HomeMy WebLinkAboutLansing substation - 3-23-18 REV project manualUC SYNERGETIC, LLC. 123 N. White Street Fort Mill, SC 29715 (803) 835-7929 NC COA F-1217 Date:02/22/2018 Rev:03/23/2018 Client:Blue Ridge Electric Membership Corp. Project:Lansing Substation Specification No.:N/A Title:LANSING SUBSTATION PROJECT REPORT LANSING 100-12.5kV SUBSTATION PREPARED FOR: BLUE RIDGE ELECTRIC MEMBERSHIP CORPORATION 1216 BLOWING ROCK BLVD. NE PO BOX 112 LENOIR, NC 28645 PHONE: (828) 759-8928 PROJECT REPORT UC SYNERGETIC, LLC. 123 N. White Street Fort Mill, SC 29715 (803) 835-7929 NC COA F-1217 Date:02/22/2018 Rev:03/23/2018 Client:Blue Ridge Electric Membership Corp. Project:Lansing Substation Specification No.:N/A Title:LANSING SUBSTATION PROJECT REPORT Blue Ridge Electric Membership Corporation (“Blue Ridge Energ y”)proposes to construct the new Lansing 100-12.5kV Substation to increase the electrical capacity and reliability in central Ashe County, North Carolina.The existing Warrensville and United Chemi-Con Substations are currently serving the existing electrical load,but due to the age of the existing equipment, Blue Ridge Energy has determined the existing facilities need to be decommissioned, removed,and a replacement facility built. When completed, the substation pad will be covered in 3 inches of uniformly-graded, #57 washed stone underlain by 6 inches of crusher run (ABC mix).The access drives will be covered with approximately 8” of compacted crusher run gravel topped by 4 inches of washed #57 stone during construction. Upon completion of substation construction, the driveway will be paved with asphalt from the edge of pavement on Hwy 194 to the edge of the substation pad, as shown on the grading and erosion control drawings.Total built upon area will be approximately 1.32 acres. Property Description The property consists of two parcels and is owned by Blue Ridge Energy. It is listed in the Ashe County GIS system in Plat Book 00008, Page 901. The total acreage of the two parcels is 20.95 acres.The property is located within the North Fork of the New River Basin. Currently the property is undeveloped and consists of mixed hardwood forest with small areas of spicebush and flowering dogwoods.While no wetlands or state or federally listed endangered species were found to be present by a third party environmental consultant, two first-order perennial streams, determined to be Jurisdictional to the U.S. Army Corps of Engineers (“USACE”),have been identified on site. The eastern-most stream, identified as Stream 1, parallels the existing driveway to the property and extends from a small seepage just below the roadbed, and flows down and into a small catch basin which crosses under Highway 194 and into the New River. UC SYNERGETIC, LLC. 123 N. White Street Fort Mill, SC 29715 (803) 835-7929 NC COA F-1217 Date:02/22/2018 Rev:03/23/2018 Client:Blue Ridge Electric Membership Corp. Project:Lansing Substation Specification No.:N/A Title:LANSING SUBSTATION PROJECT REPORT The western-most stream, identified as Stream 2, originates approximately 200 f eet north of the existing logging road (north of the proposed substation)and flows through a culvert under the existing roadbed. The stream then passes through a small spring box before it exits the property to the south/southwest. Soils on site consist primarily of Braddock-Urban Land Complex (BuC),Colvard Fine Sandy Loam (Co), and Evard Loam (EvF). Soils are primarily classified as Type A/B hydrologic soils. Proposed Improvements Both existing Warrensville and United Chemi -Con substations were constructed in the early 1950’s and are located on the banks of the New River. Annual dissolved gas analysis (“DGA”) testing reports have recently shown internal insulation degradation of the transformers, which will likely lead to transformer failure in the future. The current Spill Prevention, Control, and Countermeasure (“SPCC”)plan identifies a concern that, in the event of an oil leak, contaminants could quickly make their way into the river. Therefore, this project calls for the construction of a new electrical substation to ensure electrical reliability standards are maintained while providing maximum protection to environmental resources. The substation will be scheduled and constructed in phases to ensure adequate sediment and erosion control measures are maintained, and to aid in the creation of a working space to perform the overall site construction. Phase I will consist of the widening and construction of the first 250 linear feet of the existing roadbed. The road shall be widened to 20 feet (with 2-foot shoulders). A cut-slope swale will be installed along the east side of the access road to collect stormwater runoff. This swale will be protected by rip-rap to help prevent erosive conditions and sediment runoff. An 18” cross- under culvert will be installed near the entrance of the driveway to convey stormwater runoff under the driveway to the existing culvert under Highway 194. A temporary construction entrance will be constructed at the highway and entrance to the property for all construction traffic. Additionally,a small mechanically stabilized earth (“MSE”)retaining wall will be installed along the west side of the access drive, to minimize disturbance into the stream buffer. A ll debris and spoils from the site will be promptly removed and properly disposed of in permitted UC SYNERGETIC, LLC. 123 N. White Street Fort Mill, SC 29715 (803) 835-7929 NC COA F-1217 Date:02/22/2018 Rev:03/23/2018 Client:Blue Ridge Electric Membership Corp. Project:Lansing Substation Specification No.:N/A Title:LANSING SUBSTATION PROJECT REPORT disposal sites, as directed by Blue Ridge Energy. This section of access road will rise at an approximate 23% slope and therefore will be either graveled or seeded (for stabilization) prior to moving to the next phase of construction. Phase II will consist of the widening and construction of the next 250 linear feet of access road up to the substation perimeter. This section will begin as a standard 20 -foot (with 2-foot wide shoulders), gravel paved access drive, as per Phase I above. However, the Phase II section will increase in width as the drive reaches the substation. As