Loading...
HomeMy WebLinkAboutSW3180606_6198 Engineer's Report Summary 9-25-18_20181026STORMWATER MANAGEMENT AND EROSION CONTROL DESIGN CAVESSON SUBDIVISION Wesley Chapel, North Carolina for Bowman Development Group John H. Ross, P.E. EAGLE ENGINEERING, INC. 2013A Van Buren Ave. Indian Trail, NC 28079 EEI PROJECT NO.: 6198 May 25, 2018 REVISION DATE: Initials Date KEW 8-1-18 KEW 9-25-18 5-28-18 Cavesson Subdivision - Wesley Chapel, NC EEI Project #6198 Stormwater Management Report May 28, 2018 Contents   1.0 Project Address and Summary ..................................................................................................................... 3  2.0 Water Quality Volume Control and Peak Flow Control .............................................................................. 3  3.0 Predeveloped ........................................................................................................................................... 3-4  4.0 Post Developed Conditions .......................................................................................................................... 4  5.0 Detention Stage/Storage Computations ........................................................................................................ 4  6.0 Outlet Structures .......................................................................................................................................... 5  7.0 Stormwater System ...................................................................................................................................... 5  8.0 Erosion Control ............................................................................................................................................ 5  Cavesson Subdivision - Wesley Chapel, NC EEI Project #6198 Stormwater Management Report May 28, 2018 1.0 Project Address and Summary The project is located within the City of Wesley Chapel, in Union County of North Carolina, on the east side of Chambwood Road, between New Town Road and Potter Road. The proposed development will include the construction of 28 single family lots. The site was entitled as a low impact development and the construction will included only the installation of the proposed roads, utility infrastructure, and BMP wet pond. The single family lots are intended to be graded by each individual purchaser to accommodate a custom built home. Runoff calculations were performed following the procedures outlined in the NCDEQ Stormwater BMP Manual using the SCS method, while taking into consideration Section 14.5 "General Standards for Stormwater Management" of the Village of Wesley Chapel Zoning Ordinance. Calculations are provided in Appendix A of this report. The receiving drainage system for this site is East Fork Twelvemile Creek (FIRM Map Number 3710449500J effective date 10/16/2008). Soils on the site consist of:  BdB2 –Badin Channery Silty Loam, 2 to 8 percent slopes, moderately eroded, Hydrologic Soils Group "C"  ChA - Chewacla Silty Loam, 0 to 2 percent slopes, Hydrologic Soils Group "B/D"  TbB2 – Tarrus Gravelly Silty Clay Loam, 2 to 8 percent slopes, moderately eroded, Hydrologic Soils Group "B" Weighted curve number values based on the existing and proposed soils conditions were used to calculate pre and post development runoff. Drainage area maps supporting curve number calculation information can be found in Appendix C. 2.0 Water Quality Volume Control and Peak Flow Control The project is a low impact development and no water quality control will be required for the site. 3.0 Predeveloped Conditions The existing conditions currently consist of primarily prairie style grass with pockets of dense woods sporadically throughout the site. A small cow pond is located on the south side of the site, alongside an existing dirt road which parallels the existing flood plain. The terrain of the site consist of moderate to steep slopes forming natural ditches conveying overland runoff to an existing pond to the west, and to the flood plain at the southern portion of the property. The total pre-development drainage from the site was studied at the southwest corner of the property within the existing flood plain. This study point is the lowest elevation of the site. See the Pre- Development and Post Development Drainage Area Maps included in the Appendix A of this report. The time of concentration has been calculated using TR-55 and is outlined on the drainage area maps, and calculations. Curve Numbers (CN) were computed as a composite average of the various existing soil types and land features in the pre-development drainage area which is the following:  Pre-Development Area 1: CN = 75 Cavesson Subdivision - Wesley Chapel, NC EEI Project #6198 Stormwater Management Report May 28, 2018  Pre-Development Area 2: CN = 70 Calculations have been included on the hydrographs in Appendix A of this report. See the Pre- Development and Post Development Drainage Area Maps also included in the Appendix A of this report. 4.0 Post Developed Conditions The development will consist of the grading of the proposed roads, BMP wet pond, and miscellaneous drainage ditches that convey runoff into the proposed storm system. The remaining undisturbed area on the site was treated as bypass area to be taken into consideration in terms of the overall pre/post comparison of runoff from the site. The post development hydrographs have been modeled for the proposed onsite improvements and the proposed bypass areas, and combined for a cumulative comparison to the existing runoff from the site. The composite Curve Numbers calculated for the post developed basins are the following  Post Development Area: CN = 73  Post Development Bypass Area 1: CN = 78  Post Development Bypass Area 2: CN = 61 5.0 Detention Stage/Storage Computations A wet detention pond has been designed to detain the 1-year, 2-year, 10-year, and 25-year storm frequencies and control the 50-year and 100-year storm frequencies through proposed discharge outlet controls. Due to the fact that the project is a low impact development, no water quality treatment is required for the site. The pre-development and post development peak flow comparison is the following: The stage/storage calculations are included in Appendix A of this report. The rainfall intensities used are for the 24 hour storm for each storm event for both the pre-developed and post-developed conditions based on the latest rainfall data from NOAA. Cavesson Subdivision - Wesley Chapel, NC EEI Project #6198 Stormwater Management Report May 28, 2018 6.0 Outlet Structures The outlet structure will be constructed within the BMP near the downstream end of the pond. The structure has been designed to efficiently provide control of the peak rate of discharge. An emergency spillway has been included into the design to pass the 50 & 100 year storm events with at least 0.5’ of freeboard. 7.0 Stormwater System Stormwater conveyances to the BMP forebay will be through overland flow and a closed stormwater drainage pipe network. The pipe network calculations are based on the future build out of the site and were sized for a 10-year storm frequency. All proposed catch basins have be sized based on a flow of 4- incehs per hour to effectively analyze gutter spread within the subdivision. The calculations have been provided in Appendix B. 8.0 Erosion Control Erosion control will be provided by utilizing construction entrance, perimeter silt fence, diversion ditches, check dams, and a temporary skimmer basins (with Faircloth Skimmer device). Phase II erosion control shall also utilize inlet protection until the project area has been adequately stabilized. Erosion control devices will be maintain in place until approval by the Village of Wesley Chapel Engineering staff at which time temporary measures will be removed. A copy of the erosion control plan and sediment basin calculations has been provided in Appendix D. Cavesson Subdivision - Wesley Chapel, NC EEI Project #6198 Stormwater Management Report May 28, 2018 Appendix A Stormwater Hydrographs (24-hour: 1-yr, 2-yr, 10-yr, 25-yr, 50-year, and 100-year) Pre-Development Drainage Area Map Post-Development Drainage Area Map 6198-CAVESSON U.S. Fish and Wildlife Service, National Standards and Support Team,wetlands_team@fws.gov Wetlands Estuarine and Marine Deepwater Estuarine and Marine Wetland Freshwater Emergent Wetland Freshwater Forested/Shrub Wetland Freshwater Pond Lake Other Riverine July 26, 2018 0 0.15 0.30.075 mi 0 0.3 0.60.15 km 1:11,072 This page was produced by the NWI mapperNational Wetlands Inventory (NWI) This map is for general reference only. The US Fish and Wildlife Service is not responsible for the accuracy or currentness of the base data shown on this map. All wetlands related data should be used in accordance with the layer metadata found on the Wetlands Mapper web site. 0+001+002 + 0 03+004+0 0 5 + 0 0 6 + 0 0 7 + 0 0 8+ 0 09+0010+0011+0012+0013+0014+0015+00 16 + 0 0 17+0018+0019+0020+0021+0022+0022+910+001+002+00 3+004+005+00 6+ 0 0 7 + 0 0 8 + 0 0 9+ 0 0 10+ 0 0 1 1 + 0 0 12+00 12 + 3 8 ALIGNMENT=TC-PRE-1STATION=5+03.16OFFSET=0.00NORTHING=455213.24EASTING=1498285.22ALIGNMENT=TC-PRE-1STATION=3+00.00OFFSET=0.00NORTHING=455211.89EASTING=1498090.446 0 0 5955 9 0 5 8 5 5805755706 0 0 610605 600 5955905855805755455505555605655705755805855905956005 4 5 5455455455455 7 5 58 0 585 59 0 59 5 6 0 0 600 605605600595 590 585570570565560555 59 5545 ALIGNMENT=TC-PRE-2STATION=3+26.97OFFSET=0.00NORTHING=456471.15EASTING=1498071.23ALIGNMENT=TC-PRE-2STATION=11+70.07OFFSET=0.00NORTHING=455750.58EASTING=1498390.90ALIGNMENT=TC-PRE-2STATION=15+03.13OFFSET=0.00NORTHING=455667.68EASTING=1498712.71ALIGNMENT=TC-PRE-2STATION=2+59.97OFFSET=0.00NORTHING=456534.73EASTING=1498050.985455500+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0015+510040'80'80SheetScale DESIGNED BY CHECKED BY JOB NUMBER DRAWN BY DATE NO.DATE BY ISSUE www.eagleonline.net P.O. BOX 551 Alpharetta, GA 30009 (678) 339-0640 2013A Van Buren Avenue Indian Trail, NC 28079 (704) 882-4222 FIRM LICENSE # C-0873 AS