Loading...
HomeMy WebLinkAboutDuncan Industrial Park - 6/8/2018 10:13:41 AMWW "Arpplemental Information Upload Fon Staff Review: Updated ID#: Updated Version: Who needs a copy?* SW5180401 3 V Central Office r Regional Office Select Reviewing Office* Raleigh Regional Office — 919-791-4200 Central Office Reviewer: Corey Anen - eads\scanen Select RO Reviewer:* bill.denton@ncdenr.gov SUBMITTED PROJECT INFORMATION Existing Project Information: ID# SW5180401 Version: 3 Facility Name: Duncan Industrial Park County: Harnett Name: Carlos Bagley Who is subnitting the inforrration? Email Address: carlos.bagley@rlenc.com Describe the attachments: Please upload all files that need to be submitted Duncan Industrial Concrete Plant 6-8-18.pdf 11.54MB OM Agreement Signed.pdf 2.9MB Stormwater Calcs.pdf 23.95MB Supplemental EZ.pdf 2.16MB SSW-SWU-101-Application-DEMLR-SPU Oct 5.29MB 2013.pdf Only pdf files are accepted. Water Resources ENVIRONMENTAL QUALITY PF By checking the box and signing box below, certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this Supplemental Information form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act') • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the Supplemental Information form. Full Name: Carlos Bagley Signature: Date Submitted: