Loading...
HomeMy WebLinkAboutPratt Industries - 20181105 - Pratt Corrugating Civil CalculationsPratt Industries PROJECT NO.:2018028200CL BY:ETS DATE:10/18/2018 T.M.:ETS REVISED:-P.M.:WGB CURVE NUMBER: Predeveloped CN Basin #1 Cover Type Area (SF)%CN Wtd. CN Existing Open Space (B soils)283048 0.30 61 18.20 Existing Impervious Area 665793 0.70 98 68.77 Total 948841 86.96 Composite CN 86.96 Use CN =87 Postdeveloped CN Basin Bypass Cover Type Area (SF)%CN Wtd. CN Impervious Area 593013 0.74 98 72.46 Open Space (B soils)209044 0.26 61 15.90 Total 802057 1.00 88.36 Composite CN 88.36 Use CN =89 PRE/POST DEVELOPMENT CURVE NUMBERS Pratt Industries PROJECT NO.:2018028200CL BY:ETS DATE:10/18/2018 T.M.:ETS REVISED:-P.M.:WGB BMP 1 Drainage Area 3.37 acres Impervious Areas Total Impervious=125196 Percent Impervious=85.18% IMPERVIOUS CALCULATIONS Impervious Calculations for Basins Pratt Industries PROJECT NO.:18028200CL BY:ETS DATE:10/18/18 T.M.:ETS REVISED:-P.M.:WGB WATER QUALITY REQUIREMENTS To meet the Water Quality requirements, the procedure outlined in the "Stormwater Best Management Practices" published by NCDENR will be used. This guide gives the required pond surface area and storage volume to meet an 85% pollutant removal efficiency. Also, the pond must detain the first 1" of rainfall and release this volume over a period of 2 to 5 days. Calculations for these requirements are as follows: %PERMANENT POOL DEPTH Surface area requirements Impervious 3 4 5 6 7 8 Drainage area to pond (Da)= 3.37 Ac 10 0.51 0.43 0.37 0.3 0.27 0.25 Post-development impervious percentage = 85%20 0.84 0.69 0.61 0.51 0.44 0.4 Average pool depth = 3.5 ft 30 1.17 0.81 0.84 0.72 0.61 0.56 Designed permanent pool elevation = 973.5 40 1.51 1.22 1.09 0.91 0.78 0.71 50 1.79 1.47 1.31 1.13 0.95 0.87 60 2.09 1.73 1.49 1.31 1.12 1.03 Interpolation to find required SA/DA ratio for non whole number 70 2.51 2.04 1.8 1.56 1.34 1.17 Amberley Subdivision 80 2.92 2.36 2.07 1.82 1.62 1.4 Depth volume 90 3.25 2.64 2.31 2.04 1.84 1.59 3 3.09 3.5 2.80 4 2.51 From table I.1 in the BMP guidelines the required Surface Area to Drainage Area Ratio (SA/DA) for a permanent pool depth = 2.80 Required surface area = SA/DA / 100 x Drainage area=0.09 Ac 4112.436 Surface area of pond as designed at permanent pool elevation = 0.1896 Ac Water Quality Requirements Using the runoff volume calculations in the "Simple Method" : Rv = 0.05 + 0.9 (I) Rv=0.816616 in/in Volume = (Design rainfall) (Rv) (Drainage Area) Volume = 1" rainfall x Rv in/in x 1/12 in/ft x Da = or 0.23 ac-ft This volume must be released over a period of 2-5 days 10002 ft^3 As designed pond areas: Elevation Forebay Forebay FB Volume FB Volume Pond Pond Pond Volume Pond Volume Storage Volumes (msl)(sf)(ac)(cu-ft)(ac-ft)(sf)(ac)(cu-ft)(ac-ft) Cumulative 968 0.0000 0 0.0000 1795 0.0412 0 0 Elevation Area(ac)Volume(ac-ft)969 0 0.0000 0 0.0000 2172 0.0499 1979 0.0454 973.5 0.137764 0.00 970 335 0.0077 112 0.0026 2580 0.0592 4349 0.0998 974 0.161685 0.07 971 555 0.0127 552 0.0127 3021 0.0694 7144 0.1640 975 0.189624 0.25 972 801 0.0184 1225 0.0281 3492 0.0802 10394 0.2386 976 0.215289 0.45 973 1072 0.0246 2157 0.0495 3991 0.0916 14129 0.3244 977 0.242149 0.68 973.5 1217 0.0279 2729 0.0626 4784 0.1098 16318 0.3746 978 0.270432 0.94 974 0.0000 2931 0.0673 7043 0.1617 19254 0.4420 975 0.0000 2931 0.0673 8260 0.1896 26889 0.6173 Forbay Volume (CF)2729 976 9378 0.2153 35694 0.8194 Total Volume (CF)16318 977 10548 0.2421 45641 1.0478 Forebay % of Pond 16.72%978 11780 0.2704 56788 1.3037 Interpolation to find elevation at which required storage volume is reached Storage Storage Storage Elev volume area (ac.)area (sf.) 974 0.07 0.16 7043 Elev 0.23 0.19 8118 975 0.25 0.19 8260 Elev=974.88 Storage elevation = 1.38 feet above permanent pool elevation Assume 2 day minimum Determination of Orifice size for 2-5 day drawdown a=2A x sqrt(h)*Falling head equation Ct(sqrt(2g)) a=Area of orifice a sqft t=Time to drawdown 172800 sec A=Average pond surface area 8189 sf (2 day drawdown) g=Gravity constant 32.2 ft/s^2 h=Change in head 1.38 ft C=Orifice constant 0.6 Maximum orifice area =0.02 sqft Maximum orifice size =2.06 inches Selected orifice size =2.00 inches WATER QUALITY BASIN CALCULATIONS - WETPOND Permanent Pond Storage Volume Pratt Industries PROJECT NO.18028200CL BY:ETS DATE:10/18/18 T.M:ETS REVISED:-P.M.:WGB FLOATATION CALCULATIONS - 2 CONSTRAINTS: Weight of Concrete 150 lbs/ft^3 Weight of Water 62.4 lbs/ft^4 Safety Factor (S.F.)1.2 Height of structure 3.75 ft Structure thickness 6 in Outlet box width (interior)6 ft Weight of outlet structure(Ws) Ws = (width + thickness x 4) x thickness x height x weight of concrete =7313 lbs Weight of water displaced Amberley Subdivision Ww = ((width + 2 x thickness)^2) x Weight of water x height = 11466 lbs Size Base Wb = ( S.F. x Ww) - Ws =6447 lbs Footing size Required concrete = Wb / (Weight of concrete-weight of water) =74 cuft *Assume base is 6" wider than exterior box width and minimum thickness is 8". Thickness of base =1.31 ft Length =8.00 ft Width =8.00 ft Thickness =1.31 ft Pratt Industries PROJECT NO.:18028200CL BY:ETS DATE:10/18/18 T.M:ETS REVISED:-P.M.:WGB ANTI-SEEP COLLARS BASIN 2 30 in 17 ft 2 Anti-Seep Collar Sizes Length:3.20 ft Width:3.20 ft Note: Anti-seep collars are centered on pipe PRELIMINARY CALCULATIONS Pipe Diameter Length of Covered Pipe Number of Collars Pratt Industries PROJECT NO.:18028200CL BY:ETS DATE:10/18/18 T.M:ETS REVISED:-P.M.:WGB Amberley Subdivision FES #Do (Pipe ø)Tw Tw<0.5ø Q V d50 La Apron width Apron width Max Stone Apron (ft)(ft)(cfs)(ft/s)(ft)(ft)at pipe (ft)at outlet (ft)ø (ft)Thickness(ft) FES-BMP 2.5 0 OKAY 13.37 5 0.5 15 7.5 18 0.75 1.13 Design of outlet protection from a round pipe flowing full, minimum tailwater condition Tw<0.5 diameter RIPRAP APRON DESIGN (NCDENR METHOD) Pratt Industries PROJECT NO.:2018028200CL BY:ETS DATE:10/18/18 T.M.:WGB REVISED:-P.M.:WGB FES #Do(Pipe ø)Tw Tw≥0.5ø Q V d50 La Apron width Apron width Max Stone Apron (ft)(ft)(cfs)(ft/s)(ft)(ft)at pipe (ft)at outlet (ft)ø (ft)Thickness(ft) FES-1 2.5 2.5 OKAY 18.97 6.07 0.25 10 7.5 7 0.38 0.56 RIPRAP APRON DESIGN (NCDENR METHOD) Design of outlet protection from a round pipe flowing full, maximum tailwater condition Tw≥0.5 diameter Pratt Industries PROJECT NO.:2018028200CL BY:ETS DATE:10/18/18 T.M:ETS REVISED:-P.M.:WGB SKIMMER SEDIMENT BASIN PH1 EROSION CONTROL PHASE 1 DRAINAGE AREAS/REQ'D STORAGE DESIGN CRITERIA Total drainage area (TDA)6.50 ac Proposed sediment depth 2 ft Disturbed area(DA)6.50 ac Bottom elevation of basin 974 msl Required sediment storage(1800xTDA)11700 cf Depth of flow over spillway 1 ft BASIN CONFIGURATION PLANNED BASIN SIZE Bottom elevation 974 msl (REFER TO EROSION CONTROL PLAN) Sediment Storage elevation 976 msl Elev.Area (SF)Cumulative Volume (CF) Spillway crest 976 msl 974 7195 0 Top of Berm 978 msl 975 8254 7725 976 9378 16541 