SHOWN 5/25/2018 6198 PRE-DEVELOPMENT DRAINAGE AREA MAP CAVESSON VILLAGE OF WESLEY CHAPEL BOWMAN DEVELOPMENT 13815 CINNABAR PL HUNTERSVILLE, NC JHRKEWKEWPRE-DANSWEE.E.I.STUDY POINTPRE-DEVELOPMENT AREA 2AREA = 27.92 ACCN = 70Tc = 32.1 minEXISTING FLOOD PLAINSHEET FLOWSHALLOWCONCENTRATEDFLOWC H A N N E L F L OWCHANNEL FLOW ALONG REACHCHAMBWOOD ROADCHAMBWOOD ROADPRE-DEVELOPMENT AREA 1AREA = 25.33 ACCN = 75Tc = 42 minC H A N N E L F L OW EXISTING POND LENGTHNOT INCLUDED IN TcCALCULATIONSSHALLOWCONCENTRATEDFLOWSHEET FLOWCHANNEL FLOWCHANNEL FLOW EXISTINGPONDEXISTINGPONDEXISTINGPONDCHANNEL FLOW ALONG REACHCHANNEL FLOW ALONG REACHEND PRE-1 TcEND PRE-2 Tc OPEN SPACE 71,807 sq ft 1.65 ac LOT : 20 43,137 sq ft 0.99 ac LOT : 27 40,130 sq ft 0.92 ac OPEN SPACE : 107 8,546 sq ft 0.20 ac OPEN SPACE : 120 9,596 sq ft 0.22 ac OPEN SPACE 391,321 sq ft 8.98 ac LOT : 19 45,589 sq ft 1.05 ac LOT : 21 40,291 sq ft 0.92 ac LOT : 26 41,930 sq ft 0.96 ac LOT : 22 48,262 sq ft 1.11 ac LOT : 23 40,248 sq ft 0.92 ac LOT : 25 41,071 sq ft 0.94 ac LOT : 24 41,998 sq ft 0.96 ac LOT : 28 43,358 sq ft 1.00 ac LOT : 16 40,240 sq ft 0.92 ac LOT : 17 40,071 sq ft 0.92 ac LOT : 18 40,073 sq ft 0.92 ac LOT : 14 40,569 sq ft 0.93 ac LOT : 15 40,040 sq ft 0.92 ac LOT : 13 40,708 sq ft 0.93 ac LOT : 12 50,858 sq ft 1.17 ac LOT : 3 40,422 sq ft 0.93 ac LOT : 11 41,000 sq ft 0.94 ac LOT : 2 41,374 sq ft 0.95 ac LOT : 10 40,987 sq ft 0.94 ac LOT : 1 43,441 sq ft 1.00 ac LOT : 9 40,974 sq ft 0.94 ac LOT : 8 40,961 sq ft 0.94 ac LOT : 7 40,948 sq ft 0.94 ac LOT : 6 56,352 sq ft 1.29 ac LOT : 4 43,306 sq ft 0.99 ac LOT : 5 59,984 sq ft 1.38 ac D600 590 580 570600610 600590 58 0 55 0 560 570 58 0 59 0 600 580590600 6006005905 7 0 5 7 0 560 0+ 0 0 1 + 0 0 2 + 0 0 3 + 0 0 4+00 5+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+00 22+00 23+0024+0025+0026+0027+0028+0029+0030+00 3 1 + 0 0 32 + 0 0 33 + 0 034+0035+0035+15ALIGNMENT=TC-POST-BYPASS STATION=1+00.00 OFFSET=0.00 NORTHING=456260.43 EASTING=1498419.37 ALIGNMENT=TC-POST-BYPASS STATION=3+69.55 OFFSET=0.00 NORTHING=456130.63 EASTING=1498186.55 5505 6 4 . 4 9 5 64 . 8 5 5 6 7 . 6 6 5 7 1 . 1 1 5 74 . 7 0 5 78 . 1 3 5 82 . 2 7 5 8 1 . 8 3 Sheet ScaleDESIGNED BYCHECKED BYJOB NUMBERDRAWN BYDATENO.DATEBYISSUEwww.eagleonline.net P.O. BOX 551Alpharetta, GA 30009(678) 339-06402013A Van Buren AvenueIndian Trail, NC 28079(704) 882-4222FIRM LICENSE # C-0873AS SHOWN6198CAVESSONVILLAGE OF WESLEY CHAPELBOWMAN DEVELOPMENT13815 CINNABAR PLHUNTERSVILLE, NCJHRNSWEE.E . I .DRAINAGE AREA MAPPOST DEVELOPMENTKEWKEW5/25/2018POST-DA STUDY POINT POST DEVELOPMENT AREA AREA = 27.15 AC CN = 73 Tc = 5 min 00 40'80' 80 EXISTING FLOOD PLAIN CHAMBWOO D R O A D CHAMBWOO D R O A D POST DEVELOPMENT BYPASS 1 AREA = 26.15 AC CN = 78 Tc = 29.6 min EXISTING POND LENGTH NOT INCLUDED IN Tc CALCULATIONS EXISTING POND POST DEVELOPMENT BYPASS 2 AREA = 0.32 AC CN = 61 Tc = 5 min (SAME PRE VS. POST)17-20-18KEWREVISED DRAINAGE AREAS PER TOWN 1st REVIEW COMMENTSS H E E T FL O W S H A L L OW C O N C E N T R A T E D F L OW CHANNEL FLOWCHANNEL FLOWCHANNEL FLOW EXISTING POND EXISTING POND Hydraflow Table of Contents 6198-PRE-POST - Wet Pond.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Watershed Model Schematic..................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 - Year Summary Report......................................................................................................................... 3 Hydrograph Reports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, PRE-DEVELOPMENT AREA 1............................................ 4 TR-55 Tc Worksheet............................................................................................................ 5 Hydrograph No. 2, Reach, PRE 1 - CONVEYANCE TO STUDY POINT................................. 6 Hydrograph No. 3, SCS Runoff, PRE-DEVELOPMENT AREA 2............................................ 7 TR-55 Tc Worksheet............................................................................................................ 8 Hydrograph No. 4, Reach, PRE-2 - CONVEYANCE TO STUDY POINT................................ 9 Hydrograph No. 6, Combine, TOTAL PRE DISCHARGE...................................................... 10 Hydrograph No. 8, SCS Runoff, POST DEVELOPMENT AREA........................................... 11 Hydrograph No. 9, Reservoir, DRY POND DISCHARGE...................................................... 12 Pond Report - WET POND................................................................................................ 13 Hydrograph No. 10, SCS Runoff, POST BYPASS 1.............................................................. 14 TR-55 Tc Worksheet.......................................................................................................... 15 Hydrograph No. 11, Reach, PRE-2 - CONVEYANCE TO STUDY POINT............................ 16 Hydrograph No. 13, Combine, TOTAL POST DISCHARGE.................................................. 17 2 - Year Summary Report....................................................................................................................... 18 Hydrograph Reports................................................................................................................. 19 Hydrograph No. 1, SCS Runoff, PRE-DEVELOPMENT AREA 1.......................................... 19 Hydrograph No. 2, Reach, PRE 1 - CONVEYANCE TO STUDY POINT............................... 20 Hydrograph No. 3, SCS Runoff, PRE-DEVELOPMENT AREA 2.......................................... 21 Hydrograph No. 4, Reach, PRE-2 - CONVEYANCE TO STUDY POINT.............................. 22 Hydrograph No. 6, Combine, TOTAL PRE DISCHARGE...................................................... 23 Hydrograph No. 8, SCS Runoff, POST DEVELOPMENT AREA........................................... 24 Hydrograph No. 9, Reservoir, DRY POND DISCHARGE...................................................... 25 Hydrograph No. 10, SCS Runoff, POST BYPASS 1.............................................................. 26 Hydrograph No. 11, Reach, PRE-2 - CONVEYANCE TO STUDY POINT............................ 27 Hydrograph No. 13, Combine, TOTAL POST DISCHARGE.................................................. 28 10 - Year Summary Report....................................................................................................................... 29 Hydrograph Reports................................................................................................................. 30 Hydrograph No. 1, SCS Runoff, PRE-DEVELOPMENT AREA 1.......................................... 30 Hydrograph No. 2, Reach, PRE 1 - CONVEYANCE TO STUDY POINT............................... 31 Hydrograph No. 3, SCS Runoff, PRE-DEVELOPMENT AREA 2.......................................... 32 Hydrograph No. 4, Reach, PRE-2 - CONVEYANCE TO STUDY POINT.............................. 33 Hydrograph No. 6, Combine, TOTAL PRE DISCHARGE...................................................... 34 Hydrograph No. 8, SCS Runoff, POST DEVELOPMENT AREA........................................... 35 Hydrograph No. 9, Reservoir, DRY POND DISCHARGE...................................................... 36 Hydrograph No. 10, SCS Runoff, POST BYPASS 1.............................................................. 37 Hydrograph No. 11, Reach, PRE-2 - CONVEYANCE TO STUDY POINT............................ 38 Contents continued...6198-PRE-POST - Wet Pond.gpw Hydrograph No. 13, Combine, TOTAL POST DISCHARGE.................................................. 39 25 - Year Summary Report....................................................................................................................... 40 Hydrograph Reports................................................................................................................. 41 Hydrograph No. 1, SCS Runoff, PRE-DEVELOPMENT AREA 1.......................................... 41 Hydrograph No. 2, Reach, PRE 1 - CONVEYANCE TO STUDY POINT............................... 42 Hydrograph No. 3, SCS Runoff, PRE-DEVELOPMENT AREA 2.......................................... 43 Hydrograph No. 4, Reach, PRE-2 - CONVEYANCE TO STUDY POINT.............................. 44 Hydrograph No. 6, Combine, TOTAL PRE DISCHARGE...................................................... 45 Hydrograph No. 8, SCS Runoff, POST DEVELOPMENT AREA........................................... 46 Hydrograph No. 9, Reservoir, DRY POND DISCHARGE...................................................... 47 Hydrograph No. 10, SCS Runoff, POST BYPASS 1.............................................................. 48 Hydrograph No. 11, Reach, PRE-2 - CONVEYANCE TO STUDY POINT............................ 49 Hydrograph No. 13, Combine, TOTAL POST DISCHARGE.................................................. 50 50 - Year Summary Report....................................................................................................................... 51 Hydrograph Reports................................................................................................................. 52 Hydrograph No. 1, SCS Runoff, PRE-DEVELOPMENT AREA 1.......................................... 52 Hydrograph No. 2, Reach, PRE 1 - CONVEYANCE TO STUDY POINT............................... 53 Hydrograph No. 3, SCS Runoff, PRE-DEVELOPMENT AREA 2.......................................... 54 Hydrograph No. 4, Reach, PRE-2 - CONVEYANCE TO STUDY POINT.............................. 55 Hydrograph No. 6, Combine, TOTAL PRE DISCHARGE...................................................... 56 Hydrograph No. 8, SCS Runoff, POST DEVELOPMENT AREA........................................... 57 Hydrograph No. 9, Reservoir, DRY POND DISCHARGE...................................................... 58 Hydrograph No. 10, SCS Runoff, POST BYPASS 1.............................................................. 59 Hydrograph No. 11, Reach, PRE-2 - CONVEYANCE TO STUDY POINT............................ 60 Hydrograph No. 13, Combine, TOTAL POST DISCHARGE.................................................. 