HomeMy WebLinkAboutCorning CEPI - 190108 Project approach-calculations-supports docs  1919 South Boulevard, Suite 200 Charlotte, North Carolina 28203 M 704.905.0530 | D 704.780.4972 jbanks@civilbanks.com | www.civilbanks.com CORNING EMPLOYEE PARKING IMPROVEMENTS (CEPI)   PROJECT DESCRIPTION & STORMWATER APPROACH    January 8, 2019    RE: Corning CEPI – Phase II Stormwater compliance    Project Description  The Corning Concord Facility is located in Cabarrus County, NC near the town of Midland at 14556 US‐601  Midland, NC.  The campus was originally designed and constructed circa 1996 and encompasses  approximately 234 acres with Tax ID of 55435780680000 & 55434413150000.  Prior to construction, this  site was a non‐paved landing strip.   Increased overall plant production has subsequently required additional employees.  To accommodate  the additional workers, Corning plans to follow through with original 1996 design intent and construct a  +/‐ 400 space surface parking lot (a.k.a. Craft Parking Area) with expansion potential to +/‐ 600 spaces.  In  addition, existing parking area near main entrance will be reconfigured to resolve drainage issues as well  as increase circulation/parking efficiency.    During original plant construction, four (4) stormwater facilities were installed – two (2) wet ponds on the  south end and two (2) dry detention basin to the north.  The proposed parking lot area drains to one of  the existing north dry detention basins and has been identified as Basin‐4 (or Northeast Detention  Facility). Unfortunately, per discussions with Corning, it appears as though the original design calculations  have been lost but a 2001 Stormwater Pollution Prevention Plan was located that shows proposed parking  area ‐ see “Original SWPPP from 2001” exhibit. In addition, as of +/‐ 2007, this site falls under Stormwater  Phase II regulations.   Due to the absence of original design calculations, reverse engineering of existing detention facility ‐4 will  be necessary for verification that required stormwater targets have been met.  The following is a detailed  breakdown of stormwater calculation approach.  Stormwater Calculations  Phase II regulations vary depending upon % of Built‐Upon‐Area (BUA) and are divided into two categories:  high and low density.  Low density for this particular site is defined as BUA < 24%.  To facilitate this  calculation, current 2018 impervious areas were compared to 2001 aerial imagery to determine if  additional impervious areas were added after Phase II adoption – see “Impervious exhibit with 2001  aerial”.  Based on this comparison, no significant impervious additions are evident.  Subsequently, BUA  calculations will be based on proposed new impervious for +/‐400 space lot as well as future expansion.     Using allowable deduction of existing BUA from total project area this yields a BUA of 4.2% which classifies  as Low Density – see “C8‐1 Impervious Inventory” exhibit with Phase II calculation summary highlighted.   Per Low Density requirements, one of the primary objectives is to utilize vegetated conveyances.  For  compliance as well as reduced piping costs, the original design intent was to capture parking area runoff  and discharge on the south side into a vegetative swale running parallel with existing access road flowing  north to existing detention facility.  Unfortunately, due to extremely flat conditions (0.7%) and inadequate  pipe cover at drive connection, using vegetative conveyance is not viable.  See “Detention‐4 Drainage  Area” exhibit for additional notes and graphic summary of constraints as well as “Grading overall” exhibit  for proposed storm layout.   For verification that existing facility will effectively mitigate 2 & 10 year peaks, 1995 aerial imagery prior  to plant construction was utilized to determine pre‐development ground cover.  Post‐development  condition, time of concentration calculations as well as soils information and pre‐developed topography  via USGS map are also included with calculations. Calculated sheet flow at most remote point is the same  in both pre and post condition. However, a post‐condition TOC of +15 minutes did not seem appropriate  and has been reduced to 10 minutes for calculation purposes.   The existing detention facility has two outlet structures: a primary 18” RCP culvert and secondary 10’ wide  concrete paved broad‐crested emergency spillway.  Final hydraulic analysis included in the attached  HydroCad report indicates that the existing facility with proposed parking lot and future expansion will  sufficiently mitigate both the 2 and 10 year peak storm events.  Results are as follows:  2 year:  Pre = 45.77 cfs   Post = 38.51 cfs  10 year: Pre = 82.14 cfs  Post = 81.56 cfs  Summary  BUA calculations with removal of existing impervious areas yields a BUA of 4.2% which is considered “Low  Density” development. Existing flat site conditions have precluded the use of vegetative conveyance from  original desired outfall location to existing detention facility.  Reverse engineering of existing detention  facility has verified that existing facility will mitigate both the 2 and 10 year peak storm events without  additional modifications.   In addition to the challenges noted above, Geotechnical report developed by Stewart Engineering  indicates relatively shallow partially weathered rock.  This condition would significantly impact potential  for basin modification if ultimately deemed necessary.        Jay D. Banks, PE  CORNING (CEPI) BE#1045001 CALCULATIONS FOR: EXISTING DETENTION CONFIRMATION DATE:01.08.19 REV: 1919 SOUTH BLVD. CHARLOTTE, NC 28203 704.780.4972 DRAKERD.KISERRD.WHITLEYRD.US-601(NCDOTMAINTAINED- 100'R.O.W.) WET POND DRY DETENTION FACILITY DRY DETENTION FACILITY WET POND C:\Users\Ba\Dropbox(BanksEngineering)\BEPROJECTS\01045WalkerParking\001Corning\Dwg\Z-IMPEXHIBIT-2001.dwgTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY BANKS ENGINEERING, PLLC. SHALL BE WITHOUT LIABILITY TO BANKS ENGINEERING, PLLC. IMP 01.04.2019 PROJECT:TITLE: 0 SCALE: 350175 1"= 350'CONCORD EMPLOYEE PARKING IMPROVEMENTS (CEPI)TOTAL POST-PROJECT CAMPUS IMPERVIOUS WITH 2001 AERIAL IMAGE N O R T H ENGINEERING 14.66°75'FRONTSETBACK 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1415161718 19 20 21 22 23 N67°16'50.37"W678.730'S28°24'08.80"W 182.498' S28°17'03.87"W 839.691'N75°20'18.97"W698.880'S 3 °1 3 '3 6 .0 4 "E455.2 0 8 'S 3 °1 3 '3 2 .0 4 "E606.4 3 5 'N78°08'15.95"W918.365'S 6 °0 8 '0 6.01"W154.6 4 0'S16°20'31.47"W 1167.092'S16°20'31.47"W 1124.905' S36°35'40.99"W 739.980'S46°01'42.01"E228.880'S52°37'35.01"E1021.940'S72°15'00.01"E154.800'N27°16'05.99"E1134.550'N21° 18' 45.99"E 17.400'S71°54'40.01"E386.920'S71°53'08.01"E386.695'N21°27'57.99"E702.954'N21°42'35.67"E233.294'N21°33'41.49"E369.876'N21°53'53.33"E215.613' L=560.148,R=3176.645 D=10.1032 N32°53'34.10"E584.966' N32°19'18.45"E35.840' N32°54'24.09"E1856.429'N68°03'18.76"W889.215'75'FRONT