Loading...
HomeMy WebLinkAboutNC0004979_Application_20180719 4' DUKEDuke Energy EC13K 526 South Church Street E N E RGY„ Charlotte, NC 28202 July 19, 2018 Mailing Address: PO Box 1006 Mr.John Hennessy Charlotte, NC 28201-1006 NC Division of Water Resources Surface Water Protection Section 1617 Mail Service Center Raleigh,NC 27699-1617 RECEIVED/DENRIDWR Subject: Application for Certification of Pollution Control Facility JUI .90 8 Plant Allen Steam Station Belmont,North Carolina;Gaston County Water Resources NPDES Permit No.NC0004979 Permitting Section Dear Mr. Hennessy, Pursuant to North Carolina General Statute(NCGS) §105-275(8), Duke Energy Carolinas,LLC. is requesting tax exemption certification for qualifying water pollution control equipment currently being installed at the referenced plant. The qualifying water pollution control equipment and appurtenances,operating in accordance with the terms and conditions of the referenced NPDES permit, are detailed in the attached North Carolina Department of Environment and Natural Resources,Division of Water Resources Application for Tax Certification and Exemption Form TC-WQ. In accordance with NCGS §105-275(8), form TC-WQ details the facility's water cleaning devices and appurtenances, which are "[Rjeal and personal property that is used...exclusively for ... waste disposal or to abate,reduce or prevent the pollution of...water..." Submission of this application is required as a process step in the State of North Carolina Department of Revenue's pollution control certification process for real and personal property tax exemption of certain assets used in pollution control capacities within the facility. The equipment's primary function is the waste disposal, reduction,or prevention • of water pollution. Please send one copy of the completed tax exemption certification to the following address: Ms. Anne Pifer Manager EHS-CCP Permitting and Compliance Duke Energy 526 S.Church Street,EC 13K Charlotte, North Carolina 28202 If you have any questions regarding this request for tax exemption certification, please contact me at (980) 373-1609. Sincerely, 446 Anne Pifer Manager, EHS-CCP Permitting and Compliance Enclosure c: Ms. Cindy Mobberley, Duke Energy www.duke-energy.com L DIVISION OF WATER RESOURCES TCN: APPLICATION FOR TAX CERTIFICATION This application is to be used only for waste treatment systems and equipment Rev. & EXEMPTION FORM TC-WQ under the authority of the NC Division of Water Resources (DWR) 01/29/2016 DIRECTIONS:Complete and mail signed copies of the application form and all supporting information to both: 1)the County Tax Administrator for the County in which the facility is located(one copy) AND 2)to the NC Division of Water Resources,Surface Water Protection Section, 1617 Mail Service Center, Raleigh,NC 27699-1617(two copies). Type or print in blue or black ink. A separate application package is required for each facility where property proposed for tax certification is located. THIS APPLICATION WILL NOT BE PROCESSED WITHOUT COMPLETE AND ACCURATE INFORMATION. If you have any questions regarding this application,please call the local tax office or the NC Division of Water Resources at 919/807-6300 or their web site at httpsa/ox.deq.prod.nc.qov/about/divisions/water-resources/water-resources-permits/wastewater-branch/npdes-wastewaterltax- certification for more specific contact information. Please Note: a)Tax Certifications will only be processed for facilities under the authority of the DWR and only if the DWR has found that the described property: 1.Has been or will be constructed or installed; 2.Complies with or that plans therefore which have been submitted to the DWR indicate that it will comply with the requirements of the Environmental Management Commission; 3. Is being effectively operated or will,when completed,be required to operate in accordance with the terms and conditions of the permit,certificate of approval,or other document of approval issued by the DWR;and 4.Has or,when completed,will have as its PRIMARY rather than incidental purpose the reduction of water pollution; 5.Is being used exclusively(100%)for waste treatment. b)If approved,the Tax Certification issued will incorporate all requested assets at the facility that meet the criteria for Tax Certification by DWR. Therefore this application must include any new assets for which Tax Certification is being requested,as well as any assets previously receiving Tax Certification from DWR for which Tax Certification is still needed. A.Applicant(Applicant is the owner of,and taxpayer for,the property