principal executive
officer or ranking elected official.
Part III Page 3 of 8
Permit No. NCS000525
b. All reports required by the individual permit and other information requested by the Director shall
be signed by a person described above or by a duly authorized representative of that person. A
person is a duly authorized representative only if:
(1) The authorization is made in writing by a person described above;
(2) The authorization specified either an individual or a position having responsibility for the
overall operation of the regulated facility or'activity, such as the position of plant
manager, operator of a well or well field, superintendent, a position of equivalent
responsibility, or an individual or position having overall responsibility for
environmental matters for the company. (A duly authorized representative may thus be
either a named individual or any individual occupying a named position.); and
(3) The written authorization is submitted to the Director.
c. Any person signing a document under paragraphs a. or b. of this section shall make the following
certification:
"I certify, under penalty of law, that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations."
4. Individual Permit Modification, Revocation and Reissuance, or Termination
The issuance of this individual permit does not prohibit the Director from reopening and modifying the
individual permit, revoking and reissuing the individual permit, or terminating the individual permit as
allowed by the laws, rules, and regulations contained in Title 40, Code of Federal Regulations, Parts 122
and 123; Title 15A of the North Carolina Administrative Code, Subchapter 2H .0100; and North Carolina
General Statute 143-215.1 et. al.
S. Pennit�ons
The permit may be modified, revoked and reissued, or terminated for cause. The notification of planned
changes or anticipated noncompliance does not stay any individual permit condition.
SECTION C: OPERATION AND MAINTENANCE OF POLLUTION CONTROLS
1. Proler Operation and Maintenance
The permittee shall at all times properly operate and maintain all facilities and systems of treatment and
control (and related appurtenances) which are installed or used by the permittee to achieve compliance with
the conditions of this individual permit. Proper operation and maintenance also'includes adequate
laboratory controls and appropriate quality assurance procedures. This provision requires the operation of
back-up or auxiliary facilities or similar systems which are installed by a permittee only when the operation
is necessary to achieve compliance with the conditions of this individual permit.
Part III Page 4 of 8
Permit No. NCS000525
2. Need to Halt or Reduce Not a Defensg
It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt
or reduce the permitted activity in order to maintain compliance with the condition of this individual
permit.
3. Bvnassina of Stormwater Control Facilities
Bypass is prohibited and the Director may take enforcement action against a permittee for bypass unless:
a. Bypass was unavoidable to prevent loss of life, personal injury or severe property damage; and
b. There were no feasible alternatives to the bypass, such as the use of auxiliary control facilities,
retention of stormwater or maintenance during normal periods of equipment downtime or dry
weather. This condition is not satisfied if adequate backup controls should have been installed in
the exercise of reasonable engineering judgment to prevent a bypass which occurred during
normal periods of equipment downtime or preventive maintenance; and
C. The permittee submitted notices as required under, Part III, Section E of this permit.
If the Director determines that it will meet the three conditions listed above, the Director may approve an
anticipated bypass after considering its adverse effects.
SECTION D: MONITORING AND RECORDS
I. Representative Samoliniz
Samples collected and measurements taken, as required herein, shall be characteristic of the volume and
nature of the permitted discharge. Analytical sampling shall be performed during a representative storm
event. Samples shall be taken on a day and time that is characteristic of the discharge. All samples shall
be taken before the discharge joins or is diluted by any other waste stream, body of water, or substance.
Monitoring points as specified in this permit shall not be changed without notification to and approval of
the Director.
Recolding Results
For each measurement, sample, inspection or maintenance activity performed or collected pursuant to the
requirements of this individual permit, the permittee shall record the following information:
a. The date, exact place, and time of sampling, measurements, inspection or maintenance activity;
b. The individual(s) who performed the sampling, measurements, inspection or maintenance activity;
C. .. The date(s) analyses were performed;
d. The individual(s) who performed the analyses;
e. The analytical techniques or methods used; and
f The results of such analyses.