in Phase I of construction, the access drive will incorporate a rip-rapped, cut-slope swale along the north/west side, and two 18” reinforced concrete pipe (“RCP”)cross culverts for drainage. The cut-slope swales will be lined with geotextile fabric and rip-rapped, with all graded and disturbed surfaces graveled and/or grassed as soon as possible. This phase of construction will rise at an approximate 16% slope until it nears the substation perimeter, where the slope will then decrease to approximately 3% slope into the substation. As with Phase I construction, all graded and disturbed surfaces will be either graveled or seeded (for stabilization) prior to proceeding to the next phase of construction. Phase III will consist of grading and construction of the substation pad. This work will involve the construction of approximately 650 feet of MSE retaining wall around the perimeter of the substation pad. All excavated material for construction of the retaining walls are proposed to be stockpiled near the center of the substation pad (in the vicinity of the existing knoll). Appropriate erosion control measures will be installed around all stockpiled and exposed soils. Along with the construction of the retaining walls, the grade of the substation pad will rise accordingly. As in previous construction phases, all disturbed areas will be seeded (for stabilization) as soon as possible, and following completion of construction in the area. With the completion of construction of the substation pad, an underground drainage system will be installed. Appropriate erosion control measures will be installed for all catch basins and all associated outlets will be promptly armored for stabilization. Calculations for the proposed drainage system and for swale stability are included in the appendix.Since this is a low density development (7.9 % built upon area), post construction storm water controls for the site are not required. UC SYNERGETIC, LLC. 123 N. White Street Fort Mill, SC 29715 (803) 835-7929 NC COA F-1217 Date:02/22/2018 Rev:03/23/2018 Client:Blue Ridge Electric Membership Corp. Project:Lansing Substation Specification No.:N/A Title:LANSING SUBSTATION PROJECT REPORT Phase IV will consist of the grading and construction of the remaining secondary access drive to connect to the existing logging road system. As in all other phases of construction, appropriate erosion control measures will be installed during construction, and all graded and disturbed areas will be seeded (for stabilization) as soon as possible upon completion of construction in the area. It should also be noted that a 100 kV transmission line will be built to coincide with this new substation. However, the line alignment is yet to be finalized and will be submitted separately. The substation site and access road is expected to generate an excess of material during grading operations. This material will be stored on site in an area designated on the plans. Sediment and Erosion Control During construction, minimizing sediment loss is the priority. All disturbed slopes, 2:1 or greater, will be covered in erosion control matting upon completion of land disturbing activities.Temporary and permanent ground cover stabilization will be performed in accordance with the requirements of the construction general permit and the North Carolina Department of Environmental Quality (NCDEQ)Erosion and Sediment Control Manual. Sediment and erosion control will be accomplished with the installation of skimmer basins placed throughout the disturbed area. In addition, diversion berms will be used to bypass runoff water from undisturbed areas. Perimeter controls consist of silt fences and rock outlets. Energy dissipaters will be placed at the discharge of each culvert to control erosion at the discharge of the culvert pipes, The sediment basins will be used to contain sediment-laden water until the exposed soils can be stabilized.In areas of possible concentrated flow, the plan shows the installation of rock outlets in the silt fence. The outlets will serve as a “relief point” and will allow for stormwater to pass through as the sediment filters out. UC SYNERGETIC, LLC. 123 N. White Street Fort Mill, SC 29715 (803) 835-7929 NC COA F-1217 Date:02/22/2018 Rev:03/23/2018 Client:Blue Ridge Electric Membership Corp. Project:Lansing Substation Specification No.:N/A Title:LANSING SUBSTATION PROJECT REPORT Additionally, rip-rap lined channels will be utilized to control erosion in the channels. The use of rip-rap will minimize erosive conditions and therefore reduce the amount of sediment travel until site stabilization. UC SYNERGETIC, LLC. 123 N. White Street Fort Mill, SC 29715 (803) 835-7929 NC COA F-1217 Date:02/22/2018 Rev:03/23/2018 Client:Blue Ridge Electric Membership Corp. Project:Lansing Substation Specification No.:N/A Title:LANSING SUBSTATION PROJECT REPORT CALCULATIONS UC SYNERGETIC, LLC. 123 N. White Street Fort Mill, SC 29715 (803) 835-7929 NC COA F-1217 Date:01/19/2018 Revision: Client:Blue Ridge Electric Membership Corp. Project:Lansing Substation Specification No.:N/A Title:LANSING SUBSTATION PROJECT REPORT STORM DRAIN CALCULATIONS 2S Swale 2 Watershed 3S Swale 3 Watershed 5S CB #5 Watershed 6S CB #6 Watershed 9S CB #8 Watershed 13S CB #9 Watershed 2R Swale 2 3RA Swale 3 A 3RB Swale 3 B 13R (new Reach) 14R (new Reach) 1PCB CULVERT 1 5PCB CB #5 6PCB CB #6 9PCB CB #9 10PCB CB #8 Drainage Diagram for Lansing Substation Part 2 Prepared by {enter your company name here}, Printed 1/31/2018 HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Subcat Reach Pond Link Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 2HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Pipe Listing (all nodes) Line#Node Number In-Invert (feet) Out-Invert (feet) Length (feet) Slope (ft/ft) n Diam/Width (inches) Height (inches) 1 13R 2,752.88 2,744.33 33.0 0.2591 0.013 18.0 0.0 2 14R 2,752.50 2,749.47 85.0 0.0356 0.013 18.0 0.0 3 1P 2,756.69 2,756.00 33.0 0.0209 0.013 18.0 0.0 4 5P 2,753.50 2,752.50 88.0 0.0114 0.013 18.0 0.0 5 6P 2,752.50 2,749.47 78.0 0.0388 0.013 18.0 0.0 6 9P 2,745.25 2,743.42 28.0 0.0654 0.013 18.0 0.0 7 10P 2,753.50 2,752.88 88.0 0.0070 0.012 18.0 0.0 Type II 24-hr 10 Year