ESTIMATED BASIN SIZE (RECTANGULAR)977 10540 26500 Length(ft)Width(ft)978 11769 37654 Bottom 105 51 Top 121 67 BASIN EFFICIENCY Sediment storage provided:16541 OKAY Sediment storage required:11700 cf Surface area/Flow comparison:9378 OKAY SPILLWAY DESIGN DESIGN FLOW (Q=CIA)SPILLWAY DESIGN Bare soil coefficient 'C' =0.6 Spillway design: (L=Q/(C*h^1.5));C=3.0 Paved runoff coefficient=0.95 Percent of TDA paved 0 Composite 'C'=0.60 Area 'A' =6.5 ac h=1.00 10 yr. storm rainfall intensity, 'I' =6.91 in/hr Spillway length @ flow depth 10 Computed flow from site, 'Q' =27 cfs SURFACE AREA/FLOW COMPARISON: Formula:A=325*Q I 6.91 10 year storm A:Minimum Surface Area (acres) measured Q(design):27 CFS at the crest of the principal spillway A(Required):8775 sf of surface area at sed stor elev Q:Peak inflow rate of 10 year storm in cfs A(Provided)9378 OKAY SKIMMER ORIFICE DIAMETER: Cubic Feet per day NCDENR Head on Orifice Chart Formula:Qd=V/td = (ft^3/day) NCDENR optimal dewatering time is 3 days td = desired detwatering time in days = 3 days Qd:3900 ft^3/day Orifice Diameter Select Skimmer Size:3 in. Head on Orifice (Use Chart):0.25 ft. Formula: D: 1.84 in. Actual Orifice Daimeter:1.75 in.OKAY SEDIMENT BASIN CALCULATIONS Pratt Industries PROJECT NO.:2018028200CL BY:ETS DATE:10/18/18 T.M:ETS REVISED:-P.M.:WGB SKIMMER SEDIMENT BASIN PH2 EROSION CONTROL PHASE 2 DRAINAGE AREAS/REQ'D STORAGE DESIGN CRITERIA Total drainage area (TDA)3.37 ac Proposed sediment depth 2 ft Disturbed area(DA)3.37 ac Bottom elevation of basin 974 msl Required sediment storage(1800xTDA)6073.512 cf Depth of flow over spillway 1 ft BASIN CONFIGURATION PLANNED BASIN SIZE Bottom elevation 974 msl (REFER TO EROSION CONTROL PLAN) Sediment Storage elevation 976 msl Elev.Area (SF)Cumulative Volume (CF) Spillway crest 976 msl 974 7195 0 Top of Berm 978 msl 975 8254 7725 976 9378 16541 ESTIMATED BASIN SIZE (RECTANGULAR)977 10540 26500 Length(ft)Width(ft)978 11769 37654 Bottom 74 35 Top 90 51 BASIN EFFICIENCY Sediment storage provided:16541 OKAY Sediment storage required:6073.5124 cf Surface area/Flow comparison:9378 OKAY SPILLWAY DESIGN DESIGN FLOW (Q=CIA)SPILLWAY DESIGN Bare soil coefficient 'C' =0.6 Spillway design: (L=Q/(C*h^1.5));C=3.0 Paved runoff coefficient=0.95 Percent of TDA paved 0 Composite 'C'=0.60 Area 'A' =3.3741736 ac h=1.00 10 yr. storm rainfall intensity, 'I' =6.91 in/hr Spillway length @ flow depth 10 Computed flow from site, 'Q' =14 cfs SURFACE AREA/FLOW COMPARISON: Formula:A=325*Q I 6.91 10 year storm A:Minimum Surface Area (acres) measured Q(design):14 CFS at the crest of the principal spillway A(Required):4550 sf of surface area at sed stor elev Q:Peak inflow rate of 10 year storm in cfs A(Provided)9378 OKAY SKIMMER ORIFICE DIAMETER: Cubic Feet per day NCDENR Head on Orifice Chart Formula:Qd=V/td = (ft^3/day) NCDENR optimal dewatering time is 3 days td = desired detwatering time in days = 3 days Qd:2024.504132 ft^3/day Orifice Diameter Select Skimmer Size:3 in. Head on Orifice (Use Chart):0.25 ft. Formula: D: 1.32 in. Actual Orifice Daimeter:1.75 in.OKAY SEDIMENT BASIN CALCULATIONS Trapezoidal Channel Computation SheetPROJECT:Pratt AdditionLOCATION: Statesville, NCDitch No.Contributing Area (Acres)Runoff Coefficient (c)Rainfall Intensity (in/hr)Length (ft)Depth (ft)Bottom Width (ft)Top Width (ft)Side Slopes (xH:1V)Mannings No. (n)Full Capacity (cfs)Design Flow (cfs)Design Flow Depth (ft)Design Flow Velocity (fps) Slope of Ditch (ft/ft)Shear Stress (psf)Check Dam Spacing (ft)Channel Lining TypeAcceptableAc Co Ri L d be n Qf QdS TTDD #1.1 3.47 0.60 6.91 469.0 1.50 2.508.5020.03334.53 14.39 0.97 3.320.0100.61 150 Straw with Net*Manning's values area based on channel lining and design flow depth as shown in NC DENR Table 8.05e.**Shear Stress is NA if design velocity is less than 2 fps and temporary seeding is used as a liner. Per NC DENR linings are not required if velocity is less than 2 fps. 1S Basin 1 Post Dev. 3S Pre Dev. 4S Bypass 2P Pond 5L Post Development Routing Diagram for Basin Prepared by {enter your company name here}, Printed 10/25/2018 HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Subcat Reach Pond Link Basin Printed 10/25/2018Prepared by {enter your company name here} Page 2HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres) CN Description (subcatchment-numbers) 3.390 93 (1S) 21.780 87 (3S) 18.390 89 (4S) 43.560 88 TOTAL AREA Basin Printed 10/25/2018Prepared by {enter your company name here} Page 3HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Soil Listing (all nodes) Area (acres) Soil Group Subcatchment Numbers 0.000 HSG A 0.000 HSG B 0.000 HSG C 0.000 HSG D 43.560 Other 1S, 3S, 4S 43.560 TOTAL AREA Basin Printed 10/25/2018Prepared by {enter your company name here} Page 4HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Ground Covers (all nodes) HSG-A (acres) HSG-B (acres) HSG-C (acres) HSG-D (acres) Other (acres) Total (acres) Ground Cover Subcatchment Numbers 0.000 0.000 0.000 0.000 43.560 43.560 1S, 3S, 4S 0.000 0.000 0.000 0.000 43.560 43.560 TOTAL AREA Basin Printed 10/25/2018Prepared by {enter your company name here} Page 5HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Pipe Listing (all nodes) Line# Node Number In-Invert (feet) Out-Invert (feet) Length (feet) Slope (ft/ft) n Diam/Width (inches) Height (inches) Inside-Fill (inches) 1 2P 973.50 973.41 17.0 0.0053 0.011 30.0 0.0 0.0 Type II 24-hr 1-inch Rainfall=1.00"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 6HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Time span=0.10-99.00 hrs, dt=0.05 hrs, 1979 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=3.390 ac 0.00% Impervious Runoff Depth=0.45"Subcatchment 1S: Basin 1 Post Dev. Tc=5.0 min CN=93 Runoff=2.75 cfs 0.127 af Runoff Area=21.780 ac 0.00% Impervious Runoff Depth=0.22"Subcatchment 3S: Pre Dev. Tc=5.0 min CN=87 Runoff=8.20 cfs 0.406 af Runoff Area=18.390 ac 0.00% Impervious Runoff Depth=0.28"Subcatchment 4S: Bypass Tc=5.0 min CN=89 Runoff=9.19 cfs 0.437 af Peak Elev=974.01' Storage=3,310 cf Inflow=2.75 cfs 0.127 afPond 2P: Pond Primary=0.07 cfs 0.127 af Secondary=0.00 cfs 0.000 af Outflow=0.07 cfs 0.127 af Inflow=9.24 cfs 0.564 afLink 5L: Post Development Primary=9.24 cfs 0.564 af Total Runoff Area = 43.560 ac Runoff Volume = 0.970 af Average Runoff Depth = 0.27" 100.00% Pervious = 43.560 ac 0.00% Impervious = 0.000 ac Type II 24-hr 1-inch Rainfall=1.00"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 7HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Basin 1 Post Dev. [49] Hint: Tc<2dt may require smaller dt Runoff = 2.75 cfs @ 11.96 hrs, Volume= 0.127 af, Depth= 0.45" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 1-inch Rainfall=1.00" Area (ac) CN Description * 3.390 93 3.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: Basin 1 Post Dev. Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)3 2 1 0 Type II 24-hr 1-inch Rainfall=1.00" Runoff Area=3.390 ac Runoff Volume=0.127 af Runoff Depth=0.45" Tc=5.0 min CN=93 2.75 cfs Type II 24-hr 1-inch Rainfall=1.00"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 8HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 3S: Pre Dev. [49] Hint: Tc<2dt may require smaller dt Runoff = 8.20 cfs @ 11.97 hrs, Volume= 0.406 af, Depth= 0.22" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 1-inch Rainfall=1.00" Area (ac) CN Description * 21.780 87 21.780 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: Pre Dev. Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)9 8 7 6 5 4 3 2 1 0 Type II 24-hr 1-inch Rainfall=1.00" Runoff Area=21.780 ac Runoff Volume=0.406 af Runoff Depth=0.22" Tc=5.0 min CN=87 8.20 cfs Type II 24-hr 1-inch Rainfall=1.00"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 9HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 4S: Bypass [49] Hint: Tc<2dt may require smaller dt Runoff = 9.19 cfs @ 11.97 hrs, Volume= 0.437 af, Depth= 0.28" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 1-inch Rainfall=1.00" Area (ac) CN Description * 18.390 89 18.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Bypass Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 1-inch Rainfall=1.00" Runoff Area=18.390 ac Runoff Volume=0.437 af Runoff Depth=0.28" Tc=5.0 min CN=89 9.19 cfs Type II 24-hr 1-inch Rainfall=1.00"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 10HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Pond 2P: Pond Inflow Area = 3.390 ac, 0.00% Impervious, Inflow Depth = 0.45" for 1-inch event Inflow = 2.75 cfs @ 11.96 hrs, Volume= 0.127 af Outflow = 0.07 cfs @ 15.10 hrs, Volume= 0.127 af, Atten= 97%, Lag= 188.3 min Primary = 0.07 cfs @ 15.10 hrs, Volume= 0.127 af Secondary = 0.00 cfs @ 0.10 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Peak Elev= 974.01' @ 15.10 hrs Surf.Area= 7,051 sf Storage= 3,310 cf Plug-Flow detention time= 589.0 min calculated for 0.127 af (100% of inflow) Center-of-Mass det. time= 590.4 min ( 1,427.1 - 836.7 ) Volume Invert Avail.Storage Storage Description #1 973.50' 40,859 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 973.50 6,001 0 0 974.00 7,043 3,261 3,261 975.00 8,260 7,652 10,913 976.00 9,378 8,819 19,732 977.00 10,548 9,963 29,695 978.00 11,780 11,164 40,859 Device Routing Invert Outlet Devices #1 Primary 973.50'30.0" Round RCP_Round 30" L= 17.0' Box, 0° wingwalls, square crown edge, Ke= 0.700 Inlet / Outlet Invert= 973.50' / 973.41' S= 0.0053 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 4.91 sf #2 Device 1 973.50'2.0" Horiz. WQ Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 974.88'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.77 Width (feet) 3.50 3.50 #4 Device 1 975.65'48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 976.29'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.07 cfs @ 15.10 hrs HW=974.01' (Free Discharge) 1=RCP_Round 30" (Passes 0.07 cfs of 1.21 cfs potential flow) 2=WQ Orifice (Orifice Controls 0.07 cfs @ 3.43 fps) 3=Custom Weir/Orifice ( Controls 0.00 cfs) 4=Riser ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.10 hrs HW=973.50' (Free Discharge) 5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 1-inch Rainfall=1.00"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 11HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Pond 2P: Pond Inflow Outflow Primary Secondary Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)3 2 1 0 Inflow Area=3.390 ac Peak Elev=974.01' Storage=3,310 cf 2.75 cfs 0.07 cfs0.07 cfs 0.00 cfs Type II 24-hr 1-inch Rainfall=1.00"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 12HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Link 5L: Post Development Inflow Area = 21.780 ac, 0.00% Impervious, Inflow Depth = 0.31" for 1-inch event Inflow = 9.24 cfs @ 11.97 hrs, Volume= 0.564 af Primary = 9.24 cfs @ 11.97 hrs, Volume= 0.564 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Link 5L: Post Development Inflow Primary Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)10 9 8 7 6 5 4 3 2 1 0 Inflow Area=21.780 ac 9.24 cfs9.24 cfs Type II 24-hr 1-Year Rainfall=2.87"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 13HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Time span=0.10-99.00 hrs, dt=0.05 hrs, 1979 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=3.390 ac 0.00% Impervious Runoff Depth=2.13"Subcatchment 1S: Basin 1 Post Dev. Tc=5.0 min CN=93 Runoff=12.30 cfs 0.602 af Runoff Area=21.780 ac 0.00% Impervious Runoff Depth=1.63"Subcatchment 3S: Pre Dev. Tc=5.0 min CN=87 Runoff=63.17 cfs 2.951 af Runoff Area=18.390 ac 0.00% Impervious Runoff Depth=1.78"Subcatchment 4S: Bypass Tc=5.0 min CN=89 Runoff=57.87 cfs 2.732 af Peak Elev=975.28' Storage=13,268 cf Inflow=12.30 cfs 0.602 afPond 2P: Pond Primary=3.04 cfs 0.602 af Secondary=0.00 cfs 0.000 af Outflow=3.04 cfs 0.602 af Inflow=58.14 cfs 3.334 afLink 5L: Post Development Primary=58.14 cfs 3.334 af Total Runoff Area = 43.560 ac Runoff Volume = 6.285 af Average Runoff Depth = 1.73" 100.00% Pervious = 43.560 ac 0.00% Impervious = 0.000 ac Type II 24-hr 1-Year Rainfall=2.87"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 14HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Basin 1 Post Dev. [49] Hint: Tc<2dt may require smaller dt Runoff = 12.30 cfs @ 11.95 hrs, Volume= 0.602 af, Depth= 2.13" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.87" Area (ac) CN Description * 3.390 93 3.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: Basin 1 Post Dev. Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 1-Year Rainfall=2.87" Runoff Area=3.390 ac Runoff Volume=0.602 af Runoff Depth=2.13" Tc=5.0 min CN=93 12.30 cfs Type II 24-hr 1-Year Rainfall=2.87"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 15HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 3S: Pre Dev. [49] Hint: Tc<2dt may require smaller dt Runoff = 63.17 cfs @ 11.96 hrs, Volume= 2.951 af, Depth= 1.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.87" Area (ac) CN Description * 21.780 87 21.780 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: Pre Dev. Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 1-Year Rainfall=2.87" Runoff Area=21.780 ac Runoff Volume=2.951 af Runoff Depth=1.63" Tc=5.0 min CN=87 63.17 cfs Type II 24-hr 1-Year Rainfall=2.87"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 16HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 4S: Bypass [49] Hint: Tc<2dt may require smaller dt Runoff = 57.87 cfs @ 11.96 hrs, Volume= 2.732 af, Depth= 1.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.87" Area (ac) CN Description * 18.390 89 18.