Part III Page 5 of 8
Permit No. NCS000525
3, Flow Measurements
Where required, appropriate flow measurement devices and methods consistent with accepted scientific
practices shall be selected and used to ensure the accuracy and reliability of measurements of the volume of
monitored discharges.
4. Test Procedures
Test procedures for the analysis of pollutants shall conform to the EMC regulations published pursuant to
NCGS 143-215.63 et. seq, the Water and Air Quality Reporting Acts, and to regulations published pursuant
to Section 304(g), 33 USC 1314, of the Federal Water Pollution Control Act, as Amended, and Regulation
40 CFR 136.
To meet the intent of the monitoring required by this individual permit, all test procedures must produce
minimum detection and reporting levels and all data generated must be reported down to the minimum
detection or.lower reporting level of the procedure.
Representative Outfall
If a facility has multiple discharge locations with substantially identical stormwater discharges that are
required to be sampled, the permittee may petition the Director for representative outfall status. If it is
established that the stormwater discharges are substantially identical and the permittee is granted
representative outfall status, then sampling requirements may be performed at a reduced number of
outfalls.
6. Records Retention
Visual monitoring shall be documented and records maintained at the facility along with the Stormwater
Pollution Prevention Plan. Copies of analytical monitoring results shall also be maintained on -site. The
permittee shall retain records of all monitoring information, including all calibration and maintenance
records and all original strip chart recordings for continuous monitoring instrumentation, and copies of all
reports required by this individual permit for a period of at least 5 years from the date of the sample,
measurement, report or application. This period may be extended by request of the Director at any time.
7. Inspection and Entry
The permittee shall allow the Director, or an authorized representative (including an authorized contractor
acting as a representative of the Director), or in the case of a facility which discharges through a municipal
separate storm sewer system, an authorized representative of a municipal operator or the separate storm
sewer system receiving the discharge, upon the presentation of credentials and other documents as may be
required by law, to;
a. Enter upon the permittee's premises where a regulated facility or activity is located or conducted,
or where records must be kept under the conditions of this individual permit;
b. Have access to and copy, at reasonable times, any records that must be kept under the conditions
of this individual permit;
Inspect at reasonable times any facilities, equipment (including monitoring and control
equipment), practices, or operations regulated or required under this individual permit; and
d. Sample or monitor at reasonable times, for the purposes of assuring individual permit compliance
or as otherwise authorized by the Clean Water Act, any substances or parameters at any location.
Part III Page 6 of 8
Permit No. NCS000525
SECTION E: REPORTING REQUIREMENTS
Discharge Monitoring Reports
Samples analyzed in accordance with the terms of this permit shall be submitted to the Division on
Discharge Monitoring Report forms provided by the Director. Submittals shall be received by the Division
no later than 30 days, from the date the facility receives the sampling results from the, laboratory.
When no discharge has occurred'from the facility during the report period, the permittee is required to
submit a discharge monitoring report within 30 days of the end of the six-month sampling period, giving
all required information and indicating "NO FLOW" as per NCAC T15A 02B .0506.
2. Submitting Remr-ts
Duplicate signed copies of all reports required herein, shall be submitted to the following address:
Division of Water Quality
Surface Water Protection Section -
AT TENTION: Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Availability of Reports
Except for data determined to be confidential under NCGS 143-215.3(a)(2) or Section 308 of the Federal
Act, 33 USC 1318, all reports prepared in accordance with the terms shall be available for public
inspection at the offices of the Division of Water Quality. As required by the Act, analytical data shall not
be considered confidential. Knowingly making any false statement on any such report may result in the
imposition of criminal penalties as provided for in NCGS I43-215.613 or in Section 309 of the Federal Act.
4. Non-Stormwater Discharges
If the storm event monitored in accordance with this individual permit coincides with a non-stormwater
discharge, the permittee shall separately monitor all parameters as required under the non-stormwater
discharge permit and provide this information with the stormwater discharge monitoring report.