Rainfall=5.44"Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 3HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Time span=5.00-30.00 hrs, dt=0.01 hrs, 2501 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Runoff Area=0.730 ac 0.00% Impervious Runoff Depth=1.95"Subcatchment2S:Swale 2 Watershed Flow Length=535' Tc=6.0 min CN=65 Runoff=2.55 cfs 0.119 af Runoff Area=0.220 ac 0.00% Impervious Runoff Depth=2.54"Subcatchment3S:Swale 3 Watershed Flow Length=204' Slope=0.1600 '/' Tc=0.2 min CN=72 Runoff=1.22 cfs 0.047 af Runoff Area=0.190 ac 0.00% Impervious Runoff Depth>3.88"Subcatchment5S:CB #5 Watershed Flow Length=40' Slope=0.0124 '/' Tc=0.6 min CN=86 Runoff=1.50 cfs 0.061 af Runoff Area=0.160 ac 0.00% Impervious Runoff Depth>3.88"Subcatchment6S:CB #6 Watershed Flow Length=25' Slope=0.0200 '/' Tc=0.3 min CN=86 Runoff=1.26 cfs 0.052 af Runoff Area=0.190 ac 0.00% Impervious Runoff Depth>3.88"Subcatchment9S:CB #8 Watershed Flow Length=54' Slope=0.0090 '/' Tc=0.9 min CN=86 Runoff=1.48 cfs 0.061 af Runoff Area=0.220 ac 0.00% Impervious Runoff Depth>3.88"Subcatchment13S:CB #9 Watershed Flow Length=50' Slope=0.0100 '/' Tc=0.8 min CN=86 Runoff=1.73 cfs 0.071 af Avg. Depth=0.12' Max Vel=6.48 fps Inflow=2.55 cfs 0.119 afReach2R:Swale 2 n=0.022 L=169.0' S=0.1733 '/' Capacity=107.56 cfs Outflow=2.54 cfs 0.119 af Avg. Depth=0.07' Max Vel=5.34 fps Inflow=1.22 cfs 0.047 afReach3RA:Swale 3 A n=0.022 L=107.0' S=0.2243 '/' Capacity=122.37 cfs Outflow=1.21 cfs 0.047 af Avg. Depth=0.17' Max Vel=5.50 fps Inflow=3.13 cfs 0.165 afReach3RB:Swale 3 B n=0.022 L=97.0' S=0.0825 '/' Capacity=74.20 cfs Outflow=3.13 cfs 0.165 af Avg. Depth=0.25' Max Vel=16.65 fps Inflow=3.31 cfs 0.133 afReach13R:(new Reach) 18.0" Round Pipe n=0.013 L=33.0' S=0.2591 '/' Capacity=53.47 cfs Outflow=3.21 cfs 0.133 af Avg. Depth=0.38' Max Vel=7.88 fps Inflow=2.75 cfs 0.113 afReach14R:(new Reach) 18.0" Round Pipe n=0.013 L=85.0' S=0.0356 '/' Capacity=19.83 cfs Outflow=2.75 cfs 0.113 af Peak Elev=2,757.43' Inflow=2.54 cfs 0.119 afPond1P:CULVERT 1 18.0" Round Culvert n=0.013 L=33.0' S=0.0209 '/' Outflow=2.54 cfs 0.119 af Peak Elev=2,754.11' Inflow=1.50 cfs 0.061 afPond5P:CB #5 18.0" Round Culvert n=0.013 L=88.0' S=0.0114 '/' Outflow=1.50 cfs 0.061 af Peak Elev=2,753.43' Inflow=2.75 cfs 0.113 afPond6P:CB #6 18.0" Round Culvert n=0.013 L=78.0' S=0.0388 '/' Outflow=2.75 cfs 0.113 af Peak Elev=2,753.28' Inflow=3.21 cfs 0.133 afPond9P:CB #9 18.0" Round Culvert n=0.013 L=28.0' S=0.0654 '/' Outflow=3.31 cfs 0.133 af Peak Elev=2,754.07' Inflow=1.48 cfs 0.061 afPond10P:CB #8 18.0" Round Culvert n=0.012 L=88.0' S=0.0070 '/' Outflow=1.48 cfs 0.061 af Type II 24-hr 10 Year Rainfall=5.44"Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 4HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Total Runoff Area = 1.710 ac Runoff Volume = 0.411 af Average Runoff Depth = 2.88" 100.00% Pervious = 1.710 ac 0.00% Impervious = 0.000 ac Type II 24-hr 10 Year Rainfall=5.44"Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 5HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Summary for Subcatchment 2S: Swale 2 Watershed Runoff =2.55 cfs @ 11.98 hrs, Volume=0.119 af, Depth=1.95" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-30.00 hrs, dt= 0.01 hrs Type II 24-hr 10 Year Rainfall=5.44" Area (ac)CN Description 0.420 60 Woods, Fair, HSG B 0.260 69 Pasture/grassland/range, Fair, HSG B 0.050 85 Gravel roads, HSG B 0.730 65 Weighted Average 0.730 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min)(feet)(ft/ft)(ft/sec)(cfs) 4.0 28 0.0900 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.63" 1.8 302 0.3200 2.83 Shallow Concentrated Flow, Woods Woodland Kv= 5.0 fps 0.1 36 0.5900 5.38 Shallow Concentrated Flow, Grass Short Grass Pasture Kv= 7.0 fps 0.1 169 0.1700 19.27 211.99 Channel Flow, Ditch Area= 11.0 sf Perim= 12.0' r= 0.92' n= 0.030 Earth, grassed & winding 6.0 535 Total Subcatchment 2S: Swale 2 Watershed Runoff Hydrograph Time (hours)30292827262524232221201918171615141312111098765Flow (cfs)2 1 0 Type II 24-hr 10 Year Rainfall=5.44" Runoff Area=0.730 ac Runoff Volume=0.119 af Runoff Depth=1.95" Flow Length=535' Tc=6.0 min CN=65 2.55 cfs Type II 24-hr 10 Year Rainfall=5.44"Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 6HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Summary for Subcatchment 3S: Swale 3 Watershed [49] Hint: Tc<2dt may require smaller dt Runoff =1.22 cfs @ 11.90 hrs, Volume=0.047 af, Depth=2.54" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-30.00 hrs, dt= 0.01 hrs Type II 24-hr 10 Year Rainfall=5.44" Area (ac)CN Description 0.180 69 Pasture/grassland/range, Fair, HSG B 0.040 85 Gravel roads, HSG B 0.220 72 Weighted Average 0.220 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min)(feet)(ft/ft)(ft/sec)(cfs) 0.2 204 0.1600 18.70 205.66 Channel Flow, Ditch Area= 11.0 sf Perim= 12.0' r= 0.92' n= 0.030 Earth, grassed & winding Subcatchment 3S: Swale 3 Watershed Runoff Hydrograph Time (hours)30292827262524232221201918171615141312111098765Flow (cfs)1 0 Type II 24-hr 10 Year Rainfall=5.44" Runoff Area=0.220 ac Runoff Volume=0.047 af Runoff Depth=2.54" Flow Length=204' Slope=0.1600 '/' Tc=0.2 min CN=72 1.22 cfs Type II 24-hr 10 Year Rainfall=5.44"Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 7HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Summary for Subcatchment 5S: CB #5 Watershed [49] Hint: Tc<2dt may require smaller dt Runoff =1.50 cfs @ 11.91 hrs, Volume=0.061 af, Depth>3.88" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-30.00 hrs, dt= 0.01 hrs Type II 24-hr 10 Year Rainfall=5.44" Area (ac)CN Description 0.190 86 Newly graded area, HSG B 0.