Loading...
HomeMy WebLinkAboutSW3171003 Site Plans_2017-12-04FC CAROLINAS SOCCER COMPLEX TOWN OF WAXHAW, NORTH CAROLINA VICINITY MAP SITE P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-PB.dwg, C0.0-COVER, 12/4/2017 1:44:08 PM, rrovillos, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 13:47:30-05'00' P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-DE.dwg, Model, 12/1/2017 5:51:14 PM, rrovillos, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 13:44:33-05'00' x x x x P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-PB.dwg, C1.2-SITE, 12/4/2017 11:24:22 AM, rrovillos, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 13:48:00-05'00' P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-RI.dwg, C1.3-RI PLAN, 12/4/2017 12:15:59 PM, mmcglauflin, 1:1.00261 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 13:49:41-05'00' 2" BITUMINOUS CONCRETE COURSE, TYPE S9.5B OLD WAXHAW MONROE ROAD OVERLAY PAVEMENT SECTION 3.0" TYPE I19.0B 5.0" TYPE B25.0 B OR C IN ONE LIFT IN TWO 2.5" LIFTS COMPACTED SUBGRADE P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-RI.dwg, C1.4-RI PLAN, 12/4/2017 11:11:57 AM, mmcglauflin, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 13:50:23-05'00' 2" BITUMINOUS CONCRETE COURSE, TYPE S9.5B OLD WAXHAW MONROE ROAD OVERLAY PAVEMENT SECTION 3.0" TYPE I19.0B 5.0" TYPE B25.0 B OR C IN ONE LIFT IN TWO 2.5" LIFTS COMPACTED SUBGRADE P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-RI.dwg, C1.5-X-SECT, 12/4/2017 7:58:49 AM, mmcglauflin, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 13:52:35-05'00' 2" BITUMINOUS CONCRETE COURSE, TYPE S9.5B OLD WAXHAW MONROE ROAD OVERLAY PAVEMENT SECTION 3.0" TYPE I19.0B 5.0" TYPE B25.0 B OR C IN ONE LIFT IN TWO 2.5" LIFTS COMPACTED SUBGRADE P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-RI.dwg, C1.6-X-SECT, 12/4/2017 7:59:19 AM, mmcglauflin, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 13:52:49-05'00' 2" BITUMINOUS CONCRETE COURSE, TYPE S9.5B OLD WAXHAW MONROE ROAD OVERLAY PAVEMENT SECTION 3.0" TYPE I19.0B 5.0" TYPE B25.0 B OR C IN ONE LIFT IN TWO 2.5" LIFTS COMPACTED SUBGRADE P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-RI.dwg, C1.7-X-SECT, 12/4/2017 7:59:54 AM, mmcglauflin, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 13:56:00-05'00' 2" BITUMINOUS CONCRETE COURSE, TYPE S9.5B OLD WAXHAW MONROE ROAD OVERLAY PAVEMENT SECTION 3.0" TYPE I19.0B 5.0" TYPE B25.0 B OR C IN ONE LIFT IN TWO 2.5" LIFTS COMPACTED SUBGRADE P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-RI.dwg, C1.8-X-SECT, 12/4/2017 8:00:22 AM, mmcglauflin, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 13:55:47-05'00' 2" BITUMINOUS CONCRETE COURSE, TYPE S9.5B OLD WAXHAW MONROE ROAD OVERLAY PAVEMENT SECTION 3.0" TYPE I19.0B 5.0" TYPE B25.0 B OR C IN ONE LIFT IN TWO 2.5" LIFTS COMPACTED SUBGRADE P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-RI.dwg, C1.9-X-SECT, 12/4/2017 8:00:49 AM, mmcglauflin, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 13:53:39-05'00' 2" BITUMINOUS CONCRETE COURSE, TYPE S9.5B OLD WAXHAW MONROE ROAD OVERLAY PAVEMENT SECTION 3.0" TYPE I19.0B 5.0" TYPE B25.0 B OR C IN ONE LIFT IN TWO 2.5" LIFTS COMPACTED SUBGRADE P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-RI.dwg, C1.10-X-SECT, 12/4/2017 8:01:13 AM, mmcglauflin, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 13:52:20-05'00' P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-PB.dwg, C2.0-OVERALL GP, 12/4/2017 11:24:31 AM, rrovillos, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 13:56:53-05'00' P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-PB.dwg, C2.1-GRADING, 12/4/2017 12:00:06 PM, rrovillos, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 13:58:49-05'00' P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-BMP.dwg, C2.2 BMP PLAN, 12/1/2017 5:47:15 PM, rrovillos, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 13:59:32-05'00' P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-BMP.dwg, C2.3 PREDEVELOPED, 12/1/2017 5:53:03 PM, rrovillos, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 14:01:57-05'00' P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-BMP.dwg, C2.4 POSTDEVELOPED, 12/1/2017 5:47:52 PM, rrovillos, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 14:01:40-05'00' x x x x P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-BMP.dwg, C2.5 BMP PLANTING PLAN, 12/4/2017 12:14:58 PM, rrovillos, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 14:00:59-05'00' P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-PB.dwg, C2.6-ST PROF, 12/4/2017 11:25:54 AM, rrovillos, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 14:00:34-05'00' P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-PB.dwg, C2.7-ST PROF, 12/4/2017 11:26:08 AM, rrovillos, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 13:59:50-05'00' P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-PB.dwg, C3.0-EC PH1, 12/4/2017 12:25:32 PM, rrovillos, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 14:03:36-05'00' P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-PB.dwg, C3.1-EC PH2, 12/4/2017 12:24:48 PM, rrovillos, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 14:04:23-05'00' P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-DE.dwg, C4.3, 12/1/2017 5:47:00 PM, rrovillos, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 14:05:17-05'00' P:\Active Projects\WGM Design\Broxton Soccer Complex 16240\Engineering\Design Drawings\Current\16240-DE.dwg, C4.4, 12/1/2017 5:47:01 PM, rrovillos, 1:1 Digitally signed by Anthony B. Cowan, P.E. Date: 2017.12.04 14:04:40-05'00'