61 100 - Year Summary Report....................................................................................................................... 62 Hydrograph Reports................................................................................................................. 63 Hydrograph No. 1, SCS Runoff, PRE-DEVELOPMENT AREA 1.......................................... 63 Hydrograph No. 2, Reach, PRE 1 - CONVEYANCE TO STUDY POINT............................... 64 Hydrograph No. 3, SCS Runoff, PRE-DEVELOPMENT AREA 2.......................................... 65 Hydrograph No. 4, Reach, PRE-2 - CONVEYANCE TO STUDY POINT.............................. 66 Hydrograph No. 6, Combine, TOTAL PRE DISCHARGE...................................................... 67 Hydrograph No. 8, SCS Runoff, POST DEVELOPMENT AREA........................................... 68 Hydrograph No. 9, Reservoir, DRY POND DISCHARGE...................................................... 69 Hydrograph No. 10, SCS Runoff, POST BYPASS 1.............................................................. 70 Hydrograph No. 11, Reach, PRE-2 - CONVEYANCE TO STUDY POINT............................ 71 Hydrograph No. 13, Combine, TOTAL POST DISCHARGE.................................................. 72 IDF Report.................................................................................................................. 73 1 2 3 4 6 8 9 10 11 13 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Project: 6198-PRE-POST - Wet Pond.gpw Wednesday, 09 / 12 / 2018 Hyd.Origin Description Legend 1 SCS Runoff PRE-DEVELOPMENT AREA 1 2 Reach PRE 1 - CONVEYANCE TO STUDY POINT 3 SCS Runoff PRE-DEVELOPMENT AREA 2 4 Reach PRE-2 - CONVEYANCE TO STUDY POINT 6 Combine TOTAL PRE DISCHARGE 8 SCS Runoff POST DEVELOPMENT AREA 9 Reservoir DRY POND DISCHARGE 10 SCS Runoff POST BYPASS 1 11 Reach PRE-2 - CONVEYANCE TO STUDY POINT 13 Combine TOTAL POST DISCHARGE Hydrograph Return Period Recap 2 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s)Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 15.34 23.16 ------- ------- 46.84 62.37 75.29 88.96 PRE-DEVELOPMENT AREA 1 2 Reach 1 10.75 16.86 ------- ------- 36.26 49.41 60.49 72.28 PRE 1 - CONVEYANCE TO STUDY 3 SCS Runoff ------ 13.63 22.57 ------- ------- 50.91 70.09 86.29 103.60 PRE-DEVELOPMENT AREA 2 4 Reach 3 6.454 11.48 ------- ------- 29.29 42.18 53.36 65.53 PRE-2 - CONVEYANCE TO STUDY 6 Combine 2, 4, 17.20 28.33 ------- ------- 65.50 91.47 113.78 137.70 TOTAL PRE DISCHARGE 8 SCS Runoff ------ 37.78 56.33 ------- ------- 112.04 149.47 180.67 213.44 POST DEVELOPMENT AREA 9 Reservoir 8 1.714 4.834 ------- ------- 16.41 23.03 27.35 40.66 DRY POND DISCHARGE 10 SCS Runoff ------ 24.96 35.96 ------- ------- 68.59 89.65 107.01 125.15 POST BYPASS 1 11 Reach 10 12.32 18.87 ------- ------- 39.60 53.58 65.45 78.07 PRE-2 - CONVEYANCE TO STUDY 13 Combine 9, 11, 13.28 23.70 ------- ------- 55.25 75.76 91.95 109.04 TOTAL POST DISCHARGE Proj. file: 6198-PRE-POST - Wet Pond.gpw Wednesday, 09 / 12 / 2018 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Summary Report 3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 15.34 2 740 86,170 ------ ------ ------ PRE-DEVELOPMENT AREA 1 2 Reach 10.75 2 762 86,156 1 ------ ------ PRE 1 - CONVEYANCE TO STUDY 3 SCS Runoff 13.63 2 734 70,464 ------ ------ ------ PRE-DEVELOPMENT AREA 2 4 Reach 6.454 2 760 70,438 3 ------ ------ PRE-2 - CONVEYANCE TO STUDY 6 Combine 17.20 2 762 156,593 2, 4, ------ ------ TOTAL PRE DISCHARGE 8 SCS Runoff 37.78 2 718 76,389 ------ ------ ------ POST DEVELOPMENT AREA 9 Reservoir 1.714 2 824 73,410 8 546.28 39,145 DRY POND DISCHARGE 10 SCS Runoff 24.96 2 732 103,787 ------ ------ ------ POST BYPASS 1 11 Reach 12.32 2 752 103,764 10 ------ ------ PRE-2 - CONVEYANCE TO STUDY 13 Combine 13.28 2 754 177,174 9, 11, ------ ------ TOTAL POST DISCHARGE 6198-PRE-POST - Wet Pond.gpw Return Period: 1 Year Wednesday, 09 / 12 / 2018 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 1 PRE-DEVELOPMENT AREA 1 Hydrograph type = SCS Runoff Peak discharge = 15.34 cfs Storm frequency = 1 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 86,170 cuft Drainage area = 25.330 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 42.00 min Total precip. = 2.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.200 x 61) + (18.480 x 74) + (5.650 x 81)] / 25.330 4 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (hrs) PRE-DEVELOPMENT AREA 1 Hyd. No. 1 -- 1 Year Hyd No. 1 TR55 Tc Worksheet 5 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 1 PRE-DEVELOPMENT AREA 1 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.56 0.00 0.00 Land slope (%) = 4.09 0.00 0.00 Travel Time (min) = 24.47 + 0.00 + 0.00 = 24.47 Shallow Concentrated Flow Flow length (ft) = 203.16 0.00 0.00 Watercourse slope (%) = 5.85 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.90 0.00 0.00 Travel Time (min) = 0.87 + 0.00 + 0.00 = 0.87 Channel Flow X sectional flow area (sqft) = 5.45 0.00 0.00 Wetted perimeter (ft) = 12.54 0.00 0.00 Channel slope (%) = 4.30 0.00 0.00 Manning's n-value = 0.240 0.015 0.015 Velocity (ft/s) =0.74 0.00 0.00 Flow length (ft) ({0})735.2 0.0 0.0 Travel Time (min) = 16.64 + 0.00 + 0.00 = 16.64 Total Travel Time, Tc ..............................................................................42.00 min Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 2 PRE 1 - CONVEYANCE TO STUDY POINT Hydrograph type = Reach Peak discharge = 10.75 cfs Storm frequency = 1 yrs Time to peak = 12.70 hrs Time interval = 2 min Hyd. volume = 86,156 cuft Inflow hyd. No. = 1 - PRE-DEVELOPMENT AREA 1Section type = Trapezoidal Reach length = 870.2 ft Channel slope = 1.5 % Manning's n = 0.240 Bottom width = 15.0 ft Side slope = 7.0:1 Max. depth = 4.1 ft Rating curve x = 0.123 Rating curve m = 1.359 Ave. velocity = 0.44 ft/s Routing coeff. = 0.0793 Modified Att-Kin routing method used. 6 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (hrs) PRE 1 - CONVEYANCE TO STUDY POINT Hyd. No. 2 -- 1 Year Hyd No. 2 Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 3 PRE-DEVELOPMENT AREA 2 Hydrograph type = SCS Runoff Peak discharge = 13.63 cfs Storm frequency = 1 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 70,464 cuft Drainage area = 27.920 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 32.10 min Total precip. = 2.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(11.380 x 61) + (13.140 x 74) + (3.400 x 84)] / 27.920 7 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 14.00 14.00 Q (cfs) Time (hrs) PRE-DEVELOPMENT AREA 2 Hyd. No. 3 -- 1 Year Hyd No. 3 TR55 Tc Worksheet 8 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 3 PRE-DEVELOPMENT AREA 2 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 260.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.56 0.00 0.00 Land slope (%) = 5.58 0.00 0.00 Travel Time (min) = 19.27 + 0.00 + 0.00 = 19.27 Shallow Concentrated Flow Flow length (ft) = 67.00 0.00 0.00 Watercourse slope (%) = 6.33 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =4.06 0.00 0.00 Travel Time (min) = 0.28 + 0.00 + 0.00 = 0.28 Channel Flow X sectional flow area (sqft) = 24.03 0.00 0.00 Wetted perimeter (ft) = 13.88 0.00 0.00 Channel slope (%) = 5.79 0.00 0.00 Manning's n-value = 0.240 0.015 0.015 Velocity (ft/s) =2.16 0.00 0.00 Flow length (ft) ({0})1630.7 0.0 0.0 Travel Time (min) = 12.60 + 0.00 + 0.00 = 12.60 Total Travel Time, Tc ..............................................................................32.10 min Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 4 PRE-2 - CONVEYANCE TO STUDY POINT Hydrograph type = Reach Peak discharge = 6.454 cfs Storm frequency = 1 yrs Time to peak = 12.67 hrs Time interval = 2 min Hyd. volume = 70,438 cuft Inflow hyd. No. = 3 - PRE-DEVELOPMENT AREA 2Section type = Trapezoidal Reach length = 1551.3 ft Channel slope = 1.5 % Manning's n = 0.240 Bottom width = 15.0 ft Side slope = 7.0:1 Max. depth = 4.1 ft Rating curve x = 0.123 Rating curve m = 1.359 Ave. velocity = 0.43 ft/s Routing coeff. = 0.0439 Modified Att-Kin routing method used. 9 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 14.00 14.00 Q (cfs) Time (hrs) PRE-2 - CONVEYANCE TO STUDY POINT Hyd. No. 4 -- 1 Year Hyd No. 4 Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 6 TOTAL PRE DISCHARGE Hydrograph type = Combine Peak discharge = 17.20 cfs Storm frequency = 1 yrs Time to peak = 12.70 hrs Time interval = 2 min Hyd. volume = 156,593 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 0.000 ac 10 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (hrs) TOTAL PRE DISCHARGE Hyd. No. 6 -- 1 Year Hyd No. 6 Hyd No. 2 Hyd No. 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 8 POST DEVELOPMENT AREA Hydrograph type = SCS Runoff Peak discharge = 37.78 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 76,389 cuft Drainage area = 27.150 ac Curve number = 73* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(10.770 x 68) + (16.380 x 77)] / 27.150 11 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) POST DEVELOPMENT AREA Hyd. No. 8 -- 1 Year Hyd No. 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 9 DRY POND DISCHARGE Hydrograph type = Reservoir Peak discharge = 1.714 cfs Storm frequency = 1 yrs Time to peak = 13.73 hrs Time interval = 2 min Hyd. volume = 73,410 cuft Inflow hyd. No. = 8 - POST DEVELOPMENT AREAMax. Elevation = 546.28 ft Reservoir name = WET POND Max. Storage = 39,145 cuft Storage Indication method used. 12 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) DRY POND DISCHARGE Hyd. No. 9 -- 1 Year Hyd No. 9 Hyd No. 8 Total storage used = 39,145 cuft Pond Report 13 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Pond No. 1 - WET POND Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 545.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 545.00 28,325 0 0 1.00 546.00 30,944 29,635 29,635 2.00 547.00 36,385 33,665 63,299 3.00 548.00 39,206 37,796 101,095 4.00 549.00 42,094 40,650 141,745 5.00 550.00 45,050 43,572 185,317 6.00 551.00 48,073 46,562 231,878 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 24.00 3.00 0.00 0.00 Span (in)= 24.00 3.00 0.00 0.00 No. Barrels = 1 100 Invert El. (ft)= 545.00 545.00 0.00 0.00 Length (ft)= 72.00 0.00 0.00 0.00 Slope (%)= 0.63 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes No No Crest Len (ft)= 13.00 3.00 Inactive 20.00 Crest El. (ft)= 549.50 546.00 546.00 550.00 Weir Coeff.