Loading...
HomeMy WebLinkAboutNCS000348_Outfall Letter_20180417Energy, Mineral & Land Resources ENVIRONMENTAL QUALITY April 17, 2018 CPI USA North Carolina, LLC Attn: Virginia Grace 1281 Powerhouse Drive Southport, NC 28461 Subject: NPDES Stormwater Permit No. NCS000348 Representative Outfall Status Request CPI USA North Carolina LLC Southport Facility Brunswick County Dear Ms. Grace: ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. (TOBY) VINSON, JR. Interim Director The Wilmington Regional Office staff of the Division of Energy, Mineral, and Land Resources has reviewed your request received March 22, 2018 for determination that Outfall 1C be granted representative outfall status for Outfalls 1-6. Based on Mr. James and Mr. Lambe's site inspection on April 17, 2018, we are approving this request. In accordance with 40 CFR §122.21(g)(7), you are authorized to sample Outfall 1C as the representative outfall. This approval is effective with the next sampling event. However, this approval is contingent on the following requirements: (1) All outfalls, regardless of representative status, must have a cleared path and the right of way to the outfall must be properly maintained. (2) The permit still requires that Qualitative Monitoring be performed at all Stormwater Discharge Outfalls, regardless of representative status. (3) Revise the site map to accurately depict all sampling points. Sampling points should be defined with GPS data, pictures, and site labels. (4) Ensure that the Outfall 1C is within CPI USA North Carolina LLC leased property. Define leased area on site map. Please submit the site map for our files. In addition, please remember that any actions you initiate in response to benchmark exceedences as directed in the tiered response provisions of your permit must address all drainage areas represented by Outfall 1C, where appropriate. Please append this letter to your Stormwater Pollution Prevention Plan or permit to document that representative outfall status has been approved. If changes in drainage areas, structures, processes, storage practices, or other activities occur that significantly alter the basis of this approval, representative outfall status may no longer be valid. You should either resume sampling at all storm water discharge outfalls, or reapply to this office for representative outfall status based on updated information. State of North Carolina I Environmental Quality 1 Energy. Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, NC 28405 910 7967215 CPI USA North Carolina Southport Facility Page 2 of 2 I If you have any questions or concerns concerning this letter and the attached report, please contact Brian Lambe or me at 910-796-7215. Sincerely, Trent James Environmental Specialist Land Quality Section Attachments: 1. BIMS Inspection Checklist) cc: WiRO Files — Land Quality Stormwater Permitting Unit DWR — Central Files, NPDES Permit NCS000348 State of North Carolina I Environmental Quality Energy. Mineral and Land Resources Wilmington Regional: Office i 127 cardinal Drivc Extension Wilmington. NC 28405 L) K' 7`?6 2!5 Y Permit: NCS000348 SOC: County: Brunswick Region: Wilmington Compliance Inspection Report Effective: 05/01/10 Effective: Contact Person: Virginia Grace Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Expiration: 04/30/15 Owner: CPI USA North Carolina LLC Expiration: Facility: Southport Power Plant 1281 Power House Dr SE Aka Cogentrix Dr Southport NC 28461 Title: Phone: 910-343-6711 Inspection Date: 04/17/2018 EntryTime: 10:OOAM Primary Inspector: Elsie C James -- Secondary Inspector(s): Brian P Lambe Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: Compliant E] Not Compliant Question Areas: M Storm Water (See attachment summary) Certification: Phone: Exit Time: 12:OOPM Phone: Phone: Inspection Type: Compliance Evaluation Page: 1 Permit: NCSOCC348 Owner - Facility: CPI USA North Carolina LLC •'+ Inspection Date: 04/17/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Trent James and Brian Lambe inspected the Southport Power Plant in response to a request for representative outfall status. The site is surrounded by a ditch on three sides with all outfalls 1-6 discharging at outfall 1C. Outfall 5 is not located as per submitted documents, rather outfall 5 has been sampled at the location of 1 C. All outfalls should be clearly labeled on site and documented in the SWPPP. Please take pictures of the locations and take GPS data points to avoid any confusion in the future. Please provide details of all sampling points to this office. All sampling points did not have corresponding records, assumedly for no flow conditions. These must be documented for submitted sampling dates in the future. Representative Outfall Status (ROS) is granted. ALL outfalls are still subject to the qualitative monitoring requirements of the facility's permit. The ROS approval letter from DEQ must be kept on site with the facility's Stormwater Pollution Prevention Plan. The facility must notify DEQ in writing if any changes affect representative status. Please clarify the definition of the site in terms of lease agreements. The question arose if the outfall 1C is within the lease boundaries due to a November 24; 2014 map submitted with the ROS request. Submit a revised map indicating leased area. During the inspection, a concern was raised of the bottom ash being uncovered and able to drain to the stormwater system. This material should be undercover with containment. Greater attention to housekeeping regarding the TDF is needed. There is scrap TDF throughout the yard. The TDF stockpile is over the containment walls. The site is granted representative outfall status to sample at one location, Outfall 1C (formally named outfall 5). This is contingent on the concerns expressed previously. Page: 2 M Permit: NCS000348 Owner - Facility: CPI USA North Carolina LLC Inspection Date: 04/17/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (LISGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? N ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? E ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ 1:11:1 Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment.- Analytical omment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ N ❑ Comment: Analytical monitoring data must include all sampling points in all recorded events, documenting no flow if applicable. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? E 111:1 ❑ # Were all outfalls observed during the inspection? N ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ E ❑ # Has the facility evaluated all illicit (non stormwater) discharges? E ❑ ❑ ❑ Comment: Page: 3