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Bypass Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 1-Year Rainfall=2.87" Runoff Area=18.390 ac Runoff Volume=2.732 af Runoff Depth=1.78" Tc=5.0 min CN=89 57.87 cfs Type II 24-hr 1-Year Rainfall=2.87"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 17HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Pond 2P: Pond Inflow Area = 3.390 ac, 0.00% Impervious, Inflow Depth = 2.13" for 1-Year event Inflow = 12.30 cfs @ 11.95 hrs, Volume= 0.602 af Outflow = 3.04 cfs @ 12.11 hrs, Volume= 0.602 af, Atten= 75%, Lag= 9.3 min Primary = 3.04 cfs @ 12.11 hrs, Volume= 0.602 af Secondary = 0.00 cfs @ 0.10 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Peak Elev= 975.28' @ 12.11 hrs Surf.Area= 8,573 sf Storage= 13,268 cf Plug-Flow detention time= 631.0 min calculated for 0.602 af (100% of inflow) Center-of-Mass det. time= 630.8 min ( 1,423.2 - 792.4 ) Volume Invert Avail.Storage Storage Description #1 973.50' 40,859 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 973.50 6,001 0 0 974.00 7,043 3,261 3,261 975.00 8,260 7,652 10,913 976.00 9,378 8,819 19,732 977.00 10,548 9,963 29,695 978.00 11,780 11,164 40,859 Device Routing Invert Outlet Devices #1 Primary 973.50'30.0" Round RCP_Round 30" L= 17.0' Box, 0° wingwalls, square crown edge, Ke= 0.700 Inlet / Outlet Invert= 973.50' / 973.41' S= 0.0053 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 4.91 sf #2 Device 1 973.50'2.0" Horiz. WQ Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 974.88'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.77 Width (feet) 3.50 3.50 #4 Device 1 975.65'48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 976.29'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=3.01 cfs @ 12.11 hrs HW=975.28' (Free Discharge) 1=RCP_Round 30" (Passes 3.01 cfs of 11.62 cfs potential flow) 2=WQ Orifice (Orifice Controls 0.14 cfs @ 6.42 fps) 3=Custom Weir/Orifice (Weir Controls 2.87 cfs @ 2.06 fps) 4=Riser ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.10 hrs HW=973.50' (Free Discharge) 5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 1-Year Rainfall=2.87"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 18HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Pond 2P: Pond Inflow Outflow Primary Secondary Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=3.390 ac Peak Elev=975.28' Storage=13,268 cf 12.30 cfs 3.04 cfs3.04 cfs 0.00 cfs Type II 24-hr 1-Year Rainfall=2.87"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 19HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Link 5L: Post Development Inflow Area = 21.780 ac, 0.00% Impervious, Inflow Depth = 1.84" for 1-Year event Inflow = 58.14 cfs @ 11.96 hrs, Volume= 3.334 af Primary = 58.14 cfs @ 11.96 hrs, Volume= 3.334 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Link 5L: Post Development Inflow Primary Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=21.780 ac 58.14 cfs58.14 cfs Type II 24-hr 2-Year Rainfall=3.49"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 20HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Time span=0.10-99.00 hrs, dt=0.05 hrs, 1979 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=3.390 ac 0.00% Impervious Runoff Depth=2.73"Subcatchment 1S: Basin 1 Post Dev. Tc=5.0 min CN=93 Runoff=15.49 cfs 0.770 af Runoff Area=21.780 ac 0.00% Impervious Runoff Depth=2.17"Subcatchment 3S: Pre Dev. Tc=5.0 min CN=87 Runoff=83.53 cfs 3.945 af Runoff Area=18.390 ac 0.00% Impervious Runoff Depth=2.35"Subcatchment 4S: Bypass Tc=5.0 min CN=89 Runoff=75.24 cfs 3.598 af Peak Elev=975.56' Storage=15,711 cf Inflow=15.49 cfs 0.770 afPond 2P: Pond Primary=6.57 cfs 0.770 af Secondary=0.00 cfs 0.000 af Outflow=6.57 cfs 0.770 af Inflow=78.38 cfs 4.368 afLink 5L: Post Development Primary=78.38 cfs 4.368 af Total Runoff Area = 43.560 ac Runoff Volume = 8.313 af Average Runoff Depth = 2.29" 100.00% Pervious = 43.560 ac 0.00% Impervious = 0.000 ac Type II 24-hr 2-Year Rainfall=3.49"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 21HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Basin 1 Post Dev. [49] Hint: Tc<2dt may require smaller dt Runoff = 15.49 cfs @ 11.95 hrs, Volume= 0.770 af, Depth= 2.73" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.49" Area (ac) CN Description * 3.390 93 3.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: Basin 1 Post Dev. Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 2-Year Rainfall=3.49" Runoff Area=3.390 ac Runoff Volume=0.770 af Runoff Depth=2.73" Tc=5.0 min CN=93 15.49 cfs Type II 24-hr 2-Year Rainfall=3.49"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 22HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 3S: Pre Dev. [49] Hint: Tc<2dt may require smaller dt Runoff = 83.53 cfs @ 11.96 hrs, Volume= 3.945 af, Depth= 2.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.49" Area (ac) CN Description * 21.780 87 21.780 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: Pre Dev. Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 2-Year Rainfall=3.49" Runoff Area=21.780 ac Runoff Volume=3.945 af Runoff Depth=2.17" Tc=5.0 min CN=87 83.53 cfs Type II 24-hr 2-Year Rainfall=3.49"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 23HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 4S: Bypass [49] Hint: Tc<2dt may require smaller dt Runoff = 75.24 cfs @ 11.95 hrs, Volume= 3.598 af, Depth= 2.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.49" Area (ac) CN Description * 18.390 89 18.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Bypass Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 2-Year Rainfall=3.49" Runoff Area=18.390 ac Runoff Volume=3.598 af Runoff Depth=2.35" Tc=5.0 min CN=89 75.24 cfs Type II 24-hr 2-Year Rainfall=3.49"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 24HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Pond 2P: Pond Inflow Area = 3.390 ac, 0.00% Impervious, Inflow Depth = 2.73" for 2-Year event Inflow = 15.49 cfs @ 11.95 hrs, Volume= 0.770 af Outflow = 6.57 cfs @ 12.06 hrs, Volume= 0.770 af, Atten= 58%, Lag= 6.7 min Primary = 6.57 cfs @ 12.06 hrs, Volume= 0.770 af Secondary = 0.00 cfs @ 0.10 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Peak Elev= 975.56' @ 12.06 hrs Surf.Area= 8,886 sf Storage= 15,711 cf Plug-Flow detention time= 509.1 min calculated for 0.769 af (100% of inflow) Center-of-Mass det. time= 510.7 min ( 1,296.3 - 785.5 ) Volume Invert Avail.Storage Storage Description #1 973.50' 40,859 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 973.50 6,001 0 0 974.00 7,043 3,261 3,261 975.00 8,260 7,652 10,913 976.00 9,378 8,819 19,732 977.00 10,548 9,963 29,695 978.00 11,780 11,164 40,859 Device Routing Invert Outlet Devices #1 Primary 973.50'30.0" Round RCP_Round 30" L= 17.0' Box, 0° wingwalls, square crown edge, Ke= 0.700 Inlet / Outlet Invert= 973.50' / 973.41' S= 0.0053 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 4.91 sf #2 Device 1 973.50'2.0" Horiz. WQ Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 974.88'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.77 Width (feet) 3.50 3.50 #4 Device 1 975.65'48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 