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min)(feet)(ft/ft)(ft/sec)(cfs) 0.6 40 0.0124 1.11 Shallow Concentrated Flow, Nearly Bare & Untilled Kv= 10.0 fps Subcatchment 5S: CB #5 Watershed Runoff Hydrograph Time (hours) 30292827262524232221201918171615141312111098765Flow (cfs)1 0 Type II 24-hr 10 Year Rainfall=5.44" Runoff Area=0.190 ac Runoff Volume=0.061 af Runoff Depth>3.88" Flow Length=40' Slope=0.0124 '/' Tc=0.6 min CN=86 1.50 cfs Type II 24-hr 10 Year Rainfall=5.44"Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 8HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Summary for Subcatchment 6S: CB #6 Watershed [49] Hint: Tc<2dt may require smaller dt Runoff =1.26 cfs @ 11.90 hrs, Volume=0.052 af, Depth>3.88" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-30.00 hrs, dt= 0.01 hrs Type II 24-hr 10 Year Rainfall=5.44" Area (ac)CN Description 0.160 86 Newly graded area, HSG B 0.160 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min)(feet)(ft/ft)(ft/sec)(cfs) 0.3 25 0.0200 1.41 Shallow Concentrated Flow, Nearly Bare & Untilled Kv= 10.0 fps Subcatchment 6S: CB #6 Watershed Runoff Hydrograph Time (hours) 30292827262524232221201918171615141312111098765Flow (cfs)1 0 Type II 24-hr 10 Year Rainfall=5.44" Runoff Area=0.160 ac Runoff Volume=0.052 af Runoff Depth>3.88" Flow Length=25' Slope=0.0200 '/' Tc=0.3 min CN=86 1.26 cfs Type II 24-hr 10 Year Rainfall=5.44"Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 9HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Summary for Subcatchment 9S: CB #8 Watershed [49] Hint: Tc<2dt may require smaller dt Runoff =1.48 cfs @ 11.91 hrs, Volume=0.061 af, Depth>3.88" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-30.00 hrs, dt= 0.01 hrs Type II 24-hr 10 Year Rainfall=5.44" Area (ac)CN Description 0.190 86 Newly graded area, HSG B 0.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min)(feet)(ft/ft)(ft/sec)(cfs) 0.9 54 0.0090 0.95 Shallow Concentrated Flow, Nearly Bare & Untilled Kv= 10.0 fps Subcatchment 9S: CB #8 Watershed Runoff Hydrograph Time (hours) 30292827262524232221201918171615141312111098765Flow (cfs)1 0 Type II 24-hr 10 Year Rainfall=5.44" Runoff Area=0.190 ac Runoff Volume=0.061 af Runoff Depth>3.88" Flow Length=54' Slope=0.0090 '/' Tc=0.9 min CN=86 1.48 cfs Type II 24-hr 10 Year Rainfall=5.44"Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 10HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Summary for Subcatchment 13S: CB #9 Watershed [49] Hint: Tc<2dt may require smaller dt Runoff =1.73 cfs @ 11.91 hrs, Volume=0.071 af, Depth>3.88" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-30.00 hrs, dt= 0.01 hrs Type II 24-hr 10 Year Rainfall=5.44" Area (ac)CN Description 0.220 86 Newly graded area, HSG B 0.220 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min)(feet)(ft/ft)(ft/sec)(cfs) 0.8 50 0.0100 1.00 Shallow Concentrated Flow, Nearly Bare & Untilled Kv= 10.0 fps Subcatchment 13S: CB #9 Watershed Runoff Hydrograph Time (hours) 30292827262524232221201918171615141312111098765Flow (cfs)1 0 Type II 24-hr 10 Year Rainfall=5.44" Runoff Area=0.220 ac Runoff Volume=0.071 af Runoff Depth>3.88" Flow Length=50' Slope=0.0100 '/' Tc=0.8 min CN=86 1.73 cfs Type II 24-hr 10 Year Rainfall=5.44"Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 11HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Summary for Reach 2R: Swale 2 Inflow Area =0.730 ac,0.00% Impervious, Inflow Depth =1.95" for 10 Year event Inflow =2.55 cfs @ 11.98 hrs, Volume=0.119 af Outflow =2.54 cfs @ 11.98 hrs, Volume=0.119 af, Atten= 0%, Lag= 0.3 min Routing by Dyn-Stor-Ind method, Time Span= 5.00-30.00 hrs, dt= 0.01 hrs Max. Velocity= 6.48 fps, Min. Travel Time= 0.4 min Avg. Velocity = 1.67 fps, Avg. Travel Time= 1.7 min Peak Storage= 66 cf @ 11.98 hrs, Average Depth at Peak Storage= 0.12' Bank-Full Depth= 1.00', Capacity at Bank-Full= 107.56 cfs 3.00' x 1.00' deep channel, n= 0.022 Earth, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 7.00' Length= 169.0' Slope= 0.1733 '/' Inlet Invert= 2,786.00', Outlet Invert= 2,756.71' Reach 2R: Swale 2 Inflow Outflow Hydrograph Time (hours)30292827262524232221201918171615141312111098765Flow (cfs)2 1 0 Inflow Area=0.730 ac Avg. Depth=0.12' Max Vel=6.48 fps n=0.022 L=169.0' S=0.1733 '/' Capacity=107.56 cfs 2.55 cfs 2.54 cfs Type II 24-hr 10 Year Rainfall=5.44"Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 12HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Summary for Reach 3RA: Swale 3 A Inflow Area =0.220 ac,0.00% Impervious, Inflow Depth =2.54" for 10 Year event Inflow =1.22 cfs @ 11.90 hrs, Volume=0.047 af Outflow =1.21 cfs @ 11.91 hrs, Volume=0.047 af, Atten= 1%, Lag= 0.3 min Routing by Dyn-Stor-Ind method, Time Span= 5.00-30.00 hrs, dt= 0.01 hrs Max. Velocity= 5.34 fps, Min. Travel Time= 0.3 min Avg. Velocity = 1.58 fps, Avg. Travel Time= 1.1 min Peak Storage= 24 cf @ 11.91 hrs, Average Depth at Peak Storage= 0.07' Bank-Full Depth= 1.00', Capacity at Bank-Full= 122.37 cfs 3.00' x 1.00' deep channel, n= 0.022 Earth, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 7.00' Length= 107.0' Slope= 0.2243 '/' Inlet Invert= 2,780.00', Outlet Invert= 2,756.00' Reach 3RA: Swale 3 A Inflow Outflow Hydrograph Time (hours)30292827262524232221201918171615141312111098765Flow (cfs)1 0 Inflow Area=0.220 ac Avg. Depth=0.07' Max Vel=5.34 fps n=0.022 L=107.0' S=0.2243 '/' Capacity=122.37 cfs 1.22 cfs 1.21 cfs Type II 24-hr 10 Year Rainfall=5.44"Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 13HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Summary for Reach 3RB: Swale 3 B [62] Warning: Exceeded Reach 3RA OUTLET depth by 0.13' @ 12.00 hrs Inflow Area =0.950 ac,0.00% Impervious, Inflow Depth =2.09" for 10 Year event Inflow =3.13 cfs @ 11.96 hrs, Volume=0.165 af Outflow =3.13 cfs @ 11.96 hrs, Volume=0.165 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 5.00-30.00 hrs, dt= 0.01 hrs Max. Velocity= 5.50 fps, Min. Travel Time= 0.3 min Avg. Velocity = 1.42 fps, Avg. Travel Time= 1.1 min Peak Storage= 55 cf @ 11.96 hrs, Average Depth at Peak Storage= 0.17' Bank-Full Depth= 1.00', Capacity at Bank-Full= 74.20 cfs 3.00' x 1.00' deep channel, n= 0.022 Earth, clean & straight Side Slope Z-value= 2.0 '/' Top Width= 7.00' Length= 97.0' Slope= 0.0825 '/' Inlet Invert= 2,756.00', Outlet Invert= 2,748.00' Reach 3RB: Swale 3 B InflowOutflow Hydrograph Time (hours)30292827262524232221201918171615141312111098765Flow (cfs)3 2 1 0 Inflow Area=0.950 ac Avg. Depth=0.17' Max Vel=5.50 fps n=0.022 L=97.0' S=0.0825 '/' Capacity=74.20 cfs 3.13 cfs 3.13 cfs Type II 24-hr 10 Year Rainfall=5.44"Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 14HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Summary for Reach 13R: (new Reach) [52] Hint: Inlet/Outlet conditions not evaluated [80] Warning: Exceeded Pond 9P by 7.68' @ 