Loading...
HomeMy WebLinkAboutFleetwood Fire Dept Riddle, Rick L From:Riddle, Rick L Sent:Thursday, November 09, 2017 10:58 AM To:'Justin Church' Subject:Fleetwood Fire Dept. Justin, The Division of Energy, Mineral, and Land Resources (DELMR), received a complete Stormwater Management Permit Application for the subject project on September 12, 2017. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 rules. We are forwarding Permit No. SW4170901, dated November 09, 2017, for the construction, operation and maintenance of the subject project and the stormwater system. This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to Bartt Winebarger at: Fleetwood Fire Department 9005 Hwy 221 South Fleetwood, North Carolina 28626 This project will be kept on file after 30 days at the Winston Salem Regional Office. If you have any questions, or need additional information concerning this matter, please contact me at (919) 807-6375; or rick.riddle@ncdenr.gov. Rick Richard L. Riddle, Jr. Stormwater Engineer North Carolina Department Enviromental Quality North Carolina Division Energy Mineral Land Resources 919 807-6375 office rick.riddle@ncdenr.gov 512 North Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 2