Planned Changes
The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted
facility which could significantly alter the nature or quantity of pollutants discharged. This notification
requirement includes pollutants which are not specifically listed in the individual permit or subject to
notification requirements under 40 CFR Part 122.42 (a).
6. Anticipated Noncomuliance
The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted
facility which may result in noncompliance with the individual permit requirements.
lBynass
a. Anticipated bypass. If the permittee knows in advance of the need for a bypass, it shall submit
prior notice, if possible at least ten days before the date of the bypass; including an evaluation of
the anticipated quality and affect of the bypass,
Part III Page 7 of 8
Permit No. NCS000525
PART IV LIMITATIONS REOPENER
This individual permit shall be modified or alternatively, revoked and reissued, to comply with any applicable
effluent guideline or water quality standard issued or approved under Sections 302(b) (2) (c), and (d), 304(b) (2)
and 307(a) of the Clean Water Act, if the effluent guideline or water quality standard so issued or approved:
a. Contains different conditions or is otherwise more stringent than any effluent limitation in the individual
permit; or
b. Controls any pollutant not limited in the individual permit.
The individual permit as modified or reissued under this paragraph shall also contain any other requirements in the
Act then applicable.
PART V ADMINISTERING AND COMPLIANCE MONITORING FEE
REQUIREMENTS _
The permittee must pay the administering and compliance monitoring fee within 30 (thirty) days after being billed
by the Division. Failure to pay the fee in timely manner in accordance with 15A NCAC 2H .0105(b)(4) may cause
this Division to initiate action to revoke the Individual Permit.
PART VI DEFINITIONS
1. Act
See Clean Water Act.
2. Arithmetic Mean
The arithmetic mean of any set of values is the summation of the individual values divided by the number
of individual values.
3. Allowable Non-Stormwater Discharges
This permit regulates stormwater discharges. Non-stormwater discharges which shall be allowed in the
stormwater conveyance system are:
(a) All other discharges that are authorized by a non-stormwater NPDES permit.
.(b) Uncontaminated groundwater, foundation drains, air -conditioner condensate without added
chemicals, springs, discharges of uncontaminated potable water, waterline and fire hydrant
flushings, water from footing drains, flows from riparian habitats and wetlands.
(c) Discharges resulting from fire -fighting or fire -fighting training.
4. Best Management Practices (BMPs)
Measures or practices used to reduce the amount of pollution entering surface waters. BMPs may take the
form of a process, activity, or physical structure.
Parts IV, V and VI Page 1 of 5
Permit No. NCS000525
b. Unanticipated bypass. The permittee shall submit notice within 24 hours of becoming aware of an
unanticipated bypass.
Twentv-four Hour Renortin
The permittee shall report to the central office or the appropriate regional office any noncompliance which
may endanger health or the environment. Any information shall be provided orally within 24 hours from '
the time the permittee became aware of the circumstances. A written submission shall also be provided
within 5 days of the time the permittee becomes aware of the circumstances.
The written submission shall contain a description of the noncompliance, and its causes; the period of
noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the
anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and
prevent reoccurrence of the noncompliance.
The Director may waive the written report on a case -by -case basis if the oral report has been received
within 24 hours.
Other Noncompliance
The permittee shall report all instances of noncompliance not reported under 24 hour reporting at the time
monitoring reports are submitted.
10. Other Information
Where the permittee becomes aware that it failed to submit any relevant facts in an application for an
individual permit or in any report to the Director, it shall promptly submit such facts or information.
Part III Page 8 of 8
Permit No. NCS000525
Industrial materials or activities include, but are not limited to, material handling equipment or activities,
industrial machinery, raw materials, intermediate products, by-products, final products, or waste products.'
DWQ may grant a No Exposure Exclusion from NPDES Stormwater Permitting requirements only if a
facility complies with the terms and conditions described in 40 CFR § 122.26(g).
16. Overburden
Any material of any nature, consolidated or unconsolidated, that overlies a mineral deposit, excluding
topsoil or similar naturally -occurring surface materials that are not disturbed by mining operations.