= 3.33 3.33 3.33 3.33 Weir Type = 1 Rect Rect Ciplti Multi-Stage = Yes Yes Yes No Exfil.(in/hr)= 0.000 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 545.00 0.00 0.00 --- --- 0.00 0.00 0.00 0.00 --- --- 0.000 1.00 29,635 546.00 0.22 ic 0.21 ic --- --- 0.00 0.00 0.00 0.00 --- --- 0.214 2.00 63,299 547.00 8.92 oc 0.18 ic --- --- 0.00 8.74 s 0.00 0.00 --- --- 8.920 3.00 101,095 548.00 17.01 oc 0.14 ic --- --- 0.00 16.87 s 0.00 0.00 --- --- 17.01 4.00 141,745 549.00 24.08 oc 0.12 ic --- --- 0.00 23.96 s 0.00 0.00 --- --- 24.08 5.00 185,317 550.00 29.93 ic 0.07 ic --- --- 8.83 s 21.02 s 0.00 0.00 --- --- 29.92 6.00 231,878 551.00 33.75 ic 0.03 ic --- --- 17.87 s 15.80 s 0.00 66.60 --- --- 100.31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 10 POST BYPASS 1 Hydrograph type = SCS Runoff Peak discharge = 24.96 cfs Storm frequency = 1 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 103,787 cuft Drainage area = 26.150 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 29.60 min Total precip. = 2.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.810 x 68) + (15.340 x 76) + (9.000 x 82)] / 26.150 14 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (hrs) POST BYPASS 1 Hyd. No. 10 -- 1 Year Hyd No. 10 TR55 Tc Worksheet 15 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 10 POST BYPASS 1 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 260.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.56 0.00 0.00 Land slope (%) = 5.58 0.00 0.00 Travel Time (min) = 19.27 + 0.00 + 0.00 = 19.27 Shallow Concentrated Flow Flow length (ft) = 67.00 0.00 0.00 Watercourse slope (%) = 6.33 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =4.06 0.00 0.00 Travel Time (min) = 0.28 + 0.00 + 0.00 = 0.28 Channel Flow X sectional flow area (sqft) = 24.03 0.00 0.00 Wetted perimeter (ft) = 13.88 0.00 0.00 Channel slope (%) = 5.79 0.00 0.00 Manning's n-value = 0.240 0.015 0.015 Velocity (ft/s) =2.16 0.00 0.00 Flow length (ft) ({0})1303.6 0.0 0.0 Travel Time (min) = 10.07 + 0.00 + 0.00 = 10.07 Total Travel Time, Tc ..............................................................................29.60 min Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 11 PRE-2 - CONVEYANCE TO STUDY POINT Hydrograph type = Reach Peak discharge = 12.32 cfs Storm frequency = 1 yrs Time to peak = 12.53 hrs Time interval = 2 min Hyd. volume = 103,764 cuft Inflow hyd. No. = 10 - POST BYPASS 1 Section type = Trapezoidal Reach length = 1551.3 ft Channel slope = 1.5 % Manning's n = 0.240 Bottom width = 15.0 ft Side slope = 7.0:1 Max. depth = 4.1 ft Rating curve x = 0.123 Rating curve m = 1.359 Ave. velocity = 0.50 ft/s Routing coeff. = 0.0513 Modified Att-Kin routing method used. 16 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (hrs) PRE-2 - CONVEYANCE TO STUDY POINT Hyd. No. 11 -- 1 Year Hyd No. 11 Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 13 TOTAL POST DISCHARGE Hydrograph type = Combine Peak discharge = 13.28 cfs Storm frequency = 1 yrs Time to peak = 12.57 hrs Time interval = 2 min Hyd. volume = 177,174 cuft Inflow hyds. = 9, 11 Contrib. drain. area = 0.000 ac 17 0 6 12 18 24 30 36 42 48 54 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 14.00 14.00 Q (cfs) Time (hrs) TOTAL POST DISCHARGE Hyd. No. 13 -- 1 Year Hyd No. 13 Hyd No. 9 Hyd No. 11 Hydrograph Summary Report 18 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 23.16 2 740 124,807 ------ ------ ------ PRE-DEVELOPMENT AREA 1 2 Reach 16.86 2 760 124,794 1 ------ ------ PRE 1 - CONVEYANCE TO STUDY 3 SCS Runoff 22.57 2 734 107,269 ------ ------ ------ PRE-DEVELOPMENT AREA 2 4 Reach 11.48 2 758 107,246 3 ------ ------ PRE-2 - CONVEYANCE TO STUDY 6 Combine 28.33 2 758 232,040 2, 4, ------ ------ TOTAL PRE DISCHARGE 8 SCS Runoff 56.33 2 718 112,734 ------ ------ ------ POST DEVELOPMENT AREA 9 Reservoir 4.834 2 752 109,721 8 546.60 49,834 DRY POND DISCHARGE 10 SCS Runoff 35.96 2 732 146,480 ------ ------ ------ POST BYPASS 1 11 Reach 18.87 2 750 146,459 10 ------ ------ PRE-2 - CONVEYANCE TO STUDY 13 Combine 23.70 2 750 256,180 9, 11, ------ ------ TOTAL POST DISCHARGE 6198-PRE-POST - Wet Pond.gpw Return Period: 2 Year Wednesday, 09 / 12 / 2018 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 1 PRE-DEVELOPMENT AREA 1 Hydrograph type = SCS Runoff Peak discharge = 23.16 cfs Storm frequency = 2 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 124,807 cuft Drainage area = 25.330 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 42.00 min Total precip. = 3.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.200 x 61) + (18.480 x 74) + (5.650 x 81)] / 25.330 19 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) PRE-DEVELOPMENT AREA 1 Hyd. No. 1 -- 2 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 2 PRE 1 - CONVEYANCE TO STUDY POINT Hydrograph type = Reach Peak discharge = 16.86 cfs Storm frequency = 2 yrs Time to peak = 12.67 hrs Time interval = 2 min Hyd. volume = 124,794 cuft Inflow hyd. No. = 1 - PRE-DEVELOPMENT AREA 1Section type = Trapezoidal Reach length = 870.2 ft Channel slope = 1.5 % Manning's n = 0.240 Bottom width = 15.0 ft Side slope = 7.0:1 Max. depth = 4.1 ft Rating curve x = 0.123 Rating curve m = 1.359 Ave. velocity = 0.49 ft/s Routing coeff. = 0.0880 Modified Att-Kin routing method used. 20 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) PRE 1 - CONVEYANCE TO STUDY POINT Hyd. No. 2 -- 2 Year Hyd No. 2 Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 3 PRE-DEVELOPMENT AREA 2 Hydrograph type = SCS Runoff Peak discharge = 22.57 cfs Storm frequency = 2 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 107,269 cuft Drainage area = 27.920 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 32.10 min Total precip. = 3.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(11.380 x 61) + (13.140 x 74) + (3.400 x 84)] / 27.920 21 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) PRE-DEVELOPMENT AREA 2 Hyd. No. 3 -- 2 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 4 PRE-2 - CONVEYANCE TO STUDY POINT Hydrograph type = Reach Peak discharge = 11.48 cfs Storm frequency = 2 yrs Time to peak = 12.63 hrs Time interval = 2 min Hyd. volume = 107,246 cuft Inflow hyd. No. = 3 - PRE-DEVELOPMENT AREA 2Section type = Trapezoidal Reach length = 1551.3 ft Channel slope = 1.5 % Manning's n = 0.240 Bottom width = 15.0 ft Side slope = 7.0:1 Max. depth = 4.1 ft Rating curve x = 0.123 Rating curve m = 1.359 Ave. velocity = 0.49 ft/s Routing coeff. = 0.0500 Modified Att-Kin routing method used. 22 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) PRE-2 - CONVEYANCE TO STUDY POINT Hyd. No. 4 -- 2 Year Hyd No. 4 Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 6 TOTAL PRE DISCHARGE Hydrograph type = Combine Peak discharge = 28.33 cfs Storm frequency = 2 yrs Time to peak = 12.63 hrs Time interval = 2 min Hyd. volume = 232,040 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 0.000 ac 23 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 Q (cfs) Time (hrs) TOTAL PRE DISCHARGE Hyd. No. 6 -- 2 Year Hyd No. 6 Hyd No. 2 Hyd No. 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 8 POST DEVELOPMENT AREA Hydrograph type = SCS Runoff Peak discharge = 56.33 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 112,734 cuft Drainage area = 27.150 ac Curve number = 73* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(10.770 x 68) + (16.380 x 77)] / 27.150 24 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) POST DEVELOPMENT AREA Hyd. No. 8 -- 2 Year Hyd No. 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 9 DRY POND DISCHARGE Hydrograph type = Reservoir Peak discharge = 4.834 cfs Storm frequency = 2 yrs Time to peak = 12.53 hrs Time interval = 2 min Hyd. volume = 109,721 cuft Inflow hyd. No. = 8 - POST DEVELOPMENT AREAMax. Elevation = 546.60 ft Reservoir name = WET POND Max. Storage = 49,834 cuft Storage Indication method used. 25 0 8 16 24 32 40 48 56 64 72 80 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) DRY POND DISCHARGE Hyd. No. 9 -- 2 Year Hyd No. 9 Hyd No. 8 Total storage used = 49,834 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 10 POST BYPASS 1 Hydrograph type = SCS Runoff Peak discharge = 35.96 cfs Storm frequency = 2 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 146,480 cuft Drainage area = 26.150 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 29.60 min Total precip. = 3.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.810 x 68) + (15.340 x 76) + (9.000 x 82)] / 26.150 26 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) POST BYPASS 1 Hyd. No. 10 -- 2 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 11 PRE-2 - CONVEYANCE TO STUDY POINT Hydrograph type = Reach Peak discharge = 18.87 cfs Storm frequency = 2 yrs Time to peak = 12.50 hrs Time interval = 2 min Hyd. volume = 146,459 cuft Inflow hyd. No. = 10 - POST BYPASS 1 Section type = Trapezoidal Reach length = 1551.3 ft Channel slope = 1.5 % Manning's n = 0.240 Bottom width = 15.0 ft Side slope = 7.0:1 Max. depth = 4.1 ft Rating curve x = 0.123 Rating curve m = 1.359 Ave. velocity = 0.55 ft/s Routing coeff. = 0.0564 Modified Att-Kin routing method used. 27 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) PRE-2 - CONVEYANCE TO STUDY POINT Hyd. No. 11 -- 2 Year Hyd No. 11 Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 13 TOTAL POST DISCHARGE Hydrograph type = Combine Peak discharge = 23.70 cfs Storm frequency = 2 yrs Time to peak = 12.50 hrs Time interval = 2 min Hyd. volume = 256,180 cuft Inflow hyds. = 9, 11 Contrib. drain. area = 0.000 ac 28 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) TOTAL POST DISCHARGE Hyd. No. 13 -- 2 Year Hyd No. 13 Hyd No. 9 Hyd No. 11 Hydrograph Summary Report 29 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 46.84 2 740 243,279 ------ ------ ------ PRE-DEVELOPMENT AREA 1 2 Reach 36.26 2 756 243,269 1 ------ ------ PRE 1 - CONVEYANCE TO STUDY 3 SCS Runoff 50.91 2 734 225,073 ------ ------ ------ PRE-DEVELOPMENT AREA 2 4 Reach 29.29 2 754 225,055 3 ------ ------ PRE-2 - CONVEYANCE TO STUDY 6 Combine 65.50 2 754 468,323 2, 4, ------ ------ TOTAL PRE DISCHARGE 8 SCS Runoff 112.04 2 718 226,023 ------ ------ ------ POST DEVELOPMENT AREA 9 Reservoir 16.41 2 728 222,950 8 547.93 98,435 DRY POND DISCHARGE 10 SCS Runoff 68.59 2 730 274,414 ------ ------ ------ POST BYPASS 1 11 Reach 39.60 2 748 274,396 10 ------ ------ PRE-2 - CONVEYANCE TO STUDY 13 Combine 55.25 2 748 497,345 9, 11, ------ ------ TOTAL POST DISCHARGE 6198-PRE-POST - Wet Pond.gpw Return Period: 10 Year Wednesday, 09 / 12 / 2018 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 1 PRE-DEVELOPMENT AREA 1 Hydrograph type = SCS Runoff Peak discharge = 46.84 cfs Storm frequency = 10 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 243,279 cuft Drainage area = 25.330 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 42.00 min Total precip. = 5.