13.38 hrs (22.40 cfs 6.890 af) Inflow Area =0.410 ac,0.00% Impervious, Inflow Depth >3.88" for 10 Year event Inflow =3.31 cfs @ 11.91 hrs, Volume=0.133 af Outflow =3.21 cfs @ 11.91 hrs, Volume=0.133 af, Atten= 3%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 5.00-30.00 hrs, dt= 0.01 hrs Max. Velocity= 16.65 fps, Min. Travel Time= 0.0 min Avg. Velocity = 4.63 fps, Avg. Travel Time= 0.1 min Peak Storage= 6 cf @ 11.91 hrs, Average Depth at Peak Storage= 0.25' Bank-Full Depth= 1.50', Capacity at Bank-Full= 53.47 cfs 18.0" Round Pipe n= 0.013 Length= 33.0' Slope= 0.2591 '/' Inlet Invert= 2,752.88', Outlet Invert= 2,744.33' Reach 13R: (new Reach) InflowOutflow Hydrograph Time (hours)30292827262524232221201918171615141312111098765Flow (cfs)3 2 1 0 Inflow Area=0.410 ac Avg. Depth=0.25' Max Vel=16.65 fps 18.0" Round Pipe n=0.013 L=33.0' S=0.2591 '/' Capacity=53.47 cfs 3.31 cfs 3.21 cfs Type II 24-hr 10 Year Rainfall=5.44"Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 15HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Summary for Reach 14R: (new Reach) [52] Hint: Inlet/Outlet conditions not evaluated [80] Warning: Exceeded Pond 6P by 0.01' @ 24.04 hrs (0.00 cfs 0.000 af) Inflow Area =0.350 ac,0.00% Impervious, Inflow Depth >3.88" for 10 Year event Inflow =2.75 cfs @ 11.91 hrs, Volume=0.113 af Outflow =2.75 cfs @ 11.91 hrs, Volume=0.113 af, Atten= 0%, Lag= 0.1 min Routing by Dyn-Stor-Ind method, Time Span= 5.00-30.00 hrs, dt= 0.01 hrs Max. Velocity= 7.88 fps, Min. Travel Time= 0.2 min Avg. Velocity = 2.18 fps, Avg. Travel Time= 0.7 min Peak Storage= 30 cf @ 11.91 hrs, Average Depth at Peak Storage= 0.38' Bank-Full Depth= 1.50', Capacity at Bank-Full= 19.83 cfs 18.0" Round Pipe n= 0.013 Length= 85.0' Slope= 0.0356 '/' Inlet Invert= 2,752.50', Outlet Invert= 2,749.47' Reach 14R: (new Reach) InflowOutflow Hydrograph Time (hours)30292827262524232221201918171615141312111098765Flow (cfs)3 2 1 0 Inflow Area=0.350 ac Avg. Depth=0.38' Max Vel=7.88 fps 18.0" Round Pipe n=0.013 L=85.0' S=0.0356 '/' Capacity=19.83 cfs 2.75 cfs 2.75 cfs Type II 24-hr 10 Year Rainfall=5.44"Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 16HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Summary for Pond 1P: CULVERT 1 [62] Warning: Exceeded Reach 2R OUTLET depth by 0.60' @ 11.98 hrs Inflow Area =0.730 ac,0.00% Impervious, Inflow Depth =1.95" for 10 Year event Inflow =2.54 cfs @ 11.98 hrs, Volume=0.119 af Outflow =2.54 cfs @ 11.98 hrs, Volume=0.119 af, Atten= 0%, Lag= 0.0 min Primary =2.54 cfs @ 11.98 hrs, Volume=0.119 af Routing by Dyn-Stor-Ind method, Time Span= 5.00-30.00 hrs, dt= 0.01 hrs Peak Elev= 2,757.43' @ 11.98 hrs Flood Elev= 2,760.00' Device Routing Invert Outlet Devices #1 Primary 2,756.69'18.0" Round Culvert L=33.0'RCP,sq.cut end projecting,Ke=0.500 Outlet Invert=2,756.00'S=0.0209 '/'Cc=0.900 n= 0.013 Primary OutFlow Max=2.54 cfs @ 11.98 hrs HW=2,757.43' TW=2,756.17' (Dynamic Tailwater) 1=Culvert (Inlet Controls 2.54 cfs @ 2.93 fps) Pond 1P: CULVERT 1 InflowPrimary Hydrograph Time (hours)30292827262524232221201918171615141312111098765Flow (cfs)2 1 0 Inflow Area=0.730 ac Peak Elev=2,757.43' 18.0" Round Culvert n=0.013 L=33.0' S=0.0209 '/' 2.54 cfs 2.54 cfs Type II 24-hr 10 Year Rainfall=5.44"Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 17HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Summary for Pond 5P: CB #5 Inflow Area =0.190 ac,0.00% Impervious, Inflow Depth >3.88" for 10 Year event Inflow =1.50 cfs @ 11.91 hrs, Volume=0.061 af Outflow =1.50 cfs @ 11.91 hrs, Volume=0.061 af, Atten= 0%, Lag= 0.0 min Primary =1.50 cfs @ 11.91 hrs, Volume=0.061 af Routing by Dyn-Stor-Ind method, Time Span= 5.00-30.00 hrs, dt= 0.01 hrs Peak Elev= 2,754.11' @ 11.91 hrs Flood Elev= 2,758.50' Device Routing Invert Outlet Devices #1 Primary 2,753.50'18.0" Round Culvert L=88.0'RCP,sq.cut end projecting,Ke=0.500 Outlet Invert=2,752.50'S=0.0114 '/'Cc=0.900 n= 0.013 Primary OutFlow Max=1.47 cfs @ 11.91 hrs HW=2,754.11' TW=2,753.42' (Dynamic Tailwater) 1=Culvert (Outlet Controls 1.47 cfs @ 3.26 fps) Pond 5P: CB #5 Inflow Primary Hydrograph Time (hours)30292827262524232221201918171615141312111098765Flow (cfs)1 0 Inflow Area=0.190 ac Peak Elev=2,754.11' 18.0" Round Culvert n=0.013 L=88.0' S=0.0114 '/' 1.50 cfs 1.50 cfs Type II 24-hr 10 Year Rainfall=5.44"Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 18HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Summary for Pond 6P: CB #6 Inflow Area =0.350 ac,0.00% Impervious, Inflow Depth >3.88" for 10 Year event Inflow =2.75 cfs @ 11.91 hrs, Volume=0.113 af Outflow =2.75 cfs @ 11.91 hrs, Volume=0.113 af, Atten= 0%, Lag= 0.0 min Primary =2.75 cfs @ 11.91 hrs, Volume=0.113 af Routing by Dyn-Stor-Ind method, Time Span= 5.00-30.00 hrs, dt= 0.01 hrs Peak Elev= 2,753.43' @ 11.91 hrs Flood Elev= 2,758.50' Device Routing Invert Outlet Devices #1 Primary 2,752.50'18.0" Round Culvert L=78.0'RCP,sq.cut end projecting,Ke=0.500 Outlet Invert=2,749.47'S=0.0388 '/'Cc=0.900 n= 0.013 Primary OutFlow Max=2.71 cfs @ 11.91 hrs HW=2,753.42' TW=2,752.87' (Dynamic Tailwater) 1=Culvert (Outlet Controls 2.71 cfs @ 3.41 fps) Pond 6P: CB #6 Inflow Primary Hydrograph Time (hours)30292827262524232221201918171615141312111098765Flow (cfs)3 2 1 0 Inflow Area=0.350 ac Peak Elev=2,753.43' 18.0" Round Culvert n=0.013 L=78.0' S=0.0388 '/' 2.75 cfs 2.75 cfs Type II 24-hr 10 Year Rainfall=5.44"Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 19HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Summary for Pond 9P: CB #9 [90] Warning: Qout>Qin may require Finer Routing or smaller dt [87] Warning: Oscillations may require Finer Routing or smaller dt Inflow Area =0.410 ac,0.00% Impervious, Inflow Depth >3.88" for 10 Year event Inflow =3.21 cfs @ 11.91 hrs, Volume=0.133 af Outflow =3.31 cfs @ 11.91 hrs, Volume=0.133 af, Atten= 0%, Lag= 0.0 min Primary =3.31 cfs @ 11.91 hrs, Volume=0.133 af Routing by Dyn-Stor-Ind method, Time Span= 5.00-30.00 hrs, dt= 0.01 hrs Peak Elev= 2,753.28' @ 11.91 hrs Flood Elev= 2,758.50' Device Routing Invert Outlet Devices #1 Primary 2,745.25'18.0" Round Culvert #8 L=28.0'RCP,sq.cut end projecting,Ke=0.500 Outlet Invert=2,743.42'S=0.0654 '/'Cc=0.900 n= 0.013 Primary OutFlow Max=3.26 cfs @ 11.91 