April 12, 2010
Mr. Wesley Sherrill, PE
Site Solutions
2320 West Morehead
Charlotte, NC 28208
Subject: Request for Additional Information
Stormwater Project No. SW3100301
Hopewell Baptist Church
Union County
Dear Mr. Sherrill:
Dee Freeman
Secretary
The Division of Water Quality Central Office received the requested information for the subject project on March
25, 2010. A preliminary review of that information has determined that the application is not complete. The
following information is needed to continue the stormwater review:
L An intermediate stream was indentified to be on the property. Alan Johnson from the Mooresville Regional
Office performed a stream call on March 31, 2010. The origin of the stream was flagged and noted. Since
the site is in the Goose Creek Watershed, 100 ft buffers must be applied. Please revise the plan sheets to
show the stream as well as the buffers. The revised application must be in compliance with the Goose
creek Watershed Rules 15A NCAC 2B .0600-.0609.
2. There is a diffused flow requirement for the site. Diffuse flow of runoff must be converted to diffuse flow
before the runoff enters the riparian buffer. The application did not include any details about meeting this
requirement. A level spreader is typically used to meet this requirement. Please revise the application to
meet this requirement.
Please note that this request for additional information is in response to a preliminary review. The requested
information should be received by this Office prior to May 1, 2010, or the application will be returned as
incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee.
If you need additional time to submit the information, please mail or fax your request for a time extension to the
Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you
expect to submit the required information. The Division is allowed 90 days from the receipt of a completed
application to issue the permit.
Please reference the State assigned project number on all correspondence. If you have any questions concerning
this matter please feel free to call me at (919) 807-6368.
Sincerely,
Brian Lowther
Environmental Engineer
cc: Mooresville Regional Office
DWQ Central Files
Stormwater Permitting Unit Files
Wetlands and Stormwater Branch One
1617 Mail Service Center, Raleigh, North Carolina 27699-1617 NorthCaroxxna
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 y��
Phone: 919-807-63001 FAX: 919-807-64941 Customer Service: 1-877-623-6748 �aturaL■
Internet: www.ncwaterquality.org
An Equal Opportunity 1 Affirmative Action Employer