976.29'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=6.42 cfs @ 12.06 hrs HW=975.55' (Free Discharge) 1=RCP_Round 30" (Passes 6.42 cfs of 14.71 cfs potential flow) 2=WQ Orifice (Orifice Controls 0.15 cfs @ 6.89 fps) 3=Custom Weir/Orifice (Weir Controls 6.27 cfs @ 2.68 fps) 4=Riser ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.10 hrs HW=973.50' (Free Discharge) 5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 2-Year Rainfall=3.49"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 25HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Pond 2P: Pond Inflow Outflow Primary Secondary Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=3.390 ac Peak Elev=975.56' Storage=15,711 cf 15.49 cfs 6.57 cfs6.57 cfs 0.00 cfs Type II 24-hr 2-Year Rainfall=3.49"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 26HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Link 5L: Post Development Inflow Area = 21.780 ac, 0.00% Impervious, Inflow Depth = 2.41" for 2-Year event Inflow = 78.38 cfs @ 11.96 hrs, Volume= 4.368 af Primary = 78.38 cfs @ 11.96 hrs, Volume= 4.368 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Link 5L: Post Development Inflow Primary Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=21.780 ac 78.38 cfs78.38 cfs Type II 24-hr 10-Year Rainfall=5.16"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 27HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Time span=0.10-99.00 hrs, dt=0.05 hrs, 1979 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=3.390 ac 0.00% Impervious Runoff Depth=4.36"Subcatchment 1S: Basin 1 Post Dev. Tc=5.0 min CN=93 Runoff=24.00 cfs 1.230 af Runoff Area=21.780 ac 0.00% Impervious Runoff Depth=3.72"Subcatchment 3S: Pre Dev. Tc=5.0 min CN=87 Runoff=139.02 cfs 6.749 af Runoff Area=18.390 ac 0.00% Impervious Runoff Depth=3.93"Subcatchment 4S: Bypass Tc=5.0 min CN=89 Runoff=122.08 cfs 6.016 af Peak Elev=975.96' Storage=19,323 cf Inflow=24.00 cfs 1.230 afPond 2P: Pond Primary=19.29 cfs 1.230 af Secondary=0.00 cfs 0.000 af Outflow=19.29 cfs 1.230 af Inflow=137.97 cfs 7.246 afLink 5L: Post Development Primary=137.97 cfs 7.246 af Total Runoff Area = 43.560 ac Runoff Volume = 13.994 af Average Runoff Depth = 3.86" 100.00% Pervious = 43.560 ac 0.00% Impervious = 0.000 ac Type II 24-hr 10-Year Rainfall=5.16"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 28HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Basin 1 Post Dev. [49] Hint: Tc<2dt may require smaller dt Runoff = 24.00 cfs @ 11.95 hrs, Volume= 1.230 af, Depth= 4.36" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.16" Area (ac) CN Description * 3.390 93 3.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: Basin 1 Post Dev. Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 10-Year Rainfall=5.16" Runoff Area=3.390 ac Runoff Volume=1.230 af Runoff Depth=4.36" Tc=5.0 min CN=93 24.00 cfs Type II 24-hr 10-Year Rainfall=5.16"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 29HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 3S: Pre Dev. [49] Hint: Tc<2dt may require smaller dt Runoff = 139.02 cfs @ 11.95 hrs, Volume= 6.749 af, Depth= 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.16" Area (ac) CN Description * 21.780 87 21.780 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: Pre Dev. Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 10-Year Rainfall=5.16" Runoff Area=21.780 ac Runoff Volume=6.749 af Runoff Depth=3.72" Tc=5.0 min CN=87 139.02 cfs Type II 24-hr 10-Year Rainfall=5.16"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 30HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 4S: Bypass [49] Hint: Tc<2dt may require smaller dt Runoff = 122.08 cfs @ 11.95 hrs, Volume= 6.016 af, Depth= 3.93" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.16" Area (ac) CN Description * 18.390 89 18.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Bypass Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 10-Year Rainfall=5.16" Runoff Area=18.390 ac Runoff Volume=6.016 af Runoff Depth=3.93" Tc=5.0 min CN=89 122.08 cfs Type II 24-hr 10-Year Rainfall=5.16"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 31HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Pond 2P: Pond Inflow Area = 3.390 ac, 0.00% Impervious, Inflow Depth = 4.36" for 10-Year event Inflow = 24.00 cfs @ 11.95 hrs, Volume= 1.230 af Outflow = 19.29 cfs @ 12.01 hrs, Volume= 1.230 af, Atten= 20%, Lag= 3.4 min Primary = 19.29 cfs @ 12.01 hrs, Volume= 1.230 af Secondary = 0.00 cfs @ 0.10 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Peak Elev= 975.96' @ 12.01 hrs Surf.Area= 9,329 sf Storage= 19,323 cf Plug-Flow detention time= 340.9 min calculated for 1.230 af (100% of inflow) Center-of-Mass det. time= 340.7 min ( 1,113.7 - 773.0 ) Volume Invert Avail.Storage Storage Description #1 973.50' 40,859 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 973.50 6,001 0 0 974.00 7,043 3,261 3,261 975.00 8,260 7,652 10,913 976.00 9,378 8,819 19,732 977.00 10,548 9,963 29,695 978.00 11,780 11,164 40,859 Device Routing Invert Outlet Devices #1 Primary 973.50'30.0" Round RCP_Round 30" L= 17.0' Box, 0° wingwalls, square crown edge, Ke= 0.700 Inlet / Outlet Invert= 973.50' / 973.41' S= 0.0053 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 4.91 sf #2 Device 1 973.50'2.0" Horiz. WQ Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 974.88'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.77 Width (feet) 3.50 3.50 #4 Device 1 975.65'48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 976.29'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=19.39 cfs @ 12.01 hrs HW=975.95' (Free Discharge) 1=RCP_Round 30" (Passes 19.39 cfs of 19.41 cfs potential flow) 2=WQ Orifice (Orifice Controls 0.16 cfs @ 7.53 fps) 3=Custom Weir/Orifice (Orifice Controls 10.78 cfs @ 4.00 fps) 4=Riser (Weir Controls 8.45 cfs @ 1.78 fps) Secondary OutFlow Max=0.00 cfs @ 0.10 hrs HW=973.50' (Free Discharge) 5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 10-Year Rainfall=5.16"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 32HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Pond 2P: Pond Inflow Outflow Primary Secondary Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=3.390 ac Peak Elev=975.96' Storage=19,323 cf 24.00 cfs 19.29 cfs19.29 cfs 0.00 cfs Type II 24-hr 10-Year Rainfall=5.16"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 33HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Link 5L: Post Development Inflow Area = 21.780 ac, 0.00% Impervious, Inflow Depth = 3.99" for 10-Year event Inflow = 137.97 cfs @ 11.96 hrs, Volume= 7.246 af Primary = 137.97 cfs @ 11.96 hrs, Volume= 7.246 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Link 5L: Post Development Inflow Primary Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=21.780 ac 137.97 cfs137.97 cfs Type II 24-hr 25-Year Rainfall=6.17"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 34HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Time