17. ermittec
The owner or operator issued a permit pursuant to this individual permit.
18. Point Source Discharge of Stormwater
Any discernible, confined and discrete conveyance including, but not specifically limited to, any pipe,
ditch, channel, tunnel, conduit, well, or discrete fissure from which stormwatenis or may be discharged to
waters of the state.
19. Re re entat've Storm Event
A storm event that measures greater than 0.1 inches of rainfall and that is preceded by at Ieast 72 hours in which no
storm event measuring greater. than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive
hours of no precipitation. For example, if it rains for 2 hours without producing any collectable discharge, and then
stops, a sample may be collected if a rain producing a discharge begins again within the next 10 hours.
20. Repmsentative Outfall Status
When it is established that the discharge of stormwater runoff from a single outfall is representative of the
discharges at multiple outfalls, the DWQ may grant representative outfall status. Representative outfall
status allows the permittee to perform analytical monitoring at a reduced number of outfalls.
21. Rinse Water Discharge
The discharge of rinse water from equipment cleaning areas associated with industrial activity. Rinse
waters from vehicle and equipment cleaning areas are process wastewaters and do not include washwaters
utilizing any type of detergent or cleaning agent.
22. Secondary Containment
Spill containment for the contents of the single largest tank within the containment structure plus sufficient
freeboard to allow for the 25-year, 24-hour storm event.
23. Section 313 Water Priority Chemical
A chemical or chemical category which:
a. Is listed in 40 CFR 372.65 pursuant to Section 313 of Title III of the Superfund Amendments and
Reauthorizaiion Act (SARA) of 1986, also titled the Emergency Planning and Community Right -
to -Know Act of 1986;
b. Is present at or above threshold levels at a facility subject to SARA Title III, Section 313 reporting
requirements; and
Part VI Page 3 of 5 Pages
Permit No. NCS000525 '
5. Bypass
A bypass is the known diversion of stormwater from any portion of a stormwater control facility including
the collection system, which is not a designed or established operating mode for the facility.
6. Bulk Storage of Liquid Products
Liquid raw materials, manufactured products, waste materials or by-products with a single above ground
storage container having a capacity of greater than 660 gallons or with multiple above ground storage
containers located in close proximity to each other having a total combined storage capacity of greater than
I,320 gallons.
7. , Clean Water Act
The Federal Water Pollution Control Act, also known as the CIean Water Act (CWA), as amended, 33
USC 1251, et. seq.
8. Division or DM
The Division of Water Quality, Department of Environment and Natural Resources.
9. Director
The Director of the Division of Water Quality, the permit issuing authority.
10. EMC
The North Carolina Environmental Management Commission.
11. Grab Sample
An individual sample collected instantaneously. Grab samples that will be directly analyzed or
qualitatively monitored must be taken within the first 30 minutes of discharge.
12. Hazardous Substance
Any substance designated under 40 CFR Part 116 pursuant to Section 311 of the Clean Water Act.
13. Landfill
A disposal facility or part of a disposal facility where waste is placed in or on land and which is not a land
treatment facility, a surface impoundment, an injection well, a hazardous waste Iong-term storage facility
or a surface storage facility.
14. Municipal Separate Storm Sewer System
A stormwater collection system within an incorporated area of local self-government such as a city or
town.
15. No Exposure
A condition of no exposure means that all industrial materials and activities are protected by a storm
resistant shelter or acceptable storage containers to prevent exposure to rain, snow, snowmelt, or runoff.
Part VI Page 2 of 5 Pages
Permit No. NCS000525
31. Total Flow
The flow corresponding to the time period over which the entire storm event occurs. Total flow shall be
either; (a) measured continuously, (b) calculated based on the amount of area draining to the outfall, the
amount of built -upon (impervious) area, and the total amount of rainfall, or (c) e_stimated by the
measurement of flow at 20 minute intervals during the rainfall event.
