HomeMy WebLinkAboutOrchard Tie Substaion - 17757514-CR001-002_NC State Stormwater Permit_Rev_B Stormwater Management Plan Duke Energy Document # 17757514-CR001-002 November 13, 2018 Contact Information 10604 Murdock Drive Knoxville, TN 37932 Tel: 865.671.5400 Fax: 865.671.5403 www.mesainc.com William Deichert Mesa Civil Engineer 865.671.5459 wdeichert@mesainc.com Ruth Neely Duke Project Mananger (704) 382-7820 ruth.neely@duke-energy.com Orchard Tie Substation Engineers and Consultants November 13, 2018 Page 1 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Revision Log REV.DATE PAGE DESCRIPTION APPROVAL A 07/27/2018 ALL Issued for Review PCC B 11/13/2018 ALL Issued for Review PCC November 13, 2018 Page 2 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Table of Contents 1 PROJECT DESCRIPTION...................................................................................................................3 2 SITE DESCRIPTION............................................................................................................................3 3 ADJACENT PROPERTY.....................................................................................................................4 4 SOILS ..................................................................................................................................................4 5 STORMWATER MANAGEMENT........................................................................................................4 6 STORMWATER CALCULATIONS......................................................................................................5 Appendix A – USGS Vicinity Map and NRCS Soil Map Appendix B – Stormwater Calculations November 13, 2018 Page 3 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B 1 PROJECT DESCRIPTION The purpose of the project is to construct a new 230-100 kV substation in Catawba County, North Carolina. The project is located north and south of Elbow Road and west of US Highway 321. The project is situated on property being purchased by Duke Energy and totals approximately 134.79 acres. The substation yard will be approximately 13.48 acres in size and approximately 24 acres will be disturbed during construction of the substation. Additionally, approximately 19.48 acres will be cleared of vegetation for the installation of electrical transmission lines and associated towers. Minimal grading will occur only in the vicinity of line support structures and access to those structures. Clearing techniques will vary along transmission right-of-way corridors depending upon terrain features and vegetation types. Normally, topsoil shall not be graded, removed, or redistributed on rights-of-way, nor shall contours be altered (except around structure foundations and to construct diversions and roads). Root systems shall be left intact as much as possible. Where transmission right-of-way corridors cross open land (pastures, fields, etc.), no land disturbance will occur except as required for access roads and diversions. Where feasible, required cut and fill slopes required on rights-of-way shall be no steeper than 2:1, stabilized the same day, and permanently seeded within 7 working days. As part of a lease agreement between Duke Energy and the previous land owner, select portions of the remaining property will be cleared to turn the wooded land into pasture. After construction of the substation yard is completed, access drives and the fenced yard will be surfaced with stone. The yard area will not receive vehicular traffic and the access drive around the perimeter of the yard and the middle of the yard (east to west) will only receive minimal traffic. Therefore, the yard area with the exception of the access drives will be considered as pervious; however, for the purpose of the calculations the yard is concerned impervious. 2 SITE DESCRIPTION The site is currently undeveloped and consists wooded areas, both deciduous and evergreen and grassy areas. A hill is located near the center of the property and has an approximate elevation of 898.0. The hill slopes away in all directions. The site is located in a watershed that drains to the South Fork Catawba River. The South Fork Catawba River is not listed on the North Carolina impaired waters (303d) list. The substation yard area will be graded to final elevations of approximately 877.0’ to 880.63’, requiring cuts of approximately 25 feet and fills of approximately 40 feet. The yard area will have a high point near the center of the yard and extending north and south the length of the yard and will have a stone surfacing. An access drive approximately 750 feet long will provide access to the station from Elbow Road. Existing trees and vegetation will be protected as much as possible and will only be cleared within the limits of grading and where necessary for the transmission lines and towers. November 13, 2018 Page 4 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B 3 ADJACENT PROPERTY Land use in the vicinity of the project site consists of undeveloped land covered by woods or grasses for agricultural uses. There are some residential structures located along Elbow Road southeast and southwest of the property. 4 SOILS The NRCS Soils Survey map for the project area identified seven different soil types summarized in the table below. Map Unit Symbol Map Unit Name Hydrologic Soil Group CoA Congaree loam, 0 to 2 percent slopes, frequently flooded C LcB Lloyd loam 2 to 6 percent slopes B LcE Lloyd loam 15 to 25 percent slopes B LdB2 Lloyd loam 2 to 6 percent slopes, moderately eroded B LdC2 Lloyd loam 6 to 10 percent slopes, moderately eroded B MkF4 Madison-Udorthents complex, 25 to 45 percent slopes, gullied B PaE3 Pacolet clay loam, 10 to 25 percent slopes, severely eroded B 5 STORMWATER MANAGEMENT The proposed substation development will be considered high density development. The total proposed site area is approximately 134.79 acres and much of this will remain undeveloped. The substation yard and associated access drives will consist of approximately 13.48 acres. During construction and rough grading of the project site sediment basins will be installed on the east and west side of the substation. The substation yard will be graded with a high point or ridge running generally north to south and dividing the substation yard in half. The substation yard will have approximately a 1% cross slope. A gravel access drive will be constructed from Elbow Road (SR 2114) to the substation. The access drive will continue inside the substation around the perimeter of the substation fence. Two access drives will run generally east and west across the center of the substation yard. The access drives will be constructed of crushed stone with a crown along the centerline. The substation yard area will have a stone surface. Since the substation is unmanned there will be minimal vehicular traffic on the access roads and the majority of the yard area will rarely see vehicular traffic after construction is complete. November 13, 2018 Page 5 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B As discussed above, the substation will be graded with a high point running