SETBACK 30'SETBACK3 0 'S E T B A C K 30'SETBACK 30'SETBACK13 CORNING INCORPORATED BOOK: 2890; PAGE: 0084 PIN14: 55434413150000 ZONED: GI USE: INDUSTRIAL-FIBER OPTICS MANUFACTURING CORNING INCORPORATED BOOK: 1758; PAGE: 0240 PIN14: 55435780680000 ZONED: GI USE: INDUSTRIAL-FIBER OPTICS MANUFACTURING DRAKERD.KISERRD.WHITLEYRD.FIELDSTONETRCEUS-601(NCDOTMAINTAINED- 100'R.O.W.) EX. DRY DETENTION FACILITY-3 EX. WET POND-1 EX. WET POND-2 EX. DRY DETENTION FACILITY-4 C:\Users\Ba\Dropbox(BanksEngineering)\BEPROJECTS\01045WalkerParking\001Corning\Dwg\C8-1IMPERVIOUSINVENTORY.dwgJanuary09,2019-2:09pmBy:BaOWNER:1919 SOUTH BOULEVARD SUITE 200 CHARLOTTE, NC 28203 T: 704.780.4972 NC License #P-1370 © 2018 ENGINEERINGDESIGNED: DRAWN: CHECKED: PROJECT: DATE: JDB 01045001 11.19.18PROJECT:SHEET:A---xx.xx.1912.18.1812.06.1811.19.18Addressreviewcomments1stsubmittaltoNCDOT.2ndsubmittaltoNCDENR1stsubmittaltoNCDENR1stsubmittaltoCabarrusPlanning14556US-601MIDLAND,NC28107CONCORDEMPLOYEESPARKINGIMPROVEMENTS14556US-601MIDLAND,NC28107CLIENT:C8-1IMPERVIOUSINVENTORY0 SCALE: 200100 400 1"= 200'NORTHFLOWE, SAMUEL JUSTIN BOOK: 5851; PAGE: 0327 PIN14: 55431265000000 ZONED: CR USE: SINGLE FAMILY RESIDENTIAL FLOWE, SAMUEL JUSTIN BOOK: 5851; PAGE: 0304 PIN14: 55431374500000 ZONED: CR USE: SINGLE FAMILY RURAL ROBERTS, JAMES B JR REAL ESTATE BOOK: UNKNOWN; PAGE: UNKNOWN PIN14: 55432415940000 ZONED: CR USE: SINGLE FAMILY RESIDENTIAL MILLS, STEPHEN M BOOK: 3058; PAGE: 0201 PIN14: 55433508890000 ZONED: CR USE: SINGLE FAMILY RESIDENTIAL STEPP, DAVID B LF EST BOOK: 10437; PAGE: 0088 PIN14: 55433622700000 ZONED: CR USE: SINGLE FAMILY RESIDENTIAL TROUTMAN, WILLIAM F SR BOOK: 6923; PAGE: 0281 PIN14: 55433744680000 ZONED: CR USE: SINGLE FAMILY RURAL TROUTMAN WILLIAM F SR BOOK: 6923; PAGE: 0281 PIN14: 55434777470000 ZONED: CR USE: SINGLE FAMILY RESIDENTIAL MURPHY, MAC LLC BOOK: 10821; PAGE: 0105 PIN14: 55435858580000 ZONED: CR USE: SINGLE FAMILY RURAL BOC GROUP INC, A DELAWARE CORP BOOK: 6880; PAGE: 2910 PIN14: 55436804250000 ZONED: GI USE: OFFICE-INDUSTRIAL PARK WALLACE, ROBERT L BOOK: 5061; PAGE: 0009 PIN14: 55436749850000 ZONED: GI USE: WAREHOUSE-INDUSTRIAL PARK WALLACE, ROBERT L BOOK: 5061; PAGE: 0013 PIN14: 55436787760000 ZONED: GI USE: WAREHOUSE-INDUSTRIAL PARK BROOKS WILLIAM E SR EST BOOK: UNKNOWN; PAGE: UNKNOWN PIN14: 55438881450000 ZONED: GI USE: INDUSTRIAL LOVE, CLAYTON C JR BOOK: 9022; PAGE: 0220 PIN14: 55437693370000 ZONED: GI USE: INDUSTRIAL DRAKE, JERRY M BOOK: UNKNOWN; PAGE: UNKNOWN PIN14: 55435452470000 ZONED: CR USE: SINGLE FAMILY RURAL BAKER, LARRY N & MELANNIE E BOOK: UNKNOWN; PAGE: UNKNOWN PIN14: 55435420520000 ZONED: CR USE: SINGLE FAMILY RURAL BAKER, LARRY N & MELANNIE E BOOK: UNKNOWN; PAGE: UNKNOWN PIN14: 55435338030000 ZONED: CR USE: SINGLE FAMILY RESIDENTIAL EUDY, LARRY JOE & SHARON A BOOK: UNKNOWN; PAGE: UNKNOWN PIN14: 55435335960000 ZONED: CR USE: SINGLE FAMILY RESIDENTIAL EUDY TRINETTE MARIE REUSCHLEIN BOOK: 8480; PAGE: 0145 PIN14: 55435332020000 ZONED: CR USE: SINGLE FAMILY RURAL HAIGLER, DANNIE H BOOK: UNKNOWN; PAGE: UNKNOWN PIN14: 55434355880000 ZONED: CR USE: SINGLE FAMILY RURAL HAIGLER, DANNIE H BOOK: 0582; PAGE: 0563 PIN14: 55434326650000 ZONED: CR USE: SINGLE FAMILY RESIDENTIAL GORIS, MARIA BOOK: 7425; PAGE: 0349 PIN14: 55434311900000 ZONED: CR USE: SINGLE FAMILY RURAL SANDERS, GREGORY A BOOK: 9841; PAGE: 0139 PIN14: 55433265490000 ZONED: CR USE: SINGLE FAMILY RESIDENTIAL HOOKS, RANDY C BOOK: 3784; PAGE: 0142 PIN14: 55432288870000 ZONED: CR USE: SINGLE FAMILY RURAL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 CORNING TOTAL IMPERVIOUS 234.22 ACRES %OVERALL STRUCTURE 15.13 6.46% GRAVEL 26.88 11.47% ASPHALT 24.86 10.62% CONCRETE 3.74 1.59% TOTAL:70.61 30.15% 80.97 153.25 CORNING PROPOSED IMPERVIOUS 234.22 ACRES %OVERALL STRUCTURE 0 0.00% GRAVEL 1.48 0.63% ASPHALT 3.25 1.39% REV. ASPHALT 1.98 0.84% CONCRETE 0.52 0.22% TOTAL:7.23 3.09% 80.97 153.25 CORNING EXISTING IMPERVIOUS (PRIOR 2001) 234.22 ACRES %OVERALL STRUCTURE 15.13 6.46% GRAVEL 25.40 10.84% ASPHALT 19.63 8.38% CONCRETE 3.21 1.37% TOTAL:63.37 27.06% 80.97 153.25 STORMWATER PHASE II IMPERVIOUS CALCULATION: TOTAL CAMPUS AREA:234.22 AC EXISTING IMPERVIOUS (PRIOR TO 2007): 63.37 AC PROPOSED IMPERVIOUS: 7.23 AC BUILT UPON AREA (B.U.A.): 7.23 / (234.22 - 63.37) = 4.2% CLASSIFICATION (%B.U.A.<24% = LOW DENSITY):LOW DENSITY DETENTION FACILITY-4 DRAINAGE AREA = 25.66 ACKISERRD.WHITLEYRD.US-601(NCDOTMAINTAINED- 100'R.O.W.) EX. DRY DETENTION FACILITY-3 EX. DRY DETENTION FACILITY-4 X 100'SHEET@5.0%1622'CHANNEL185'SHALLOW@5.40%XC:\Users\Ba\Dropbox(BanksEngineering)\BEPROJECTS\01045WalkerParking\001Corning\Dwg\Z-DETBASIN-4DA-TOCEXHIBIT.dwgTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY BANKS ENGINEERING, PLLC. SHALL BE WITHOUT LIABILITY TO BANKS ENGINEERING, PLLC. DA 01.08.19 PROJECT:TITLE: 0 SCALE: 15075 1"= 150'CONCORD EMPLOYEE PARKING IMPROVEMENTS (CEPI)EXISTING DETENTION FACILITY-4 DRAINAGE AREA / TIME OF CONCENTRATION N O R T H ENGINEERING C C C C C C C CCC C C C CCCCCCC C CCCC C CCCCC C C C SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF CB-66 RIM: 529.30 MOTORCYCLEPARKINGONLY75' FRONT SETBACK75' FRONT SETBACK 15' T HO RO UG HF ARELANDSCAPE YARD 15' T HO RO UG HF ARE LANDSCAPE YARD15' T HO RO UG HF ARE LANDSCAPE YARD US-601 (NCDOT MAINTAINED-100' R.O.W.)US-601 (NCDOT MAINTAINED-100' R.O.W.)KISERRD.WHITLEYRD.US-601 (NCDOT MAINTAINED- 100' R.O.W.)30'SETBACKUEUEUEUEPHASE2-EX.LOTPHASE1-NEWLOT2 :1(MAX.) STRUCTURAL FILLSTOCKPILE FOR PHASE 2 SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFS F SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFS F SFSFSFS F S F SFSFSFSFSFSFS F SF SF S FSFSFEX. LOT #2 LOT #4 FUTURE LOT #4523524525526527528529530531 5325335345355365375385365355345315285 2 2 52252752853052953153253453353552653753625.5527527 526 525 52952652753053153253453453334.534.529.553529.55305335325275285345255265295245245245 2 0 52052152252352452552652752852953153253353453653452852752953052429.552952852752552352652453052552952752652853253152524.524.552552454053552752753221.5 53052552321.5 21.522.2521.2552222.552323.552452552322.552252423.552221.522.522.55295245385395405415 4 1539 542531530532533534535536537538539540542543544546546545543544541545CB-63 RIM: 522.65 CB-08 RIM: 523.00 DI-67 RIM: 532.00 CB-09 RIM: 524.90 CB-12 RIM: 529.00 DCB-10 RIM: 523.75 CB-11 RIM: 528.80 CB-15 RIM: 526.65 CB-13 RIM: 533.80 CB-14 RIM: 534.00 CB-07 RIM: 523.00 CB-06 RIM: 523.00 CB-19 RIM: 531.20 CB-16 RIM: 527.90 CB-17 RIM: 529.00 CB-18 RIM: 529.95 CB-20 RIM: 532.35 CB-21 RIM: 519.50 EXMH-50 RIM: 521.40 INV: 514.76 CB-51 RIM: 521.00 STMH-52 RIM: 523.40 INV: 519.90 CDI-53 RIM: 521.00 INV: 515.07 CDI-54 RIM: 521.00 INV: 515.29 CDI-55 RIM: 521.00 INV: 515.44 CDI-56 RIM: 521.00 INV: 515.72 CDI-57 RIM: 521.00 INV: 516.53 CB-58 RIM: 521.20 CB-59 RIM: 522.65 CB-61 RIM: 522.65 CB-60 RIM: 521.30CB-62 RIM: 521.30 EXDI-64 RIM: 522.44 INV: 517.80 CB-65 RIM: 526.65 CB-05 RIM: 521.50 FES-01 INV: 515.00 STMH-04 