32. Total Maximum Daily Load (TMDL1
A TMDL is a calculation of the maximum amount of a pollutant that a waterbody can receive and still meet
water quality standards, and an allocation of that amount to the pollutant's sources. A TMDL is a detailed
water quality assessment that provides the scientific foundation for an implementation plan. The
implementation plan outlines the steps necessary to reduce pollutant loads in a certain body of water to
restore and maintain water quality standards in all seasons. The Clean Water Act, section 303, establishes
the water quality standards and TMDL programs.
33. Toxic Pollutant
Any pollutant listed as toxic under Section 307(a)(1) of the Clean Water Act.
34. UP —Set
Means an exceptional -incident in which there is unintentional and temporary noncompliance with
technology based permit effluent limitations because of factors beyond the reasonable control of the
permittee. An upset does not include noncompliance to the extent caused by operational error, improperly
designed treatment or control facilities, inadequate treatment or control facilities, lack of preventive
maintenance, or careless or improper operation.
35. Vehicle Maintenance Activity
Vehicle rehabilitation, mechanical repairs, painting, fueling, lubrication, vehicle cleaning operations, or
airport deicing operations.
36. Visible Sedimentation
Solid particulate matter, both mineral and organic, that has been or is being transported by water, air,
gravity, or ice from its site of origin which can be seen with the unaided eye.
37. 25-near, 24 hour storm event
The maximum 24-hour precipitation event expected to be equaled or exceeded, on the average, once in 25
years.
Part VI . Page 5 of 5 Pages
Permit No. NCS000525
C. That meet at least one of the following criteria:
(1) Is listed in Appendix D of 40 CFR part 122 on either Table II (organic priority
pollutants), Table III (certain metals, cyanides, and phenols) or Table IV (certain toxic
pollutants and hazardous substances);
(2) Is.listed as a hazardous substance pursuant to section 311(b)(2)(A) of the CWA at 40
CFR 116.4; or
(3) Is a pollutant for which EPA has published acute or chronic water quality criteria.
24. Severe Prol2ejjy Damage
Means substantial physical damage to property, damage to the control facilities which causes them to
become inoperable, or substantial and permanent loss of natural resources which can reasonably be
expected to occur in the absence of a bypass. Severe property damage does not mean economic loss
caused by delays in production.
25. Significant Materials
Includes, but is not limited to: raw materials; fuels; materials such as solvents, detergents, and plastic
pellets; finished materials such as metallic products; raw materials used in food processing or production;
hazardous substances designated under section 101(14) of CERCLA; any chemical the facility is required
to report pursuant to section 313 of Title III of SARA; fertilizers; pesticides; and waste products such as
ashes, slag and sludge that have the potential to be released with stormwater discharges.
26. Signifiicant_Spills
Includes, but is not limited to: releases of oil or hazardous substances in excess of reportable quantities
under section 311 of the Clean Water Act (Ref: 40 CFR 110.10 and CFR 117.2I) or section 102 of
CERCLA (Ref: 40 CFR 302.4).
27, Stormwater Runoff
The flow of water which results from precipitation and which occurs immediately following rainfall or as a
result of snowmelt.
28. Stormwater Associated with Industrial Activity
The discharge from any point source which is used for collecting and conveying stormwater and which is
directly related to manufacturing, processing or raw material storage areas at an industrial site. Facilities
considered to be engaged in "industrial activities" include those activities defined in 40 CFR 122.26(b)(14).
The term does not include discharges from facilities or activities excluded from the NPDES program.
29.. Stormwater Pollution Prevention Plan
A comprehensive site -specific plan which details measures and practices to reduce stormwater pollution
and is based on an evaluation of the pollution potential of the site.
30. Ten Year Design Storm
The maximum 24 hour precipitation event expected to be equaled or exceeded on the average once in ten
years. Design storm information can be found in the State of North Carolina Erosion and Sediment
Control Planning and Design Manual.
Part VI Page 4 of 5 Pages