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.200 x 61) + (18.480 x 74) + (5.650 x 81)] / 25.330 30 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) PRE-DEVELOPMENT AREA 1 Hyd. No. 1 -- 10 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 2 PRE 1 - CONVEYANCE TO STUDY POINT Hydrograph type = Reach Peak discharge = 36.26 cfs Storm frequency = 10 yrs Time to peak = 12.60 hrs Time interval = 2 min Hyd. volume = 243,269 cuft Inflow hyd. No. = 1 - PRE-DEVELOPMENT AREA 1Section type = Trapezoidal Reach length = 870.2 ft Channel slope = 1.5 % Manning's n = 0.240 Bottom width = 15.0 ft Side slope = 7.0:1 Max. depth = 4.1 ft Rating curve x = 0.123 Rating curve m = 1.359 Ave. velocity = 0.59 ft/s Routing coeff. = 0.1051 Modified Att-Kin routing method used. 31 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) PRE 1 - CONVEYANCE TO STUDY POINT Hyd. No. 2 -- 10 Year Hyd No. 2 Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 3 PRE-DEVELOPMENT AREA 2 Hydrograph type = SCS Runoff Peak discharge = 50.91 cfs Storm frequency = 10 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 225,073 cuft Drainage area = 27.920 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 32.10 min Total precip. = 5.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(11.380 x 61) + (13.140 x 74) + (3.400 x 84)] / 27.920 32 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) PRE-DEVELOPMENT AREA 2 Hyd. No. 3 -- 10 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 4 PRE-2 - CONVEYANCE TO STUDY POINT Hydrograph type = Reach Peak discharge = 29.29 cfs Storm frequency = 10 yrs Time to peak = 12.57 hrs Time interval = 2 min Hyd. volume = 225,055 cuft Inflow hyd. No. = 3 - PRE-DEVELOPMENT AREA 2Section type = Trapezoidal Reach length = 1551.3 ft Channel slope = 1.5 % Manning's n = 0.240 Bottom width = 15.0 ft Side slope = 7.0:1 Max. depth = 4.1 ft Rating curve x = 0.123 Rating curve m = 1.359 Ave. velocity = 0.61 ft/s Routing coeff. = 0.0617 Modified Att-Kin routing method used. 33 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) PRE-2 - CONVEYANCE TO STUDY POINT Hyd. No. 4 -- 10 Year Hyd No. 4 Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 6 TOTAL PRE DISCHARGE Hydrograph type = Combine Peak discharge = 65.50 cfs Storm frequency = 10 yrs Time to peak = 12.57 hrs Time interval = 2 min Hyd. volume = 468,323 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 0.000 ac 34 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) TOTAL PRE DISCHARGE Hyd. No. 6 -- 10 Year Hyd No. 6 Hyd No. 2 Hyd No. 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 8 POST DEVELOPMENT AREA Hydrograph type = SCS Runoff Peak discharge = 112.04 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 226,023 cuft Drainage area = 27.150 ac Curve number = 73* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(10.770 x 68) + (16.380 x 77)] / 27.150 35 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) POST DEVELOPMENT AREA Hyd. No. 8 -- 10 Year Hyd No. 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 9 DRY POND DISCHARGE Hydrograph type = Reservoir Peak discharge = 16.41 cfs Storm frequency = 10 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 222,950 cuft Inflow hyd. No. = 8 - POST DEVELOPMENT AREAMax. Elevation = 547.93 ft Reservoir name = WET POND Max. Storage = 98,435 cuft Storage Indication method used. 36 0 4 8 12 16 20 24 28 32 36 40 44 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) DRY POND DISCHARGE Hyd. No. 9 -- 10 Year Hyd No. 9 Hyd No. 8 Total storage used = 98,435 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 10 POST BYPASS 1 Hydrograph type = SCS Runoff Peak discharge = 68.59 cfs Storm frequency = 10 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 274,414 cuft Drainage area = 26.150 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 29.60 min Total precip. = 5.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.810 x 68) + (15.340 x 76) + (9.000 x 82)] / 26.150 37 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) POST BYPASS 1 Hyd. No. 10 -- 10 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 11 PRE-2 - CONVEYANCE TO STUDY POINT Hydrograph type = Reach Peak discharge = 39.60 cfs Storm frequency = 10 yrs Time to peak = 12.47 hrs Time interval = 2 min Hyd. volume = 274,396 cuft Inflow hyd. No. = 10 - POST BYPASS 1 Section type = Trapezoidal Reach length = 1551.3 ft Channel slope = 1.5 % Manning's n = 0.240 Bottom width = 15.0 ft Side slope = 7.0:1 Max. depth = 4.1 ft Rating curve x = 0.123 Rating curve m = 1.359 Ave. velocity = 0.65 ft/s Routing coeff. = 0.0666 Modified Att-Kin routing method used. 38 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) PRE-2 - CONVEYANCE TO STUDY POINT Hyd. No. 11 -- 10 Year Hyd No. 11 Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 13 TOTAL POST DISCHARGE Hydrograph type = Combine Peak discharge = 55.25 cfs Storm frequency = 10 yrs Time to peak = 12.47 hrs Time interval = 2 min Hyd. volume = 497,345 cuft Inflow hyds. = 9, 11 Contrib. drain. area = 0.000 ac 39 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) TOTAL POST DISCHARGE Hyd. No. 13 -- 10 Year Hyd No. 13 Hyd No. 9 Hyd No. 11 Hydrograph Summary Report 40 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 62.37 2 740 322,156 ------ ------ ------ PRE-DEVELOPMENT AREA 1 2 Reach 49.41 2 754 322,146 1 ------ ------ PRE 1 - CONVEYANCE TO STUDY 3 SCS Runoff 70.09 2 734 305,877 ------ ------ ------ PRE-DEVELOPMENT AREA 2 4 Reach 42.18 2 752 305,859 3 ------ ------ PRE-2 - CONVEYANCE TO STUDY 6 Combine 91.47 2 754 628,006 2, 4, ------ ------ TOTAL PRE DISCHARGE 8 SCS Runoff 149.47 2 716 302,316 ------ ------ ------ POST DEVELOPMENT AREA 9 Reservoir 23.03 2 728 299,222 8 548.83 134,847 DRY POND DISCHARGE 10 SCS Runoff 89.65 2 730 358,236 ------ ------ ------ POST BYPASS 1 11 Reach 53.58 2 748 358,219 10 ------ ------ PRE-2 - CONVEYANCE TO STUDY 13 Combine 75.76 2 746 657,441 9, 11, ------ ------ TOTAL POST DISCHARGE 6198-PRE-POST - Wet Pond.gpw Return Period: 25 Year Wednesday, 09 / 12 / 2018 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 1 PRE-DEVELOPMENT AREA 1 Hydrograph type = SCS Runoff Peak discharge = 62.37 cfs Storm frequency = 25 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 322,156 cuft Drainage area = 25.330 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 42.00 min Total precip. = 6.22 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.200 x 61) + (18.480 x 74) + (5.650 x 81)] / 25.330 41 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) PRE-DEVELOPMENT AREA 1 Hyd. No. 1 -- 25 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 2 PRE 1 - CONVEYANCE TO STUDY POINT Hydrograph type = Reach Peak discharge = 49.41 cfs Storm frequency = 25 yrs Time to peak = 12.57 hrs Time interval = 2 min Hyd. volume = 322,146 cuft Inflow hyd. No. = 1 - PRE-DEVELOPMENT AREA 1Section type = Trapezoidal Reach length = 870.2 ft Channel slope = 1.5 % Manning's n = 0.240 Bottom width = 15.0 ft Side slope = 7.0:1 Max. depth = 4.1 ft Rating curve x = 0.123 Rating curve m = 1.359 Ave. velocity = 0.64 ft/s Routing coeff. = 0.1129 Modified Att-Kin routing method used. 42 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) PRE 1 - CONVEYANCE TO STUDY POINT Hyd. No. 2 -- 25 Year Hyd No. 2 Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 3 PRE-DEVELOPMENT AREA 2 Hydrograph type = SCS Runoff Peak discharge = 70.09 cfs Storm frequency = 25 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 305,877 cuft Drainage area = 27.920 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 32.10 min Total precip. = 6.22 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(11.380 x 61) + (13.140 x 74) + (3.400 x 84)] / 27.920 43 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (hrs) PRE-DEVELOPMENT AREA 2 Hyd. No. 3 -- 25 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 4 PRE-2 - CONVEYANCE TO STUDY POINT Hydrograph type = Reach Peak discharge = 42.18 cfs Storm frequency = 25 yrs Time to peak = 12.53 hrs Time interval = 2 min Hyd. volume = 305,859 cuft Inflow hyd. No. = 3 - PRE-DEVELOPMENT AREA 2Section type = Trapezoidal Reach length = 1551.3 ft Channel slope = 1.5 % Manning's n = 0.240 Bottom width = 15.0 ft Side slope = 7.0:1 Max. depth = 4.1 ft Rating curve x = 0.123 Rating curve m = 1.359 Ave. velocity = 0.66 ft/s Routing coeff. = 0.0669 Modified Att-Kin routing method used. 44 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (hrs) PRE-2 - CONVEYANCE TO STUDY POINT Hyd. No. 4 -- 25 Year Hyd No. 4 Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 6 TOTAL PRE DISCHARGE Hydrograph type = Combine Peak discharge = 91.47 cfs Storm frequency = 25 yrs Time to peak = 12.57 hrs Time interval = 2 min Hyd. volume = 628,006 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 0.000 ac 45 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 100.00 100.00 Q (cfs) Time (hrs) TOTAL PRE DISCHARGE Hyd. No. 6 -- 25 Year Hyd No. 6 Hyd No. 2 Hyd No. 