generally north to south and dividing the substation in half east to west. Stormwater runoff will sheet flow across the yard area towards the east and west sides. The access drive along the east and west sides will create a high point for the stormwater runoff that sheet flows across the yard and the stormwater will be collected in a series of catch basins and drain pipes inside the access drive along the east and west sides to collect stormwater runoff that may collect along the access drives. The stormwater drains will convey stormwater to the wet ponds on the east and west side. Two oil water separators (40,000 gallons each) will be installed and tied to the storm drain system. The oil water separators will collect runoff and/or any spills or leaks from electrical equipment containing oil. After construction is complete and the site is stabilized the the sediment basins will be converted to wet ponds, the sediment basin skimmers will be removed and the outfall structures will be modified or replaced to serve as a permanent outlet structure, and maintain post-construction peak flows below pre-construction peak flows. 6 STORMWATER CALCULATIONS Stormwater calculations are included in Appendix B. These calculations include pre- construction runoff calculations, post construction runoff calculations, calculations for sediment basins, calculations for culverts, and selection of energy dissipaters. HydroCAD version 10.0 was used to develop the stormwater runoff peak flows. As discussed previously the project will construct a new approximately 13.48 acre substation. The NCDEQ Stormwater Design Manual was used as guidance for the design of the wet ponds. The Simple Method for Runoff Volume was used with a 1-inch storm to determine the design volume. The Hydraulic Retention Time (HRT) Method was used to size the main pool of the wet ponds. The forebay of the wet pond was sized to have 15% of the volume of the main pool. The outlet structures are equipped with low flow orifices sized to drawdown the temporary pool in a time period of 2 to 5 days. The outfall structures in each wet pond will attenuate stormwater runoff peak flows so the substation post development peak flows will be less than the predevelopment runoff peak flows. The stormwater basins and outfall structures were designed conservatively considering the yard surface as impervious. November 13, 2018 Page 6 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Summary Table Pre-Construction Peak Discharge (cfs) Drainage Area 1-yr, 24-hr 2-yr, 24-hr 10-yr, 24-hr 25-yr, 24-hr 100-yr, 24-hr Area 1 12.38 20.28 47.46 60.62 83.89 Area 2 6.73 11.47 28.72 37.32 52.78 Area 3 10.17 18.14 47.02 61.35 87.04 Area 4 30.81 50.41 119.14 152.4 211.28 Area 5 1.40 2.29 5.38 6.89 9.55 Post-Construction Peak Discharge (cfs) Drainage Area 1-yr, 24-hr 2-yr, 24-hr 10-yr, 24-hr 25-yr, 24-hr 100-yr, 24-hr Area 1 5.72 10.84 36.0 51.26 80.12 Area 2 5.41 9.75 26.55 35.12 50.54 Area 3 5.55 9.33 25.93 37.23 56.10 Area 4 23.79 42.26 110.47 144.95 206.51 Area 5 1.11 1.90 4.81 6.25 8.81 November 13, 2018 Page 7 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Appendix A USGS Vicinity Map & NRCS Soils Map November 13, 2018 Page 8 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Project Vicinity Map Source: USGS Reepsville, NC Quadrangle 2016 PROJECT SITE November 13, 2018 Page 9 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 10 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 11 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Appendix C Stormwater Calculations Design Volume, HRT Method Pond Sizing, Pre-construction Stormwater Runoff Calculations, Post-construction Stormwater Runoff Calculations, Yard Drain System, and Access Drive Culverts November 13, 2018 Page 12 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Design Volume and HRT Method Pond Sizing Calculations: November 13, 2018 Page 13 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 14 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Pre-construction Stormwater Runoff Calculations: November 13, 2018 Page 15 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Pre-construction Stormwater Runoff Calculations: 1-year, 24-hour event November 13, 2018 Page 16 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 17 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 18 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 19 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 20 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 21 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Pre-construction Stormwater Runoff Calculations: 2-year, 24-hour event November 13, 2018 Page 22 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 23 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 24 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 25 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 26 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 27 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Pre-construction Stormwater Runoff Calculations: 10-year, 24-hour event November 13, 2018 Page 28 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 29 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 30 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 31 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 32 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 33 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Pre-construction Stormwater Runoff Calculations: 25-year, 24-hour event November 13, 2018 Page 34 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 35 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 36 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 37 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 38 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 39 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Pre-construction Stormwater Runoff Calculations: 100-year, 24-hour event November 13, 2018 Page 40 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 41 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 42 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 43 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 44 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 45 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Post-construction Stormwater Runoff Calculations: November 13, 2018 Page 46 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Post-construction Stormwater Runoff Calculations: 1-year, 24-hour event November 13, 2018 Page 47 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 48 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 49 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 50 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 51 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 52 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 53 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 54 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 55 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 56 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 57 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 58 