hrs HW=2,753.28' TW=2,753.13' (Dynamic Tailwater) 1=Culvert #8 (Inlet Controls 3.26 cfs @ 1.85 fps) Pond 9P: CB #9 InflowPrimary Hydrograph Time (hours)30292827262524232221201918171615141312111098765Flow (cfs)3 2 1 0 Inflow Area=0.410 ac Peak Elev=2,753.28' 18.0" Round Culvert n=0.013 L=28.0' S=0.0654 '/' 3.21 cfs3.31 cfs Type II 24-hr 10 Year Rainfall=5.44"Lansing Substation Part 2 Printed 1/31/2018Prepared by {enter your company name here} Page 20HydroCAD® 9.00 s/n 05036 © 2009 HydroCAD Software Solutions LLC Summary for Pond 10P: CB #8 Inflow Area =0.190 ac,0.00% Impervious, Inflow Depth >3.88" for 10 Year event Inflow =1.48 cfs @ 11.91 hrs, Volume=0.061 af Outflow =1.48 cfs @ 11.91 hrs, Volume=0.061 af, Atten= 0%, Lag= 0.0 min Primary =1.48 cfs @ 11.91 hrs, Volume=0.061 af Routing by Dyn-Stor-Ind method, Time Span= 5.00-30.00 hrs, dt= 0.01 hrs Peak Elev= 2,754.07' @ 11.91 hrs Flood Elev= 2,758.50' Device Routing Invert Outlet Devices #1 Primary 2,753.50'18.0" Round Culvert L=88.0'RCP,sq.cut end projecting,Ke=0.500 Outlet Invert=2,752.88'S=0.0070 '/'Cc=0.900 n=0.012 Concrete pipe,finished Primary OutFlow Max=1.48 cfs @ 11.91 hrs HW=2,754.07' TW=2,753.28' (Dynamic Tailwater) 1=Culvert (Barrel Controls 1.48 cfs @ 3.55 fps) Pond 10P: CB #8 InflowPrimary Hydrograph Time (hours)30292827262524232221201918171615141312111098765Flow (cfs)1 0 Inflow Area=0.190 ac Peak Elev=2,754.07' 18.0" Round Culvert n=0.012 L=88.0' S=0.0070 '/' 1.48 cfs 1.48 cfs UC SYNERGETIC, LLC. 123 N. White Street Fort Mill, SC 29715 (803) 835-7929 NC COA F-1217 Date:02/22/2018 Rev:03/23/2018 Client:Blue Ridge Electric Membership Corp. Project:Lansing Substation Specification No.:N/A Title:LANSING SUBSTATION PROJECT REPORT PERMANENT ROAD SWALE CALCULATIONS Form SW401-Low Density-Rev.3-2/10/09 Page 1 of 4 Permit No. (to be provided by DEMLR) State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM LOW DENSITY SUPPLEMENT This form may be photocopied for use as an original A low density project is one that meets the appropriate criteria for built upon area and transports stormwater runoff primarily through vegetated conveyances.Low density projects should not have a discrete stormwater collection system as defined by 15A NCAC 2H .1002(18).Low density requirements and density factors can be found in Session Law 2008-211,15A NCAC 2H .1000, Session Law 2006-246 and the State of North Carolina Stormwater Best Management Practice Manual.Curb and gutter systems are allowed provided they meet the requirements in 15A NCAC 2H .1008(g). I.PROJECT INFORMATION Project Name :Lansing Substation Contact Person:Ralph Seamon, P.E.Phone Number:(828 )759-8928 Number of Lots:1 Allowable Built Upon Area (BUA)Per Lot*: Number of Dwelling Units Per Acre**: Low Density Development (check one):without curb & gutter with curb & gutter,outlets to (check one): Swales Vegetated Area *If lot sizes are not uniform, attach a table indicating the number of lots, lot sizes and allowable built upon area for each lot. The attachment must include the project name, phase, page numbers and provide area subtotals and totals. BUA sh all be shown in units of square feet. **(Phase II Post-Construction [non-SA]only) II.BUILT UPON AREA Refer to DEMLR’s forms and applications website for specific language that must be recorded in the deed restrictions for all subdivided projects .(http://portal.ncdenr.org/web/lr/state-stormwater-forms_docs) Complete the following calculation in the space provided below where: • SA Site Area -the total project area above Mean High Water. • DF Density Factor -the appropriate percent built upon area divided by 100. • RA Road Area -the total impervious surface occupied by roadways. • OA Other Area -the total area of impervious surfaces such as clubhouses, tennis cour ts, sidewalks, etc. •No.of Lots -the total number of lots in the subdivision. •BUA per Lot -the computed allowable built upon area for each lot including driveways and impervious surfaces located between the front lot line and the edge of pavement. •Total allowable lot BUA -the computed allowable built upon area for all lots combined. •Total BUA from lot listing -the sum of built upon area allocated for each lot on the list of non -uniform lots. Form SW401-Low Density-Rev.3-2/10/09 Page 2 of 4 Calculation: For uniform lot sizes: (SA:ft2 x DF:)–(RA:ft2)–(OA:ft2)= BUA per Lot =ft2 (No of Lots:) For non-uniform lot sizes: a.(SA:ft2 x DF:)–(RA:ft2)–(OA:ft2)=Total allowable lot BUA =ft2 b.Total BUA from lot listing:sf.b must be ≤a III.DESIGN INFORMATION Complete the following table.If additional space is needed the information should be provided in the same format as Table 1 and attached to this form.Rainfall intensity data can be found in Appendix 8.03 of the State of North Carolina Erosion and Sediment Control Planning and Design Manual or at http://hdsc.nws.noaa.gov/hdsc/pfds/ Table 1.Swale design information based on the 10-year storm. Swale No.Drainage Area (ac) Impervious Area (ac) Grassed Area (ac) C Q (cfs) Slope (%) Vallow (fps) Vactual (fps) Flow Depth (ft) 1 0.63 .01 0.62 61 1.7 2.44 3.5 3.1 0.17 2 0.72 .05 0.67 65 2.6 17.3 3.5 6.5 0.12 3 0.22 .04 .18 72 1.2 22.6 3.5 5.3 0.07 4 1.41 0.02 1.39 62 4.1 13.6 3.5 7.1 0.17 5 1.44 0.05 1.39 63 5.7 19.7 3.5 8.4 0.17 6 0.87 0.04 0.83 63 2.8 18.7 3.5 6.9 0.13 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Form SW401-Low Density-Rev.3-2/10/09 Page 3 of 4 IV.REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the North Carolina Administrative Code Section 15A NCAC 2H .1000, NCDENR BMP Manual (2007),Session Law 2006-246, and Session Law 2008-211. Please indicate the page or plan sheet numbers where the supporting documentation can be found.An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project.Initial in the space provided to indicate t hat the following requirements have been met and supporting documentation is provided as necessary.If the applicant has designated an agent on the Stormwater Management Permit Application Form, the agent may initial below.If any item is not met, then justification must be attached.Only complete items n through p for projects with curb outlets. Page/Plan Initials Sheet No. n/a a.