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 8 POST DEVELOPMENT AREA Hydrograph type = SCS Runoff Peak discharge = 149.47 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 302,316 cuft Drainage area = 27.150 ac Curve number = 73* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.22 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(10.770 x 68) + (16.380 x 77)] / 27.150 46 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) POST DEVELOPMENT AREA Hyd. No. 8 -- 25 Year Hyd No. 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 9 DRY POND DISCHARGE Hydrograph type = Reservoir Peak discharge = 23.03 cfs Storm frequency = 25 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 299,222 cuft Inflow hyd. No. = 8 - POST DEVELOPMENT AREAMax. Elevation = 548.83 ft Reservoir name = WET POND Max. Storage = 134,847 cuft Storage Indication method used. 47 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) DRY POND DISCHARGE Hyd. No. 9 -- 25 Year Hyd No. 9 Hyd No. 8 Total storage used = 134,847 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 10 POST BYPASS 1 Hydrograph type = SCS Runoff Peak discharge = 89.65 cfs Storm frequency = 25 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 358,236 cuft Drainage area = 26.150 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 29.60 min Total precip. = 6.22 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.810 x 68) + (15.340 x 76) + (9.000 x 82)] / 26.150 48 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) POST BYPASS 1 Hyd. No. 10 -- 25 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 11 PRE-2 - CONVEYANCE TO STUDY POINT Hydrograph type = Reach Peak discharge = 53.58 cfs Storm frequency = 25 yrs Time to peak = 12.47 hrs Time interval = 2 min Hyd. volume = 358,219 cuft Inflow hyd. No. = 10 - POST BYPASS 1 Section type = Trapezoidal Reach length = 1551.3 ft Channel slope = 1.5 % Manning's n = 0.240 Bottom width = 15.0 ft Side slope = 7.0:1 Max. depth = 4.1 ft Rating curve x = 0.123 Rating curve m = 1.359 Ave. velocity = 0.70 ft/s Routing coeff. = 0.0713 Modified Att-Kin routing method used. 49 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) PRE-2 - CONVEYANCE TO STUDY POINT Hyd. No. 11 -- 25 Year Hyd No. 11 Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 13 TOTAL POST DISCHARGE Hydrograph type = Combine Peak discharge = 75.76 cfs Storm frequency = 25 yrs Time to peak = 12.43 hrs Time interval = 2 min Hyd. volume = 657,441 cuft Inflow hyds. = 9, 11 Contrib. drain. area = 0.000 ac 50 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (hrs) TOTAL POST DISCHARGE Hyd. No. 13 -- 25 Year Hyd No. 13 Hyd No. 9 Hyd No. 11 Hydrograph Summary Report 51 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 75.29 2 738 388,473 ------ ------ ------ PRE-DEVELOPMENT AREA 1 2 Reach 60.49 2 754 388,464 1 ------ ------ PRE 1 - CONVEYANCE TO STUDY 3 SCS Runoff 86.29 2 734 374,721 ------ ------ ------ PRE-DEVELOPMENT AREA 2 4 Reach 53.36 2 752 374,704 3 ------ ------ PRE-2 - CONVEYANCE TO STUDY 6 Combine 113.78 2 752 763,168 2, 4, ------ ------ TOTAL PRE DISCHARGE 8 SCS Runoff 180.67 2 716 366,788 ------ ------ ------ POST DEVELOPMENT AREA 9 Reservoir 27.35 2 728 363,679 8 549.57 166,506 DRY POND DISCHARGE 10 SCS Runoff 107.01 2 730 428,216 ------ ------ ------ POST BYPASS 1 11 Reach 65.45 2 746 428,200 10 ------ ------ PRE-2 - CONVEYANCE TO STUDY 13 Combine 91.95 2 746 791,879 9, 11, ------ ------ TOTAL POST DISCHARGE 6198-PRE-POST - Wet Pond.gpw Return Period: 50 Year Wednesday, 09 / 12 / 2018 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 1 PRE-DEVELOPMENT AREA 1 Hydrograph type = SCS Runoff Peak discharge = 75.29 cfs Storm frequency = 50 yrs Time to peak = 12.30 hrs Time interval = 2 min Hyd. volume = 388,473 cuft Drainage area = 25.330 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 42.00 min Total precip. = 7.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.200 x 61) + (18.480 x 74) + (5.650 x 81)] / 25.330 52 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (hrs) PRE-DEVELOPMENT AREA 1 Hyd. No. 1 -- 50 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 2 PRE 1 - CONVEYANCE TO STUDY POINT Hydrograph type = Reach Peak discharge = 60.49 cfs Storm frequency = 50 yrs Time to peak = 12.57 hrs Time interval = 2 min Hyd. volume = 388,464 cuft Inflow hyd. No. = 1 - PRE-DEVELOPMENT AREA 1Section type = Trapezoidal Reach length = 870.2 ft Channel slope = 1.5 % Manning's n = 0.240 Bottom width = 15.0 ft Side slope = 7.0:1 Max. depth = 4.1 ft Rating curve x = 0.123 Rating curve m = 1.359 Ave. velocity = 0.67 ft/s Routing coeff. = 0.1183 Modified Att-Kin routing method used. 53 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (hrs) PRE 1 - CONVEYANCE TO STUDY POINT Hyd. No. 2 -- 50 Year Hyd No. 2 Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 3 PRE-DEVELOPMENT AREA 2 Hydrograph type = SCS Runoff Peak discharge = 86.29 cfs Storm frequency = 50 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 374,721 cuft Drainage area = 27.920 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 32.10 min Total precip. = 7.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(11.380 x 61) + (13.140 x 74) + (3.400 x 84)] / 27.920 54 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) PRE-DEVELOPMENT AREA 2 Hyd. No. 3 -- 50 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 4 PRE-2 - CONVEYANCE TO STUDY POINT Hydrograph type = Reach Peak discharge = 53.36 cfs Storm frequency = 50 yrs Time to peak = 12.53 hrs Time interval = 2 min Hyd. volume = 374,704 cuft Inflow hyd. No. = 3 - PRE-DEVELOPMENT AREA 2Section type = Trapezoidal Reach length = 1551.3 ft Channel slope = 1.5 % Manning's n = 0.240 Bottom width = 15.0 ft Side slope = 7.0:1 Max. depth = 4.1 ft Rating curve x = 0.123 Rating curve m = 1.359 Ave. velocity = 0.70 ft/s Routing coeff. = 0.0706 Modified Att-Kin routing method used. 55 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) PRE-2 - CONVEYANCE TO STUDY POINT Hyd. No. 4 -- 50 Year Hyd No. 4 Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 6 TOTAL PRE DISCHARGE Hydrograph type = Combine Peak discharge = 113.78 cfs Storm frequency = 50 yrs Time to peak = 12.53 hrs Time interval = 2 min Hyd. volume = 763,168 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 0.000 ac 56 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) TOTAL PRE DISCHARGE Hyd. No. 6 -- 50 Year Hyd No. 6 Hyd No. 2 Hyd No. 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 8 POST DEVELOPMENT AREA Hydrograph type = SCS Runoff Peak discharge = 180.67 cfs Storm frequency = 50 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 366,788 cuft Drainage area = 27.150 ac Curve number = 73* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(10.770 x 68) + (16.380 x 77)] / 27.150 57 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (hrs) POST DEVELOPMENT AREA Hyd. No. 8 -- 50 Year Hyd No. 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 9 DRY POND DISCHARGE Hydrograph type = Reservoir Peak discharge = 27.35 cfs Storm frequency = 50 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 363,679 cuft Inflow hyd. No. = 8 - POST DEVELOPMENT AREAMax. Elevation = 549.57 ft Reservoir name = WET POND Max. Storage = 166,506 cuft Storage Indication method used. 58 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (hrs) DRY POND DISCHARGE Hyd. No. 9 -- 50 Year Hyd No. 9 Hyd No. 8 Total storage used = 166,506 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 10 POST BYPASS 1 Hydrograph type = SCS Runoff Peak discharge = 107.01 cfs Storm frequency = 50 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 428,216 cuft Drainage area = 26.150 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 29.60 min Total precip. = 7.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.810 x 68) + (15.340 x 76) + (9.000 x 82)] / 26.150 59 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) POST BYPASS 1 Hyd. No. 10 -- 50 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 11 PRE-2 - CONVEYANCE TO STUDY POINT Hydrograph type = Reach Peak discharge = 65.45 cfs Storm frequency = 50 yrs Time to peak = 12.43 hrs Time interval = 2 min Hyd. volume = 428,200 cuft Inflow hyd. No. = 10 - POST BYPASS 1 Section type = Trapezoidal Reach length = 1551.3 ft Channel slope = 1.5 % Manning's n = 0.240 Bottom width = 15.0 ft Side slope = 7.0:1 Max. depth = 4.1 ft Rating curve x = 0.123 Rating curve m = 1.359 Ave. velocity = 0.74 ft/s Routing coeff. = 0.0745 Modified Att-Kin routing method used. 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) PRE-2 - CONVEYANCE TO STUDY POINT Hyd. No. 11 -- 50 Year Hyd No. 11 Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 13 TOTAL POST DISCHARGE Hydrograph type = Combine Peak discharge = 91.95 cfs Storm frequency = 50 yrs Time to peak = 12.43 hrs Time interval = 2 min Hyd. volume = 791,879 cuft Inflow hyds. = 9, 11 Contrib. drain. area = 0.000 ac 61 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 100.00 100.00 Q (cfs) Time (hrs) TOTAL POST DISCHARGE Hyd. No. 13 -- 50 Year Hyd No. 13 Hyd No. 9 Hyd No. 11 Hydrograph Summary Report 62 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 88.96 2 738 458,824 ------ ------ ------ PRE-DEVELOPMENT AREA 1 2 Reach 72.28 2 752 458,815 1 ------ ------ PRE 1 - CONVEYANCE TO STUDY 3 SCS Runoff 103.60 2 732 448,424 ------ ------ ------ PRE-DEVELOPMENT AREA 2 4 Reach 65.53 2 750 448,408 3 ------ ------ PRE-2 - CONVEYANCE TO STUDY 6 Combine 137.70 2 752 907,223 2, 4, ------ ------ TOTAL PRE DISCHARGE 8 SCS Runoff 213.44 2 716 435,419 ------ ------ ------ POST DEVELOPMENT AREA 9 Reservoir 40.66 2 726 432,299 8 550.28 198,039 DRY POND DISCHARGE 10 SCS Runoff 125.15 2 730 502,097 ------ ------ ------ POST BYPASS 1 11 Reach 78.07 2 746 502,082 10 ------ ------ PRE-2 - CONVEYANCE TO STUDY 13 Combine 109.04 2 744 934,381 9, 11, ------ ------ TOTAL POST DISCHARGE 6198-PRE-POST - Wet Pond.gpw Return Period: 100 Year Wednesday, 09 / 12 / 2018 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 1 PRE-DEVELOPMENT AREA 1 Hydrograph type = SCS Runoff Peak discharge = 88.96 cfs Storm frequency = 100 yrs Time to peak = 12.30 hrs Time interval = 2 min Hyd. volume = 458,824 cuft Drainage area = 25.330 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 42.00 min Total precip. = 7.