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 59 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 60 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 61 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 62 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Post-construction Stormwater Runoff Calculations: 2-year, 24-hour event November 13, 2018 Page 63 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 64 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 65 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 66 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 67 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 68 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 69 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 70 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 71 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 72 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 73 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 74 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 75 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 76 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 77 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 78 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 79 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Post-construction Stormwater Runoff Calculations: 10-year, 24-hour event November 13, 2018 Page 80 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 81 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 82 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 83 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 84 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 85 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 86 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 87 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 88 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 89 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 90 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 91 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 92 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 93 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 94 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 95 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 96 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Post-construction Stormwater Runoff Calculations: 25-year, 24-hour event November 13, 2018 Page 97 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 98 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 99 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 100 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 101 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 102 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 103 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 104 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 105 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 106 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 107 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 108 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 109 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 110 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 111 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 112 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 113 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 114 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Post-construction Stormwater Runoff Calculations: 100-year, 24-hour event November 13, 2018 Page 115 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 116 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 117 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 118 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 119 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 120 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 121 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 122 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 123 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 124 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 125 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 126 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 127 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 128 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 129 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 130 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 131 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Yard Drain System – West Side Drainage System: November 13, 2018 Page 132 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 133 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 134 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 135 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 136 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 137 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 138 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 139 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 140 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 141 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 142 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 143 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 144 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 145 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 146 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 147 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Yard Drain System – East Side Yard Drain System: November 13, 2018 Page 148 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 149 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 150 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 151 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 152 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 153 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 154 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 155 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 156 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 157 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 158 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 159 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 160 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 161 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 162 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 163 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B Access Drive Culverts: November 13, 2018 Page 164 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 165 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 166 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 167 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 168 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 169 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 170 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B November 13, 2018 Page 171 Orchard Tie Substation | Stormwater Management Plan Document Number 177575148-CR001-002 Rev. B THIS PAGE INTENTIONALLY LEFT BLANK