RIM: 523.00 STMH-03 RIM: 523.00 STMH-02 RIM: 520.75 FES-22 INV: 517.10 DRY DETENTION FACILITY 15" RCP CULVERT SEE ROADWAY SHEETS RD2-X FOR GRADING DETAILS 15+850+00 1+00 2+00 3+00 4+00 5+00 6 +00 7+00 8 +00 9+00 10+00 11+00 12+00 13+00 1 4+00 15+00 Know what's R C:\Users\Ba\Dropbox(BanksEngineering)\BEPROJECTS\01045WalkerParking\001Corning\Dwg\C4-0TOC4-3GRADING.dwgTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY BANKS ENGINEERING, PLLC. SHALL BE WITHOUT LIABILITY TO BANKS ENGINEERING, PLLC.December17,2018-2:37amBy:BaOWNER:1919 SOUTH BOULEVARD SUITE 200 CHARLOTTE, NC 28203 T: 704.780.4972 NC License #P-1370 © 2018 ENGINEERINGDESIGNED: DRAWN: CHECKED: PROJECT: DATE: JDB 01045001 11.19.18PROJECT:SHEET:---REV.12.18.1812.06.1811.19.18DATE1stsubmittaltoNCDOT.2ndsubmittaltoNCDENR1stsubmittaltoNCDENR1stsubmittaltoCabarrusPlanningDESCRIPTIONNORT H14556US-601MIDLAND,NC28107CONCORDEMPLOYEESPARKINGIMPROVEMENTS14556US-601MIDLAND,NC28107CLIENT:0 SCALE: 8040 160 1"= 80'C4-0GRADINGOVERALLPROPOSED CONSTRUCTION LIMITS PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED SPOT PROPOSED GRADING ARROW GRADING LEGEND PROPOSED WALL SPOTS PROPOSED INTER. CONTOUR 799 TC: 100.00BC: 100.00597.00 TW: 100.00BW: 100.00 25.5 PROPOSED IRRIGATION SLEEVE PROPOSED STORMSTMH-1 STUB TC: 100.00BC: 100.00597.00 TW: 100.00BW: 100.00 TC: 100.00BC: 100.00597.00 TW: 100.00BW: 100.00 2 - 2" PVCGRADING NOTES 1. SEE GENERAL NOTES SHEET C0-2 FOR GRADING NOTES. 2. CONTRACTOR SHALL REVIEW, UNDERSTAND AND IMPLEMENT ALL REQUIRED EROSION AND SEDIMENTATION CONTROL MEASURES PRIOR TO ANY DISTURBANCE. 3. SEE THE EROSION CONTROL PLANS AND DETAILS FOR THE LOCATION AND SIZING OF ALL RIP-RAP APRONS AND SLOPE AND CHANNEL LININGS. 4. ON ALL SLOPES STEEPER THAN 3:1, CONTRACTOR SHALL INSTALL NORTH AMERICAN GREEN PRODUCT SC150 EROSION CONTROL MATTING. REFER TO NAG FOR INSTALLATION GUILDELINES. 5. ALL SPOT ELEVATIONS ALONG CURB AND GUTTER LINE REPRESENT FLOW LINE ELEVATIONS UNLESS OTHERWISE NOTED. 6. CONTRACTOR AND/OR CONSTRUCTION SURVEYOR TO VERIFY THAT CONSTRUCTION STAKING BASED ON CONTOURS AND SPOT ELEVATIONS DOES NOT CONFLICT WITH SLOPE CALL-OUTS OR ADA REQUIREMENTS. NOTIFY SITE ENGINEER OF ANY DISCREPANCIES AND AWAIT FURTHER INSTRUCTION. 7. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY THE ACCURACY OF ALL STORM/UTILITY TIE-IN INVERTS SHOWN AND NOTIFY THE SITE ENGINEER IMMEDIATELY IF THERE IS A DISCREPANCY 8. AFTER VERIFICATION, ALL GRAVITY PIPE INSTALLATION(S) SHALL BEGIN AT THE LOWEST ELEVATION OUTFALL AND/OR TIE-IN POINT(S) INDICATED AND PROCEED UPSTREAM UNLESS OTHERWISE INDICATED ON THE PLANS. INSTALLATION(S) NOT FOLLOWING THIS SEQUENCE WILL BE CONSIDERED A CONTRACTOR "MEANS AND METHODS" AND WILL SUBSEQUENTLY ASSUME ALL RISKS ASSOCIATED WITH MEETING INDICATED TIE-OUT ELEVATION, NECESSARY PIPE ADJUSTMENTS DUE TO CONFLICTS AND PIPE SLOPES AS INDICATED. ALL ADDITIONAL COSTS (INCLUDING ENGINEERING) ASSOCIATED WITH RE-WORKING PIPE SYSTEM TO FUNCTION PROPERLY WILL BE AT THE CONTRACTORS EXPENSE. NOTE TO CONTRACTOR - AS-BUILT FOR DETENTION SYSTEM: CONTRACTOR SHALL ENGAGE NC LICENSED SURVEYOR TO PROVIDE AS-BUILT SURVEY OF STORM COLLECTION SYSTEM AS WELL AS UNDERGROUND UTILITIES. SURVEY SHALL BE IN NC STATE PLANE COORDINATE SYSTEM USING SAME SURVEY CONTROL AS ORIGINAL DESIGN SURVEY. UTILITY SERVICES (I.E. POWER, GAS, WATER, FOC, ETC. TO INCLUDE LINES SIZES AND DEPTH INFORMATION. AS-BUILT SURVEY INFORMATION WILL BE COMPARED WITH DESIGN DRAWINGS FOR VERIFICATION THAT PIPE INVERTS, PIPE LENGTHS AND OTHER SYSTEM PARAMETERS MATCH THE DESIGN DRAWINGS. VARIATIONS FROM THE DESIGN DRAWINGS MAY REQUIRE REMOVAL/REPLACEMENT AT THE CONTRACTORS EXPENSE. DIP = DUCTILE IRON PIPE - PC 350 W/ TYPE 5 BEDDING. USE 16" DIA. PIPE IF TABLE ABOVE INDICATES 15" **ALL PIPE MATERIALS AND STRUCTURES TO BE INSTALLED PER MANUFACTURES SPECIFICATIONS, GEOTECHNICAL ENGINEER AND/OR LOCAL REGULATIONS, WHICHEVER IS MORE STRINGENT. *** PERIMETER PIPING AROUND BUILDING TO PICK UP ROOF LEADERS OR SMALL AREA DRAINS SHALL NOT COMMENCE UNTIL AFTER BUILDING FOOTINGS HAVE BEEN INSTALLED. ADJUSTMENT TO THESE LINES MAY BE NECESSARY DUE TO FOOTINGS. RCP = REINFORCED CONCRETE PIPE-CLASS III IF NOT SPECIFIED. JOINT TO CONFORM WITH AASHTO M198 PVC = POLYVINYL CHLORIDE PIPE - SCHEDULE 40 DI = DROP INLET (WITH FRAME AND GRATE) PER NCDOT STD 840.15/16 SDMH = MANHOLE JUNCTION (WITH SOLID LID) PER NCDOT STD 840.31/54 JB = ROOF LEADER/SMALL DIA. DRAIN STRUCTURE - SEE NYOPLAST 15" CAST IRON H-20 GRATE AND DRAIN BASIN DETAILS YI = YARD INLET - SEE NYOPLAST 15" CAST IRON H-20 GRATE AND DRAIN BASIN DETAILS AD = AREA DRAIN - SEE NYOPLAST 15" CAST IRON H-20 GRATE AND DRAIN BASIN DETAILS O-RING - WATER TIGHT GASKETED RCP/HDPE RL = ROOF LEADER COLLECTION MANIFOLD - HDPE SMOOTH WALL (TYPE S) HDPE = HIGH DENSITY POLYETYLENE - CORRUGATED EXTERIOR/SMOOTH INTERIOR (TYPE S). AASHTO M294 CMP = CORRUGATED METAL PIPE - ALUMINIZED TYPE II, 14 GAUGE, HEL-COR W/ HUGGER JOINTS OR EQUAL. DCB = DOUBLE CATCH BASIN (WITH FRAME, GRATE, AND HOOD) PER NCDOT STD 840.01/02 CDI & CCB = CONVERT EX STRUCTURE TO DROP INLET OR CATCH BASIS. SEE CB & DI FOR STANDARDS STCB = SLAB TOP CATCH BASIN PER NCDOT 840.04 EW = PRECAST CONCRETE ENDWALL PER NCDOT STD 838.80 FES = FLARED END SECTION - CONCRETE WITH ADAPTER IF NECESSARY FOR CONNECTION TO HDPE STORM PIPE-NO HDPE OR CMP. CO - PVC CLEAN-OUT WITH TRAFFIC RATED BRASS CAP JCT - PRECAST CONCRETE JUNCTION BOX - NO "KNOCK-OUT" TYPE BOXES ARE PERMITTED CB = CATCH BASIN (WITH FRAME, GRATE, AND HOOD) PER NCDOT STD 840.01/02 NOTE TO CONTRACTOR: GEOTECHNICAL REPORT INDICATES SHALLOW WEATHERED ROCK WITH BPF > 50. OVERALL MASS GRADING DOES NOT APPEAR TO ENCROACH UPON THESE REGIONS BUT IT MAY BE ENCOUNTERED DURING STORM DRAINAGE INSTALLATION. AN ALLOWANCE SHALL BE INCLUDED WITH BASE BID TO ACCOUNT FOR THIS CONDITION. SEE GEOTECHNICAL ENGINEERING REPORT DATED 11.06.18 DEVELOPED BY STEWART ENGINEERING PRIOR TO BIDDDING. STRUCTURE RIM ELEV (ft) INVERT IN (1) (ft) INVERT IN (2) (ft) INVERT IN (3) (ft) INVERT OUT (ft) STMH-52 523.40 (N/A)(N/A)(N/A)519.90 STMH-04 523.00 516.32 (N/A)(N/A)516.32 STMH-03 523.00 515.64 (N/A)(N/A)515.64 STMH-02 520.75 515.12 (N/A)(N/A)515.12 FES-22 519.75 (N/A)(N/A)(N/A)517.10 DI-67 532.00 (N/A)(N/A)(N/A)528.16 DCB-10 523.75 (N/A)(N/A)(N/A)520.50 CB-66 529.30 526.05 (N/A)(N/A)526.05 CB-65 526.65 523.40 (N/A)(N/A)520.73 CB-63 522.65 (N/A)(N/A)(N/A)519.40 CB-62 521.30 518.05 (N/A)(N/A)518.05 CB-61 522.65 (N/A)(N/A)(N/A)519.40 CB-60 521.30 518.05 (N/A)(N/A)518.05 CB-59 522.65 (N/A)(N/A)(N/A)519.40 CB-58 521.20 517.95 (N/A)(N/A)517.95 CB-51 521.00 516.75 (N/A)(N/A)516.50 CB-21 519.50 516.85 (N/A)(N/A)516.85 CB-20 532.35 (N/A)(N/A)(N/A)529.10 CB-19 531.20 527.95 (N/A)(N/A)527.95 CB-18 529.95 526.70 (N/A)(N/A)525.27 CB-17 529.00 (N/A)(N/A)(N/A)525.75 CB-16 527.90 524.65 (N/A)(N/A)524.65 CB-15 526.65 523.40 522.40 (N/A)522.40 CB-14 534.00 (N/A)(N/A)(N/A)530.75 CB-13 533.80 530.18 (N/A)(N/A)527.83 CB-12 529.00 (N/A)(N/A)(N/A)525.75 CB-11 528.80 524.55 525.18 (N/A)522.39 CB-09 524.90 520.65 520.06 (N/A)520.06 CB-08 523.00 519.00 (N/A)(N/A)519.00 CB-07 523.00 518.52 (N/A)(N/A)518.52 CB-06 523.00 517.91 (N/A)(N/A)517.91 CB-05 521.50 517.42 518.25 516.66 516.66 FES-01 520.00 515.05 (N/A)(N/A)515.00 EXMH-50 521.40 516.34 (N/A)(N/A)514.76 EXDI-64 522.44 518.19 (N/A)(N/A)517.80 CDI-56 521.00 517.67 (N/A)(N/A)515.72 CDI-55 521.00 517.75 (N/A)(N/A)515.44 CDI-53 521.00 517.75 (N/A)(N/A)515.29 STORM STRUCTURE TABLE START NODE STOP NODE US INVERT (ft) DS INVERT (ft) DIAMETER (in) MATERIAL LENGTH (ft) SLOPE (ft/ft) CB-14 CB-13 530.75 530.18 15 HDPE O-RING 113.4 0.005 CB-13 CB-11 527.83 524.55 15 HDPE O-RING 82 0.040 CB-11 CB-09 522.39 520.65 15 HDPE O-RING 86.9 0.020 CB-09 CB-08 520.06 519.00 24 HDPE O-RING 154.2 0.007 CB-08 CB-07 519.00 518.52 24 HDPE O-RING 95.2 0.005 CB-07 CB-06 518.52 517.91 24 HDPE O-RING 122.3 0.005 CB-06 CB-05 517.91 517.42 24 HDPE O-RING 99.2 0.005 CB-05 STMH-04 516.66 516.32 30 HDPE O-RING 67.9 0.005 STMH-04 STMH-03 516.32 515.64 30 HDPE O-RING 136.1 0.005 STMH-03 STMH-02 515.64 515.12 30 HDPE O-RING 104.7 0.005 STMH-02 FES-01 515.12 515.05 30 HDPE O-RING 14.1 0.005 CB-12 CB-11 525.75 525.18 15 HDPE O-RING 113.4 0.005 DCB-10 CB-09 520.50 520.06 15 HDPE O-RING 88.8 0.005 CB-17 CB-16 525.75 524.65 15 HDPE O-RING 170 0.006 CB-16 CB-15 524.65 523.40 15 HDPE O-RING 127.1 0.010 CB-15 CB-05 522.40 518.25 15 HDPE O-RING 98.4 0.042 CB-20 CB-19 529.10 527.95 15 HDPE O-RING 117.9 0.010 CB-19 CB-18 527.95 526.70 15 HDPE O-RING 127 0.010 CB-18 CB-15 525.27 522.40 15 HDPE O-RING 82 0.035 DI-67 CB-66 528.16 526.05 15 HDPE O-RING 21.1 0.100 CB-66 CB-65 526.05 523.40 15 HDPE O-RING 77.9 0.034 CB-65 EXDI-64 520.73 518.19 15 HDPE O-RING 50.9 0.050 CB-59 CB-58 519.40 517.95 15 HDPE O-RING 93.2 0.016 CB-58 CDI-56 517.95 517.67 15 HDPE O-RING 56.3 0.005 CB-61 CB-60 519.40 518.05 15 HDPE O-RING 90.3 0.015 CB-60 CDI-55 518.05 517.75 15 HDPE O-RING 33.6 0.009 CB-63 CB-62 519.40 518.05 15 HDPE O-RING 58.5 0.023 CB-62 CDI-53 518.05 517.75 15 HDPE O-RING 42.8 0.007 STMH-52 CB-51 519.90 516.75 18 HDPE O-RING 42.1 0.075 CB-51 EXMH-50 516.50 516.34 18 HDPE O-RING 15.9 0.010 FES-22 CB-21 517.10 516.85 15 DIP 47.5 0.005 CB-21 CB-05 516.85 516.66 15 HDPE O-RING 37.3 0.005 STORM PIPE TABLE CORNING (CEPI) PROJECT NO.:1045001 BY:jdb DATE:01.08.19 T.M.: REVISED: P.M.: INTRODUCTION: SUMMARY DRAINAGE AREAS: (see attached drainage area map) Pond A Predeveloped Drainage Area =1,117,764 sqft 25.7 ac Postdeveloped Drainage Area=1,117,764 sqft 25.7 ac SOIL TYPES:(see attached soils map) Basin A Area (%) Soil Type Area (sf) Hydrologic Soil Group 52.3% Badin 584,591 C 47.7% Kirksey 533,173 C Total 100%1,117,764 sf CURVE NUMBER: Predeveloped CN - Basin-4 Cover Type Area (SF) % CN Wtd. CN Woods-Good cond. 261,316 0.23 70 16.36 Row crops-Good cond. 808,808 0.72 85 61.51 Impervious 47,640 0.04 98 4.18 Total 1,117,764 82.05 Composite CN 82.05 Use CN =82 Postdeveloped CN - Pond A Cover Type Area (SF) % CN Wtd. CN Wood-Good cond. 261,316 0.23 70 16.36 Grass-Good cond. 384,941 0.34 74 25.48 Impervious 471,507 0.42 98 41.34 Total 1,117,764 83.19 Composite CN 83.19 Use CN =83 PROJECT DESCRIPTION & SOILS (BASIN-4) The Corning facility in Midland, NC is planning to construct a 400-600 space surface parking facility that was a component of the original site design plans when the plant was first constructed in the late 1990's. Four (4) stormwater facilities (two wet ponds and two dry detention) were installed during initial plant construction. Unfortunately, per Corning research, it appears as though the original design calculations for these facilites have been lost over the last two decades. As a result, the following calculations are an attempt to re- create design calculations for the basin (a.k.a Basin-4 or Northeast Detention Basin) that serves proposed parking area. Historical imagery and 2001 SWPPP have been utilized to assist with re-creating design calculations. Page 1 of 1 Hydrologic Soil Group—Cabarrus County, North Carolina (CORNING DETENTION FACILITY-4) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/7/2019 Page 1 of 4389680038968703896940389701038970803897150389722038972903897360389680038968703896940389701038970803897150389722038972903897360543590543660543730543800543870543940544010 543590 543660 543730 543800 543870 543940 544010 35° 13' 6'' N 80° 31' 15'' W35° 13' 6'' N80° 30' 58'' W35° 12' 47'' N 80° 31' 15'' W35° 12' 47'' N 80° 30' 58'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 0 100 200 400 600 Feet 0 40 80 160 240 Meters Map Scale: 1:2,810 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BaB Badin channery silt loam, 2 to 8 percent slopes C 13.4 52.3% KkB Kirksey silt loam, 1 to 6 percent slopes C 12.2 47.7% Totals for Area of Interest 25.7 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Hydrologic Soil Group—Cabarrus County, North Carolina CORNING DETENTION FACILITY-4 Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/7/2019 Page 3 of 4 CORNING (CEPI) PROJECT NO.145001 BY:jdb DATE:01.08.19 T.M: REVISED: P.M.: BASIN-4 TIME OF CONCENTRATION PRE-DEVELOPMENT Pre-development Type: Sheet Flow Flow Phase One Length:100 ft "N" Value:0.4 from tables Slope:0.05 ft/ft Computed 'T' 15.1 Minutes Pre-development Type: Shallow Concentrated Flow Flow Phase Two Surface:u Length:185 ft u=unpaved Slope:0.054 ft/ft p=paved Velocity:3.75 ft/sec Computed 'T': 0.014 hr, or 0.84 Minutes Pre-development Type: Open Channel Flow Flow Phase Three Length:1622 ft Velocity:5 ft/sec (assumed) Computed 'T': 0.09 hr, or 5.4 Minutes Pre-development Time of Concentration Total Flow Total T c =21.3 Minutes Summary Lag Time T LAG =12.8 Minutes T LAG =0.6 x T c T LAG =0.21 Hours BASIN-4 TIME OF CONCENTRATION POST-DEVELOPMENT Post-development Time of Concentration Total Flow Total T c =10.0 Minutes Summary Lag Time T LAG =3.0 Minutes T LAG =0.6 x T c T LAG =0.05 Hours TIME OF CONCENTRATION Page 1 of 1 1S Pre-dev Det-4 2S Post-Dev Det-4 3P Detention Basin-4 Routing Diagram for 190109 Corning CEPI - Det-4 Prepared by Banks Engineering, Printed 1/9/2019 HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Subcat Reach Pond Link Corning CEPI - Detention Basin-4 Type II 24-hr 2 yr 24hr Storm Rainfall=3.38"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 2HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Pre-dev Det-4 Runoff = 45.77 cfs @ 12.15 hrs, Volume= 3.601 af, Depth= 1.68" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 2 yr 24hr Storm Rainfall=3.38" Area (ac) CN Description * 25.660 82 25.660 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.6 Direct Entry, From spreadsheet Subcatchment 1S: Pre-dev Det-4 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 2 yr 24hr Storm Rainfall=3.38" Runoff Area=25.660 ac Runoff Volume=3.601 af Runoff Depth=1.68" Tc=21.6 min CN=82 45.77 cfs Corning CEPI - Detention Basin-4 Type II 24-hr 2 yr 24hr Storm