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.200 x 61) + (18.480 x 74) + (5.650 x 81)] / 25.330 63 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) PRE-DEVELOPMENT AREA 1 Hyd. No. 1 -- 100 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 2 PRE 1 - CONVEYANCE TO STUDY POINT Hydrograph type = Reach Peak discharge = 72.28 cfs Storm frequency = 100 yrs Time to peak = 12.53 hrs Time interval = 2 min Hyd. volume = 458,815 cuft Inflow hyd. No. = 1 - PRE-DEVELOPMENT AREA 1Section type = Trapezoidal Reach length = 870.2 ft Channel slope = 1.5 % Manning's n = 0.240 Bottom width = 15.0 ft Side slope = 7.0:1 Max. depth = 4.1 ft Rating curve x = 0.123 Rating curve m = 1.359 Ave. velocity = 0.70 ft/s Routing coeff. = 0.1234 Modified Att-Kin routing method used. 64 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) PRE 1 - CONVEYANCE TO STUDY POINT Hyd. No. 2 -- 100 Year Hyd No. 2 Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 3 PRE-DEVELOPMENT AREA 2 Hydrograph type = SCS Runoff Peak discharge = 103.60 cfs Storm frequency = 100 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 448,424 cuft Drainage area = 27.920 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 32.10 min Total precip. = 7.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(11.380 x 61) + (13.140 x 74) + (3.400 x 84)] / 27.920 65 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) PRE-DEVELOPMENT AREA 2 Hyd. No. 3 -- 100 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 4 PRE-2 - CONVEYANCE TO STUDY POINT Hydrograph type = Reach Peak discharge = 65.53 cfs Storm frequency = 100 yrs Time to peak = 12.50 hrs Time interval = 2 min Hyd. volume = 448,408 cuft Inflow hyd. No. = 3 - PRE-DEVELOPMENT AREA 2Section type = Trapezoidal Reach length = 1551.3 ft Channel slope = 1.5 % Manning's n = 0.240 Bottom width = 15.0 ft Side slope = 7.0:1 Max. depth = 4.1 ft Rating curve x = 0.123 Rating curve m = 1.359 Ave. velocity = 0.73 ft/s Routing coeff. = 0.0739 Modified Att-Kin routing method used. 66 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) PRE-2 - CONVEYANCE TO STUDY POINT Hyd. No. 4 -- 100 Year Hyd No. 4 Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 6 TOTAL PRE DISCHARGE Hydrograph type = Combine Peak discharge = 137.70 cfs Storm frequency = 100 yrs Time to peak = 12.53 hrs Time interval = 2 min Hyd. volume = 907,223 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 0.000 ac 67 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) TOTAL PRE DISCHARGE Hyd. No. 6 -- 100 Year Hyd No. 6 Hyd No. 2 Hyd No. 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 8 POST DEVELOPMENT AREA Hydrograph type = SCS Runoff Peak discharge = 213.44 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 435,419 cuft Drainage area = 27.150 ac Curve number = 73* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(10.770 x 68) + (16.380 x 77)] / 27.150 68 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 240.00 240.00 Q (cfs) Time (hrs) POST DEVELOPMENT AREA Hyd. No. 8 -- 100 Year Hyd No. 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 9 DRY POND DISCHARGE Hydrograph type = Reservoir Peak discharge = 40.66 cfs Storm frequency = 100 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 432,299 cuft Inflow hyd. No. = 8 - POST DEVELOPMENT AREAMax. Elevation = 550.28 ft Reservoir name = WET POND Max. Storage = 198,039 cuft Storage Indication method used. 69 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 240.00 240.00 Q (cfs) Time (hrs) DRY POND DISCHARGE Hyd. No. 9 -- 100 Year Hyd No. 9 Hyd No. 8 Total storage used = 198,039 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 10 POST BYPASS 1 Hydrograph type = SCS Runoff Peak discharge = 125.15 cfs Storm frequency = 100 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 502,097 cuft Drainage area = 26.150 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 29.60 min Total precip. = 7.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.810 x 68) + (15.340 x 76) + (9.000 x 82)] / 26.150 70 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) POST BYPASS 1 Hyd. No. 10 -- 100 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 11 PRE-2 - CONVEYANCE TO STUDY POINT Hydrograph type = Reach Peak discharge = 78.07 cfs Storm frequency = 100 yrs Time to peak = 12.43 hrs Time interval = 2 min Hyd. volume = 502,082 cuft Inflow hyd. No. = 10 - POST BYPASS 1 Section type = Trapezoidal Reach length = 1551.3 ft Channel slope = 1.5 % Manning's n = 0.240 Bottom width = 15.0 ft Side slope = 7.0:1 Max. depth = 4.1 ft Rating curve x = 0.123 Rating curve m = 1.359 Ave. velocity = 0.77 ft/s Routing coeff. = 0.0776 Modified Att-Kin routing method used. 71 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) PRE-2 - CONVEYANCE TO STUDY POINT Hyd. No. 11 -- 100 Year Hyd No. 11 Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Hyd. No. 13 TOTAL POST DISCHARGE Hydrograph type = Combine Peak discharge = 109.04 cfs Storm frequency = 100 yrs Time to peak = 12.40 hrs Time interval = 2 min Hyd. volume = 934,381 cuft Inflow hyds. = 9, 11 Contrib. drain. area = 0.000 ac 72 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) TOTAL POST DISCHARGE Hyd. No. 13 -- 100 Year Hyd No. 13 Hyd No. 9 Hyd No. 11 Hydraflow Rainfall Report 73 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 09 / 12 / 2018 Return Intensity-Duration-Frequency Equation Coefficients (FHA) Period (Yrs) B D E (N/A) 1 66.8196 12.9000 0.8963 -------- 2 71.1962 12.5000 0.8678 -------- 3 0.0000 0.0000 0.0000 -------- 5 77.9030 12.9000 0.8403 -------- 10 71.8008 12.0000 0.7927 -------- 25 66.0145 11.1000 0.7420 -------- 50 59.2567 10.1000 0.6965 -------- 100 53.8843 9.2000 0.6563 -------- File name: 6198-NOAA.IDF Intensity = B / (Tc + D)^E Return Intensity Values (in/hr) Period (Yrs)5 min1015202530354045505560 1 5.03 4.04 3.38 2.92 2.57 2.30 2.08 1.91 1.76 1.63 1.52 1.43 2 5.94 4.78 4.01 3.47 3.07 2.75 2.50 2.29 2.12 1.97 1.84 1.73 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.90 5.61 4.75 4.14 3.67 3.31 3.02 2.78 2.57 2.40 2.25 2.12 10 7.60 6.19 5.27 4.60 4.10 3.71 3.39 3.13 2.91 2.72 2.56 2.42 25 8.40 6.87 5.87 5.15 4.61 4.19 3.85 3.56 3.33 3.12 2.95 2.79 50 8.94 7.33 6.28 5.53 4.97 4.53 4.17 3.88 3.63 3.42 3.23 3.07 100 9.44 7.75 6.66 5.88 5.30 4.85 4.48 4.18 3.92 3.70 3.51 3.34 Tc = time in minutes. Values may exceed 60. Rainfall Precipitation Table (in) X:\Land Projects R2\6198 - Chambwood Rd - Wesley Chapel - Bowman\Calculations\Stormwater\6198-NOAA 24hr.pcp Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.95 3.56 0.00 4.48 5.21 6.22 7.04 7.89 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Cavesson Subdivision - Wesley Chapel, NC EEI Project #6198 Stormwater Management Report May 28, 2018 Appendix B Storm Drain Calculations (Pipes, Catch Basins, HGL, Gutter Spread) OPEN SPACE71,807 sq ft1.65 acLOT : 2043,137 sq ft0.99 acLOT : 2740,130 sq ft0.92 acOPEN SPACE : 1078,546 sq ft0.20 acOPEN SPACE : 1209,596 sq ft0.22 acOPEN SPACE391,321 sq ft8.98 acLOT : 1945,589 sq ft1.05 acLOT : 2140,291 sq ft0.92 acLOT : 2641,930 sq ft0.96 acLOT : 2248,262 sq ft1.11 acLOT : 2340,248 sq ft0.92 acLOT : 2541,071 sq ft0.94 acLOT : 2441,998 sq ft0.96 acLOT : 2843,358 sq ft1.00 acLOT : 1640,240 sq ft0.92 acLOT : 1740,071 sq ft0.92 acLOT : 1840,073 sq ft0.92 acLOT : 1440,569 sq ft0.93 acLOT : 1540,040 sq ft0.92 acLOT : 1340,708 sq ft0.93 acLOT : 1250,858 sq ft1.17 acLOT : 340,422 sq ft0.93 acLOT : 1141,000 sq ft0.94 acLOT : 241,374 sq ft0.95 acLOT : 1040,987 sq ft0.94 acLOT : 143,441 sq ft1.00 acLOT : 940,974 sq ft0.94 acLOT : 840,961 sq ft0.94 acLOT : 740,948 sq ft0.94 acLOT : 656,352 sq ft1.29 acLOT : 443,306 sq ft0.99 acLOT : 559,984 sq ft1.38 ac5905925 8 0 5 8 4 5 7 0 58058658057256456256657 0 570 58859 1 59 2DCB-1020.39ac.CB-1240.13ac.CB-1250.16ac.CB-1260.18ac.CB-1270.22ac.CB-1300.86ac.DI-1310.50ac.CB-1360.47ac.CB-1030.40ac.CB-1050.27ac.CB-1040.16ac.CB-1370.02ac.CB-1100.50ac.CB-1110.63ac.CB-1380.07ac.CB-1120.53ac.CB-1390.26ac.CB-1161.38ac.CB-1170.08ac.CB-1180.52ac.CB-1410.42ac.CB-1200.07ac.CB-1420.35ac.DI-1431.29ac.CB-1210.15ac.CB-1220.56ac.CB-1230.65ac.DI-1331.65ac.CB-1340.21ac.CB-1320.22ac.CB-1060.27ac.CB-1070.25ac.CB-1090.70ac.CB-1141.00ac.CB-1290.46ac.CB-1280.27ac.CB-1150.59ac.6 0 0 5955 9 0 5 8 5 5805755706 0 0 610605 600 5955905855805755455505555605655705755805855905956005 4 5 5455455455455 7 5 58 0 585 59 0 59 5 6 0 0 600 605605600595 590 585570570565560555 59 5545DI-108A0.63ac.CB-1350.95ac.CB-1080.29ac.CB-109A0.10ac.5465505485455500+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0015+51DI-1191.41ac.DI-1440.28ac.DI-112A0.30ac.CB-1130.58ac.DI-1401.04ac.DI-140A2.22ac.