Loading...
HomeMy WebLinkAboutSW3100301 - Hopewell Baptist Church - Worship Addition (2)Permit No (to be provided by DWQ) OF W A TF9 ®�A �? OG .M NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information I. PROJECT INFORMATION Project name Hopewell Baptist Worship Addition Contact person Kevin Westra Phone number '704-496-6297 Date 1115!_2018 Drainage area number 1 _ _ 1 II. DESIGN INFORMATION Site Characteristics Drainage area _ 1,308,044iffz Impervious area, post -development 443,531;fe % impervious 33.91 % Design rainfall depth 2 9 (post-pre)E in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 15" runoff volume Pre -development 1 -yr, 24 -hr runoff Post -development 1 -yr, 24 -hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1 -yr, 24 -hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity 1 -yr, 24 -hr storm Pre -development 1 -yr, 24 -hr peak flow Post -development 1 -yr, 24 -hr peak flow Pre/Post 1 -yr, 24 -hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx at the perm pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp pool9 Elevation of the top of the additional volume 72,135.ft3 100,284! ff3 OK, volume provided is equal to or in excess of volume required ;ft3 y �? (Y or N) 291 in 0 301(unitless) 0 651 (unitless) 3 301 in/hr OK 16.96 fC1sec 0 70 0sec -16 26 0sec 518 001 fmsl 514.001 fmsl 505 OOi fmsl 514 501 fmsl 513 500sl 509 OOlfmsl 508.00, fmsl 100 ft y (Y or N) " 518 Olfmsl OK Form SW401-Wet Detention Basin -Rev 9-4/18/12 Parts I & If Design Summary, Page 1 of 2 JK II. DESIGN INFORMATION Surface Areas Permit No Area, temporary pool ______197,920 19,920, ftz 10i 1 Area REQUIRED, permanent pool 12,557 tY OK SAIDA ratio 0 961(unitless) 301.1 Area PROVIDED, permanent pool, A,._pd 19,9201ft' OK Area, bottom of 10ft vegetated shelf, Amt_"neir 16,2731 fe y ; (Y or N) Area, sediment cleanout, top elevation (bottom of pond), A�,yo d 8,027: ff OK Volumes OK —------- - -- - -- - -- — -- — -- — - ----- - pump pond down Volume, temporary pool _ 1 200 84 ft3 OK Volume, permanent pool, Vp._pw 69,069!fe Volume, forebay (sum of forebays if more than one forebay) 10,193! ft3 Forebay % of permanent pool volume 148%% Insufficient forebay volume SAIDA Table Data Design TSS removal _ 851% Coastal SAIDA Table Used? n _ _ _ I (Y or N) Mountain/Piedmont SAIDA Table Used? y J (Y or N) SAIDA ratio 0 96 (unitless) Average depth (used in SAIDA table) Calculation option 1 used? (See Figure 10-2b) _ n (Y or N) Volume, permanent pool, Vp__pod 69,069 ft3 Area provided, permanent pool, A�„2Pw 19,920 ff Average depth calculated 4 20'ft OK Average depth used in SAIDA, d.„ (Round to nearest 0 5ft) 4 2;ft OK Calculation option 2 used? (See Figure 10-2b) y ; (Y or N) Area provided, permanent pool, Ap„_,Oi 19,920 ff2 Area, bottom of 1Oft vegetated shelf, Abo, �hejr 16,273 ff Area, sediment cleanout, top elevation (bottom of pond), Abp d 8,027 fe "Depth" (distance b/w bottom of 10ftshelf and top of sediment) 4 50 ft Average depth calculated 4 201ft OK Average depth used in SAIDA, d., (Round to down to nearest 0 5ft) 4 21 ft OK Drawdown Calculations Drawdown through orifice? Diameter of onfice (if circular) Area of orfice (if -non -circular) Coefficient of discharge (Co) Driving head (Ha) Drawdown through weir? Weir type Coefficient of discharge (CW) Length of weir (L) Driving head (H) Pre -development 1 -yr, 24 -hr peak flow Post -development 1 -yr, 24 -hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is Forth SW401-Wet Detenbon Basin -Rev 94/18/12 r—y (Y or N) 4 00, in hn2 0 621(unitless) 1 281ft n (Y or N) j (umtless) (unifless) Eft - Ift 16.961 f3/sec 0 70! ft3/sec 0 491 f3/sec 2 361 days OK, draws down in 2-5 days (to be provided by DWQ) 1 OK 10i 1 OK 100ift OK 31 1 Insufficient flow path to width ratio Must not short-circuit pond 301.1 OK y I (Y or N) OK 1 01ft OK y ; (Y or N) OK y "I (Y or N) OK y I (Y 0r N) - - -- OK —------- - -- - -- - -- — -- — -- — - ----- - pump pond down Parts I & II Design Summary, Page 2 of 2