†For projects in the 20 coastal counties:Per NCAC 2H.1005, a 50 foot wide vegetative buffer is provided adjacent to surface waters. For Redevelopment projects, a 30’ wide vegetative buffer adjacent surface waters is provided. sheet 4,6 b.†For HQW or ORW projects outside the 20 coastal counties: A 30 f oot wide vegetative buffer is provided adjacent to surface waters. sheet 4,6 c.†For Phase II Post-Construction projects: All built upon area is located at least 30 feet landward of all perennial and intermittent surface waters. X d.Deed restriction language as required on form SWU -101 shall be recorded as a restrictive covenant. A copy of the recorded document shall be provided to DWQ within 30 days of platting and prior to the sale of any lots. FRO e.Built upon area calculations are provided for the overall project and all lots. X f.Project conforms to low density requirements within the ORW AEC . (if applicable per 15A NCAC 2H .1007) g.Side slopes of swales are no steeper than 3:1;or no steeper than 5:1 for curb outlet swales . Attached h.Longitudinal slope of swales is no greater than 5%;for non-curb outlet projects,calculations for shear stress and velocity are provided if slope is greater than 5%. Attached i.At a minimum, swales are designed to carry the 10 year storm velocity at a non-erosive rate. n/a j.Swales discharging to wetlands are designed to flow into and through the wetlands at a non- erosive velocity (for this flow requirement into wetlands, non-erosive is velocity ≤2 ft/s). sheet 10 k.Swale detail and permanent vegetation is specified on the plans. sheet 10 l.Swale detail provided on plans; includes grass type(s) for permanent vegetative cover. TBD m.Swales are located in recorded drainage easements. n.††Length of swale or vegetated area is at least 100 feet for each curb outlet. o.††The system takes into account the run-off at ultimate built-out potential from all surfaces draining to the system (delineate drainage area for each swale). p.††Curb outlets direct flow to a swale or vegetated area. †Projects in the Neuse,Tar-Pamlico, Catawba River basins, and Randleman Lake may require additional buffers. ††Only complete these items for projects with curb outlets. Form SW401-Low Density-Rev.3-2/10/09 Page 4 of 4 V.SWALE SYSTEM MAINTENANCE REQUIREMENTS 1.Mowing will be accomplished as needed according to the season.Grass height will not exceed six inches at any time; and grass will not be mowed too close to the ground or “scalped”. 2.Swales will be inspected monthly or after every runoff producing rainfall event for sediment build -up, erosion, and trash accumulation. 3.Accumulated sediment and trash will be removed as necessary.Swales will be reseeded or sodded following sediment removal. 4.Eroded areas of the swales will be repaired and reseeded.Swales will be revegetated as needed and in a timely manner based on the monthly inspections.Side slopes must be maintained at the permitted slope. 5.Catch basins, curb cuts, velocity reduction devices, and piping will be inspected monthly or after every significant runoff producing rainfall event.Trash and debris will be cleared away from grates, curb cuts, velocity reduction devices and piping. 6.Swales will not be altered, piped, or filled in without approval from NCDENR Division of Energy, Mineral and Land Resources. I acknowledge and agree by my signature below that I am respon sible for the performance of the six maintenance procedures listed above. I agree to notify DEMLR of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: Address: Phone:Date: Signature: Note:The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, _____________________________________, a Notary Public for the State of ____________________, County of ____________________, do hereby certify that ______________________________________ personally appeared before me this day of _________________, __________, and acknowledge the due execution of the forgoing swale maintenance requirements. Witness my hand and official seal, __________________________________________________ Notary signature SEAL My commission expires UC SYNERGETIC, LLC. 123 N. White Street Fort Mill, SC 29715 (803) 835-7929 NC COA F-1217 Date:02/22/2018 Rev:03/23/2018 Client:Blue Ridge Electric Membership Corp. Project:Lansing Substation Specification No.:N/A Title:LANSING SUBSTATION PROJECT REPORT PERMANENT DIVERSION BERM CALCULATIONS 2720 2730 2740 27502760 2770 27502760277027802 7 9 0 2 8 0 0 2 8 1 0 2 8 2 0 2 8 3 0 28402 8 5 0 2 8 6 0 2 8 7 0 270027102720273027402750272027302 7 4 0 2750276027702780279028002810282028302840285028602680 2690 2700 2710 2720 2730 2740 2750 2760 277027202730274027502760 100' RIGHT-OF-WA Y H W Y 1 9 4 HWY 1 9 4 EDGE OF PADEDGE OF PADP5 H P : 2 7 0 5 . 5 5 HP:2758. 2' HP: 2745.39 H P : 2 7 8 6 . 3 2759'R=50'R =50' R=50'R=50'2759' < - - - T O L A N S I N G VEHIC L E A C C E S S VEHIC L E A C C E S S (GRAV E P A V I N G ) PROPOSED OVERHEAD TRANSMISSION LINE ALIGNMENT ADDITIONAL 20' VEGETATIVE STREAM BUFFER (DISTURBANCE PERMITTED DURING CONSTRUCTION. CONTRACTOR REQUIRED TO RE-VEGETATE UPON CONSTRUCTION COMPLETION.) 30' NON-DISTURBED STREAM BUFFER (DISTURBANCE PROHIBITED WITHOUT MITIGATION) ADDITIONAL 20' VEGETATIVE STREAM BUFFER (DISTURBANCE PERMITTED DURING CONSTRUCTION. CONTRACTOR REQUIRED TO RE-VEGETATE UPON CONSTRUCTION COMPLETION.) VEHICLE GUARD RAIL DETAIL 17 ISOLATION FENCE PROVIDED BY OTHERS DETAIL 18 ISOLATION FENCE PROVIDED BY OTHERS DETAIL 18 ISOLATION FENCE PROVIDED BY OTHERS DETAIL 18 ISOLATION FENCE PROVIDED BY OTHERS DETAIL 18 APPROX. -19%APPRO X. - 1 9 %APPROX. -23% APPROX . - 2 3 % A P P R O X . - 3 % -1.5:1 -1. 5 : 1 -1.5:1-6.0:1-1 .5 :1 -1.5:1APPROX. -2% 2 7 6 0 ' 2 7 7 0 ' 2 7 8 0 ' 2 7 9 0 ' 2 8 0 0 ' 2 8 1 0 '2780'2790'2800'2810'2750' 2770'2740'2750'2760'2770'2780'2700'2710'2720'APPROX. -4% 30' NON-DISTURBED STREAM BUFFER (DISTURBANCE PROHIBITED WITHOUT MITIGATION) SOUTHERN RETAINING WALL (APPROX. 67 FT.) WEST RETAINING WALL (APPROX. 300 FT.) SEE DWG. TITLED PROPOSED TRANSMISSION LINE ALIGNMENT FOR LINE ROUTING ACROSS HWY 194 20' ROLLER DRIVE GATE 24' DRIVE GATE ACCESS ROAD SHALL BE BLENDED INTO ORIGINAL GRADE TO ESTABLISH SMOOTH TRANSITION TO EXISTING ROAD ALIGNMENT EAST RETAINING WALL (APPROX. 