Loading...
HomeMy WebLinkAboutHopewell Baptist Church - Hopewell Rev 3REVISIONSDATESHEET NUMBERSEALPROJECT NO01.29.2018170028900 Concord HwyFairview, NC 28110HOPEWELLBAPTISTWORSHIPADDITIONOVERALL SITE PLAN10C502NORTHZONING CODE SUMMARYKnow what'sRSITE NOTES REVISIONSDATESHEET NUMBERSEALPROJECT NO01.29.2018170028900 Concord HwyFairview, NC 28110HOPEWELLBAPTISTWORSHIPADDITIONSITE PLANENLARGEMENT3C5022C502NORTH2C5025C5023C5021C5021C5028C502Know what'sRSEE SHEET C200 FOR SITE NOTESLEGEND4C5021C5021C5022C5021R1001C5026C5022C502Y:\charlotte\17000100S\17000199.00_Hopewell_Worship_Add\Eng_Docs\Drawings\17000199.00-CD\17000199 SITE.dwg, C201 SITE PLAN ENLARGEMENT, 3/12/2018 9:10:37 AM REVISIONSDATESHEET NUMBERSEALPROJECT NO01.29.2018170028900 Concord HwyFairview, NC 28110HOPEWELLBAPTISTWORSHIPADDITIONOVERALL GRADING &DRAINAGE PLANNORTHKnow what'sRLEGENDGRADING AND DRAINAGE NOTES< REVISIONSDATESHEET NUMBERSEALPROJECT NO01.29.2018170028900 Concord HwyFairview, NC 28110HOPEWELLBAPTISTWORSHIPADDITIONGRADING &DRAINAGE PLANENLARGEMENT1C501NORTHKnow what'sR5C500SEE SHEET C303 FOR GRADINGNOTES AND LEGEND9C501 NORTH BMP PLANTING NOTES: 4 C504 SL 49 BMP CONSTRUCTION DETAILS SV 85 CT 40 LE 46 LE 53 IV 80 EF 136 EF 38 BMP CONSTRUCTION SEQUENCE: 5 Wet Detention Pond Section THE WET DETENTION POND, OUTLET CONTROL STRUCTURE, LEVEL SPREADER, ETC. SHOWN ON THIS DRAWING WERE CONSTRUCTED IN PHASE 1 (2011). ONLY ITEMS SHOWN IN A BOX AND GRADING & PLANTINGS SHOWN IN DETAIL 1 ARE MODIFICATIONS THAT NEED TO BE MADE IN THIS PHASE. OTHER/EXISTING INFORMATION IS SHOWN FOR PERMITTING PURPOSES. REVISIONS DATE SHEET NUMBER SEAL PROJECT NO 01.29.2018 17002 8900 Concord Hwy Fairview, NC 28110 HOPEWELL BAPTIST WORSHIP ADDITION SL 68 CT 42 SL 203 Y:\charlotte\17000100S\17000199.00_Hopewell_Worship_Add\Eng_Docs\Drawings\17000199.00-CD\17000199 BMP DETAILS.dwg, C504 BMP DETAILS, 3/19/2018 8:17:16 AM