Rainfall=3.38"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 3HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 1S: Pre-dev Det-4 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.50 0.05 0.00 0.00 3.00 0.12 0.00 0.00 4.50 0.19 0.00 0.00 6.00 0.27 0.00 0.00 7.50 0.37 0.00 0.00 9.00 0.50 0.00 0.06 10.50 0.69 0.03 0.61 12.00 2.24 0.81 28.16 13.50 2.70 1.15 3.73 15.00 2.88 1.29 2.19 16.50 3.01 1.39 1.56 18.00 3.11 1.47 1.31 19.50 3.19 1.53 1.06 21.00 3.26 1.59 0.89 22.50 3.32 1.64 0.85 24.00 3.38 1.68 0.80 25.50 3.38 1.68 0.00 27.00 3.38 1.68 0.00 28.50 3.38 1.68 0.00 30.00 3.38 1.68 0.00 31.50 3.38 1.68 0.00 33.00 3.38 1.68 0.00 34.50 3.38 1.68 0.00 36.00 3.38 1.68 0.00 37.50 3.38 1.68 0.00 39.00 3.38 1.68 0.00 40.50 3.38 1.68 0.00 42.00 3.38 1.68 0.00 43.50 3.38 1.68 0.00 45.00 3.38 1.68 0.00 46.50 3.38 1.68 0.00 48.00 3.38 1.68 0.00 49.50 3.38 1.68 0.00 51.00 3.38 1.68 0.00 52.50 3.38 1.68 0.00 54.00 3.38 1.68 0.00 55.50 3.38 1.68 0.00 57.00 3.38 1.68 0.00 58.50 3.38 1.68 0.00 60.00 3.38 1.68 0.00 61.50 3.38 1.68 0.00 63.00 3.38 1.68 0.00 64.50 3.38 1.68 0.00 66.00 3.38 1.68 0.00 67.50 3.38 1.68 0.00 69.00 3.38 1.68 0.00 70.50 3.38 1.68 0.00 72.00 3.38 1.68 0.00 73.50 3.38 1.68 0.00 75.00 3.38 1.68 0.00 76.50 3.38 1.68 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 78.00 3.38 1.68 0.00 79.50 3.38 1.68 0.00 81.00 3.38 1.68 0.00 82.50 3.38 1.68 0.00 84.00 3.38 1.68 0.00 85.50 3.38 1.68 0.00 87.00 3.38 1.68 0.00 88.50 3.38 1.68 0.00 90.00 3.38 1.68 0.00 91.50 3.38 1.68 0.00 93.00 3.38 1.68 0.00 94.50 3.38 1.68 0.00 96.00 3.38 1.68 0.00 97.50 3.38 1.68 0.00 99.00 3.38 1.68 0.00 100.50 3.38 1.68 0.00 102.00 3.38 1.68 0.00 103.50 3.38 1.68 0.00 105.00 3.38 1.68 0.00 106.50 3.38 1.68 0.00 108.00 3.38 1.68 0.00 109.50 3.38 1.68 0.00 111.00 3.38 1.68 0.00 112.50 3.38 1.68 0.00 114.00 3.38 1.68 0.00 115.50 3.38 1.68 0.00 117.00 3.38 1.68 0.00 118.50 3.38 1.68 0.00 120.00 3.38 1.68 0.00 Corning CEPI - Detention Basin-4 Type II 24-hr 2 yr 24hr Storm Rainfall=3.38"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 4HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Summary for Subcatchment 2S: Post-Dev Det-4 Runoff = 69.21 cfs @ 12.02 hrs, Volume= 3.759 af, Depth= 1.76" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 2 yr 24hr Storm Rainfall=3.38" Area (ac) CN Description * 25.660 83 25.660 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, From spreadsheet Subcatchment 2S: Post-Dev Det-4 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 2 yr 24hr Storm Rainfall=3.38" Runoff Area=25.660 ac Runoff Volume=3.759 af Runoff Depth=1.76" Tc=10.0 min CN=83 69.21 cfs Corning CEPI - Detention Basin-4 Type II 24-hr 2 yr 24hr Storm Rainfall=3.38"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 5HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 2S: Post-Dev Det-4 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.50 0.05 0.00 0.00 3.00 0.12 0.00 0.00 4.50 0.19 0.00 0.00 6.00 0.27 0.00 0.00 7.50 0.37 0.00 0.00 9.00 0.50 0.00 0.18 10.50 0.69 0.03 0.88 12.00 2.24 0.86 67.98 13.50 2.70 1.21 3.48 15.00 2.88 1.35 2.16 16.50 3.01 1.46 1.56 18.00 3.11 1.54 1.31 19.50 3.19 1.60 1.05 21.00 3.26 1.66 0.91 22.50 3.32 1.71 0.86 24.00 3.38 1.76 0.81 25.50 3.38 1.76 0.00 27.00 3.38 1.76 0.00 28.50 3.38 1.76 0.00 30.00 3.38 1.76 0.00 31.50 3.38 1.76 0.00 33.00 3.38 1.76 0.00 34.50 3.38 1.76 0.00 36.00 3.38 1.76 0.00 37.50 3.38 1.76 0.00 39.00 3.38 1.76 0.00 40.50 3.38 1.76 0.00 42.00 3.38 1.76 0.00 43.50 3.38 1.76 0.00 45.00 3.38 1.76 0.00 46.50 3.38 1.76 0.00 48.00 3.38 1.76 0.00 49.50 3.38 1.76 0.00 51.00 3.38 1.76 0.00 52.50 3.38 1.76 0.00 54.00 3.38 1.76 0.00 55.50 3.38 1.76 0.00 57.00 3.38 1.76 0.00 58.50 3.38 1.76 0.00 60.00 3.38 1.76 0.00 61.50 3.38 1.76 0.00 63.00 3.38 1.76 0.00 64.50 3.38 1.76 0.00 66.00 3.38 1.76 0.00 67.50 3.38 1.76 0.00 69.00 3.38 1.76 0.00 70.50 3.38 1.76 0.00 72.00 3.38 1.76 0.00 73.50 3.38 1.76 0.00 75.00 3.38 1.76 0.00 76.50 3.38 1.76 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 78.00 3.38 1.76 0.00 79.50 3.38 1.76 0.00 81.00 3.38 1.76 0.00 82.50 3.38 1.76 0.00 84.00 3.38 1.76 0.00 85.50 3.38 1.76 0.00 87.00 3.38 1.76 0.00 88.50 3.38 1.76 0.00 90.00 3.38 1.76 0.00 91.50 3.38 1.76 0.00 93.00 3.38 1.76 0.00 94.50 3.38 1.76 0.00 96.00 3.38 1.76 0.00 97.50 3.38 1.76 0.00 99.00 3.38 1.76 0.00 100.50 3.38 1.76 0.00 102.00 3.38 1.76 0.00 103.50 3.38 1.76 0.00 105.00 3.38 1.76 0.00 106.50 3.38 1.76 0.00 108.00 3.38 1.76 0.00 109.50 3.38 1.76 0.00 111.00 3.38 1.76 0.00 112.50 3.38 1.76 0.00 114.00 3.38 1.76 0.00 115.50 3.38 1.76 0.00 117.00 3.38 1.76 0.00 118.50 3.38 1.76 0.00 120.00 3.38 1.76 0.00 Corning CEPI - Detention Basin-4 Type II 24-hr 2 yr 24hr Storm Rainfall=3.38"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 6HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Summary for Pond 3P: Detention Basin-4 Inflow Area = 25.660 ac, 0.00% Impervious, Inflow Depth = 1.76" for 2 yr 24hr Storm event Inflow = 69.21 cfs @ 12.02 hrs, Volume= 3.759 af Outflow = 38.51 cfs @ 12.13 hrs, Volume= 3.759 af, Atten= 44%, Lag= 6.5 min Primary = 12.73 cfs @ 12.13 hrs, Volume= 3.021 af Secondary = 25.79 cfs @ 12.13 hrs, Volume= 0.738 af Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev= 513.99' @ 12.13 hrs Surf.Area= 24,842 sf Storage= 41,475 cf Plug-Flow detention time= 20.0 min calculated for 3.758 af (100% of inflow) Center-of-Mass det. time= 20.0 min ( 850.9 - 830.9 ) Volume Invert Avail.Storage Storage Description #1 511.00' 75,871 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) 511.00 5 16.0 0 0 5 512.00 11,321 454.0 3,855 3,855 16,389 513.00 20,086 578.0 15,496 19,350 26,585 514.00 24,909 992.0 22,454 41,804 78,315 515.00 28,490 1,006.0 26,679 68,484 80,754 515.25 30,616 1,030.0 7,387 75,871 84,651 Device Routing Invert Outlet Devices #1 Primary 511.00'18.0" Round Culvert L= 41.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 511.00' / 510.71' S= 0.0071 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 1.77 sf #2 Secondary 513.00'10.