described in this application for tax certification.) Name of Applicant: Name of Facility: Duke Energy Carolinas,LLC. Plant Allen Steam Station Address of Applicant,if different from facility where property located: Physical Address of Facility where property located(no P.O.Box): 253 Plant Allen Road 253 Plant Allen Road Belmont,NC 28012 Belmont,NC 28012 (address) (city) (zip) (street address) (city) (zip) Business Relationship of Applicant to facility where property located: County where property located: Gaston Name of Contact Person at Facility where property located: I,ir Glenn Does the Applicant hold any NC Division of Water Resources Permits? ®Yes / 0 No Title: Sr.Environmental Specialist Phone Number: 980-373-0530 If yes,please list Permit No.NC0004979 • Permit No(s): If approved,will this be the first Tax Certification issued for this Facility? If no,attach any previously issued ❑ Yes / ® No tax certifications B.Complete this Section only if the Operator/User of the facility and equipment is different from the Owner of the facility. Name of Operator/User: Operator/User Address: (address) (city) (zip) Operator/User Contact Name: Relationship between Operator/User of facility and equipment and applicant: ***ATTACH A PROCESS SCHEMATIC TO YOUR APPLICATION The number of each item for which Tax Certification is being requested must be shown on the schematic*** Application continues on Next page DIVISION OF WATER RESOURCES TAX CERTIFICATION & EXEMPTION APPLICATION PAGE 2 Waste Treatment Systems & Equipment: Waste treatment systems&equipment must be used exclusively for the abatement of water pollution Rev.09/01/2013 For DWR Use Was asset listed in Asset Number, %of time item is Is this asset For Canty orrh''A' Year of Original Historical Use Only Approved'V Description of Waste Treatment Systems or Equipment the permit(Yes/No) Vehicle Identification How is this equipment used for pollution abatement? used for pollution replacing a prior Disapproved Number(VIN) Acquisition Cost" abatement asset? Included in updated Under 1 Dry Bottom Ash Handling System NPDES permit application N/A Bottom ash handling system to replace ash basin per CCR requirements 100%construction 2018 $67,487,795 No Included in updated Under 2 Lined Retention Basin NPDES permit application N/A Lined retention basin to replace ash basin per CCR requirements 100%construction 2018 $39,432,666 yes Included in updated Piping Installed to reroute plant water away from Ash basin and to new Lined Under 3 Plant Water Reroute NPOES permit application WA Retention Basin 100%construction 2018 $29.988,355 No 4 5 6 7 9 10 11 12 13 14 is Attach additional pages it necessary 'If the asset is listed in the DWO permit,the description must be identical as listed on the current permit. If the asset is not specifically listed in the DWO permit,the applicant must attach detailed information as to why the asset should qualify for Tax Certification. "When certifying systems or equipment,DENR is not certifying the cost of the equipment or the year of acquisition. Facilities: To qualify for tax certification,the building or section of building being applied for,must be used exclusively for water pollution prevention. A sketch of the building,square footage along with details as to how the building is used for water pollution prevention,is required. Land: To qualify for tax certification,the land must be used exclusively for water pollution prevention. A schematic diagram of the facility detailing the land being applied for is required. The amount of land (acreage)is required and how this land is being used to prevent water pollution. For wastewater treatment and irrigation system list separately the acreage used for actual treatment from the acreage required by the facility's water quality permit for buffers and setbacks. SIGNATURE: I hereby certify that the above equipment,facilities and/or land are used for the purpose stated,and that the information presented in this application is accurate. Furthermore,I certify that any portable or mobile equipment listed on this application will be used exclusively in the state of North Carolina. Applicant Signature: Dave Renner Title: VP CCP Engineering Date: l�l� (print name also) NOTICE: The penalty for al tatement,representation or certification Of: Duke Energy Carolinas,LLC herein includes imprisonment and/or the assessment of civil penalties. (Name of Applicant Business Entity) Tc.wo Attachment A Dry Bottom Ash Handling System As a result of Coal Ash Management Act and the federal CCR Rule,Allen's bottom ash handling must be converted from a