Loading...
HomeMy WebLinkAbout2222_001IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff will be VilZtd throw h a ro osed storm pipe collections stem to an infiltration basin on the project site. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: [] Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Storm w this project drains to the Cape Fear River basin. otal Property Area: 6.65 acres 5. Total Coastal Wetlands Area: 0.00 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:6.65 acres + Total project area shrill be calculated to exclude the fralloxving: the normal pool of inipFounded structures, the area between the banks of stretams and rivers, the area below the Normal Hi h Water (NHW) line orMean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHA) line. The resultant project area is used to calettlate oz)erall percent lit+ilt ttlxotr area (BUA). Nair -coastal zt etlartds larrdzotn'd of the N TW (or MHm lir:e niait be included in the total project area. 4�4# 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 50.4 al '/ s 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole properly/ area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ Receiving Stream Name Beaver Creek 32,931 Stream Class * C Stream Index Number * 18-31-24-5-1 109,535 Total Drainage Area (so 269,619 10"' • 3,706 On-site Drainage Area (sf) 269,619 Off-site Drainage Area (sf) Proposed Impervious Area** (so 146,172 % Impervious Area** total 54.20 Impervious' Surface Area Drainage Area 1 1 Drainage Area _ Drainage Area _ Drainage Area _ On-site Buildings/Lots (so 32,931 On-site Streets (sf) On-site Parking (sf) 109,535 On-site Sidewalks (so 3,706 Other on-site (so Future (sf) Off-site (sf) Existing BUA*** (so Total (sf): 146,172 * Stream Class and Index Number can be determined at: ]ty�(lre�rfal,nccleatr.nr� iHb/zurl/7s/csn/rlassrficatiort Inzpervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 06Aug2012 Page 3 of 6 INFILTRATION BASIN STORAGE CALCULATIONS PROJECT: DATE PREPARED: SMOKE BOMB HILL REDEVELOPMENT 6/4/2014 REV. 3/30/15 DESCRIPTION: PREPARED FOR: INFILTRATION BASIN CALCULATIONS FORT BRAGG DPW-WMB ENGINEER: & PREPARED BY: REVIEWED BY: N iV1viC7t.l EM JBS CN PROJECT NO. 6048-0003 Design Volume Drainage Area 6.19 ACRE Value from CAD Impervious Drainage Area 3.35 ACRE Value from CAD Impervious Cover 54.2% SF Impervious Cover --(Impervious Drainage Bypass Elevation 271.00 FMSL Area)/(Total Drainage Area) 100/ Runoff Coefficient, Rv 0.538 IN/IN Rv=0.05+0.009'(% Impervious) Total Required Design Volume 21,752 CF 1.8)"Runoff Volume= 1,Binch'Rv"1 foot/12 Top of Dam Elevation 275.00 FMSL inch"(Total Drainage Area) Infiltration Basin Information SHWT 265.40 FMSL Value from S&ME Testing Bottom Elevation 267.50 FMSL Elevation of the bottom of the basin Bottom SA 3,212 SF Surface area at the bottom of the basin Bypass Elevation 271.00 FMSL Temporary pool elevation Bypass SA 7,993 SF Surface area at the temporary pool Provided Storage Volume 22,484 CF See Hydraflow Results Top of Dam Elevation 275.00 FMSL Infiltration Rate 1.71 IN/HR Value from S&ME Testing Report Drawdown Time 4.5 DAYS See Drawdown Spreadsheet McKim Creed, Inc. 243 N Front Street Wilmington, North Carolina 28401 (910) 343-1048 1 of 1 Permit No (to be provided by DWQ) f W +5 YQ9 A�-*� /� STORMWATER MANAGEMENT PERMIT APPLICATION FORM a NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) most be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATiON Project Name Smoke Bomb Hill AAFES Mini -Mall Express Contact Person Branch Smith I McKim & Creed Phone Number 910-343-1048 Date 30 -Mar -2015 Drainage Area Number DA -1 II. DESIGN INFORMATION days OK 4.00 Site Characteristics 267.50 i Drainage area 269,619.00 • ft2 Impervious area 146,172.00 ft2 3. Percent impervious 54.21 % Design rainfall depth 1.80 in Peak Flow Calculations 1 -yr, 24 -hr rainfall depth NA in 1 -yr, 24 -hr intensity in/hr Pre -development 1 -yr, 24 -hr discharge ft3/sec Post-development 1 -yr, 24 -hr discharge ft3/sec Pre/Post 1 -yr, 24 -hr peak flow control ft/sec Storage Volume: Non -SA Waters Minimum design volume required Design volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1 -yr, 24 -hr runoff volume Post -development 1 -yr, 24 -hr runoff volume Minimum required volume Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area E ft3ft3 OK for non -SA waters N/A ft3 ft3 ft3 ft3 —ft3 Lakeland Sand 1.70 in/hr 265.40 fmsl 4.50 days OK 4.00 :1 OK 267.50 fmsl OK 270.93 fmsl 7,993.00 ft2 275.50 fmsl 178.00 ft 40.00 ft 3,212.00 ft2 Form SW40 1 -Infiltration Basin -Rev 5 11Apr2011 Parts I & 11 Design Summary, Page 1 of 2 Form SW401-Infiftration Basin-Rev.5 11Apr2011 Parts I. & II. Design Summary, Page 2 of 2 Permit No (to be provided by DWQ) Additional Information Maximum runoff to each inlet to the basin? 2.00 ac -in OK Length of vegetative filter for overflow NIA ft OK Distance to structure NIA ft OK Distance from surface waters NIA ft OK Distance from water supply well(s) NIA ft OK Separation from impervious soil layer 2.00 ft OK Naturally occuring soil above shwt 2.00 ft OK Bottom covered with 4 -in of clean sand? Y (Y or N) OK Proposed drainage easement provided? NIA (Y or N) OK Capures all runoff at ultimate build -out? NIA (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Pretreatment device provided Storm Inlets Form SW401-Infiftration Basin-Rev.5 11Apr2011 Parts I. & II. Design Summary, Page 2 of 2 C Nouon ISNOO dOd 3f1SSl a a a UEr m&mn m aa+s - LWOOO-WOE40 :ON *roHd S33W w a W i '. J' dNIlOdVO HlIiON'`J`JVa91a0J !qojVllauluIUOMAP.-i SS3Hdx3rl-Idw INIw -1-1IH 8W08 3AOWS ms 'EE 7 Q w U Q LL H Q U L LU G 7 LL O W- CL Ic Q Z U Q Q w m O OL0N O p WUn uj w -a O w LU IL Q