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=12.71 cfs @ 12.13 hrs HW=513.98' (Free Discharge) 1=Culvert (Inlet Controls 12.71 cfs @ 7.19 fps) Secondary OutFlow Max=25.63 cfs @ 12.13 hrs HW=513.98' (Free Discharge) 2=Broad-Crested Rectangular Weir (Weir Controls 25.63 cfs @ 2.61 fps) Corning CEPI - Detention Basin-4 Type II 24-hr 2 yr 24hr Storm Rainfall=3.38"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 7HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Pond 3P: Detention Basin-4 Inflow Outflow Primary Secondary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=25.660 ac Peak Elev=513.99' Storage=41,475 cf 69.21 cfs 38.51 cfs 12.73 cfs 25.79 cfs Pond 3P: Detention Basin-4 Total Primary Secondary Stage-Discharge Discharge (cfs) 1009080706050403020100Elevation (feet)515 514 513 512 511 Culvert Broad-Crested Rectangular Weir Corning CEPI - Detention Basin-4 Type II 24-hr 2 yr 24hr Storm Rainfall=3.38"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 8HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Pond 3P: Detention Basin-4 Surface Storage Stage-Area-Storage Storage (cubic-feet) 70,00060,00050,00040,00030,00020,00010,0000 Surface/Horizontal/Wetted Area (sq-ft) 30,00028,00026,00024,00022,00020,00018,00016,00014,00012,00010,0008,0006,0004,0002,0000 Elevation (feet)515 514 513 512 511 Custom Stage Data Corning CEPI - Detention Basin-4 Type II 24-hr 2 yr 24hr Storm Rainfall=3.38"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 9HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Hydrograph for Pond 3P: Detention Basin-4 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 511.00 0.00 0.00 0.00 3.00 0.00 0 511.00 0.00 0.00 0.00 6.00 0.00 0 511.00 0.00 0.00 0.00 9.00 0.18 32 511.18 0.15 0.15 0.00 12.00 67.98 29,640 513.49 20.08 10.95 9.13 15.00 2.16 2,267 511.83 2.63 2.63 0.00 18.00 1.31 748 511.57 1.35 1.35 0.00 21.00 0.91 403 511.46 0.91 0.91 0.00 24.00 0.81 337 511.43 0.81 0.81 0.00 27.00 0.00 0 511.00 0.00 0.00 0.00 30.00 0.00 0 511.00 0.00 0.00 0.00 33.00 0.00 0 511.00 0.00 0.00 0.00 36.00 0.00 0 511.00 0.00 0.00 0.00 39.00 0.00 0 511.00 0.00 0.00 0.00 42.00 0.00 0 511.00 0.00 0.00 0.00 45.00 0.00 0 511.00 0.00 0.00 0.00 48.00 0.00 0 511.00 0.00 0.00 0.00 51.00 0.00 0 511.00 0.00 0.00 0.00 54.00 0.00 0 511.00 0.00 0.00 0.00 57.00 0.00 0 511.00 0.00 0.00 0.00 60.00 0.00 0 511.00 0.00 0.00 0.00 63.00 0.00 0 511.00 0.00 0.00 0.00 66.00 0.00 0 511.00 0.00 0.00 0.00 69.00 0.00 0 511.00 0.00 0.00 0.00 72.00 0.00 0 511.00 0.00 0.00 0.00 75.00 0.00 0 511.00 0.00 0.00 0.00 78.00 0.00 0 511.00 0.00 0.00 0.00 81.00 0.00 0 511.00 0.00 0.00 0.00 84.00 0.00 0 511.00 0.00 0.00 0.00 87.00 0.00 0 511.00 0.00 0.00 0.00 90.00 0.00 0 511.00 0.00 0.00 0.00 93.00 0.00 0 511.00 0.00 0.00 0.00 96.00 0.00 0 511.00 0.00 0.00 0.00 99.00 0.00 0 511.00 0.00 0.00 0.00 102.00 0.00 0 511.00 0.00 0.00 0.00 105.00 0.00 0 511.00 0.00 0.00 0.00 108.00 0.00 0 511.00 0.00 0.00 0.00 111.00 0.00 0 511.00 0.00 0.00 0.00 114.00 0.00 0 511.00 0.00 0.00 0.00 117.00 0.00 0 511.00 0.00 0.00 0.00 120.00 0.00 0 511.00 0.00 0.00 0.00 Corning CEPI - Detention Basin-4 Type II 24-hr 2 yr 24hr Storm Rainfall=3.38"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 10HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Stage-Discharge for Pond 3P: Detention Basin-4 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 511.00 0.00 0.00 0.00 511.05 0.01 0.01 0.00 511.10 0.04 0.04 0.00 511.15 0.10 0.10 0.00 511.20 0.18 0.18 0.00 511.25 0.29 0.29 0.00 511.30 0.41 0.41 0.00 511.35 0.55 0.55 0.00 511.40 0.71 0.71 0.00 511.45 0.88 0.88 0.00 511.50 1.07 1.07 0.00 511.55 1.27 1.27 0.00 511.60 1.48 1.48 0.00 511.65 1.71 1.71 0.00 511.70 1.95 1.95 0.00 511.75 2.20 2.20 0.00 511.80 2.45 2.45 0.00 511.85 2.72 2.72 0.00 511.90 2.99 2.99 0.00 511.95 3.28 3.28 0.00 512.00 3.56 3.56 0.00 512.05 3.86 3.86 0.00 512.10 4.15 4.15 0.00 512.15 4.46 4.46 0.00 512.20 4.76 4.76 0.00 512.25 5.07 5.07 0.00 512.30 5.37 5.37 0.00 512.35 5.68 5.68 0.00 512.40 5.98 5.98 0.00 512.45 6.29 6.29 0.00 512.50 6.58 6.58 0.00 512.55 6.87 6.87 0.00 512.60 7.16 7.16 0.00 512.65 7.43 7.43 0.00 512.70 7.69 7.69 0.00 512.75 7.94 7.94 0.00 512.80 8.17 8.17 0.00 512.85 8.37 8.37 0.00 512.90 8.54 8.54 0.00 512.95 8.66 8.66 0.00 513.00 8.62 8.62 0.00 513.05 9.19 8.89 0.30 513.10 10.00 9.15 0.85 513.15 10.96 9.40 1.56 513.20 12.05 9.65 2.40 513.25 13.24 9.89 3.36 513.30 14.54 10.12 4.42 513.35 15.93 10.35 5.58 513.40 17.41 10.58 6.83 513.45 18.95 10.80 8.15 513.50 20.56 11.01 9.55 513.55 22.24 11.22 11.01 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 513.60 23.98 11.43 12.55 513.65 25.71 11.64 14.07 513.70 27.47 11.84 15.64 513.75 29.28 12.03 17.24 513.80 31.07 12.18 18.89 513.85 33.00 12.33 20.67 513.90 34.97 12.48 22.50 513.95 37.00 12.62 24.38 514.00 39.06 12.76 26.30 514.05 41.23 12.90 28.32 514.10 43.44 13.04 30.40 514.15 45.71 13.18 32.53 514.20 48.02 13.32 34.70 514.25 50.35 13.45 36.90 514.30 52.72 13.59 39.13 514.35 55.13 13.72 41.41 514.40 57.58 13.85 43.73 514.45 60.03 13.98 46.05 514.50 62.52 14.11 48.41 514.55 65.04 14.24 50.80 514.60 67.59 14.36 53.23 514.65 70.23 14.49 55.74 514.70 72.91 14.61 58.29 514.75 75.62 14.74 60.89 514.80 78.37 14.86 63.51 514.85 81.16 14.98 66.18 514.90 83.98 15.10 68.88 514.95 86.84 15.22 71.62 515.00 89.73 15.34 74.39 515.05 92.65 15.46 77.19 515.10 95.61 15.57 80.04 515.15 98.60 15.69 82.91 515.20 101.62 15.80 85.82 515.25 104.68 15.92 88.76 Corning CEPI - Detention Basin-4 Type II 24-hr 2 yr 24hr Storm Rainfall=3.38"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 11HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 3P: Detention Basin-4 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 511.00 5 0 511.05 55 1 511.10 160 6 511.15 319 18 511.20 532 39 511.25 800 72 511.30 1,121 120 511.35 1,497 185 511.40 1,927 271 511.45 2,412 379 511.50 2,950 513 511.55 3,543 675 511.60 4,191 868 511.65 4,892 1,095 511.70 5,648 1,358 511.75 6,458 1,661 511.80 7,322 2,005 511.85 8,240 2,394 511.90 9,213 2,830 511.95 10,240 3,316 512.00 11,321 3,855 512.05 11,700 4,430 512.10 12,085 5,025 512.15 12,477 5,639 512.20 12,874 6,273 512.25 13,278 6,926 512.30 13,688 7,600 512.35 14,105 8,295 512.40 14,528 9,011 512.45 14,956 9,748 512.50 15,392 10,507 512.55 15,833 11,287 512.60 16,281 12,090 512.65 16,734 12,916 512.70 17,194 13,764 512.75 17,661 14,635 512.80 18,133 15,530 512.85 18,612 16,449 512.90 19,097 17,391 512.95 19,588 18,358 513.00 20,086 19,350 513.05 20,315 20,360 513.10 20,545 21,382 513.15 20,776 22,415 513.20 21,009 23,459 513.25 21,243 24,516 513.30 21,478 25,584 513.35 21,715 26,664 513.40 21,953 27,755 513.45 22,192 28,859 513.50 22,433 29,974 513.55 22,674 31,102 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 513.60 22,918 32,242 513.65 23,162 33,394 513.70 23,408 34,558 513.75 23,655 35,735 513.80 23,903 36,924 513.85 24,152 38,125 513.90 24,403 39,339 513.95 24,656 40,565 514.00 24,909 41,804 514.05 25,082 43,054 514.10 25,256 44,313 514.15 25,431 45,580 514.20 25,606 46,856 514.25 25,782 48,140 514.30 25,958 49,434 514.35 26,135 50,736 514.40 26,313 52,047 514.45 26,491 53,368 514.50 26,669 54,697 514.55 26,849 56,035 514.60 27,029 57,381 514.65 27,209 58,737 514.70 27,390 60,102 514.75 27,572 61,476 514.80 27,755 62,860 514.85 27,938 64,252 514.90 28,121 65,653 514.95 28,305 67,064 515.00 28,490 68,484 515.05 28,909 69,919 515.10 29,331 71,375 515.15 29,756 72,852 515.20 30,185 74,351 515.25 30,616 75,871 Corning CEPI - Detention Basin-4 Type II 24-hr 10 yr 24hr Storm Rainfall=4.93"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 12HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Pre-dev Det-4 Runoff = 82.14 cfs @ 12.14 hrs, Volume= 6.450 af, Depth= 3.02" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 10 yr 24hr Storm Rainfall=4.93" Area (ac) CN Description * 25.660 82 25.660 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.6 Direct Entry, From spreadsheet