wet sluice operation to a dry ash handling system. This project will construct a closed loop wet sluice to dry bottom ash conversion system. It involves following: • Construction of two remote submerged flight conveyors(RSFCs). • Construction of return piping from RSFCs to the boiler. • Installation of mechanical and electrical equipment to support design of system conversion • Update of DCS control system to allow functional plant operations This project will procure and install RSFCs that will extract the bottom ash transported to the RSFC by way of the bottom ash sluicing system. Multiple RFSCs will be sized and installed in a cross configuration design to allow one RSFC to be taken off line for maintenance.This project will install the piping and control mechanisms to support cross configuration of the system.The bottom ash sluicing system will be modified into a closed loop system.A surge tank,and a maintenance tank will be procured and installed as part of this new closed loop bottom ash system.The return pumps and piping will be procured and installed into the new bottom ash system.This project will replace the existing high pressure service water booster pumps, and will tie into the bottom ash sluicing piping going to the existing ash ponds. Modifications will be made, by this project,to the existing system supplying water to the bottom ash sluicing system.This project will install a processing area to receive extracted dry bottom ash and allow for processing of the dry bottom ash into transporting vehicles.This project will construct all driving areas associated with the loading of the dry bottom ash into transport vehicles.This project will install new AC power equipment and modify the existing plant equipment necessary to support this project. Spare parts associated with this project will be supplied by this project. See rendering below for projected Allen DBA system. 41,4 y} � 001.0" ,30 gAlf csm,m� ` . � C+n � M. p:,rx✓'"� �: t maw.: ah s Lined Retention Basins In response to the CCR Rule,Allen Steam Station will be closing the ash basin that currently accepts sluiced bottom ash. The new lined retention basins will be in compliance with ELG,CAMA and CCR Rules. The Lined Retention Basins project will include the following water pollution control facilities: • one lined primary settling basin • one lined secondary settling basin • chemical addition equipment at the inlet and outlet See diagram below for more information on placement of these water pollution control facilities. • ... \\\ .,.i. \ :If 11 I--- - - , ..... . . ...,.... .. c... .,....; ..., t. 7 _, • I q - . ..... • -, 4.. , . ..r ..' , . . ... ' r ... 1 ,., I ... ._.. '•.f.;::::: ..`,f,,,. . , _:,„Z.,;.:1.1:',1;,I...l'7,,t14:4 -'' ,.,•Pif..,... .," ;.'ll't''''*441.4***.1 -—''' ' ..' ''. '' :4:.; 11„,•,4,:•.'::1•,•,;',A;cili.'..:''':•',..446,::.,,,':':A..ii.).•.::•,' .'70,•;.',•'...,. •'.',X ' ' n .„-., , ,,,,,, '''':'4''':'Ai;'*-.'j;-,:",:e:.1.--"';'?,:',1, .,''. °" • .-.' ''' ''' Ir; P. - • t•; ... ,ri.....,tIt-''' . - E • ,;-.' ,i . ' LI ,. ''''''•. 'I•'''•',`,.-.C.,:,...,„,-- ''.4--...,, - '5,.",...,.,.•i.- -,,,4,,,,, \::',:ae,''' - u •. . ,....,,, ..,,, • -- :•, •,.1•••:.. •••4 _,,••• ,uNt.•,.,•• !,.•,•••• •„..„.„..,,,,,,F.••=•,-•,,,7«,, •••••14,..-, ..,.. .:--,:. ,..„: -.., ,:. ••.. f i•,::':-..,..,-,,,,:,..,:',,,,.•.,...,.....,,-.;;•-,-::.•:-.,, ,-'•-•fi - -,... m - s ,• - -:•,:-.4,4:.:•: ,-• „:• „,-.!"..i"9, ;;',..°:,' ...'„0- tf .--"A' 0 z 21 i II g i ''''':''''13' '4'2:';'''': ,-i',..•":•.•:•,:;•'''''''!‘•' .,,4'' -*i ..,All ', . §3 (11— '-7'.":3:;;;:',.''''...(''',:' I g: ,.., ‘-• io 17, - ; -!./.• -- I( ',-- -. 1 i ,„, 0 : • ... . ... , S . - . I I I Plant water reroute Reroute of Process and Storm water lines from Ash Pond to a new Retention Pond to comply with the requirements of the Effluent Limitation Guidelines(ELG), as well as closure of the active Ash Basin in accordance with CAMA.The Plant Water Reroute project will include the following water pollution control facilities: • piping • pumps • conduit • PCM's • transformers • chemical treatment systems • chemical storage tanks See diagram below for more information on placement of these water pollution control facilities I i • t • i i . I 1 • Na aR � " 4 -4- x� or -s m .""47 ur 1 WATER REDIRECGON PROGRAM pI PRELIMINARY.NOT cEOVERALLRATgRrtWPLAN CAffNT 1 FOR CONSTRUCTION SKETCH VISYPCHINELL ALLEN STEAM STATION UNITS+ S KE 1 j { !' EtRGY 1A w...,la. ..agora.... t �.,...� � �. .1.7.1.71‘.1 •..rr. +I�+1+1�•I r..a•. SKC037 .•.A .,. w.....,....+�.... .•..,...,arra . • • 2 , j.9 1. 1.4 4'1'1 _ 4 `