span=0.10-99.00 hrs, dt=0.05 hrs, 1979 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=3.390 ac 0.00% Impervious Runoff Depth=5.35"Subcatchment 1S: Basin 1 Post Dev. Tc=5.0 min CN=93 Runoff=29.10 cfs 1.511 af Runoff Area=21.780 ac 0.00% Impervious Runoff Depth=4.68"Subcatchment 3S: Pre Dev. Tc=5.0 min CN=87 Runoff=172.53 cfs 8.494 af Runoff Area=18.390 ac 0.00% Impervious Runoff Depth=4.90"Subcatchment 4S: Bypass Tc=5.0 min CN=89 Runoff=150.22 cfs 7.510 af Peak Elev=976.14' Storage=21,040 cf Inflow=29.10 cfs 1.511 afPond 2P: Pond Primary=21.66 cfs 1.511 af Secondary=0.00 cfs 0.000 af Outflow=21.66 cfs 1.511 af Inflow=170.79 cfs 9.021 afLink 5L: Post Development Primary=170.79 cfs 9.021 af Total Runoff Area = 43.560 ac Runoff Volume = 17.515 af Average Runoff Depth = 4.83" 100.00% Pervious = 43.560 ac 0.00% Impervious = 0.000 ac Type II 24-hr 25-Year Rainfall=6.17"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 35HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Basin 1 Post Dev. [49] Hint: Tc<2dt may require smaller dt Runoff = 29.10 cfs @ 11.95 hrs, Volume= 1.511 af, Depth= 5.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.17" Area (ac) CN Description * 3.390 93 3.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: Basin 1 Post Dev. Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 25-Year Rainfall=6.17" Runoff Area=3.390 ac Runoff Volume=1.511 af Runoff Depth=5.35" Tc=5.0 min CN=93 29.10 cfs Type II 24-hr 25-Year Rainfall=6.17"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 36HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 3S: Pre Dev. [49] Hint: Tc<2dt may require smaller dt Runoff = 172.53 cfs @ 11.95 hrs, Volume= 8.494 af, Depth= 4.68" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.17" Area (ac) CN Description * 21.780 87 21.780 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: Pre Dev. Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 25-Year Rainfall=6.17" Runoff Area=21.780 ac Runoff Volume=8.494 af Runoff Depth=4.68" Tc=5.0 min CN=87 172.53 cfs Type II 24-hr 25-Year Rainfall=6.17"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 37HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 4S: Bypass [49] Hint: Tc<2dt may require smaller dt Runoff = 150.22 cfs @ 11.95 hrs, Volume= 7.510 af, Depth= 4.90" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.17" Area (ac) CN Description * 18.390 89 18.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Bypass Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 25-Year Rainfall=6.17" Runoff Area=18.390 ac Runoff Volume=7.510 af Runoff Depth=4.90" Tc=5.0 min CN=89 150.22 cfs Type II 24-hr 25-Year Rainfall=6.17"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 38HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Pond 2P: Pond Inflow Area = 3.390 ac, 0.00% Impervious, Inflow Depth = 5.35" for 25-Year event Inflow = 29.10 cfs @ 11.95 hrs, Volume= 1.511 af Outflow = 21.66 cfs @ 12.01 hrs, Volume= 1.511 af, Atten= 26%, Lag= 3.5 min Primary = 21.66 cfs @ 12.01 hrs, Volume= 1.511 af Secondary = 0.00 cfs @ 0.10 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Peak Elev= 976.14' @ 12.01 hrs Surf.Area= 9,540 sf Storage= 21,040 cf Plug-Flow detention time= 285.8 min calculated for 1.511 af (100% of inflow) Center-of-Mass det. time= 287.4 min ( 1,055.2 - 767.7 ) Volume Invert Avail.Storage Storage Description #1 973.50' 40,859 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 973.50 6,001 0 0 974.00 7,043 3,261 3,261 975.00 8,260 7,652 10,913 976.00 9,378 8,819 19,732 977.00 10,548 9,963 29,695 978.00 11,780 11,164 40,859 Device Routing Invert Outlet Devices #1 Primary 973.50'30.0" Round RCP_Round 30" L= 17.0' Box, 0° wingwalls, square crown edge, Ke= 0.700 Inlet / Outlet Invert= 973.50' / 973.41' S= 0.0053 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 4.91 sf #2 Device 1 973.50'2.0" Horiz. WQ Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 974.88'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.77 Width (feet) 3.50 3.50 #4 Device 1 975.65'48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 976.29'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=21.52 cfs @ 12.01 hrs HW=976.13' (Free Discharge) 1=RCP_Round 30" (Barrel Controls 21.52 cfs @ 5.19 fps) 2=WQ Orifice (Passes < 0.17 cfs potential flow) 3=Custom Weir/Orifice (Passes < 12.18 cfs potential flow) 4=Riser (Passes < 17.20 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.10 hrs HW=973.50' (Free Discharge) 5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 25-Year Rainfall=6.17"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 39HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Pond 2P: Pond Inflow Outflow Primary Secondary Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=3.390 ac Peak Elev=976.14' Storage=21,040 cf 29.10 cfs 21.66 cfs21.66 cfs 0.00 cfs Type II 24-hr 25-Year Rainfall=6.17"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 40HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Link 5L: Post Development Inflow Area = 21.780 ac, 0.00% Impervious, Inflow Depth = 4.97" for 25-Year event Inflow = 170.79 cfs @ 11.95 hrs, Volume= 9.021 af Primary = 170.79 cfs @ 11.95 hrs, Volume= 9.021 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Link 5L: Post Development Inflow Primary Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=21.780 ac 170.79 cfs170.79 cfs Type II 24-hr 50-Year Rainfall=6.98"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 41HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Time span=0.10-99.00 hrs, dt=0.05 hrs, 1979 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=3.390 ac 0.00% Impervious Runoff Depth=6.15"Subcatchment 1S: Basin 1 Post Dev. Tc=5.0 min CN=93 Runoff=33.17 cfs 1.738 af Runoff Area=21.780 ac 0.00% Impervious Runoff Depth=5.46"Subcatchment 3S: Pre Dev. Tc=5.0 min CN=87 Runoff=199.30 cfs 9.910 af Runoff Area=18.390 ac 0.00% Impervious Runoff Depth=5.69"Subcatchment 4S: Bypass Tc=5.0 min CN=89 Runoff=172.68 cfs 8.718 af Peak Elev=976.29' Storage=22,532 cf Inflow=33.17 cfs 1.738 afPond 2P: Pond Primary=23.42 cfs 1.738 af Secondary=0.00 cfs 0.000 af Outflow=23.42 cfs 1.738 af Inflow=194.40 cfs 10.455 afLink 5L: Post Development Primary=194.40 cfs 10.455 af Total Runoff Area = 43.560 ac Runoff Volume = 20.365 af Average Runoff Depth = 5.61" 100.00% Pervious = 43.560 ac 0.00% Impervious = 0.000 ac Type II 24-hr 50-Year Rainfall=6.98"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 42HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Basin 1 Post Dev. [49] Hint: Tc<2dt may require smaller dt Runoff = 33.17 cfs @ 11.95 hrs, Volume= 1.738 af, Depth= 6.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=6.98" Area (ac) CN Description * 3.390 93 3.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: Basin 1 Post Dev. Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 50-Year Rainfall=6.98" Runoff Area=3.390 ac Runoff Volume=1.738 af Runoff Depth=6.15" Tc=5.0 min CN=93 33.17 cfs Type II 24-hr 50-Year Rainfall=6.98"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 43HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 3S: Pre Dev. [49] Hint: Tc<2dt may require smaller dt Runoff = 199.30 cfs @ 11.95 hrs, Volume= 9.910 af, Depth= 5.46" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=6.98" Area (ac) CN Description * 21.780 87 21.780 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: Pre Dev. Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 50-Year Rainfall=6.98" Runoff Area=21.780 ac Runoff Volume=9.910 af Runoff Depth=5.46" Tc=5.0 min CN=87 199.30 cfs Type II 24-hr 50-Year Rainfall=6.98"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 44HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 4S: Bypass [49] Hint: Tc<2dt may require smaller dt Runoff = 172.68 cfs @ 11.95 hrs, Volume= 8.718 af, Depth= 5.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=6.98" Area (ac) CN Description * 18.390 89 18.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Bypass Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 50-Year Rainfall=6.98" Runoff Area=18.390 ac Runoff Volume=8.718 af Runoff Depth=5.69" Tc=5.0 min CN=89 172.68 cfs Type II 24-hr 50-Year Rainfall=6.98"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 45HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Pond 2P: Pond Inflow Area = 3.390 ac, 0.00% Impervious, Inflow Depth = 6.15" for 50-Year event Inflow = 33.17 cfs @ 11.95 hrs, Volume= 1.738 af Outflow = 23.42 cfs @ 12.02 hrs, Volume= 1.738 af, Atten= 29%, Lag= 3.9 min Primary = 23.42 cfs @ 12.02 hrs, Volume= 1.738 af Secondary = 0.00 cfs @ 0.10 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Peak Elev= 976.29' @ 12.02 hrs Surf.Area= 9,721 sf Storage= 22,532 cf Plug-Flow detention time= 255.3 min calculated for 1.737 af (100% of inflow) Center-of-Mass det. time= 256.9 min ( 1,021.2 - 764.3 ) Volume Invert Avail.Storage Storage Description #1 973.50' 40,859 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 973.50 6,001 0 0 974.00 7,043 3,261 3,261 975.00 8,260 7,652 10,913 976.00 9,378 8,819 19,732 977.00 10,548 9,963 29,695 978.00 11,780 11,164 40,859 Device Routing Invert Outlet Devices #1 Primary 973.50'30.0" Round RCP_Round 30" L= 17.0' Box, 0° wingwalls, square crown edge, Ke= 0.700 Inlet / Outlet Invert= 973.50' / 973.41' S= 0.0053 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 4.91 sf #2 Device 1 973.50'2.0" Horiz. WQ Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 974.88'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.77 Width (feet) 3.50 3.50 #4 Device 1 975.65'48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 976.29'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=23.19 cfs @ 12.02 hrs HW=976.27' (Free Discharge) 1=RCP_Round 30" (Barrel Controls 23.19 cfs @ 5.31 fps) 2=WQ Orifice (Passes < 0.17 cfs potential flow) 3=Custom Weir/Orifice (Passes < 13.21 cfs potential flow) 4=Riser (Passes < 25.75 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.10 hrs HW=973.50' (Free Discharge) 5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 50-Year Rainfall=6.98"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 46HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Pond 2P: Pond Inflow Outflow Primary Secondary Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=3.390 ac Peak Elev=976.29' Storage=22,532 cf 33.17 cfs 23.42 cfs23.42 cfs 0.00 cfs Type II 24-hr 50-Year Rainfall=6.98"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 47HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Link 5L: Post Development Inflow Area = 21.780 ac, 0.00% Impervious, Inflow Depth = 5.76" for 50-Year event Inflow = 194.40 cfs @ 11.95 hrs, Volume= 10.455 af Primary = 194.40 cfs @ 11.95 hrs, Volume= 10.455 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Link 5L: Post Development Inflow Primary Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=21.780 ac 194.40 cfs194.40 cfs Type II 24-hr 100-Year Rainfall=7.81"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 48HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Time span=0.10-99.00 hrs, dt=0.05 hrs, 1979 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=3.390 ac 0.00% Impervious Runoff Depth=6.97"Subcatchment 1S: Basin 1 Post Dev. Tc=5.0 min CN=93 Runoff=37.32 cfs 1.970 af Runoff Area=21.780 ac 0.00% Impervious Runoff Depth=6.26"Subcatchment 3S: Pre Dev. Tc=5.0 min CN=87 Runoff=226.62 cfs 11.371 af Runoff Area=18.390 ac 0.00% Impervious Runoff Depth=6.50"Subcatchment 4S: Bypass Tc=5.0 min CN=89 Runoff=195.58 cfs 9.962 af Peak Elev=976.45' Storage=24,073 cf Inflow=37.32 cfs 1.970 afPond 2P: Pond Primary=25.09 cfs 1.960 af Secondary=1.50 cfs 0.010 af Outflow=26.59 cfs 1.970 af Inflow=218.82 cfs 11.932 afLink 5L: Post Development Primary=218.82 cfs 11.932 af Total Runoff Area = 43.560 ac Runoff Volume = 23.303 af Average Runoff Depth = 6.42" 100.00% Pervious = 43.560 ac 0.00% Impervious = 0.000 ac Type II 24-hr 100-Year Rainfall=7.81"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 49HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Basin 1 Post Dev. [49] Hint: Tc<2dt may require smaller dt Runoff = 37.32 cfs @ 11.95 hrs, Volume= 1.970 af, Depth= 6.97" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.81" Area (ac) CN Description * 3.390 93 3.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: Basin 1 Post Dev. Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 100-Year Rainfall=7.81" Runoff Area=3.390 ac Runoff Volume=1.970 af Runoff Depth=6.97" Tc=5.0 min CN=93 37.32 cfs Type II 24-hr 100-Year Rainfall=7.81"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 50HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 3S: Pre Dev. [49] Hint: Tc<2dt may require smaller dt Runoff = 226.62 cfs @ 11.95 hrs, Volume= 11.371 af, Depth= 6.26" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.81" Area (ac) CN Description * 21.780 87 21.780 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: Pre Dev. Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)250 240 230 220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 100-Year Rainfall=7.81" Runoff Area=21.780 ac Runoff Volume=11.371 af Runoff Depth=6.26" Tc=5.0 min CN=87 226.62 cfs Type II 24-hr 100-Year Rainfall=7.81"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 51HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 4S: Bypass [49] Hint: Tc<2dt may require smaller dt Runoff = 195.58 cfs @ 11.95 hrs, Volume= 9.962 af, Depth= 6.50" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.81" Area (ac) CN Description * 18.390 89 18.