HomeMy WebLinkAboutProject Stormwater NarrativeAction Glass & Mirror, Inc. Project Narrative — Construction Sequence The Action Glass & Mirror project involves site improvements to develop a commercial facility. The project site is located off Highway 24/27, Midland, Cabarrus County, NC. Project property includes 3.87 acres zoned for commercial/ limited office use. The site consists of mostly gentle slopes with some generally flat areas that primarily drain South to an unnamed tributary to Horton Branch. There are no impervious areas on site. The project will disturb approximately 1.44 acres during construction and will include: 1. Removal of enough vegetation to install erosion control measures 2. Installation of erosion control measures 3. Removal of remaining vegetation 4. Perform bulk grading and temporary seeding S. Building erection 6. Install driveway/ parking stone base and perform finish grading 7. Install concrete surfaces and asphalt. 8. Install stone base and fencing in rear. 9. Install seeding, mulching, and landscaping. 10. Removal of erosion control measures and stabilize site (site shall be stabilized as shown on the stabilization timeframe table on the plans). Impervious area added during construction will result in a net increase of 0.44 acres over preconstruction conditions. The asphalt area on the property will be limited to the dimensions shown on the plans so that low density thresholds are not met. The remaining area will remain as tree cover. Construction is expected to begin in November 2017. The anticipated duration of construction is approximately 10 months. The proposed project has been designed as a low density project. No curb and gutter is used for this project; therefore, no point discharges are created. Stormwater runoff is conveyed via drainage swales to existing vegetative channels.