HomeMy WebLinkAboutRE Ft Bragg Truck Inspection Point Project - Stormwater Permit Status
Riddle, Rick L
From:Riddle, Rick L
Sent:Wednesday, September 20, 2017 3:30 PM
To:'Sesler, Jason'
Subject:RE: Ft. Bragg Truck Inspection Point Project - Stormwater Permit Status
Attachments:SW6170801_SOF Truck Inspection Point_cover Ltr.pdf; SW6170801_SOF Truck
Inspection Point_Permit Sept 2017.pdf
Jason,
I permitted that on 9/14 but forgot to send it to you. The permit, cover letter & COC was sent to
David Helms
Directorate of Public Works
2175 REILLY Road Stop A
Fort Bragg, NC 28310
Thank you for your patience.
Rick
Richard L. Riddle, Jr.
Stormwater Engineer
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Sesler, Jason \[mailto:jason.sesler@stantec.com\]
Sent: Wednesday, September 20, 2017 1:48 PM
To: Riddle, Rick L <rick.riddle@ncdenr.gov>
Subject: RE: Ft. Bragg Truck Inspection Point Project - Stormwater Permit Status
Hey Rick,
Are you still in the process of reviewing the stormwater permit for Ft. Bragg Truck Inspection Point project?
Thank you.
Jason
From: Riddle, Rick L \[mailto:rick.riddle@ncdenr.gov\]
Sent: Wednesday, September 06, 2017 10:48 AM
To: Sesler, Jason <jason.sesler@stantec.com>
Subject: RE: Ft. Bragg Truck Inspection Point Project - Stormwater Permit Status
Jason,
1
I have received the package and the application is second on my list for review at this time. Next week is the earliest that
I can probably get to it. I will contact you if I have any questions and after the review is complete I will send you an
email with a copy of the COC and cover letter.
Thanks and have a nice day
Richard L. Riddle, Jr.
Stormwater Engineer
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Sesler, Jason \[mailto:jason.sesler@stantec.com\]
Sent: Wednesday, September 06, 2017 9:28 AM
To: Riddle, Rick L <rick.riddle@ncdenr.gov>
Subject: Ft. Bragg Truck Inspection Point Project - Stormwater Permit Status
Rick,
Have you completed your review of the stormwater permit for the Ft. Bragg Truck Inspection Point project? I’m
following up because I’m not sure if NCDEQ would send correspondence/approval to me as well as Ft. Bragg.
Thank you.
Jason
From: Sesler, Jason
Sent: Tuesday, August 01, 2017 2:13 PM
To: 'Riddle, Rick L' <rick.riddle@ncdenr.gov>
Subject: Ft. Bragg Truck Inspection Point Project - Upcoming Stormwater Permit Application Submittal
Rick,
FYI, we’ve placed the Ft. Bragg Truck Inspection Point project permit package in the mail. You should have
soon. FYI, we downloaded the storm-EZ spreadsheet and the impervious area and % impervious area cells
appear to be referencing the incorrect cells, and the cells auto populate with an “error” and “0.00”. This
doesn’t appear to be an issue because the impervious area and % impervious area is also totaled immediately
below on the same sheet. I’m attaching the sheet only for your information.
After you’ve had time to review the permit application package, please let me know if you have any
questions. Thank you.
Jason
From: Riddle, Rick L \[mailto:rick.riddle@ncdenr.gov\]
Sent: Thursday, July 13, 2017 11:36 AM
To: Sesler, Jason <jason.sesler@stantec.com>
Subject: RE: Ft. Bragg Project - Upcoming Stormwater Permit Application Submittal
Jason,
2
It looks correct except I am not a PE.
Thanks and have a good week
Richard L. Riddle, Jr.
Stormwater Engineer
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Sesler, Jason \[mailto:jason.sesler@stantec.com\]
Sent: Wednesday, July 12, 2017 2:33 PM
To: Riddle, Rick L <rick.riddle@ncdenr.gov>
Subject: Ft. Bragg Project - Upcoming Stormwater Permit Application Submittal
Hi Rick,
I contacted Mike Randall regarding a Ft. Bragg stormwater permit application submittal, and he said to
forward to your attention. Attached is the transmittal that will be accompanying the permit application
submittal. I believe we will overnight it to your attention. If you could please review the address to make sure
I’ve got your mailing address listed correctly. Waiting to get the check and the signed permit application back
from Ft. Bragg, so not sure when we’ll be making the permit submittal, but probably end of next week or early
the following week.
Thank you.
Jason Sesler, PE
Project Manager, Community Development
Stantec
801 Jones Franklin Road Suite 300 Raleigh NC 27606-3394
Phone: (919) 325-4777
Fax: (919) 851-7024
jason.sesler@stantec.com
The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with
Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately.
Please consider the environment before printing this email.