Subcatchment 1S: Pre-dev Det-4 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 10 yr 24hr Storm Rainfall=4.93" Runoff Area=25.660 ac Runoff Volume=6.450 af Runoff Depth=3.02" Tc=21.6 min CN=82 82.14 cfs Corning CEPI - Detention Basin-4 Type II 24-hr 10 yr 24hr Storm Rainfall=4.93"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 13HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 1S: Pre-dev Det-4 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.50 0.08 0.00 0.00 3.00 0.17 0.00 0.00 4.50 0.27 0.00 0.00 6.00 0.39 0.00 0.00 7.50 0.54 0.00 0.15 9.00 0.72 0.03 0.68 10.50 1.01 0.12 1.87 12.00 3.27 1.59 53.27 13.50 3.94 2.15 6.14 15.00 4.21 2.38 3.56 16.50 4.39 2.54 2.52 18.00 4.54 2.67 2.11 19.50 4.66 2.78 1.70 21.00 4.76 2.86 1.43 22.50 4.85 2.94 1.35 24.00 4.93 3.02 1.27 25.50 4.93 3.02 0.00 27.00 4.93 3.02 0.00 28.50 4.93 3.02 0.00 30.00 4.93 3.02 0.00 31.50 4.93 3.02 0.00 33.00 4.93 3.02 0.00 34.50 4.93 3.02 0.00 36.00 4.93 3.02 0.00 37.50 4.93 3.02 0.00 39.00 4.93 3.02 0.00 40.50 4.93 3.02 0.00 42.00 4.93 3.02 0.00 43.50 4.93 3.02 0.00 45.00 4.93 3.02 0.00 46.50 4.93 3.02 0.00 48.00 4.93 3.02 0.00 49.50 4.93 3.02 0.00 51.00 4.93 3.02 0.00 52.50 4.93 3.02 0.00 54.00 4.93 3.02 0.00 55.50 4.93 3.02 0.00 57.00 4.93 3.02 0.00 58.50 4.93 3.02 0.00 60.00 4.93 3.02 0.00 61.50 4.93 3.02 0.00 63.00 4.93 3.02 0.00 64.50 4.93 3.02 0.00 66.00 4.93 3.02 0.00 67.50 4.93 3.02 0.00 69.00 4.93 3.02 0.00 70.50 4.93 3.02 0.00 72.00 4.93 3.02 0.00 73.50 4.93 3.02 0.00 75.00 4.93 3.02 0.00 76.50 4.93 3.02 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 78.00 4.93 3.02 0.00 79.50 4.93 3.02 0.00 81.00 4.93 3.02 0.00 82.50 4.93 3.02 0.00 84.00 4.93 3.02 0.00 85.50 4.93 3.02 0.00 87.00 4.93 3.02 0.00 88.50 4.93 3.02 0.00 90.00 4.93 3.02 0.00 91.50 4.93 3.02 0.00 93.00 4.93 3.02 0.00 94.50 4.93 3.02 0.00 96.00 4.93 3.02 0.00 97.50 4.93 3.02 0.00 99.00 4.93 3.02 0.00 100.50 4.93 3.02 0.00 102.00 4.93 3.02 0.00 103.50 4.93 3.02 0.00 105.00 4.93 3.02 0.00 106.50 4.93 3.02 0.00 108.00 4.93 3.02 0.00 109.50 4.93 3.02 0.00 111.00 4.93 3.02 0.00 112.50 4.93 3.02 0.00 114.00 4.93 3.02 0.00 115.50 4.93 3.02 0.00 117.00 4.93 3.02 0.00 118.50 4.93 3.02 0.00 120.00 4.93 3.02 0.00 Corning CEPI - Detention Basin-4 Type II 24-hr 10 yr 24hr Storm Rainfall=4.93"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 14HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Summary for Subcatchment 2S: Post-Dev Det-4 Runoff = 120.67 cfs @ 12.01 hrs, Volume= 6.652 af, Depth= 3.11" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 10 yr 24hr Storm Rainfall=4.93" Area (ac) CN Description * 25.660 83 25.660 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, From spreadsheet Subcatchment 2S: Post-Dev Det-4 Runoff Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 10 yr 24hr Storm Rainfall=4.93" Runoff Area=25.660 ac Runoff Volume=6.652 af Runoff Depth=3.11" Tc=10.0 min CN=83 120.67 cfs Corning CEPI - Detention Basin-4 Type II 24-hr 10 yr 24hr Storm Rainfall=4.93"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 15HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 2S: Post-Dev Det-4 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.50 0.08 0.00 0.00 3.00 0.17 0.00 0.00 4.50 0.27 0.00 0.00 6.00 0.39 0.00 0.00 7.50 0.54 0.01 0.27 9.00 0.72 0.04 0.91 10.50 1.01 0.13 2.36 12.00 3.27 1.67 119.35 13.50 3.94 2.23 5.65 15.00 4.21 2.47 3.47 16.50 4.39 2.63 2.50 18.00 4.54 2.76 2.09 19.50 4.66 2.87 1.67 21.00 4.76 2.95 1.44 22.50 4.85 3.03 1.36 24.00 4.93 3.11 1.28 25.50 4.93 3.11 0.00 27.00 4.93 3.11 0.00 28.50 4.93 3.11 0.00 30.00 4.93 3.11 0.00 31.50 4.93 3.11 0.00 33.00 4.93 3.11 0.00 34.50 4.93 3.11 0.00 36.00 4.93 3.11 0.00 37.50 4.93 3.11 0.00 39.00 4.93 3.11 0.00 40.50 4.93 3.11 0.00 42.00 4.93 3.11 0.00 43.50 4.93 3.11 0.00 45.00 4.93 3.11 0.00 46.50 4.93 3.11 0.00 48.00 4.93 3.11 0.00 49.50 4.93 3.11 0.00 51.00 4.93 3.11 0.00 52.50 4.93 3.11 0.00 54.00 4.93 3.11 0.00 55.50 4.93 3.11 0.00 57.00 4.93 3.11 0.00 58.50 4.93 3.11 0.00 60.00 4.93 3.11 0.00 61.50 4.93 3.11 0.00 63.00 4.93 3.11 0.00 64.50 4.93 3.11 0.00 66.00 4.93 3.11 0.00 67.50 4.93 3.11 0.00 69.00 4.93 3.11 0.00 70.50 4.93 3.11 0.00 72.00 4.93 3.11 0.00 73.50 4.93 3.11 0.00 75.00 4.93 3.11 0.00 76.50 4.93 3.11 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 78.00 4.93 3.11 0.00 79.50 4.93 3.11 0.00 81.00 4.93 3.11 0.00 82.50 4.93 3.11 0.00 84.00 4.93 3.11 0.00 85.50 4.93 3.11 0.00 87.00 4.93 3.11 0.00 88.50 4.93 3.11 0.00 90.00 4.93 3.11 0.00 91.50 4.93 3.11 0.00 93.00 4.93 3.11 0.00 94.50 4.93 3.11 0.00 96.00 4.93 3.11 0.00 97.50 4.93 3.11 0.00 99.00 4.93 3.11 0.00 100.50 4.93 3.11 0.00 102.00 4.93 3.11 0.00 103.50 4.93 3.11 0.00 105.00 4.93 3.11 0.00 106.50 4.93 3.11 0.00 108.00 4.93 3.11 0.00 109.50 4.93 3.11 0.00 111.00 4.93 3.11 0.00 112.50 4.93 3.11 0.00 114.00 4.93 3.11 0.00 115.50 4.93 3.11 0.00 117.00 4.93 3.11 0.00 118.50 4.93 3.11 0.00 120.00 4.93 3.11 0.00 Corning CEPI - Detention Basin-4 Type II 24-hr 10 yr 24hr Storm Rainfall=4.93"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 16HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Summary for Pond 3P: Detention Basin-4 Inflow Area = 25.660 ac, 0.00% Impervious, Inflow Depth = 3.11" for 10 yr 24hr Storm event Inflow = 120.67 cfs @ 12.01 hrs, Volume= 6.652 af Outflow = 81.56 cfs @ 12.10 hrs, Volume= 6.652 af, Atten= 32%, Lag= 5.2 min Primary = 15.00 cfs @ 12.10 hrs, Volume= 4.481 af Secondary = 66.57 cfs @ 12.10 hrs, Volume= 2.171 af Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev= 514.86' @ 12.10 hrs Surf.Area= 27,964 sf Storage= 64,454 cf Plug-Flow detention time= 18.9 min calculated for 6.652 af (100% of inflow) Center-of-Mass det. time= 18.9 min ( 833.6 - 814.7 ) Volume Invert Avail.Storage Storage Description #1 511.00' 75,871 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) 511.00 5 16.0 0 0 5 512.00 11,321 454.0 3,855 3,855 16,389 513.00 20,086 578.0 15,496 19,350 26,585 514.00 24,909 992.0 22,454 41,804 78,315 515.00 28,490 1,006.0 26,679 68,484 80,754 515.25 30,616 1,030.0 7,387 75,871 84,651 Device Routing Invert Outlet Devices #1 Primary 511.00'18.0" Round Culvert L= 41.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 511.00' / 510.71' S= 0.0071 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 1.77 sf #2 Secondary 513.00'10.