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Bypass Runoff Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 100-Year Rainfall=7.81" Runoff Area=18.390 ac Runoff Volume=9.962 af Runoff Depth=6.50" Tc=5.0 min CN=89 195.58 cfs Type II 24-hr 100-Year Rainfall=7.81"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 52HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Pond 2P: Pond Inflow Area = 3.390 ac, 0.00% Impervious, Inflow Depth = 6.97" for 100-Year event Inflow = 37.32 cfs @ 11.95 hrs, Volume= 1.970 af Outflow = 26.59 cfs @ 12.01 hrs, Volume= 1.970 af, Atten= 29%, Lag= 3.8 min Primary = 25.09 cfs @ 12.02 hrs, Volume= 1.960 af Secondary = 1.50 cfs @ 12.01 hrs, Volume= 0.010 af Routing by Stor-Ind method, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Peak Elev= 976.45' @ 12.02 hrs Surf.Area= 9,905 sf Storage= 24,073 cf Plug-Flow detention time= 232.6 min calculated for 1.970 af (100% of inflow) Center-of-Mass det. time= 232.4 min ( 993.8 - 761.4 ) Volume Invert Avail.Storage Storage Description #1 973.50' 40,859 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 973.50 6,001 0 0 974.00 7,043 3,261 3,261 975.00 8,260 7,652 10,913 976.00 9,378 8,819 19,732 977.00 10,548 9,963 29,695 978.00 11,780 11,164 40,859 Device Routing Invert Outlet Devices #1 Primary 973.50'30.0" Round RCP_Round 30" L= 17.0' Box, 0° wingwalls, square crown edge, Ke= 0.700 Inlet / Outlet Invert= 973.50' / 973.41' S= 0.0053 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 4.91 sf #2 Device 1 973.50'2.0" Horiz. WQ Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 974.88'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.77 Width (feet) 3.50 3.50 #4 Device 1 975.65'48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 976.29'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=24.85 cfs @ 12.02 hrs HW=976.43' (Free Discharge) 1=RCP_Round 30" (Barrel Controls 24.85 cfs @ 5.44 fps) 2=WQ Orifice (Passes < 0.18 cfs potential flow) 3=Custom Weir/Orifice (Passes < 14.20 cfs potential flow) 4=Riser (Passes < 35.83 cfs potential flow) Secondary OutFlow Max=1.31 cfs @ 12.01 hrs HW=976.43' (Free Discharge) 5=Broad-Crested Rectangular Weir (Weir Controls 1.31 cfs @ 0.93 fps) Type II 24-hr 100-Year Rainfall=7.81"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 53HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Pond 2P: Pond Inflow Outflow Primary Secondary Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=3.390 ac Peak Elev=976.45' Storage=24,073 cf 37.32 cfs 26.59 cfs 25.09 cfs 1.50 cfs Type II 24-hr 100-Year Rainfall=7.81"Basin Printed 10/25/2018Prepared by {enter your company name here} Page 54HydroCAD® 10.00-15 s/n 01460 © 2015 HydroCAD Software Solutions LLC Summary for Link 5L: Post Development Inflow Area = 21.780 ac, 0.00% Impervious, Inflow Depth = 6.57" for 100-Year event Inflow = 218.82 cfs @ 11.95 hrs, Volume= 11.932 af Primary = 218.82 cfs @ 11.95 hrs, Volume= 11.932 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.10-99.00 hrs, dt= 0.05 hrs Link 5L: Post Development Inflow Primary Hydrograph Time (hours) 9590858075706560555045403530252015105Flow (cfs)240 230 220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=21.780 ac 218.82 cfs218.82 cfs TR TR TR TR TR TR TR TR 980983984 980983975 980 968 980 FILE PATH:M:\Projects\MV Commerical Construction\2018028200CL - Pratt Corrugating\CADD\Plan Set\2018028200_C_SHT_SKETCH IMPERVIOUS PLAN.dwgM:\Projects\MV Commerical Construction\2018028200CL - Pratt Corrugating\CADD\Plan Set\2018028200_C_SHT_SKETCH IMPERVIOUS PLAN.dwg, ESUDDRETH, 10/25/2018 1:27:03 PM616 COLONNADE DR CHARLOTTE, NC 28205 (t)(704) 334-0078 (f)(704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 WGB ETS ETS AUG. 2018 2018028200.CL PRELIMINARY - DO NOT USE FOR CONSTRUCTION PLOT DATE: 10/25/2018PRATT CORRUGATINGFORMV COMMERICAL CONSTRUCTION185 N. MAIN ST. SUITE 600 DAYTON, OH 45402DRAINAGE AREA PLANCOPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.WKD PROJ. NO.: DRAWING NUMBER: PROJ. DATE: PROJ. MGR.: DESIGN BY: DRAWN BY:PROJECT NAME:DRAWING TITLE:PROFESSIONAL SEAL REVISION RECORDDESCRIPTIONBYDATENO.community infrastructure consultants DRAINAGE AREA 2: 18.41 ACRES (802,057 SQFT.) IMPERVIOUS AREA: 593,013 SQFT. PERCENT IMPERVIOUS: 73.94% DRAINAGE AREA 1: 3.37 ACRES (146,979 SQFT.) IMPERVIOUS AREA: 125,196 SQFT. PERCENT IMPERVIOUS: 85.18% G1.0 050 50 100 SCALE: 1" = 50' PROPERTY BOUNDARY (TYP.) DRAINAGE AREA DELINEATION LINE (TYP.) EX. DRAINAGE AREA: 1.04 AC. EX. DRAINAGE AREA: 1.79 AC. EX. DRAINAGE AREA: 2.21 AC. EX. DRAINAGE AREA: 0.77 AC. EX. DRAINAGE AREA: 0.79 AC. PROP. DI-2 DRAINAGE AREA: 1.46 AC.PROP. DI-3 DRAINAGE AREA: 1.42 AC. 24" RCP TR TR TR SSxSSxTR 18" CPPFILE PATH:M:\Projects\MV Commerical Construction\2018028200CL - Pratt Corrugating\CADD\Plan Set\2018028200_C_SHT_SKETCH IMPERVIOUS PLAN.dwgM:\Projects\MV Commerical Construction\2018028200CL - Pratt Corrugating\CADD\Plan Set\2018028200_C_SHT_SKETCH IMPERVIOUS PLAN.dwg, ESUDDRETH, 10/25/2018 1:27:10 PM616 COLONNADE DR CHARLOTTE, NC 28205 (t)(704) 334-0078 (f)(704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 WGB ETS ETS AUG. 2018 2018028200.CL PRELIMINARY - DO NOT USE FOR CONSTRUCTION PLOT DATE: 10/25/2018PRATT CORRUGATINGFORMV COMMERICAL CONSTRUCTION185 N. MAIN ST. SUITE 600 DAYTON, OH 45402COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.WKD PROJ. NO.: DRAWING NUMBER: PROJ. DATE: PROJ. MGR.: DESIGN BY: DRAWN BY:PROJECT NAME:DRAWING TITLE:PROFESSIONAL SEAL REVISION RECORDDESCRIPTIONBYDATENO.community infrastructure consultants EXISTING IMPERVIOUS AREA 665,793 SQFT.EXISTING IMPERVIOUS AREA PLANG1.1 PROPERTY BOUNDARY (TYP.) 050 50 100 SCALE: 1" = 50' -EXISTING IMPERVIOUS AREA: 665,793 SQFT. IMPERVIOUS SUMMARY: TR TR TR SSxSSxTR TR TR TR SSxSSxTR FILE PATH:M:\Projects\MV Commerical Construction\2018028200CL - Pratt Corrugating\CADD\Plan Set\2018028200_C_SHT_SKETCH IMPERVIOUS PLAN.dwgM:\Projects\MV Commerical Construction\2018028200CL - Pratt Corrugating\CADD\Plan Set\2018028200_C_SHT_SKETCH IMPERVIOUS PLAN.dwg, ESUDDRETH, 10/25/2018 1:27:15 PM616 COLONNADE DR CHARLOTTE, NC 28205 (t)(704) 334-0078 (f)(704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 WGB ETS ETS AUG. 2018 2018028200.CL PRELIMINARY - DO NOT USE FOR CONSTRUCTION PLOT DATE: 10/25/2018PRATT CORRUGATINGFORMV COMMERICAL CONSTRUCTION185 N. MAIN ST. SUITE 600 DAYTON, OH 45402PROPERTY BOUNDARY (TYP.)COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.WKD PROJ. NO.: DRAWING NUMBER: PROJ. DATE: PROJ. MGR.: DESIGN BY: DRAWN BY:PROJECT NAME:DRAWING TITLE:PROFESSIONAL SEAL REVISION RECORDDESCRIPTIONBYDATENO.community infrastructure consultants PROPOSED PARKING IMPERVIOUS AREA: 5,584 SQFT. 050 50 100 SCALE: 1" = 50' -EXISTING IMPERVIOUS AREA: 665,793 SQFT. - PROPOSED IMPERVIOUS AREA: 88,916 SQFT. -EXISTING IMPERVIOUS AREA TO BE REMOVED: 36,500 SQFT. -NET IMPERVIOUS AREA: 718,209 SQFT. -ADDITIONAL IMPERVIOUS AREA TO BE TREATED: 52,416 SQFT. IMPERVIOUS SUMMARY: PROPOSED PARKING IMPERVIOUS AREA: 5,607 SQFT. EX. IMPERVIOUS REMOVED: 18,852 SQFT. EX. IMPERVIOUS TO BE REMOVED: 17,648 SQFT. PROPOSED BUILDING AND DOCK AREA IMPERVIOUS AREA: 77,725 SQFT.PROPOSED IMPERVIOUS AREA PLANG1.2