Loading...
HomeMy WebLinkAboutinspection_20110825Compliance Inspection Report Permit: SW3100301 Effective: 04/29/11 Expiration: 02/03/21 Project: Hopewell Baptist Church Owner: Hopewell Baptist Church County: Union Adress: 8900 Concord Hwy Region: Mooresville City/State/Zip: Monroe NC 28110 Contact Person: Wesley Sherrill Title: Phone: 704-753-1084 Directions to Project: Type of Project: State Stormwater - Other Drain Areas: 001 - (Goose Creek) (03-07-12 } ( C) On -Site Representative(s): Related Permits: Inspection Date: 08/25/2011 Entry Time: 10:OOAM Exit Time: 11:30AM Primary Inspector: Samar E Bou Ghazale Phone: 704-663-1699 Ext.2199 Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant E Not Compliant Question Areas: 0 State Stormwater (See attachment summary) Inspection Type: Compliance Evaluation page: 1 permit: SW3100301 Owner - Project: Hopewell Baptist Church Inspection Date: 08/25/2011 Inspection Type Compliance Evaluation Reason for Visit: Routine Inspection Summary: Stormwater BMPs were construted according to approved plans. Ground cover has been provided, but not maintained. Please refer to the operation and maintenance agreement for all BMPs. Also, please submit the recorded easement of the BMPs. Please provide ground cover for the ditch that has been recently cut on the south side of ditch #3. File Review Yes No NA NE Is the permit active? ■ 1:11:11:1 Signed copy of the Engineer's certification is in the file? ■ 1:11:1 ❑ Signed copy of the Operation & Maintenance Agreement is in the file? ■ ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ❑ ■ ❑ ❑ Comment: A CODV of deed restriction is to be submitted accordina to item 411. Desian Standards) permit issued on June 14, 20109 Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ■ ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ■ ❑ ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? ■ ❑ ❑ ❑ Comment: SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ■ 111:111 Are the inlets located per the approved plans? ■ ❑ 1:10 Are the outlet structures located per the approved plans? ■ ❑ ❑ ❑ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ■ 1:11:11:1 Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ■ ❑ ❑ DWQ upon request? Comment: SW BMP has not been maintained. Please maintain the Stormwater BMP according to the Operation and Maintenance Agreement. Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? ■ 1:11:11:1 Comment: Other WQ Issues Yes No NA NE Is the site compliant with other water quality issues as noted during the inspection? ■ ❑ ❑ ❑ Comment: page: 2 C :a6ed aul#noa adSuol#aadsul#Ovgvo0 mea uogoedsul yomy3 #sl#deS ll8mGdoH :10eroid - .IGUMO LOE00 LEMS :lwlad