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=14.98 cfs @ 12.10 hrs HW=514.85' (Free Discharge) 1=Culvert (Inlet Controls 14.98 cfs @ 8.47 fps) Secondary OutFlow Max=66.05 cfs @ 12.10 hrs HW=514.85' (Free Discharge) 2=Broad-Crested Rectangular Weir (Weir Controls 66.05 cfs @ 3.57 fps) Corning CEPI - Detention Basin-4 Type II 24-hr 10 yr 24hr Storm Rainfall=4.93"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 17HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Pond 3P: Detention Basin-4 Inflow Outflow Primary Secondary Hydrograph Time (hours) 12011511010510095908580757065605550454035302520151050Flow (cfs)130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=25.660 ac Peak Elev=514.86' Storage=64,454 cf 120.67 cfs 81.56 cfs 15.00 cfs 66.57 cfs Pond 3P: Detention Basin-4 Total Primary Secondary Stage-Discharge Discharge (cfs) 1009080706050403020100Elevation (feet)515 514 513 512 511 Culvert Broad-Crested Rectangular Weir Corning CEPI - Detention Basin-4 Type II 24-hr 10 yr 24hr Storm Rainfall=4.93"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 18HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Pond 3P: Detention Basin-4 Surface Storage Stage-Area-Storage Storage (cubic-feet) 70,00060,00050,00040,00030,00020,00010,0000 Surface/Horizontal/Wetted Area (sq-ft) 30,00028,00026,00024,00022,00020,00018,00016,00014,00012,00010,0008,0006,0004,0002,0000 Elevation (feet)515 514 513 512 511 Custom Stage Data Corning CEPI - Detention Basin-4 Type II 24-hr 10 yr 24hr Storm Rainfall=4.93"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 19HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Hydrograph for Pond 3P: Detention Basin-4 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 511.00 0.00 0.00 0.00 3.00 0.00 0 511.00 0.00 0.00 0.00 6.00 0.00 0 511.00 0.00 0.00 0.00 9.00 0.91 331 511.43 0.81 0.81 0.00 12.00 119.35 51,857 514.39 57.23 13.83 43.39 15.00 3.47 5,666 512.15 4.47 4.47 0.00 18.00 2.09 1,657 511.75 2.19 2.19 0.00 21.00 1.44 843 511.59 1.46 1.46 0.00 24.00 1.28 693 511.55 1.29 1.29 0.00 27.00 0.00 0 511.00 0.00 0.00 0.00 30.00 0.00 0 511.00 0.00 0.00 0.00 33.00 0.00 0 511.00 0.00 0.00 0.00 36.00 0.00 0 511.00 0.00 0.00 0.00 39.00 0.00 0 511.00 0.00 0.00 0.00 42.00 0.00 0 511.00 0.00 0.00 0.00 45.00 0.00 0 511.00 0.00 0.00 0.00 48.00 0.00 0 511.00 0.00 0.00 0.00 51.00 0.00 0 511.00 0.00 0.00 0.00 54.00 0.00 0 511.00 0.00 0.00 0.00 57.00 0.00 0 511.00 0.00 0.00 0.00 60.00 0.00 0 511.00 0.00 0.00 0.00 63.00 0.00 0 511.00 0.00 0.00 0.00 66.00 0.00 0 511.00 0.00 0.00 0.00 69.00 0.00 0 511.00 0.00 0.00 0.00 72.00 0.00 0 511.00 0.00 0.00 0.00 75.00 0.00 0 511.00 0.00 0.00 0.00 78.00 0.00 0 511.00 0.00 0.00 0.00 81.00 0.00 0 511.00 0.00 0.00 0.00 84.00 0.00 0 511.00 0.00 0.00 0.00 87.00 0.00 0 511.00 0.00 0.00 0.00 90.00 0.00 0 511.00 0.00 0.00 0.00 93.00 0.00 0 511.00 0.00 0.00 0.00 96.00 0.00 0 511.00 0.00 0.00 0.00 99.00 0.00 0 511.00 0.00 0.00 0.00 102.00 0.00 0 511.00 0.00 0.00 0.00 105.00 0.00 0 511.00 0.00 0.00 0.00 108.00 0.00 0 511.00 0.00 0.00 0.00 111.00 0.00 0 511.00 0.00 0.00 0.00 114.00 0.00 0 511.00 0.00 0.00 0.00 117.00 0.00 0 511.00 0.00 0.00 0.00 120.00 0.00 0 511.00 0.00 0.00 0.00 Corning CEPI - Detention Basin-4 Type II 24-hr 10 yr 24hr Storm Rainfall=4.93"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 20HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Stage-Discharge for Pond 3P: Detention Basin-4 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 511.00 0.00 0.00 0.00 511.05 0.01 0.01 0.00 511.10 0.04 0.04 0.00 511.15 0.10 0.10 0.00 511.20 0.18 0.18 0.00 511.25 0.29 0.29 0.00 511.30 0.41 0.41 0.00 511.35 0.55 0.55 0.00 511.40 0.71 0.71 0.00 511.45 0.88 0.88 0.00 511.50 1.07 1.07 0.00 511.55 1.27 1.27 0.00 511.60 1.48 1.48 0.00 511.65 1.71 1.71 0.00 511.70 1.95 1.95 0.00 511.75 2.20 2.20 0.00 511.80 2.45 2.45 0.00 511.85 2.72 2.72 0.00 511.90 2.99 2.99 0.00 511.95 3.28 3.28 0.00 512.00 3.56 3.56 0.00 512.05 3.86 3.86 0.00 512.10 4.15 4.15 0.00 512.15 4.46 4.46 0.00 512.20 4.76 4.76 0.00 512.25 5.07 5.07 0.00 512.30 5.37 5.37 0.00 512.35 5.68 5.68 0.00 512.40 5.98 5.98 0.00 512.45 6.29 6.29 0.00 512.50 6.58 6.58 0.00 512.55 6.87 6.87 0.00 512.60 7.16 7.16 0.00 512.65 7.43 7.43 0.00 512.70 7.69 7.69 0.00 512.75 7.94 7.94 0.00 512.80 8.17 8.17 0.00 512.85 8.37 8.37 0.00 512.90 8.54 8.54 0.00 512.95 8.66 8.66 0.00 513.00 8.62 8.62 0.00 513.05 9.19 8.89 0.30 513.10 10.00 9.15 0.85 513.15 10.96 9.40 1.56 513.20 12.05 9.65 2.40 513.25 13.24 9.89 3.36 513.30 14.54 10.12 4.42 513.35 15.93 10.35 5.58 513.40 17.41 10.58 6.83 513.45 18.95 10.80 8.15 513.50 20.56 11.01 9.55 513.55 22.24 11.22 11.01 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 513.60 23.98 11.43 12.55 513.65 25.71 11.64 14.07 513.70 27.47 11.84 15.64 513.75 29.28 12.03 17.24 513.80 31.07 12.18 18.89 513.85 33.00 12.33 20.67 513.90 34.97 12.48 22.50 513.95 37.00 12.62 24.38 514.00 39.06 12.76 26.30 514.05 41.23 12.90 28.32 514.10 43.44 13.04 30.40 514.15 45.71 13.18 32.53 514.20 48.02 13.32 34.70 514.25 50.35 13.45 36.90 514.30 52.72 13.59 39.13 514.35 55.13 13.72 41.41 514.40 57.58 13.85 43.73 514.45 60.03 13.98 46.05 514.50 62.52 14.11 48.41 514.55 65.04 14.24 50.80 514.60 67.59 14.36 53.23 514.65 70.23 14.49 55.74 514.70 72.91 14.61 58.29 514.75 75.62 14.74 60.89 514.80 78.37 14.86 63.51 514.85 81.16 14.98 66.18 514.90 83.98 15.10 68.88 514.95 86.84 15.22 71.62 515.00 89.73 15.34 74.39 515.05 92.65 15.46 77.19 515.10 95.61 15.57 80.04 515.15 98.60 15.69 82.91 515.20 101.62 15.80 85.82 515.25 104.68 15.92 88.76 Corning CEPI - Detention Basin-4 Type II 24-hr 10 yr 24hr Storm Rainfall=4.93"190109 Corning CEPI - Det-4 Printed 1/9/2019Prepared by Banks Engineering Page 21HydroCAD® 10.00-20 s/n 08698 © 2017 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 3P: Detention Basin-4 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 511.00 5 0 511.05 55 1 511.10 160 6 511.15 319 18 511.20 532 39 511.25 800 72 511.30 1,121 120 511.35 1,497 185 511.40 1,927 271 511.45 2,412 379 511.50 2,950 513 511.55 3,543 675 511.60 4,191 868 511.65 4,892 1,095 511.70 5,648 1,358 511.75 6,458 1,661 511.80 7,322 2,005 511.85 8,240 2,394 511.90 9,213 2,830 511.95 10,240 3,316 512.00 11,321 3,855 512.05 11,700 4,430 512.10 12,085 5,025 512.15 12,477 5,639 512.20 12,874 6,273 512.25 13,278 6,926 512.30 13,688 7,600 512.35 14,105 8,295 512.40 14,528 9,011 512.45 14,956 9,748 512.50 15,392 10,507 512.55 15,833 11,287 512.60 16,281 12,090 512.65 16,734 12,916 512.70 17,194 13,764 512.75 17,661 14,635 512.80 18,133 15,530 512.85 18,612 16,449 512.90 19,097 17,391 512.95 19,588 18,358 513.00 20,086 19,350 513.05 20,315 20,360 513.10 20,545 21,382 513.15 20,776 22,415 513.20 21,009 23,459 513.25 21,243 24,516 513.30 21,478 25,584 513.35 21,715 26,664 513.40 21,953 27,755 513.45 22,192 28,859 513.50 22,433 29,974 513.55 22,674 31,102 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 513.60 22,918 32,242 513.65 23,162 33,394 513.70 23,408 34,558 513.75 23,655 35,735 513.80 23,903 36,924 513.85 24,152 38,125 513.90 24,403 39,339 513.95 24,656 40,565 514.00 24,909 41,804 514.05 25,082 43,054 514.10 25,256 44,313 514.15 25,431 45,580 514.20 25,606 46,856 514.25 25,782 48,140 514.30 25,958 49,434 514.35 26,135 50,736 514.40 26,313 52,047 514.45 26,491 53,368 514.50 26,669 54,697 514.55 26,849 56,035 514.60 27,029 57,381 514.65 27,209 58,737 514.70 27,390 60,102 514.75 27,572 61,476 514.80 27,755 62,860 514.85 27,938 64,252 514.90 28,121 65,653 514.95 28,305 67,064 515.00 28,490 68,484 515.05 28,909 69,919 515.10 29,331 71,375 515.15 29,756 72,852 515.20 30,185 74,351 515.25 30,616 75,871