-2.9%SheetScale DESIGNED BY CHECKED BY JOB NUMBER DRAWN BY DATE NO.DATE BY ISSUE www.eagleonline.net P.O. BOX 551 Alpharetta, GA 30009 (678) 339-0640 2013A Van Buren Avenue Indian Trail, NC 28079 (704) 882-4222 FIRM LICENSE # C-0873 AS SHOWN 6198 CAVESSON VILLAGE OF WESLEY CHAPEL BOWMAN DEVELOPMENT 13815 CINNABAR PL HUNTERSVILLE, NC JHRNSWEE.E.I.DRAINAGE AREA MAP CATCH BASIN KEW KEW 5/25/2018CB-DASTUDY POINT0040'80'80EXISTING FLOOD PLAINCHAMBWOOD ROADCHAMBWOOD ROAD Cavesson Subdivision - Wesley Chapel, NC EEI Project #6198 Stormwater Management Report May 28, 2018 Appendix C Hydrological Soils Map and Summary Report SCS Curve Number Designations Wesley Chapel, North Carolina Project Number: 6198 May 25, 2018 24 Hour Storm Event Pre Development Soil Type: TbB2-Tarrus Gravelly Silty Clay Loam - HSG "B" Total Drainage Area = 12.58 ac. Roofs, driveways, etc 0.00 ac. CN = 98 Open Space (Good Condition) 0.00 ac. CN = 61 Woods 1.61 ac. CN = 55 Pasture, grassland or range 10.97 ac. CN = 61 Composite CN 60 Soil Type: BdB2-Badin Channery Silty Clay Loam - HSG "C" Total Drainage Area = 28.49 ac. Roofs, driveways, ponds, etc 0.43 ac. CN = 98 Open Space (Good Condition) 0.00 ac. CN = 74 Woods 5.16 ac. CN = 70 Pasture, grassland or range 22.90 ac. CN = 74 Composite CN 74 Soil Type: ChA-Chewacla Silt Loam - HSG "B/D" Total Drainage Area = 5.65 ac. Roofs, driveways, ponds, etc 0.06 ac. CN = 98 Dirt 1.04 ac. CN = 89 Woods 1.90 ac. CN = 77 Pasture, grassland or range 2.65 ac. CN = 80 Composite CN 81 Cavesson Subdivision COMPOSITE SCS RUNOFF CURVE NUMBERS Wesley Chapel, North Carolina Project Number: 6198 May 25, 2018 24 Hour Storm Event Post Development Soil Type: TbB2-Tarrus Gravelly Silty Clay Loam - HSG "B" Total Drainage Area = 10.72 ac. Roofs, driveways, etc 0.00 ac. CN = 98 Open Space (Good Condition) 0.00 ac. CN = 61 Woods 0.00 ac. CN = 55 AVERAGE LOT SIZE = 1 ACRE 10.72 ac. CN = 68 Composite CN 68 Soil Type: BdB2-Badin Channery Silty Clay Loam - HSG "C" Total Drainage Area = 13.20 ac. Roofs, driveways, etc 0.00 ac. CN = 98 Open Space (Good Condition) 0.00 ac. CN = 74 Woods 0.00 ac. CN = 70 AVERAGE LOT SIZE = 1 ACRE 13.20 ac. CN = 79 Composite CN 79 Soil Type: Cmb-Cid Channery Silt Loam - HSG "D" Cavesson Subdivision COMPOSITE SCS RUNOFF CURVE NUMBERS Wesley Chapel, North Carolina Project Number: 6198 May 25, 2018 24 Hour Storm Event Post Development Bypass 1 Soil Type: TbB2-Tarrus Gravelly Silty Clay Loam - HSG "B" Total Drainage Area = 1.86 ac. Roofs, driveways, etc 0.00 ac. CN = 98 Open Space (Good Condition) 0.00 ac. CN = 61 Woods 0.00 ac. CN = 55 Pasture, grassland or range 1.86 ac. CN = 61 Composite CN 61 Soil Type: BdB2-Badin Channery Silty Clay Loam - HSG "C" Total Drainage Area = 6.65 ac. Roofs, driveways, ponds, etc 0.43 ac. CN = 98 Open Space (Good Condition) 0.00 ac. CN = 74 Woods 1.97 ac. CN = 70 Pasture, grassland or range 4.25 ac. CN = 74 Composite CN 74 Cavesson Subdivision COMPOSITE SCS RUNOFF CURVE NUMBERS Wesley Chapel, North Carolina Project Number: 6198 May 25, 2018 24 Hour Storm Event Post Development Bypass 2 Soil Type: BdB2-Badin Channery Silty Clay Loam - HSG "C" Total Drainage Area = 6.76 ac. Roofs, driveways, ponds, etc 0.43 ac. CN = 98 Open Space (Good Condition) 0.00 ac. CN = 74 Woods 0.53 ac. CN = 70 Pasture, grassland or range 5.80 ac. CN = 74 Composite CN 75 Soil Type: ChA-Chewacla Silt Loam - HSG "B/D" Total Drainage Area = 5.65 ac. Roofs, driveways, ponds, etc 0.06 ac. CN = 98 Dirt 1.04 ac. CN = 89 Woods 1.90 ac. CN = 77 Pasture, grassland or range 2.65 ac. CN = 80 Composite CN 81 Cavesson Subdivision COMPOSITE SCS RUNOFF CURVE NUMBERS Wesley Chapel, North Carolina Project Number: 6198 May 25, 2018 24 Hour Storm Event Post Development Bypass 3 Soil Type: TbB2-Tarrus Gravelly Silty Clay Loam - HSG "B" Total Drainage Area = 0.32 ac. Roofs, driveways, etc 0.00 ac. CN = 98 Open Space (Good Condition) 0.00 ac. CN = 61 Woods 0.00 ac. CN = 55 Pasture, grassland or range 0.32 ac. CN = 61 Composite CN 61 Soil Type: BdB2-Badin Channery Silty Clay Loam - HSG "C" Total Drainage Area = 1.66 ac. Roofs, driveways, ponds, etc 0.00 ac. CN = 98 Open Space (Good Condition) 0.00 ac. CN = 74 Woods 0.00 ac. CN = 70 Pasture, grassland or range 1.66 ac. CN = 74 Composite CN 74 Cavesson Subdivision COMPOSITE SCS RUNOFF CURVE NUMBERS Cavesson Subdivision - Wesley Chapel, NC EEI Project #6198 Stormwater Management Report May 28, 2018 Appendix D Riser Uplift Calculations Rip-rap Calculations Erosion Control Plan & Calculations Project Name: Cavesson Subdivision Project No.: 6198 551 ft. Top of Basin 1 ft. Spillway Height 550 ft. Spillway Elev. Riser Width:48 in Riser Thickness:6 in 549 ft. Riser Weir Barrel Size:24 in 48 in. RISER Top of Basin:551 ft. Bottom of Basin 541 ft.8 ft. 9 ft. Riser Weir:549 ft. Spillway Height from top of Basin:1 ft. 541 ft. Bottom of Basin Riser Buoyancy Calculations - Dry Detention Pond Unit wt. of H20 62.4 ft3 Volume of Riser 160 ft3 Wt. of H20 displaced in riser 9,984 lbs Unit Wt. of concrete (pcf)150 lbs/ft3 Ballast Pad 24 in. RCP Volume of concrete in riser 37.5 ft3 Wt. of concrete riser 5,625 lbs Total Buoyancy Force to displace 15,609 lbs 48 in. RISER Concrete Base Required to Stabilize Riser: Concrete Pad Thinckness 18 in. Concrete Pad Width/length 10 ft Ballast Pad Volume of concrete pad 150.00 ft3 Wt. of H2O displaced =9,360 lbs Wt. of concrete pad 22,500 lbs 18 in. Factor of Safety: 1.4415 OK 10 ft. 10 ft. X 10 ft. X 18 in. 10 ft. Ballast Pad Dimensions: Wt. of H20 displaced in riser + Wt. of concrete riser Factor of safety should be greater than 1.10 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Tuesday, Jun 5 2018 6198 BMP POND DITCH (Q25 = 2.56 cfs) Trapezoidal Bottom Width (ft) = 6.00 Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 4.00 Invert Elev (ft) = 540.61 Slope (%) = 0.77 N-Value = 0.150 Calculations Compute by: Known Q Known Q (cfs) = 2.56 Highlighted Depth (ft) = 0.63 Q (cfs) = 2.560 Area (sqft) = 4.57 Velocity (ft/s) = 0.56 Wetted Perim (ft) = 8.82 Crit Depth, Yc (ft) = 0.18 Top Width (ft) = 8.52 EGL (ft) = 0.63 0 5 10 15 20 25 30 35 Elev (ft)Depth (ft)Section 539.00 -1.61 540.00 -0.61 541.00 0.39 542.00 1.39 543.00 2.39 544.00 3.39 545.00 4.39 Reach (ft) Project Name: Cavesson Date:Location: Wesley Chapel, NC By:Description: DRY POND RISER DISCHARGE - FES-200Runoff Discharge InformationQ25 = 155.2 cfsPipe Dia. = 24 in.Apron SizingLength = 13 ft.Width = 15 ft.3Do @ Pipe = 6 ft. Riprap Stone Sizing (d50)d50 Size (Avg) = 0.4 ft.d50 Size (Max.)* 0.6 ft.Min. Depth** = 1.25 ft.* equal to 1.5*d50 average stone size** min. depth no less than 15"NOTES:1.0 Riprap aprons to be sized for 10-year discharge rate from each storm pipe discharge location, including sediment basins.2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth.3.0 Abbreviations:La= Length of riprap apron in feet (determined from chart)(10' min.)Do= Size of outlet pipe (discharge pipe from storm drainage system in feet or inches)W= Width of riprap apron in feet (at end furthest from outlet pipe discharge)3Do= Width of rip rap apron in feet (at outlet pipe)d50= Size of stone in feet5/25/2018K.E.W. Project Name: Cavesson Date:Location: Wesley Chapel, NC By:Description: FES-100Runoff Discharge InformationQ10 = 83.95 cfsPipe Dia. = 48 in.Apron SizingLength = 26 ft.Width = 30 ft.3Do @ Pipe = 12 ft. Riprap Stone Sizing (d50)d50 Size (Avg) = 0.9 ft.d50 Size (Max.)* 1.35 ft.Min. Depth** = 1.25 ft.* equal to 1.5*d50 average stone size** min. depth no less than 15"NOTES:1.0 Riprap aprons to be sized for 10-year discharge rate from each storm pipe discharge location, including sediment basins.2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth.3.0 Abbreviations:La= Length of riprap apron in feet (determined from chart)(10' min.)Do= Size of outlet pipe (discharge pipe from storm drainage system in feet or inches)W= Width of riprap apron in feet (at end furthest from outlet pipe discharge)3Do= Width of rip rap apron in feet (at outlet pipe)d50= Size of stone in feet5/25/2018K.E.W. Project Client Project #Date Designation Designer Total Drainage Area 12.32 Acres 536,659 Square Feet Total Disturbed Area 3.19 Acres 138,956 Square Feet C 0.50 Contour Area Volume Net Volume TC 5 Minutes 575 5,190 00 I10 7.03 Inches per Hour 576 11,309 8,250 8,250 Q10 43.30 CFS 577 18,065 14,687 22,937 578 25,456 21,761 44,697 Required Volume 11,484 Cubic Feet 579 31,285 9,156 53,853 Required Surface Area 18,838 Square Feet Provided Volume 44,697 Cubic Feet OK Provided Surface Area 25,456 Square Feet OK Length 245 Feet Width 120 Feet Q10 43.30 CFS L/W Ratio 2.04 OK H 1 Feet C 3 Spillway Elevation 578 Surface Area at Spillway 25,456 L 14.43 Feet 2013A Van Buren Ave. Spillway Design SKIMMER BASIN CAVESSON BOWMAN 6198 5/28/2018 SKIMMER BASIN 1 KEW Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Minimum Spillway Design Spillway Length 20 Feet Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 4 Inches Weir Coefficient 3 Orifice Radius 1.7 Inches Max Flow 60 CFS OK Orifice Diamter 3.4 Inches Spillway Design EAGLE, ENGINEERING, INC.  2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 Project Client Project #Date Designation Designer Total Drainage Area 12.32 Acres 536,659 Square Feet Total Disturbed Area 3.19 Acres 138,956 Square Feet C 0.50 Contour Area Volume Net Volume TC 5 Minutes 575 5,190 00 I10 7.03 Inches per Hour 576 11,309 8,250 8,250 Q10 43.30 CFS 577 18,065 14,687 22,937 578 25,456 21,761 44,697 Required Volume 11,484 Cubic Feet 579 31,285 9,156 53,853 Required Surface Area 18,838 Square Feet Provided Volume 44,697 Cubic Feet OK Provided Surface Area 25,456 Square Feet OK Length 245 Feet Width 120 Feet Q10 43.30 CFS L/W Ratio 2.04 OK H 1 Feet C 3 Spillway Elevation 578 Surface Area at Spillway 25,456 L 14.43 Feet 2013A Van Buren Ave. Spillway Design SKIMMER BASIN CAVESSON BOWMAN 6198 5/28/2018 SKIMMER BASIN 1 KEW Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Minimum Spillway Design Spillway Length 20 Feet Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 4 Inches Weir Coefficient 3 Orifice Radius 1.7 Inches Max Flow 60 CFS OK Orifice Diamter 3.4 Inches Spillway Design EAGLE, ENGINEERING, INC.  2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 Project Client Project #Date Designation Designer Total Drainage Area 26.66 Acres 1,161,310 Square Feet Total Disturbed Area 9.98 Acres 434,729 Square Feet C 0.50 Contour Area Volume Net Volume TC 5 Minutes 541 18,154 00 I10 7.03 Inches per Hour 542 20,250 19,202 19,202 Q10 93.71 CFS 543 22,445 21,347 40,549 544 24,738 23,591 64,141 Required Volume 35,928 Cubic Feet 545 27,130 25,934 90,074 Required Surface Area 40,764 Square Feet 546 29,620 28,375 118,449 547 32,198 30,909 149,358 Provided Volume 278,573 Cubic Feet OK 548 34,848 33,523 182,881 Provided Surface Area 41,762 Square Feet OK 549 37,566 36,207 219,088 550 40,348 38,957 258,045 550.5 41,762 20,528 278,573 Length 417 Feet Width 176 Feet Q10 93.71 CFS L/W Ratio 2.37 OK H 0.5 Feet C 3 Spillway Elevation 550 Surface Area at Spillway 40,348 L 88.35 Feet 2013A Van Buren Ave. Spillway Design SKIMMER BASIN CAVESSON BOWMAN 6198 5/28/2018 SKIMMER BASIN 3 KEW Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Minimum Spillway Design Spillway Length 32 Feet Days to Drain 5 Days Head over Spillway 1 Feet Skimmer Size 6 Inches Weir Coefficient 3 Orifice Radius 3.0 Inches Max Flow 96 CFS OK Orifice Diamter 6.0 Inches Spillway Design EAGLE, ENGINEERING, INC.  2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079