345 FT.) NOTE: FOR FENCE CONSTRUCTION FENCE POST HOLES SHALL BE "SLEEVED" DURING GRADING / WALL CONSTRUCTION (TYP. - ENTIRE STATION) END OF GRAVE PAVING TOP OF WALL: 2759.5 (TYP.) TOP OF WALL: 2759.5 (TYP.) ACCESS ROAD- GRAVEL PAVE FULL WIDTH (DURING CONSTRUCTION) DETAIL 12 2757.4 2758.2 2758.0 H P : 2 6 7 6 . 9 7 N27° 31' 51.23"W 5'S62° 28' 08.77"W125'S 1 6 ° 5 1 ' 5 9 . 0 8 "W 3 7 ' S27° 31' 51.23"E 167'S71° 55' 41.55"E34'N62° 28' 08.77"E75'N62° 28' 08.77"E 5' N16° 51' 59.08"E 34' N27° 31' 51.23"W 166' 218'151'1" = 30' GRADING PLAN 02-07-2018 JEE CJH 4 OF 130 BLUE RIDGE ENERGY LANSING SUBSTATION 16461-604GR PREPARED FOR: PREPARED BY: UC SYNERGETIC, LLC - North Carolina COA No. F-1217 123 North White Street, Fort Mill, SC 29715 ® LEGEND COORDINATE REFERENCE: NAD83 NORTH CAROLINA STATE PLANES, US FOOT PROPERTY LINE PROPOSED STATION FENCE GATE ROLLER GATE ACCESS DRIVE GATE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR VEHICLE ACCESS - CENTERLINE VEHICLE ACCESS - EDGE OF TRAVELWAY PROPOSED GUARD RAIL VEHICLE ACCESS - SHOULDER PROPOSED TREE LINE H 0 (ft.) 15 30 60 90 FENCE DETAILS AND DIMENSIONS NOT TO SCALE 20' ROLLING GATE DUAL 10' GATES SN Element Length Inlet Outlet Total Average Channel Channel Channel Channel Entrance Exit/Bend Additional Peak Time of Max Travel Design Max Flow /Max ID Invert Invert Drop Slope Type Height Width Manning's Losses Losses Losses Flow Peak Flow Time Flow Design Flow Flow Depth / Elevation Elevation Roughness Flow Velocity Capacity Ratio Total Depth Occurrence Ratio (ft)(ft)(ft)(ft)(%)(ft)(ft)(cfs)(days hh:mm)(ft/sec)(min)(cfs) 1 CWDB-1 80.00 2810.00 2790.00 20.00 25.0000 Trapezoidal 1.500 7.50 0.0650 0.5000 0.5000 0.0000 0.36 0 00:21 2.21 0.60 67.73 0.01 0.06 2 CWDB-2 140.00 2810.00 2809.00 1.00 0.7100 Trapezoidal 1.500 7.50 0.0650 0.5000 0.5000 0.0000 0.25 0 00:24 0.80 2.92 11.45 0.02 0.15 3 CWDB-3 115.00 2818.00 2758.00 60.00 52.1700 Trapezoidal 1.500 7.50 0.0650 0.5000 0.5000 0.0000 0.73 0 00:23 3.59 0.53 97.84 0.01 0.08 4 CWDB-4 120.00 2780.00 2758.00 22.00 18.3300 Trapezoidal 1.500 7.50 0.0650 0.5000 0.5000 0.0000 0.83 0 00:18 2.65 0.75 58.00 0.01 0.11 SN Element Invert Boundary Flap Peak Maximum Maximum ID Elevation Type Gate Inflow HGL Depth HGL Elevation Attained Attained (ft)(cfs)(ft)(ft) 1 Out-01 2790.00 FREE NO 0.36 0.10 2790.10 2 Out-02 2809.00 FREE NO 0.25 0.22 2809.22 3 Out-03 2758.00 FREE NO 0.83 0.17 2758.17 4 Out-04 2758.00 FREE NO 0.73 0.12 2758.12 SN Invert Initial Initial Surcharge Surcharge Peak Peak Maximum Maximum Minimum Average Average Time of Elevation Water Water Elevation Depth Inflow Lateral HGL HGL Freeboard HGL HGL Maximum Elevation Depth Inflow Elevation Depth Attained Elevation Depth HGL Attained Attained Attained Attained Occurrence (ft)(ft)(ft)(ft)(ft)(cfs)(cfs)(ft)(ft)(ft)(ft)(ft)(days hh:mm) 1 2810.00 2810.00 0.00 2820.00 2814.00 0.36 0.36 2810.10 0.10 1.40 2810.01 0.01 0 00:21 2 2810.00 2810.00 0.00 2820.00 2814.00 0.27 0.27 2810.22 0.22 1.28 2810.02 0.02 0 00:22 3 2818.00 2818.00 0.00 2828.00 2822.00 0.74 0.74 2818.12 0.12 1.38 2818.01 0.01 0 00:23 4 2780.00 2780.00 0.00 2790.00 2784.00 0.84 0.84 2780.17 0.17 1.33 2780.01 0.01 0 00:18 SN Element Area Drainage Weighted Accumulated Total Peak Rainfall Time ID Node ID Runoff Precipitation Runoff Runoff Intensity of Coefficient Concentration (acres)(inches)(inches)(cfs)(inches/hr)(days hh:mm:ss) 1 Sub-01 0.56 64 0.1800 1.28 0.23 0.36 3.568 0 00:21:26 2 Sub-02 0.42 64 0.1800 1.31 0.24 0.27 3.506 0 00:22:16 3 Sub-03 1.18 64 0.1800 1.32 0.24 0.74 3.465 0 00:22:51 4 Sub-04 1.20 64 0.1800 1.16 0.21 0.84 3.887 0 00:17:46 SN Element Description From (Inlet)To (Outlet)Length Inlet Inlet Outlet Outlet Total Average Channel Channel Channel Channel Entrance Exit/Bend Lengthening Peak Time of Max Travel Design Max Flow /Max ID Node Node Invert Invert Invert Invert Drop Slope Type Height Width Manning's Losses Losses Factor Flow Peak Flow Time Flow Design Flow Flow Depth / Elevation Offset Elevation Offset Roughness Flow Velocity Capacity Ratio Total Depth Occurrence Ratio (ft)(ft)(ft)(ft)(ft)(ft)(%)(ft)(ft)(cfs)(days hh:mm)(ft/sec)(min)(cfs) 1 CWDB-1 64 Out-01 80.00 2810.00 0.00 2790.00 0.00 20.00 25.0000 Trapezoidal 1.500 7.50 0.1040 0.5000 0.5000 1.00 0.36 0 00:22 1.62 0.82 42.33 0.01 0.08 2 CWDB-2 64 Out-02 140.00 2810.00 0.00 2809.00 0.00 1.00 0.7100 Trapezoidal 1.500 7.50 0.1040 0.5000 0.5000 1.00 0.25 0 00:25 0.65 3.59 7.15 0.03 0.19 3 CWDB-3 64 Out-04 115.00 2818.00 0.00 2758.00 0.00 60.00 52.1700 Trapezoidal 1.500 7.50 0.1040 0.5000 0.5000 1.00 0.73 0 00:23 2.63 0.73 61.15 0.01 0.10 4 CWDB-4 64 Out-03 120.00 2780.00 0.00 2758.00 0.00 22.00 18.3300 Trapezoidal 1.500 7.50 0.1040 0.5000 0.5000 1.00 0.83 0 00:18 1.92 1.04 36.25 0.02 0.15 SN Element Invert Boundary Peak Peak Maximum Maximum ID Elevation Type Inflow Lateral HGL Depth HGL Elevation Inflow Attained Attained (ft)(cfs)(cfs)(ft)(ft) 1 Out-01 2790.00 FREE 0.36 0.00 0.13 2790.13 2 Out-02 2809.00 FREE 0.25 0.00 0.28 2809.28 3 Out-03 2758.00 FREE 0.83 0.00 0.22 2758.22 4 Out-04 2758.00 FREE 0.73 0.00 0.15 2758.15 SN Invert Ground/Rim Initial Initial Surcharge Surcharge Peak Peak Maximum Maximum Minimum Average Average Time of Elevation (Max)Water Water Elevation Depth Inflow Lateral HGL HGL Freeboard HGL HGL Maximum Elevation Elevation Depth Inflow Elevation Depth Attained Elevation Depth HGL Attained Attained Attained Attained Occurrence (ft)(ft)(ft)(ft)(ft)(ft)(cfs)(cfs)(ft)(ft)(ft)(ft)(ft)(days hh:mm) 1 2810.00 6.00 2810.00 0.00 2820.00 2814.00 0.36 0.36 2810.13 0.13 1.37 2810.01 0.01 0 00:21 2 2810.00 6.00 2810.00 0.00 2820.00 2814.00 0.27 0.27 2810.29 0.29 1.21 2810.03 0.03 0 00:22 3 2818.00 6.00 2818.00 0.00 2828.00 2822.00 0.74 0.74 2818.16 0.16 1.34 2818.01 0.01 0 00:23 4 2780.00 6.00 2780.00 0.00 2790.00 2784.00 0.84 0.84 2780.22 0.22 1.28 2780.02 0.02 0 00:18 SN Element Area Drainage Weighted Accumulated Total Peak Rainfall Time ID Node ID Runoff Precipitation Runoff Runoff Intensity of Coefficient Concentration (acres)(inches)(inches)(cfs)(inches/hr)(days hh:mm:ss) 1 Sub-01 0.56 64 0.1800 1.28 0.23 0.36 3.568 0 00:21:26 2 Sub-02 0.42 64 0.1800 1.31 0.24 0.27 3.506 0 00:22:16 3 Sub-03 1.18 64 0.1800 1.32 0.24 0.74 3.465 0 00:22:51 4 Sub-04 1.20 64 0.1800 1.16 0.21 0.84 3.887 0 00:17:46